4.2 Flocculation & Sedimentation Processes
Pennsylvania Water and Wastewater Operator Certification Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Pennsylvania Regulatory Framework & Operator Administration
1.1 Act 11 of 2002 & 25 Pa. Code Chapter 302 Licensing 1.2 Operator Duties, Process Control Decisions & OIRC 1.3 License Renewal, Continuing Education & Facility Security
2 Chapter 2: Essential Water & Wastewater Mathematics
2.1 Volumes, Flow Rates & Detention Time Calculations 2.2 Chemical Feed, Dosage & Dilution Calculations 2.3 Loading Rates & Pumping Hydraulics Calculations
3 Chapter 3: Facility Hydraulics, Mechanical Equipment & Safety
3.1 Centrifugal & Positive Displacement Pumps 3.2 Valves, Piping & Flow Measurement Instrumentation 3.3 Workplace Safety, Confined Spaces & HazCom
4 Chapter 4: Drinking Water Treatment: Clarification & Solids Removal
4.1 Source Water & Rapid Mix Coagulation 4.2 Flocculation & Sedimentation Processes 4.3 Filtration Technologies & Backwashing Protocols
5 Chapter 5: Drinking Water Treatment: Disinfection & Chemical Processes
5.1 Chlorine Disinfection & CT Compliance 5.2 Alternative Disinfection & DBP Control 5.3 Water Softening, Iron/Manganese & Corrosion Control
6 Chapter 6: Drinking Water Distribution & Small Water Systems
6.1 Distribution Infrastructure & Storage Tanks 6.2 Water Quality Maintenance & Cross-Connection Control 6.3 Small Groundwater Systems (Classes Dc & Dn)
7 Chapter 7: Wastewater Treatment: Preliminary & Primary Treatment
7.1 Influent Characterization & Preliminary Screening 7.2 Grit Removal Systems & Velocity Control 7.3 Primary Clarification & Solids Separation
8 Chapter 8: Wastewater Treatment: Secondary Biological Processes
8.1 Activated Sludge Principles & Configurations 8.2 Activated Sludge Troubleshooting & Secondary Clarifiers 8.3 Fixed-Film Technologies & Treatment Ponds
9 Chapter 9: Nutrient Removal, Chesapeake Bay Compliance & Biosolids
9.1 Biological Nitrogen Removal (Nitrification/Denitrification) 9.2 Phosphorus Removal & Chesapeake Bay Compliance 9.3 Sludge Processing, Digestion & Biosolids Management
10 Chapter 10: Wastewater Collection, Laboratory Testing & Regulatory Reporting
10.1 Wastewater Collection Systems & Lift Stations 10.2 Sampling & Laboratory Procedures (QA/QC) 10.3 Regulatory Compliance Reporting (eDMR / DWELR) & Emergency Response
11 Chapter 11: Drinking Water Regulations, Operator Science & Residuals
11.1 Chapter 109, Part 141 Rules & Public Water System Classification 11.2 Water & Wastewater Chemistry Fundamentals 11.3 Microbiology, Pathogens & Waterborne Disease 11.4 Treatment Plant Residuals & Filter Backwash Recycling
12 Chapter 12: Alternative Filtration Technologies (Subclasses 2 through 6)
12.1 Direct Filtration (Subclass 2) 12.2 Diatomaceous Earth Filtration (Subclass 3) 12.3 Slow Sand Filtration (Subclass 4) 12.4 Cartridge & Bag Filtration (Subclass 5) 12.5 Membrane Filtration Systems Operation (Subclass 6)
13 Chapter 13: Chemical Addition & Contaminant Removal (Subclasses 8 through 10)
13.1 Chemical Addition Systems & Feed Equipment (Subclass 8) 13.2 Ion Exchange & Inorganics Removal (Subclass 9) 13.3 Aeration, Air Stripping & Activated Carbon Adsorption (Subclass 10)
14 Chapter 14: Disinfection Technology Subclasses (11 through 14)
14.1 Gaseous Chlorine Feed Systems (Subclass 11) 14.2 Nongaseous Chemical Disinfection Systems (Subclass 12) 14.3 Ultraviolet Disinfection Systems (Subclass 13) 14.4 Ozone Generation & Contacting Systems (Subclass 14)
15 Chapter 15: Plant Support Systems: Electrical, Maintenance & Instrumentation
15.1 Electrical Fundamentals & Motor Control 15.2 Preventive & Corrective Maintenance Programs 15.3 Instrumentation, SCADA & Online Analyzer Calibration
16 Chapter 16: Wastewater Effluent Disinfection, Lagoon Control & Industrial Pretreatment
16.1 Wastewater Effluent Disinfection & Dechlorination 16.2 Lagoon Process Control, Sludge Surveys & Seasonal Discharge 16.3 Industrial Pretreatment Programs
4.2 Flocculation & Sedimentation Processes
Key Takeaways Explain This Topic AI
Flocculation agglomerates destabilized microflocs into dense, settleable macroflocs through interparticle collisions governed by the velocity gradient (G) and detention time (t), characterized by the dimensionless Camp number (Gt, typically 20,000 to 100,000).
Tapered flocculation systematically reduces mixing energy across successive stages (e.g., from 50–80 s^-1 down to 10–25 s^-1) to promote initial floc collision rates while preventing high shear forces from tearing apart fragile, mature macroflocs.
Sedimentation basins are partitioned into four hydraulic zones (inlet, settling, sludge, and outlet) and require hydraulic detention times of 2 to 4 hours with length-to-width ratios of at least 4:1 to establish quiescent plug-flow settling and prevent short-circuiting.
Surface Overflow Rate (SOR, expressed in gpd/sq ft or gpm/sq ft) is the fundamental hydraulic design parameter governing clarifier performance; any floc particle whose terminal settling velocity equals or exceeds the basin SOR will be successfully captured.
High-rate clarification systems—including inclined tube/plate settlers and upflow solids contact clarifiers—drastically reduce facility footprint by multiplying effective settling surface area or utilizing recirculated sludge blanket filtration.
Last updated: September 2026
4.2 Flocculation & Sedimentation Processes
Note
Process Purpose & Regulatory Context : Following rapid mix charge destabilization, conventional drinking water facilities rely on flocculation and sedimentation to aggregate and remove the vast majority of suspended solids prior to filtration. Under 25 Pa. Code Chapter 109 and DEP design standards, optimizing clarification reduces particulate and pathogen loading onto granular filters, extending filter run times and preventing premature turbidity breakthrough.
Clarification is the two-stage mechanical and physical process comprising flocculation and sedimentation . While rapid mix coagulation operates on a molecular scale over seconds to destabilize colloidal charges, flocculation operates on a macroscopic hydrodynamic scale over tens of minutes. Gentle, controlled fluid agitation brings destabilized microflocs into physical contact, building heavy, settleable macroflocs. Sedimentation then provides a quiescent environment where gravity pulls these aggregated masses out of suspension, removing 85% to 95% of total plant solids loading before the clarified supernatant reaches the filtration train.
Flocculation Kinetics and Collision Mechanics
The physical aggregation of destabilized particles during flocculation is driven by two distinct mechanisms:
Microflocculation (Perikinetic Flocculation) : Particle collisions induced by thermal kinetic energy (Brownian motion). Perikinetic motion dominates particle aggregation when diameters are below 1.0 micron 1.0\text{ micron} 1.0 micron , but ceases to be effective once particles grow larger than colloidal dimensions.
Macroflocculation (Orthokinetic Flocculation) : Particle collisions induced by bulk fluid shear, velocity gradients, and mechanical mixing. In treatment plant flocculators, orthokinetic flocculation is the dominant mechanism, forcing fluid streamlines of varying velocities to slide past one another, bringing suspended particles into continuous physical contact.
The Dimensionless Camp Number ( G t Gt Gt )
The total energy imparted to the fluid during the flocculation process is quantified by the product of the mean velocity gradient ( G G G ) and the hydraulic detention time ( t t t , in seconds), yielding the dimensionless Camp Number ( G t Gt Gt ) : G t = G × t Gt = G \times t Gt = G × t
Where:
G G G is the root-mean-square velocity gradient in inverse seconds ( s − 1 \text{s}^{-1} s − 1 ).
t t t is the active detention time in the flocculation basin in seconds ( t = Volume / Flow t = \text{Volume} / \text{Flow} t = Volume / Flow ). +─────────────────────────────────────────────────────────────────────────────+
- | CAMP NUMBER (Gt) OPERATIONAL REGIMES |
- +─────────────────────────────────────────────────────────────────────────────+
- | Camp Number (Gt) | Operational Process State |
- +--------------------+--------------------------------------------------------+
- | < 10,000 | Under-flocculated: Insufficient particle collisions; |
- | | floc remains tiny (pin-floc) and will not settle. |
- | 20,000 to 100,000 | OPTIMAL REGIME: Well-developed, dense, heavy macrofloc |
- | | with high settling velocity and shear resistance. |
- | > 150,000 | Over-flocculated: Excessive mechanical energy input; |
- | | hydrodynamic shear ruptures mature macroflocs. |
- +─────────────────────────────────────────────────────────────────────────────+
- Hydraulic Detention Time Standards
Pennsylvania DEP and Recommended Standards for Water Works (Ten States Standards) mandate a minimum flocculation detention time of 30 minutes for conventional surface water treatment plants operating under baseline flow conditions. Typical facilities are designed with detention times between 30 and 45 minutes 30\text{ and } 45\text{ minutes} 30 and 45 minutes , though facilities utilizing advanced polymer coagulant aids may operate successfully at 20 to 30 minutes 20\text{ to } 30\text{ minutes} 20 to 30 minutes .
Tapered Flocculation Mechanics & Stage Compartmentalization
A critical physical challenge in flocculation is that as particles grow from microscopic agglomerates ( 0.05 mm 0.05\text{ mm} 0.05 mm ) into large, visible macroflocs ( 2.0 to 5.0 mm 2.0\text{ to } 5.0\text{ mm} 2.0 to 5.0 mm ), their surface area increases exponentially while their mechanical internal shear strength decreases. A velocity gradient strong enough to promote collisions among fine microflocs will exert excessive hydrodynamic shear stress on mature flocs, tearing them apart. Tapered Flocculation Profile (3-Stage Basin):
[ Raw Water + Coagulant ] ──► [ Stage 1: High Energy ] ──► [ Stage 2: Medium Energy ] ──► [ Stage 3: Gentle Roll ] ──► To Clarifier
- G = 50 to 80 s⁻¹ G = 30 to 50 s⁻¹ G = 10 to 25 s⁻¹
- Microfloc Collision Agglomeration Macrofloc Conditioning
- The Three-Stage Energy Tapering Sequence
To resolve this physical constraint, modern water facilities implement tapered flocculation , dividing the basin into three or more discrete compartments with progressively decreasing mixing energy:
Stage 1 (High Energy) : Operates at G = 50 to 80 s − 1 G = \mathbf{50\text{ to } 80\text{ s}^{-1}} G = 50 to 80 s − 1 . Provides maximum velocity shear to drive high collision frequencies among destabilized microflocs when particles are minute and mechanically durable.
Stage 2 (Intermediate Energy) : Operates at G = 30 to 50 s − 1 G = \mathbf{30\text{ to } 50\text{ s}^{-1}} G = 30 to 50 s − 1 . Promotes continued agglomeration into visible "pin-point" floc while keeping fluid shear below the tensile fracture limit of the growing particles.
Stage 3 (Low Energy / Conditioning) : Operates at G = 10 to 25 s − 1 G = \mathbf{10\text{ to } 25\text{ s}^{-1}} G = 10 to 25 s − 1 . Provides gentle, rolling hydraulic agitation that rolls flocs into dense, spherical macroflocs with high mass density without inducing floc breakup.
Basin Baffling and Short-Circuiting Prevention
Flocculation basins must incorporate physical baffling between stages to eliminate hydraulic short-circuiting (where a portion of incoming water bypasses the design detention time and rushes directly to the clarifier). Facilities utilize:
Perforated Diffuser Walls : Concrete or fiberglass partition walls featuring uniformly spaced circular ports, designed with an orifice head loss of 0.05 to 0.15 feet 0.05\text{ to } 0.15\text{ feet} 0.05 to 0.15 feet to ensure even cross-sectional flow distribution.
Over-and-Under Baffles : Directing flow alternately downward beneath submerged walls and upward over surface weirs.
Around-the-End Baffles : Creating a serpentine horizontal labyrinth flow path.
Mechanical Flocculator Machinery
Water utilities deploy two primary mechanical agitation configurations to generate controlled velocity gradients:
1. Horizontal Paddle-Wheel Flocculators
Mechanical Configuration : Horizontal steel drive shafts oriented either parallel or perpendicular to basin flow, supporting multiple structural arms equipped with wooden or fiberglass paddle blades (reels).
Operational Characteristics : Paddle reels rotate at slow speeds ( 1.0 to 5.0 RPM 1.0\text{ to } 5.0\text{ RPM} 1.0 to 5.0 RPM ), sweeping through the water column to produce gentle, uniform rolling eddies. Variable-frequency drives (VFDs) or mechanical speed variators allow operators to adjust rotational speed and G G G -values in response to seasonal temperature shifts.
Maintenance Vulnerabilities : Submerged shaft bearings, intermediate pillow blocks, and shaft packing seals operate in a continuous underwater environment, requiring regular greasing, alignment inspections, and underwater diver servicing.
2. Vertical Turbine (Hydrofoil) Flocculators
Mechanical Configuration : Standalone vertical drive shafts suspended from overhead bridge superstructures, powered by dry-mounted motor-gearbox drives. Each shaft is fitted with axial-flow hydrofoil impellers.
Operational Characteristics : Impeller rotation creates a high-volume, low-shear axial flow pattern (top-to-bottom turnover), preventing solids from settling on the flocculator floor. Each vertical turbine is housed in its own square compartment, where tank corners serve as natural anti-vortex baffles.
Maintenance Advantages : All electric motors, mechanical gearboxes, and shaft bearings are located entirely above the maximum water elevation , completely eliminating submerged mechanical seals and permitting dry, accessible maintenance.
Sedimentation Basin Architecture & Hydraulic Zones
Sedimentation (clarification) utilizes gravitational force to separate flocculated particulates from water. Fluid settling behavior is governed by Stokes' Law , which establishes that the terminal settling velocity ( v s v_s v s ) of a spherical particle in laminar flow is directly proportional to the square of its diameter and the density difference between the particle and the fluid: v s = g ( ρ p − ρ w ) d 2 18 μ v_s = \frac{g (\rho_p - \rho_w) d^2}{18 \mu} v s = 18 μ g ( ρ p − ρ w ) d 2
Where g g g is gravitational acceleration, ρ p \rho_p ρ p is particle density, ρ w \rho_w ρ w is water density, d d d is particle diameter, and μ \mu μ is fluid dynamic viscosity. Rectangular Sedimentation Basin Profile:
- Influent ──► [ Inlet Zone ] ══════════════════════════════════════════════ [ Outlet Zone ] ──► Effluent
- Perforated Settling Zone V-Notch Weirs
- Diffuser Wall (Quiescent Plug Flow) & Launders
- ══════════════════════════════════════════════════════════════
- Sludge Zone
- [ Flight & Chain Scraper Assembly ]
- │
- ▼ Sludge Hopper / Blowdown
- The Four Discrete Functional Basin Zones
A conventional rectangular clarifier is engineered with four distinct functional hydraulic zones:
Inlet Zone : Receives flocculated water and dampens turbulent inflow velocity. Equipped with a perforated diffuser baffle wall spanning the full tank cross-section (port velocity maintained between 0.5 and 1.0 ft/s 0.5\text{ and } 1.0\text{ ft/s} 0.5 and 1.0 ft/s ). This transforms concentrated inlet jetting into smooth, uniform, laminar horizontal sheet flow.
Settling Zone : The primary quiescent chamber where solids settle downward by gravity while water moves horizontally toward the effluent launders. Design parameters:
Detention Time : Typically 2.0 to 4.0 hours 2.0\text{ to } 4.0\text{ hours} 2.0 to 4.0 hours .
Length-to-Width Ratio : Minimum 4 : 1 4:1 4 : 1 (preferably 5 : 1 5:1 5 : 1 or higher) to promote true plug flow and eliminate lateral eddy currents.
Side Water Depth : Typically 10 to 16 feet 10\text{ to } 16\text{ feet} 10 to 16 feet ( 3.0 to 5.0 meters 3.0\text{ to } 5.0\text{ meters} 3.0 to 5.0 meters ) to provide adequate buffer between the settled sludge layer and active clarified flow.
Sludge Zone : The floor basin where settled solids accumulate and compact into chemical sludge ( 0.5 % to 2.0 % 0.5\%\text{ to } 2.0\% 0.5% to 2.0% dry solids). Mechanical collection machinery—including continuous flight-and-chain scrapers, traveling bridge scrapers, or submerged hydrostatic vacuum headers—drags the settled sludge into hopper sumps for automated blowdown.
Outlet Zone : Clarified supernatant collection structure designed to transition horizontal basin flow into discharge channels with minimal hydraulic disturbance. Employs suspended effluent launders equipped with adjustable 90 ∘ 90^\circ 9 0 ∘ V-notch weirs or submerged orifices.
Surface Overflow Rate (SOR) and Weir Loading Calculations
Clarifier hydraulic performance is evaluated through two fundamental loading metrics: Surface Overflow Rate and Weir Loading Rate.
1. Surface Overflow Rate (SOR)
The Surface Overflow Rate (also termed surface loading rate) represents the volume of water applied daily per square foot of horizontal clarifier liquid surface area: SOR ( gpd/sq ft ) = Total Plant Flow ( Q , gpd ) Basin Surface Area ( A s , sq ft ) \text{SOR } (\text{gpd/sq ft}) = \frac{\text{Total Plant Flow } (Q, \text{ gpd})}{\text{Basin Surface Area } (A_s, \text{ sq ft})} SOR ( gpd/sq ft ) = Basin Surface Area ( A s , sq ft ) Total Plant Flow ( Q , gpd ) SOR ( gpm/sq ft ) = Plant Flow ( Q , gpm ) Basin Surface Area ( A s , sq ft ) = SOR (gpd/sq ft) 1 , 440 min/day \text{SOR } (\text{gpm/sq ft}) = \frac{\text{Plant Flow } (Q, \text{ gpm})}{\text{Basin Surface Area } (A_s, \text{ sq ft})} = \frac{\text{SOR (gpd/sq ft)}}{1,440\text{ min/day}} SOR ( gpm/sq ft ) = Basin Surface Area ( A s , sq ft ) Plant Flow ( Q , gpm ) = 1 , 440 min/day SOR (gpd/sq ft)
The Fundamental Settling Velocity Theorem
In ideal rectangular settling theory (Hazen's Theorem), the Surface Overflow Rate possesses the physical dimensions of velocity ( ft 3 / day / ft 2 = ft/day \text{ft}^3 / \text{day} / \text{ft}^2 = \text{ft/day} ft 3 / day / ft 2 = ft/day ). It represents the upward vertical velocity of liquid exiting the basin. Consequently: v s ≥ SOR \mathbf{v_s \ge \text{SOR}} v s ≥ SOR
Important
Golden Rule of Clarification : Any suspended floc particle whose gravitational settling velocity ( v s v_s v s ) is greater than or equal to the basin's Surface Overflow Rate will settle to the bottom and be 100 % 100\% 100% captured. Particles with settling velocities less than the SOR will be carried out over the effluent weirs onto the filters.
Design Standards for Alum/Ferric Floc : Conventional rectangular basins are designed for an SOR of 500 to 1 , 000 gpd/sq ft 500\text{ to } 1,000\text{ gpd/sq ft} 500 to 1 , 000 gpd/sq ft ( 0.35 to 0.70 gpm/sq ft 0.35\text{ to } 0.70\text{ gpm/sq ft} 0.35 to 0.70 gpm/sq ft ). For fragile, lightweight color flocs, the rate is lowered to 300 to 500 gpd/sq ft 300\text{ to } 500\text{ gpd/sq ft} 300 to 500 gpd/sq ft .
2. Weir Loading Rate (WLR)
The Weir Loading Rate quantifies the hydraulic discharge volume skimming over each linear foot of effluent weir crest: WLR ( gpd/linear ft ) = Total Plant Flow ( Q , gpd ) Total Active Weir Length ( L w , ft ) \text{WLR } (\text{gpd/linear ft}) = \frac{\text{Total Plant Flow } (Q, \text{ gpd})}{\text{Total Active Weir Length } (L_w, \text{ ft})} WLR ( gpd/linear ft ) = Total Active Weir Length ( L w , ft ) Total Plant Flow ( Q , gpd )
Regulatory Thresholds : Under Pennsylvania DEP design guidelines, weir loading rates must not exceed 10 , 000 to 20 , 000 gpd per linear foot 10,000\text{ to } 20,000\text{ gpd per linear foot} 10 , 000 to 20 , 000 gpd per linear foot . If effluent weirs are undersized, water rushes toward the launders at high approach velocities, creating an upward suction ("draw effect") that scours settled flocs off the bottom and carries them out into the filter influent.
High-Rate Clarification Technologies
Conventional sedimentation basins demand massive concrete footprints and lengthy detention times ( 2 to 4 hours 2\text{ to } 4\text{ hours} 2 to 4 hours ). Modern facilities and plant expansions utilize high-rate clarification technologies to multiply settling capacity while slashing site footprint requirements. +─────────────────────────────────────────────────────────────────────────────+
- | HIGH-RATE CLARIFICATION COMPARISON |
- +─────────────────────────────────────────────────────────────────────────────+
- | Technology | Settling Mechanism | Design Overflow Rate |
- +-----------------------+---------------------------+-------------------------+
- | Conventional Basin | Gravity settling (12 ft) | 500 - 1,000 gpd/sq ft |
- | Tube / Plate Settlers | Inclined lamella (2-3 in) | 2,000 - 4,000 gpd/sq ft |
- | Solids Contact Basin | Upflow sludge blanket | 1,500 - 3,000 gpd/sq ft |
- | Ballasted Flocculation| Microsand ballast seeding | 8,000 - 15,000 gpd/sq ft|
- +─────────────────────────────────────────────────────────────────────────────+
- 1. Inclined Tube and Plate (Lamella) Settlers
Physical Operating Principle : Hazen's sedimentation theory proves that particle removal is strictly a function of available surface area, independent of basin depth. Lamella clarifiers exploit this by inserting banks of modular inclined tubes (typically chevron or hexagonal cross-sections) or parallel flat plates into the upper portion of the settling zone.
The Critical 55 ∘ to 60 ∘ 55^\circ\text{ to } 60^\circ 5 5 ∘ to 6 0 ∘ Angle : Settler tubes are installed at an incline of 55 ∘ to 60 ∘ 55^\circ\text{ to } 60^\circ 5 5 ∘ to 6 0 ∘ from the horizontal :
Why 60 ∘ 60^\circ 6 0 ∘ ? If the incline is less than 50 ∘ 50^\circ 5 0 ∘ , settled sludge will not slide off the plastic surfaces, resulting in tube clogging and biofouling. If the angle exceeds 65 ∘ 65^\circ 6 5 ∘ , settling efficiency plummets as particles slide too slowly against incoming water.
At 60 ∘ 60^\circ 6 0 ∘ , solids settle across a vertical distance of only 2 to 4 inches 2\text{ to } 4\text{ inches} 2 to 4 inches (compared to 12 feet in a conventional tank), hit the tube floor, aggregate, and slide down counter-current into the bottom hopper by gravity.
Capacity Expansion : Retrofitting tube settlers into an existing rectangular basin increases effective settling area by 400 % to 800 % 400\%\text{ to } 800\% 400% to 800% , allowing utilities to double plant throughput without pouring new concrete.
2. Solids Contact (Upflow / Slurry Recirculation) Clarifiers
Integrated Unit Architecture : Solids contact clarifiers (such as Accelator or Hydro-Treator units) combine rapid mix, mechanical flocculation, and upflow sedimentation within a single circular steel or concrete vessel.
Slurry Recirculation and Floc Seeding : Incoming raw water and chemicals enter an inner draft tube or reaction cone, where a high-volume internal turbine recirculates previously precipitated sludge solids at ratios of 3 : 1 to 5 : 1 3:1\text{ to } 5:1 3 : 1 to 5 : 1 . The dense, pre-formed sludge particles act as "seed nuclei," dramatically accelerating flocculation kinetics through particle contact.
Sludge Blanket Filtration : Water exits the reaction well and flows upward through a suspended, fluidized sludge blanket . The blanket acts as a physical and chemical filter, straining out fine pin-floc before water reaches the surface radial launders.
Operational Process Control : Operators must actively monitor the sludge blanket position using a core-sampling tube (Sludge Judge) and run percent solids tests (maintaining 8 % to 15 % 8\%\text{ to } 15\% 8% to 15% solids by volume in the reaction cone after 5 minutes of settling). Timed automated bottom blowdowns prevent the blanket from rising and washing over effluent weirs.