Study guide

14.3 Demolition: Engineering Surveys & Sequenced Removal (29 CFR 1926 Subpart T)

OSHA 30-Hour Construction Safety Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Safety Management, Regulatory Framework & Worker Rights

1.1 OSHA Regulatory Structure, OSH Act, General Duty Clause & Worker Rights 1.2 Safety Management Systems (SMS) & Safety Culture Leadership 1.3 Leading vs. Lagging Indicators, Safety Metrics & Recordkeeping (OSHA 300/300A/301) 1.4 Multi-Employer Worksite Citation Policy & Subcontractor Safety Oversight 1.5 Job Hazard Analysis (JHA/JSA), Hierarchy of Controls & Site-Specific Safety Plans (SSSP)

2 Chapter 2: Fall Protection Systems & Working at Heights

2.1 Fall Hazards, 6-Foot Rule & 29 CFR 1926 Subpart M Scope 2.2 Guardrail Systems, Safety Net Systems & Hole Covers 2.3 Personal Fall Arrest Systems (PFAS), Anchorages & Fall Clearance Calculations 2.4 Controlled Access Zones, Safety Monitoring Systems & Leading Edge Work 2.5 Stairways, Ladders & Access Systems (29 CFR 1926 Subpart X)

3 Chapter 3: Electrical Safety, Grounding & Energy Control

3.1 Electrical Hazards, Electrocution Dynamics & 29 CFR 1926 Subpart K 3.2 Ground Fault Circuit Interrupters (GFCI) & Assured Equipment Grounding Conductor Program (AEGCP) 3.3 Overhead Power Line Clearances & Encroachment Prevention 3.4 Lockout/Tagout (LOTO), De-energization & Hazardous Energy Control 3.5 Arc Flash Hazards, PPE Requirements & Qualified Worker Distinctions

4 Chapter 4: Scaffolding Systems & Aerial Lifts

4.1 Scaffold Classifications, Load Capacities & Subpart L General Requirements 4.2 Supported Scaffolds: Foundations, Planking, Bracing, Tie-ins & Erection 4.3 Suspended Scaffolds, Two-Point Swings & Rigging Counterweights 4.4 Aerial Lifts, Scissor Lifts & Mobile Elevated Work Platforms (MEWPs) 4.5 Competent Person Scaffold Inspection, Fall Protection & Access Rules

5 Chapter 5: Excavation, Trenching & Shoring Safety

5.1 Excavation Hazards, Soil Mechanics & Subpart P Scope 5.2 OSHA Soil Classification: Visual and Manual Field Testing (Types A, B, C) 5.3 Protective Systems: Sloping and Benching Ratios 5.4 Protective Systems: Hydraulic Shoring, Trench Boxes & Shields 5.5 Excavation Access/Egress, Hazardous Atmospheres & Competent Person Daily Inspections

6 Chapter 6: Cranes, Derricks, Hoists & Rigging

6.1 Subpart CC Scope, Operator Certification & Qualification Requirements 6.2 Crane Setup, Ground Conditions, Outriggers & Power Line Safety 6.3 Load Charts, Capacity Calculations & Lift Planning 6.4 Critical Lift Planning, Tandem Lifts & Personnel Hoisting 6.5 Rigging Hardware, Sling Angles, Hitches & Signal Person Qualifications

7 Chapter 7: Confined Spaces in Construction

7.1 29 CFR 1926 Subpart AA Scope & Confined Space vs. Permit-Required Confined Space (PRCS) 7.2 Atmospheric Testing: Sequential Order (O2, Flammability, Toxicity) & Calibration 7.3 PRCS Entry Permit Program, Isolation & Ventilation 7.4 Duties of Authorized Entrants, Attendants & Entry Supervisors 7.5 Non-Entry vs. Entry Rescue, Emergency Services & Retrieval Systems

8 Chapter 8: Incident Investigation, Root Cause Analysis & Prevention

8.1 Purpose of Incident Investigation & Blame-Free Reporting Culture 8.2 Immediate Response, Scene Security, Evidence Gathering & Witness Interviewing 8.3 Root Cause Analysis Methodologies: 5 Whys, Fishbone (Ishikawa), and Fault Tree 8.4 Human Factors, Swiss Cheese Model & Latent Organizational Failures 8.5 Corrective Action Plans, Hierarchy of Controls Application & Near-Miss Trending

9 Chapter 9: Occupational Health Hazards & Environmental Protection

9.1 Hazard Communication Standard (HazCom 2012 / GHS) & 16-Section Safety Data Sheets (SDSs) 9.2 Respirable Crystalline Silica (29 CFR 1926.1153) & Table 1 Control Methods 9.3 Lead & Asbestos Hazards in Construction Demolition and Renovation (29 CFR 1926.62 / 1926.1101) 9.4 Occupational Noise Exposure, Action Levels, PELs & Hearing Conservation Programs (Subpart D) 9.5 Thermal Stress (Heat Illness & Cold Injury Prevention) & Biological/Chemical Hazards

10 Chapter 10: Ergonomics, Material Handling & Tool Safety

10.1 Ergonomic Risk Factors in Construction & Musculoskeletal Disorders (MSDs) 10.2 Manual Material Handling, Safe Lifting Principles & Ergonomic Engineering Solutions 10.3 Hand-Arm Vibration Syndrome (HAVS), Whole-Body Vibration & Power Tool Safety (Subpart I) 10.4 Material Storage, Rigging Safety, Housekeeping & Disposal (29 CFR 1926 Subpart H) 10.5 Motor Vehicles, Heavy Equipment, Highway Work Zone Safety & Struck-By Prevention (Subpart O/G)

11 Chapter 11: Personal Protective and Life-Saving Equipment (29 CFR 1926 Subpart E)

11.1 PPE Programs, Hazard Assessment, the Proper-Fit Rule & Employer Payment 11.2 Head, Eye, and Face Protection (1926.100 / 1926.102) 11.3 Hearing, Hand, Foot, and Body Protection (1926.101 / 1926.95 / 1926.96) 11.4 Respiratory Protection: Program, Selection, Medical Evaluation & Fit Testing (1926.103)

12 Chapter 12: Struck-By and Caught-In/Between Focus Four Hazards

12.1 Struck-By Hazards: Flying, Falling, Swinging & Rolling Objects 12.2 Caught-In/Between Hazards, Machine Guarding & Rollover Protection 12.3 Powered Industrial Trucks, Telehandlers & Rough-Terrain Forklifts (1926.602)

13 Chapter 13: Concrete, Masonry & Steel Erection (Subparts Q and R)

13.1 Cast-in-Place Concrete, Formwork, Shoring & Rebar Impalement (Subpart Q) 13.2 Masonry Construction, Limited Access Zones & Precast/Tilt-Up Panels (Subpart Q) 13.3 Steel Erection: Column Anchorage, Connectors, Decking & the CDZ (Subpart R)

14 Chapter 14: Fire Prevention, Welding & Cutting, and Demolition (Subparts F, J, T)

14.1 Fire Protection and Prevention (29 CFR 1926 Subpart F) 14.2 Welding, Cutting & Hot Work (29 CFR 1926 Subpart J) 14.3 Demolition: Engineering Surveys & Sequenced Removal (29 CFR 1926 Subpart T)

15 Chapter 15: Emergency Preparedness, Site Welfare & Safety Leadership

15.1 Emergency Action Plans, Medical Services, First Aid & Sanitation (1926.35 / .50 / .51) 15.2 Foundations for Safety Leadership & the OSHA Outreach Card

14.3 Demolition: Engineering Surveys & Sequenced Removal (29 CFR 1926 Subpart T)

Key Takeaways Explain This Topic AI

29 CFR 1926.850(a) requires a written engineering survey by a competent person, made prior to starting demolition, of the condition of the framing, floors, and walls and the possibility of unplanned collapse.

All electric, gas, water, steam, sewer, and other service lines must be shut off, capped, or otherwise controlled outside the building line before demolition begins (29 CFR 1926.850(b)).

No wall section more than one story in height may be permitted to stand alone without lateral bracing during masonry wall demolition (29 CFR 1926.854(a)).

The weight of a demolition ball may not exceed 50 percent of the crane's rated load based on boom length and maximum angle of operation, or 25 percent of the nominal breaking strength of the suspending line, whichever is less (29 CFR 1926.859(b)).

Entrances to multistory demolition structures must be protected by sidewalk sheds or canopies extending at least 8 feet from the building and capable of sustaining a load of 150 pounds per square foot (29 CFR 1926.850(k)).

Last updated: August 2026

14.3 Demolition: Engineering Surveys & Sequenced Removal

Demolition is a standard Optional topic in the 30-hour Construction Outreach curriculum — the four optional hours exist so trainers can cover the hazards a specific workforce actually faces, and for a demolition contractor that is 29 CFR 1926 Subpart T (1926.850 – 1926.860) .

Demolition reverses the logic of every other chapter in this guide. On new construction, the structure grows stronger every day. In demolition, every hour of productive work makes the structure less stable , load paths are progressively severed, and the engineer who designed the building is not there to say which member was carrying what. That is why Subpart T opens with an engineering requirement rather than a PPE requirement.

1. The Engineering Survey — 29 CFR 1926.850(a)

"Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed."

Four elements, all testable:

  • Element Requirement
  • Who A competent person
  • When Prior to permitting employees to start demolition operations

What Condition of the framing, floors, and walls , and the possibility of unplanned collapse — plus any adjacent structure where employees may be exposed

Documentation The employer must have written evidence that the survey was performed

1926.850(b): When employees are required to work within a structure that has been damaged by fire, flood, explosion, or other cause , the walls or floors must be shored or braced before work begins.

Caution

Exam Trap: the survey requires a competent person , not a registered professional engineer. Subpart T uses "competent person" here, in contrast with Subpart P, where an excavation deeper than 20 feet requires a registered professional engineer to design the protective system. Know which subpart is being asked about.

2. Utility Isolation and Hazardous Materials — 1926.850(c) through (e)

Provision Requirement

1926.850(c) All electric, gas, water, steam, sewer, and other service lines must be shut off, capped, or otherwise controlled outside the building line before demolition starts. The utility company must be notified in advance

1926.850(d) If it is necessary to maintain any power, water, or other utilities during demolition, those lines must be temporarily relocated as necessary and protected

1926.850(e) It must be determined whether any hazardous chemicals, gases, explosives, flammable materials, or similarly dangerous substances have been used in any pipes, tanks, or other equipment. Where such substances have been used, the lines and equipment must be tested and purged before demolition begins

Outside the building line is the phrase that matters in (c). Capping a gas line inside the structure leaves live service under a building that is about to be knocked down.

Asbestos and lead

Every pre-1980 structure is presumed to contain asbestos-containing material until surveyed. Demolition triggers:

29 CFR 1926.1101 — asbestos in construction (Section 9.3). Demolition of thermal system insulation and surfacing ACM is Class I work with the highest control requirements.

29 CFR 1926.62 — lead in construction (Section 9.3). Torch cutting, burning, and abrasive blasting of lead-painted steel are the highest-exposure lead tasks in construction.

EPA NESHAP requirements for asbestos survey and notification are separate from OSHA and run in parallel.

3. Openings, Floors, and Overhead Protection — 1926.850(f) through (k)

  • Provision Requirement
  • (f) Glass that could shatter and create a fragmentation hazard must be removed

(g) Wall openings at floor level must be barricaded to a height of not less than 42 inches , except where the opening is being used for material disposal

(h) Floor openings not used for material disposal must be covered over with material substantial enough to support any load imposed, with the covering properly secured to prevent accidental movement

(i) Where debris is dropped through openings without chutes, the area onto which the material falls must be enclosed with barricades not less than 42 inches high and not less than 6 feet back from the projected edge of the opening above. Signs warning of falling material must be posted at each level, and removal must not be permitted in this lower area until debris handling ceases above

(j) All floor openings and access to the demolition area must be closed at all times except during actual passage

(k) Entrances to multistory structures being demolished must be protected by sidewalk sheds or canopies, or both , providing protection from the face of the building for a minimum of 8 feet . All such canopies must be at least 2 feet wider than the building entrances or openings and capable of sustaining a load of 150 pounds per square foot

4. Chutes — 29 CFR 1926.852

Provision Requirement

(a) No material shall be dropped to any point lying outside the exterior walls of the structure unless the area is effectively protected

(b) All materials chutes, or sections thereof, at an angle of more than 45 degrees from the horizontal , must be entirely enclosed , except for openings equipped with closures at or about floor level for the insertion of materials

(c) A substantial gate must be installed in each chute at or near the discharge end, with a competent employee assigned to control the gate and the backing and loading of trucks

(d) When operations are not in progress, the area surrounding the discharge end of a chute must be securely closed off

(e) Any chute opening into which workers dump debris must be protected by a substantial guardrail approximately 42 inches above the floor or other surface on which the workers stand. Any space between the chute and the edge of openings in floors through which it passes must be solidly covered over

(f) Where the material is dumped from mechanical equipment or wheelbarrows, a securely attached toeboard or bumper, not less than 4 inches thick and 6 inches high , must be provided at each chute opening

Recall from Section 10.4 the parallel general rule at 1926.252(a) : whenever materials are dropped more than 20 feet to any point lying outside the exterior walls of the building, an enclosed chute must be used.

  • 5. Sequenced Removal — 1926.850(j), 1926.854, 1926.855
  • Top-down

Demolition proceeds story by story from the top down . Exterior walls and floors are removed and kept substantially level, with material dropped into designated storage areas — not accumulated on floors that were never designed for the concentrated load of demolition debris.

Masonry wall demolition — 1926.854

Provision Requirement

(a) No wall section more than one story in height shall be permitted to stand alone without lateral bracing , unless the wall was originally designed and constructed to stand without such support and is in a safe condition to do so

(b) Walls that serve as retaining walls to support earth or adjoining structures shall not be demolished until the earth has been properly braced or the adjoining structure has been properly underpinned

(c) Walls that are to serve as retaining walls against which debris will be piled shall not be so used unless capable of safely supporting the imposed load

Additionally, employees are not permitted to work on top of a wall when weather conditions constitute a hazard, and structural or load-supporting members on any floor must not be cut or removed until all stories above that floor have been demolished and removed.

Floor removal — 1926.855

Openings cut in a floor must extend the full span of the arch between supports. Before demolishing any floor arch, debris and other material must be removed from that arch and other adjacent floor area. Planking must be provided for workers to stand on while breaking down floor arches between beams, and safe walkways not less than 18 inches wide , formed of planks not less than 2 inches thick (if wood) or of equivalent strength material, must be provided and used by workers when necessary to enable them to reach any point without walking on exposed beams.

6. Mechanical Demolition — 29 CFR 1926.859

Wrecking-ball and mechanical demolition adds a moving multi-ton mass to an already unstable structure.

Provision Requirement

(a) No workers shall be permitted in any area that can be adversely affected by demolition operations when balling or clamming is being performed . Only those workers necessary for the performance of the operations shall be permitted in this area at any other time

(b) The weight of the demolition ball shall not exceed 50 percent of the crane's rated load , based on the length of the boom and the maximum angle of operation at which the demolition ball will be used, or 25 percent of the nominal breaking strength of the line by which it is suspended, whichever results in a lesser value

(c) The crane boom and load line shall be as short as possible

(d) The ball shall be attached to the load line with a swivel-type connection to prevent twisting of the load line, and shall be attached by positive means so that the weight cannot become accidentally disconnected

(e) When pulling over walls or portions thereof, all steel members affected shall have been previously cut free

(f) All roof cornices or other ornamental stonework shall be removed prior to pulling walls over

(g) During demolition, continuing inspections by a competent person must detect hazards resulting from weakened or deteriorated floors, walls, or loosened material. No employee shall be permitted to work where such hazards exist until they are corrected by shoring, bracing, or other effective means

Working the ball-weight calculation

Suppose a crane has a rated load of 60,000 pounds for the planned boom length and maximum angle of operation, and the load line has a nominal breaking strength of 90,000 pounds .

50% of rated load: 0.50 × 60,000 = 30,000 0.50 \times 60{,}000 = 30{,}000 0.50 × 60 , 000 = 30 , 000 lb

25% of line breaking strength: 0.25 × 90,000 = 22,500 0.25 \times 90{,}000 = 22{,}500 0.25 × 90 , 000 = 22 , 500 lb

The standard requires the lesser value, so the maximum permissible ball weight is 22,500 pounds .

Caution

The trap is picking the larger number, or averaging them. Both limits apply simultaneously and the governing one is always the smaller. Note also how this interacts with Chapter 6: the crane's rated load is read off the load chart for the boom length and operating angle in use, so a longer boom or a lower angle reduces the maximum permitted ball weight.