Study guide
10.2 Primary Clarification & Sedimentation Hydraulics
Oregon Water and Wastewater Operator Certification Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Oregon Operator Programs and DEQ Wastewater Certification
1.1 Dual-Agency Structure: DEQ Wastewater and OHA Drinking Water Programs 1.2 DEQ Wastewater System Classification and Supervision Rules 1.3 DEQ Certificates: Qualifications, OIT, Provisional Path, Exams and Fees
2 Chapter 2: OHA Drinking Water Certification and Certificate Renewal
2.1 OHA System Classification, Direct Responsible Charge and the Filtration Endorsement 2.2 OHA Certificates: Experience Tables, OIT, Exams, Fees and Small Water System Certification 2.3 Renewal, CEUs, Reinstatement, Reciprocity and Discipline for DEQ and OHA Certificates
3 Chapter 3: Federal Rules, Oregon Water Quality Standards and Cyanotoxins
3.1 Clean Water Act, Safe Drinking Water Act & NPDES Permitting 3.2 Willamette Basin TMDL and Oregon Water Quality Standards 3.3 Harmful Algal Blooms (HABs) & Oregon Cyanotoxin Rules (OAR 333-061-0510)
4 Chapter 4: Source Water, Intakes and Wells
4.1 Raw Water Sources, Intake Structures & Pretreatment 4.2 Groundwater Sources and Wells: Hydraulics, Construction and Protection
5 Chapter 5: Coagulation, Clarification and Filtration
5.1 Coagulation, Flocculation & Jar Testing Dynamics 5.2 Sedimentation, Clarification & Media Filtration Systems 5.3 Slow Sand, Diatomaceous Earth, Cartridge and Membrane Filtration
6 Chapter 6: Drinking Water Disinfection
6.1 Disinfection Chemistry, Chlorination Dynamics & CT Calculations 6.2 UV, Ozone, Chlorine Dioxide, Chloramines and Disinfection Byproduct Control
7 Chapter 7: Specialty Water Treatment and Residuals
7.1 Iron and Manganese Removal, Softening, and Taste and Odor Control 7.2 Corrosion Control, Lead and Copper, and Fluoridation 7.3 Water Treatment Residuals: Sludge, Backwash Water and Membrane Concentrate
8 Chapter 8: Distribution System Infrastructure
8.1 Distribution System Hydraulics, Piping Materials & Storage Facilities 8.2 Valves, Fire Hydrants & Water Main Installation / Disinfection 8.3 Service Connections, Meters, Water Loss Control and Utility Locating
9 Chapter 9: Distribution Operations, Cross-Connection Control and Water Quality
9.1 Storage Tank and Booster Pump Station Operation, Inspection and Disinfection 9.2 Cross-Connection Control & Backflow Prevention Assemblies (OAR 333-061-0070) 9.3 Water Quality in Distribution: Water Age, Nitrification & Flushing Programs
10 Chapter 10: Wastewater Preliminary and Primary Treatment and Lagoons
10.1 Preliminary Treatment: Screening, Grit Removal & Flow Measurement 10.2 Primary Clarification & Sedimentation Hydraulics 10.3 Stabilization Ponds and Aerated Lagoons
11 Chapter 11: Biological Wastewater Treatment
11.1 Secondary Treatment: Activated Sludge Process Control & Variations 11.2 Fixed-Film Treatment: Trickling Filters, RBCs, MBBR and IFAS 11.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal
12 Chapter 12: Tertiary Treatment, Disinfection, Recycled Water and Small Systems
12.1 Tertiary Filtration, Membrane Bioreactors and Oregon Recycled Water Classes 12.2 Wastewater Disinfection and Dechlorination 12.3 Small Wastewater Systems, Septage Handling and Odor Control
13 Chapter 13: Solids Handling and Biosolids
13.1 Sludge Thickening, Conditioning & Dewatering Technologies 13.2 Anaerobic and Aerobic Digestion Operations & Control 13.3 Biosolids Quality, Land Application Rules & OAR 340-050 / 40 CFR 503
14 Chapter 14: Wastewater Collection Systems and Pumping
14.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management 14.2 Lift Station Design, Wet Wells & Submersible / Centrifugal Pumps 14.3 Collection System Maintenance, Pipeline Inspection (CCTV) & Trench Safety
15 Chapter 15: Collection System Rehabilitation and Overflow Control
15.1 Sewer Rehabilitation, Trenchless Renewal and New-Pipe Acceptance Testing 15.2 Overflow Response, Bypass Pumping, CMOM Programs and Sewer Sulfide Control
16 Chapter 16: Laboratory Procedures and Water Quality Testing
16.1 Drinking Water Microbiological Testing: Coliform, E. coli & RTCR 16.2 Wastewater Lab Analysis: BOD5, TSS, COD & Volatile Solids 16.3 Wastewater Lab: Nutrients, Alkalinity, Bacteria, Toxicity Testing and Lab Accreditation 16.4 Process Monitoring: pH, Turbidity, Dissolved Oxygen & Chlorine Residuals 16.5 Sampling Protocols, Quality Assurance / Chain of Custody & Reporting
17 Chapter 17: Equipment, Electrical Systems and Maintenance
17.1 Pumps, Blowers and Mechanical Maintenance Programs 17.2 Electrical Systems, Motors, Generators, Instrumentation and SCADA
18 Chapter 18: Applied Water and Wastewater Mathematics
18.1 Dimensional Analysis, Flow Conversions & Detention Time 18.2 Chemical Feed, Dosage Calculations & the Pounds Formula 18.3 Treatment Plant Hydraulics, Loading Rates (SOR, WOR) & Pumping Horsepower
19 Chapter 19: Utility Safety
19.1 OSHA Standards, Confined Space Entry & Hazardous Chemical Safety 19.2 Field Safety: Electrical Hazards, Fall Protection, Work Zones, PPE and Oregon OSHA Rules
20 Chapter 20: Emergency Preparedness, Security and Utility Management
20.1 Cascadia Subduction Zone (CSZ) Seismic Preparedness & Infrastructure Hardening 20.2 Wildfire Impacts on Watersheds, Post-Fire Water Quality & Emergency Operations 20.3 Security, Cybersecurity, Emergency Response Planning and Utility Management
10.2 Primary Clarification & Sedimentation Hydraulics
Key Takeaways Explain This Topic AI
Primary sedimentation relies on gravity settling to remove 50–60% of Total Suspended Solids (TSS) and 25–35% of Biochemical Oxygen Demand (BOD5) from raw sewage, significantly reducing organic loading on downstream biological processes.
Standard design criteria dictate Surface Overflow Rates (SOR) of 800–1200 gpd/ft² at average dry weather flow (2000–3000 gpd/ft² at peak wet weather flow), Weir Overflow Rates (WOR) of 10,000–20,000 gpd/ft, and Hydraulic Detention Times (HDT) of 1.5–2.5 hours.
Floating, dark sludge blankets and clods on the clarifier surface indicate septic, anaerobic gasification in the sludge hopper, where methane and carbon dioxide microbubbles adhere to solids and lift them upward.
Sludge pumping cycles must maintain a dense solids concentration (2–6% total dry solids); over-pumping causes rat-holing (coning), which draws dilute water into digesters, while under-pumping triggers septic rising sludge and scraper torque overload trips.
Last updated: October 2026
4.2 Primary Clarification & Sedimentation Hydraulics
Note
Primary clarification is the principal unit operation responsible for physical-chemical separation of settleable organic solids from wastewater. By removing roughly one-third of incoming carbonaceous BOD and over half of suspended solids via passive gravity settling, primary clarifiers reduce electrical aeration demands and secondary biomass generation in downstream activated sludge systems.
Primary Sedimentation Performance Benchmarks
Unlike secondary clarifiers, which must flocculate and settle living biological cultures (biomass), primary sedimentation basins process raw wastewater containing discrete and flocculent solids:
Total Suspended Solids (TSS) Removal: 50 % to 60 % 50\% \text{ to } 60\% 50% to 60% . The settled fraction consists primarily of dense fecal solids, paper fibers, and fine food particles.
Biochemical Oxygen Demand ( BOD 5 \text{BOD}_5 BOD 5 ) Removal: 25 % to 35 % 25\% \text{ to } 35\% 25% to 35% . Settling removes only the particulate organic matter. Soluble and colloidal BOD 5 \text{BOD}_5 BOD 5 (dissolved starches, sugars, volatile organic acids) passes directly through the primary clarifier unaffected.
Nutrient Removal Efficiency: Minimal. Primary clarifiers achieve only 10 % to 15 % 10\% \text{ to } 15\% 10% to 15% Total Nitrogen (TN) removal and 10 % to 20 % 10\% \text{ to } 20\% 10% to 20% Total Phosphorus (TP) removal. This nutrient capture corresponds entirely to the particulate organic nitrogen and phosphorus chemically bound within the settled solids matrix. +-----------------------------------------------------------------------------+
- | PRIMARY CLARIFIER PERFORMANCE |
- +-----------------------------------------------------------------------------+
- | RAW SEWAGE INFLUENT PRIMARY CLARIFIER EFFLUENT |
- | - TSS: 200 - 300 mg/L --------> - TSS: 80 - 120 mg/L (50-60% Removal)|
- | - BOD5: 200 - 280 mg/L --------> - BOD5: 140 - 180 mg/L (25-35% Removal)|
- | - TN: 35 - 50 mg/L --------> - TN: 30 - 45 mg/L (10-15% Removal)|
- | - TP: 5 - 8 mg/L --------> - TP: 4 - 6.5 mg/L (10-20% Removal)|
- | | |
- | v |
- | PRIMARY SLUDGE TO DIGESTION |
- | - 2% to 6% Dry Solids |
- | - High Volatile Content (70-80%) |
- +-----------------------------------------------------------------------------+
- Clarifier Basin Configurations & Mechanics
Primary sedimentation basins are engineered into two primary geometrical configurations: rectangular longitudinal tanks and circular center-feed or peripheral-feed tanks.
1. Rectangular Longitudinal Basins
Rectangular basins are laid out side-by-side with common concrete dividing walls, maximizing land-use efficiency and piping economy:
Geometry: Length-to-width ratios typically range from 3 : 1 to 5 : 1 3:1 \text{ to } 5:1 3 : 1 to 5 : 1 , with water depths of 3.0 to 4.5 m 3.0 \text{ to } 4.5 \text{ m} 3.0 to 4.5 m ( 10 to 15 ft 10 \text{ to } 15 \text{ ft} 10 to 15 ft ).
Chain-and-Flight Scrapers: Continuous loops of heavy plastic or non-metallic chains carry wooden or fiberglass scraper flights spaced every 3 m 3 \text{ m} 3 m ( 10 ft 10 \text{ ft} 10 ft ). Along the basin floor, the flights move slowly forward at 0.6 to 1.2 m/min 0.6 \text{ to } 1.2 \text{ m/min} 0.6 to 1.2 m/min ( 2 to 4 ft/min 2 \text{ to } 4 \text{ ft/min} 2 to 4 ft/min ) in the direction of or counter to wastewater flow, gently pushing settled sludge into a deep sludge hopper located at the tank inlet.
Surface Scum Travel: As the continuous chain loops return along the surface tracks, the flights ride partially submerged, pushing floating grease, oils, and scum toward an effluent scum trough or slotted dip pipe.
2. Circular Center-Feed Clarifiers
Circular clarifiers deliver wastewater through a central submerged vertical riser pipe into an energy-dissipating center feed well :
Hydraulic Flow: Water exits the feed well radially, moving outward toward peripheral effluent launders at continually decelerating horizontal velocities.
Mechanical Collectors: A motorized rotating bridge carries submerged rake arms equipped with angled plow blades. The arms rotate at tip speeds of 2.4 to 3.0 m/min 2.4 \text{ to } 3.0 \text{ m/min} 2.4 to 3.0 m/min ( 8 to 10 ft/min 8 \text{ to } 10 \text{ ft/min} 8 to 10 ft/min ), plowing settled sludge into a central circular sludge hopper.
Surface Skimming: A surface skimmer blade attached to the rotating bridge sweeps floating scum up a stationary beach plate into a collection scum box connected to a dedicated scum pump. +-----------------------------------------------------------------------------+
- | CIRCULAR CENTER-FEED CLARIFIER ZONING |
- +-----------------------------------------------------------------------------+
- | Rotating Bridge & Skimmer |
- | +------------------------------+ |
- | Influent | Center Feed Well | Effluent Launder|
- | Riser Pipe | (Inlet Baffle Zone) | & V-Notch |
- | +----------+ | | | | Weirs |
- | | |--------->| v v |---+ +-----+ |
- | | | | | | | | |
- | +----------+ +------------------------------+ v +-----+ |
- | Settling Zone ~~~~~~~| |
- | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~| |
- | | Scum |
- | Rotating Scraper Arm | Baffle |
- | \_______________________________________________/ +--------+
- | | |
- | v |
- | Central Sludge Hopper |
- +-----------------------------------------------------------------------------+
- Fundamental Hydraulic Loading Formulas & Design Criteria
Primary clarifier design and daily process control depend on three interrelated hydraulic formulas: Surface Overflow Rate, Weir Overflow Rate, and Hydraulic Detention Time.
1. Surface Overflow Rate (SOR) / Hydraulic Loading Rate
The Surface Overflow Rate represents the upward hydraulic velocity of water exiting the basin, expressed as volume per unit surface area per day:
SOR ( gpd/ft 2 ) = Flow Q ( gpd ) Surface Area A s ( ft 2 ) \text{SOR } (\text{gpd/ft}^2) = \frac{\text{Flow } Q (\text{gpd})}{\text{Surface Area } A_s (\text{ft}^2)} SOR ( gpd/ft 2 ) = Surface Area A s ( ft 2 ) Flow Q ( gpd )
For Rectangular Basins: A s = Length L × Width W \text{For Rectangular Basins: } A_s = \text{Length } L \times \text{Width } W For Rectangular Basins: A s = Length L × Width W For Circular Basins: A s = π ⋅ r 2 = π ⋅ D 2 4 \text{For Circular Basins: } A_s = \pi \cdot r^2 = \frac{\pi \cdot D^2}{4} For Circular Basins: A s = π ⋅ r 2 = 4 π ⋅ D 2
Theoretical Settling Significance: In ideal sedimentation theory, any particle whose terminal settling velocity ( v s v_s v s ) equals or exceeds the design SOR ( v s ≥ SOR v_s \ge \text{SOR} v s ≥ SOR ) will achieve 100 % 100\% 100% capture. Particles with settling velocities less than the SOR are captured at a fractional ratio of v s / SOR v_s / \text{SOR} v s / SOR .
Design Standards:
Average Dry Weather Flow: 800 to 1200 gpd/ft 2 800 \text{ to } 1200 \text{ gpd/ft}^2 800 to 1200 gpd/ft 2 ( 33 to 49 m 3 / m 2 ⋅ d 33 \text{ to } 49 \text{ m}^3/\text{m}^2\cdot\text{d} 33 to 49 m 3 / m 2 ⋅ d )
Peak Hourly Wet Weather Flow: 2000 to 3000 gpd/ft 2 2000 \text{ to } 3000 \text{ gpd/ft}^2 2000 to 3000 gpd/ft 2 ( 81 to 122 m 3 / m 2 ⋅ d 81 \text{ to } 122 \text{ m}^3/\text{m}^2\cdot\text{d} 81 to 122 m 3 / m 2 ⋅ d )
2. Weir Overflow Rate (WOR)
Weir Overflow Rate quantifies the volume of clarified effluent passing over each linear foot of effluent weir crest per day:
WOR ( gpd/ft ) = Flow Q ( gpd ) Total Active Weir Length L w ( ft ) \text{WOR } (\text{gpd/ft}) = \frac{\text{Flow } Q (\text{gpd})}{\text{Total Active Weir Length } L_w (\text{ft})} WOR ( gpd/ft ) = Total Active Weir Length L w ( ft ) Flow Q ( gpd )
Operational Importance: If weirs are excessively short or unevenly leveled, the localized approach velocity immediately upstream of the weir increases dramatically. This localized suction sweeps settled sludge upward off the blanket into the effluent launder—a phenomenon known as weir sweeping or channel scouring .
Design Standards:
Standard Design Average: 10 , 000 to 20 , 000 gpd/ft 10,000 \text{ to } 20,000 \text{ gpd/ft} 10 , 000 to 20 , 000 gpd/ft ( 124 to 248 m 3 / m ⋅ d 124 \text{ to } 248 \text{ m}^3/\text{m}\cdot\text{d} 124 to 248 m 3 / m ⋅ d )
Peak Wet Weather Flow: Up to 30 , 000 gpd/ft 30,000 \text{ gpd/ft} 30 , 000 gpd/ft ( 372 m 3 / m ⋅ d 372 \text{ m}^3/\text{m}\cdot\text{d} 372 m 3 / m ⋅ d )
3. Hydraulic Detention Time (HDT)
Detention time represents the theoretical duration that a slug of water resides within the basin volume:
HDT ( hours ) = Basin Volume V ( gallons ) × 24 hr/day Flow Q ( gpd ) \text{HDT } (\text{hours}) = \frac{\text{Basin Volume } V (\text{gallons}) \times 24 \text{ hr/day}}{\text{Flow } Q (\text{gpd})} HDT ( hours ) = Flow Q ( gpd ) Basin Volume V ( gallons ) × 24 hr/day
Where: V ( gallons ) = Volume ( ft 3 ) × 7.48 gal/ft 3 \text{Where: } V (\text{gallons}) = \text{Volume } (\text{ft}^3) \times 7.48 \text{ gal/ft}^3 Where: V ( gallons ) = Volume ( ft 3 ) × 7.48 gal/ft 3
Design Standard: 1.5 to 2.5 hours 1.5 \text{ to } 2.5 \text{ hours} 1.5 to 2.5 hours (target 2.0 hours 2.0 \text{ hours} 2.0 hours under average dry weather flow).
Hydraulic Thresholds: An HDT below 1.0 hour 1.0 \text{ hour} 1.0 hour leads to severe solids wash-through. Conversely, an HDT exceeding 3.0 hours 3.0 \text{ hours} 3.0 hours in warm weather induces septic, anaerobic conditions within the settling sludge.
Clarifier Functional Zones
A properly functioning sedimentation tank consists of four distinct hydrodynamic zones:
Inlet Zone: Incorporates energy-dissipating target baffles or submerged perforated diffuser walls. It transforms high-velocity pipe discharge ( 2 − 6 ft/s 2-6 \text{ ft/s} 2 − 6 ft/s ) into quiescent, uniform laminar sheet flow ( < 0.05 ft/s < 0.05 \text{ ft/s} < 0.05 ft/s ) distributed evenly across the tank cross-section.
Settling Zone: The main quiescent volume where gravity sedimentation takes place unimpeded by eddy turbulence or high horizontal velocities.
Sludge Zone & Hopper: Located in the lowest elevation of the basin. Serves as a consolidation reservoir where settled solids compact into a dense blanket before evacuation by primary sludge pumps.
Outlet Zone: Comprises effluent launders, adjustable V-notch weirs, and scum baffles . The scum baffle extends 150 to 300 mm 150 \text{ to } 300 \text{ mm} 150 to 300 mm ( 6 to 12 in 6 \text{ to } 12 \text{ in} 6 to 12 in ) below the liquid surface and 50 to 100 mm 50 \text{ to } 100 \text{ mm} 50 to 100 mm above it, physically preventing floating oils and grease from spilling over the weirs into secondary treatment.
Troubleshooting Clarifier Operations
Operational Problem Primary Root Causes Diagnostic Observations Corrective Operational Actions
Short-Circuiting Unlevel weirs; strong wind shear; thermal density currents (cold influent sinking or warm skimming) Dye tracer breakthrough in < 30 min < 30 \text{ min} < 30 min ; localized high-velocity boils; uneven solids loss Level all weir plates to exact horizontal tolerance; install windbreak baffles; retrofit mid-basin vertical flocculating baffles.
Septic / Rising Sludge Excessive sludge blanket detention ( > 2 − 4 hours > 2-4 \text{ hours} > 2 − 4 hours ); under-pumping; warm sewage Black, foul-smelling clods floating to surface; gas bubbles; H 2 S \text{H}_2\text{S} H 2 S rotten egg odor; effluent pH drops Increase primary sludge pump frequency or duration; lower blanket depth; verify mechanical scraper flight movement.
Sludge Too Thin ( < 2 % < 2\% < 2% TS) Over-pumping; pumping at excessive flow rates; rat-holing (coning) Primary sludge is watery, translucent; digester temperature drops; excess water loads digester Decrease pump run duration; increase cycle rest interval; throttle pump discharge to draw evenly from hopper.
Scraper Torque Alarms Heavy grit intrusion; oversized debris; excessive sludge accumulation High drive motor amperage; mechanical shear pin breaks; torque pointer approaches 80 − 100 % 80-100\% 80 − 100% alarm setpoint Immediately stop drive; inspect for foreign objects; pump down hopper manually; do not reset drive until obstruction is cleared.
1. Hydraulic Short-Circuiting
Short-circuiting occurs when wastewater passes through a clarifier along high-velocity paths, resulting in actual detention times far lower than theoretical HDT:
Density Currents: In winter, cold river storm infiltration is denser than tank liquid and plunges to the floor, creating high-velocity bottom currents that sweep settled sludge forward. In summer, warm industrial discharges skim across the top, carrying un-settled solids directly to the effluent weirs.
Wind-Induced Currents: Wind speeds exceeding 15 − 20 mph 15-20 \text{ mph} 15 − 20 mph across open circular tanks generate surface currents that push floatables over weirs and create reverse counter-currents on the tank floor.
Dye Tracer Profiling: Operators verify short-circuiting by injecting a slug of Rhodamine WT dye at the influent and monitoring fluorometer readings at the effluent launder. A narrow, high-concentration spike appearing within 15–30 minutes confirms severe short-circuiting.
2. Septic Sludge & Gasification ("Ashing" and Rising Clods)
When primary solids are left in the hopper too long, heterotrophic anaerobic bacteria consume the organic matter, depleting all residual dissolved oxygen and nitrate. The bacteria ferment volatile fatty acids, producing methane ( CH 4 \text{CH}_4 CH 4 ) and carbon dioxide ( CO 2 \text{CO}_2 CO 2 ) gases:
Microscopic gas bubbles nucleate within the settled sludge blanket, adhering to organic fibers.
As the gas bubbles grow, the buoyant force overcomes the gravitational mass of the sludge clod, tearing sheets of sludge from the bottom and floating them to the surface.
These floating rafts appear dark brown to black, generate foul hydrogen sulfide odors, and disintegrate upon contact with surface skimmers, discharging heavy suspended solids into the secondary process.
3. Sludge Pump Optimization: Pumping Thin Sludge vs. Thick Sludge
Primary sludge withdrawal requires balancing solids concentration against blanket depth:
Target Solids Concentration: Primary sludge should ideally be pumped at 2.0 % to 6.0 % 2.0\% \text{ to } 6.0\% 2.0% to 6.0% Total Dry Solids ( 20 , 000 to 60 , 000 mg/L 20,000 \text{ to } 60,000 \text{ mg/L} 20 , 000 to 60 , 000 mg/L ), with optimal operation at 3.0 % to 5.0 % 3.0\% \text{ to } 5.0\% 3.0% to 5.0% .
Consequences of Over-Pumping (Rat-Holing / Coning): If a primary sludge pump operates too long or at too high a flow rate, it pulls a high-velocity suction cone directly through the sludge blanket. Clean, dilute wastewater is drawn straight down from the supernatant, while dense, viscous sludge remains stranded along the hopper walls. Pumping dilute sludge ( < 1.5 % < 1.5\% < 1.5% solids) introduces excess water into anaerobic digesters, consuming thermal heating energy, dropping digester detention time, and washing out volatile acids.
Consequences of Under-Pumping: Under-pumping leads to high sludge blanket levels ( > 0.6 m > 0.6 \text{ m} > 0.6 m or 2 ft 2 \text{ ft} 2 ft ), septic gasification, solids carryover over weirs, and extreme mechanical torque that can snap scraper drive chains or trip overload switches.
Surface Scum Skimming Mechanics
Raw wastewater carries significant quantities of hydrophobic materials known collectively as FOG (Fats, Oils, and Grease) , along with wax, plastics, and floating food residues:
Scum Trapping: The effluent scum baffle blocks surface floatables from reaching the effluent weirs.
Collection Mechanisms:
Slotted Dip Pipe (Rotary Scum Pipe): A horizontal steel pipe with a longitudinal slot cut into its top. When rotated downward by an actuator or manual handwheel, the weir lip submerges slightly below the water surface, decanting the accumulated scum layer into a gravity drain.
Beach Plates & Skimmer Arms: In circular tanks, a neoprene-tipped wiper blade pushes scum up an inclined ramp (beach plate) and drops it into a collection hopper above water level, minimizing the volume of water decanted with the grease.
Disposal: Scum is pumped via non-clog recessed impeller vortex pumps or positive displacement progressive cavity pumps to anaerobic digesters, thermal incinerators, or dedicated off-site rendering facilities.