Study guide
19.1 Process Flow Diagrams, P&IDs, Scale-Up, and Plant Siting
PE Chemical Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
About the PE Chemical Exam How to Use This Guide and the NCEES Handbook
2 Chapter 1: Material Balances & Flowsheet Calculations
1.1 Degree-of-Freedom Analysis & Process Flowsheet Accounting 1.2 Steady-State Material Balances (Reactive & Non-Reactive Systems) 1.3 Recycle, Bypass, and Purge Operations
3 Chapter 2: Energy Balances & Thermochemistry
2.1 Enthalpy Accounting, Sensible Heat, and Phase Changes 2.2 Heats of Reaction, Formation, and Adiabatic Flame Temperatures 2.3 Unsteady-State Mass and Energy Balances
4 Chapter 3: Fluid Statics & Incompressible Pipe Flow
3.1 Fluid Statics, Pressure Measurement, and Manometry 3.2 Incompressible Flow, Friction Factors, and the Moody Diagram 3.3 Minor Losses, Equivalent Length, and Piping Networks 3.4 Pumps, Compressors, and NPSH Calculations
5 Chapter 4: Advanced Fluid Dynamics & Compressible Flow
4.1 Compressible Gas Flow, Sonic Velocity, and Choked Flow 4.2 Flow Measurement Devices (Orifices, Venturis, Rotameters) 4.3 Multiphase Flow and Fluidization Principles 4.4 Mixing, Agitation, and Agitator Scale-Up
6 Chapter 5: Thermodynamic Laws & Fundamental Relations
5.1 First and Second Laws, Heat Engines, and Carnot Efficiency 5.2 Entropy, Availability, and Exergy Analysis 5.3 Fundamental Property Relations and Maxwell Equations
7 Chapter 6: Real Gases & Equations of State
6.1 Volumetric Properties and Compressibility Factor Charts 6.2 Cubic Equations of State (vdW, RK, SRK, and Peng-Robinson) 6.3 Residual Properties and Enthalpy/Entropy Departure Functions
8 Chapter 7: Phase & Chemical Reaction Equilibria
7.1 Pure Component Vapor Pressure and Phase Equilibria 7.2 Vapor-Liquid Equilibrium (VLE), Raoult's Law, and Activity Coefficients 7.3 Chemical Reaction Equilibria and Equilibrium Constant Calculation
9 Chapter 8: Heat Transfer Mechanisms & Conduction
8.1 Steady-State Conduction in Planar, Cylindrical, and Spherical Geometries 8.2 Convective Heat Transfer and Dimensionless Correlations 8.3 Thermal Radiation, Emissivity, and Surface Radiation Exchange
10 Chapter 9: Heat Exchanger Design & Phase Change
9.1 Shell-and-Tube Exchanger Design, TEMA Standards, and LMTD 9.2 Effectiveness-NTU Method and Exchanger Rating 9.3 Boiling Regimes, Condensation Phenomena, and Fouling Resistances
11 Chapter 10: Mass Transfer Fundamentals & Diffusion
10.1 Molecular Diffusion, Fick's Laws, and Equimolar Counterdiffusion 10.2 Convective Mass Transfer and Film Theories 10.3 Mass Transfer Dimensionless Numbers (Sherwood, Schmidt, Peclet)
12 Chapter 11: Distillation Operations
11.1 Vapor-Liquid Equilibrium and Relative Volatility in Distillation 11.2 McCabe-Thiele Method for Binary Distillation 11.3 Packed vs Tray Columns, Flooding, and Tray Hydraulics 11.4 Multicomponent Distillation Fundamentals and Key Components
13 Chapter 12: Rate-Controlled & Equilibrium Separations
12.1 Gas Absorption, Stripping, and the Kremser Equation 12.2 Liquid-Liquid Extraction and Ternary Phase Equilibria 12.3 Adsorption, Membrane Separations, and Drying Operations 12.4 Filtration, Crystallization, and Solid-Fluid Separations
14 Chapter 13: Chemical Kinetics & Ideal Isothermal Reactors
13.1 Reaction Rates, Rate Laws, and Order of Reaction 13.2 Temperature Dependence and the Arrhenius Equation 13.3 Batch Reactors and Continuous Stirred-Tank Reactors (CSTR) 13.4 Plug Flow Reactors (PFR) and Reactor Combinations
15 Chapter 14: Non-Ideal Flow, Non-Isothermal Reactors & Catalysis
14.1 Yield, Selectivity, and Multiple Reactions (Series and Parallel) 14.2 Non-Isothermal Reactor Design and Thermal Runaway 14.3 Heterogeneous Catalysis, Thiele Modulus, and RTD Models
16 Chapter 15: Physical & Transport Properties of Fluids
15.1 Fluid Density, Specific Gravity, and Viscosity Correlations 15.2 Thermal Conductivity and Specific Heat Capacities 15.3 Estimation Methods and Corresponding States Principles
17 Chapter 16: Materials of Construction & Corrosion
16.1 Mechanical Properties and Materials Selection in Chemical Plants 16.2 Corrosion Mechanisms, Materials Degradation, and Prevention
18 Chapter 17: Process Safety & Pressure Relief Systems
17.1 Hazard Identification Methodologies (HAZOP, FMEA, What-If) 17.2 Pressure Relief Valve (PRV) and Rupture Disk Sizing 17.3 Flammability, Explosions, and Toxic Dispersion Limits 17.4 Inerting, Purging, Discharge Location, and Containment
19 Chapter 18: Process Control & Engineering Economics
18.1 Process Dynamics and Feedback Control Loops 18.2 PID Controller Tuning and Loop Stability 18.3 Chemical Plant Capital Cost Estimation and Profitability Analysis 18.4 Field Instrumentation, Control Valves, Alarms, and Safety Instrumented Systems
20 Chapter 19: Process Design, Equipment Selection & Environmental Compliance
19.1 Process Flow Diagrams, P&IDs, Scale-Up, and Plant Siting 19.2 Process Equipment Selection, Sizing, and Optimization 19.3 Emissions Evaluation, Mitigation, and Remediation
21 Chapter 20: Plant Operation, Reliability & Continuous Improvement
20.1 Operating Procedures, Startup, and Shutdown 20.2 Mechanical Integrity, Reliability, and Failure Mechanisms 20.3 Debottlenecking, Optimization, and Troubleshooting
19.1 Process Flow Diagrams, P&IDs, Scale-Up, and Plant Siting
Key Takeaways Explain This Topic AI
A PFD carries major equipment, process flow direction, and a stream table of flow, composition, temperature, and pressure; a P&ID carries every line, valve, instrument, and relief device with tags and specifications but no operating data .
Under ISA-5.1 the first letter of an instrument tag is the measured variable (F, L, P, T, A) and the succeeding letters are the functions (I, C, R, T, A, S, V), so FIC-201 is a flow indicating controller and PSV-301 is a pressure safety valve.
Under geometric similarity the surface-to-volume ratio falls as (1/L): scaling a reactor 100-fold in volume raises the linear dimension by 100 1 / 3 = 4.64 100^{1/3} = 4.64 10 0 1/3 = 4.64 and cuts jacket area per unit volume to 21.5% of the laboratory value.
That falling (A/V) ratio is the single most common cause of scale-up failure for exothermic reactions — a reaction that is trivially controlled in a flask can run away in a plant reactor with identical chemistry and identical jacket temperature.
Plant siting places ignition sources such as fired heaters and flares upwind of units handling flammables, and locates control rooms and occupied buildings upwind and at a separation distance justified by an API 752 facility siting study.
Last updated: September 2026
19.1 Process Flow Diagrams, P&IDs, Scale-Up, and Plant Siting
The NCEES specification names Process design (e.g., scale-up, process or product development, process flow diagrams, P&IDs, specifications, layout and siting considerations, economics) as the first subtopic under Design. Economics is covered in Section 18.3. This section covers the rest — the documents that define a plant, and the two physical arguments (similarity and separation distance) that decide whether the plant works and whether it is safe.
1. The Document Hierarchy
Design information is developed on three successive drawings, each of which answers a different question.
Drawing Question it answers Contains Deliberately omits
BFD (block flow diagram) What are the process steps? Blocks, major streams, overall balance Equipment identity, conditions
PFD (process flow diagram) What is the process, and at what conditions? Major equipment with tags, flow direction, major utilities, stream table (flow, composition, (T), (P)), control loops that affect the material balance Minor piping, most instruments, line sizes and specs, spares
P&ID (piping and instrumentation diagram) What is actually built, and how is it controlled and protected? Every line with a line number, every valve, every instrument with an ISA tag, equipment nozzles, relief devices with set pressures, insulation and tracing, interlocks, line slopes, vents and drains All operating data — no flows, temperatures, pressures, or compositions
That last row is the definition question the exam likes. A P&ID showing a stream temperature is a defective P&ID. The reason is maintenance discipline: a P&ID is a permanent as-built document that must remain valid across every operating case, and operating data varies with case. Conversely, a PFD showing every block valve is unreadable and defeats its purpose as a process summary.
The P&ID is also the base document for process hazard analysis (Section 17.1), for mechanical integrity inspection planning (Section 20.2), and for management of change. Plants that let P&IDs drift out of date lose all three.
2. Reading the Drawings
Instrument tags (ISA-5.1). The tag is read in two halves:
First letter — the measured or initiating variable: F flow, L level, P pressure, T temperature, A analysis, S speed, W weight.
Succeeding letters — functions performed: I indicate, R record, C control, T transmit, A alarm, S switch, V valve, Y compute or relay.
So FIC-201 is a flow indicating controller, LAH-104 is a level alarm high, TT-315 is a temperature transmitter, and PSV-301 is a pressure safety valve. The bubble symbol adds location: a plain circle is field mounted ; a circle with a single solid horizontal line is accessible to the operator at the primary location (control room); a circle inscribed in a square denotes a shared display / shared control function in a DCS; a dashed line denotes a location not normally accessible to the operator.
Line numbers. A typical line number such as 6"-P-1201-A1A-H encodes, in order: nominal size ( 6 in 6\text{ in} 6 in ), service ( P = process), line sequence number, piping specification class (which fixes material, pressure rating, flange facing, gasket, and corrosion allowance), and insulation code ( H = hot service). The specification class is the item that matters for integrity: it is what says this line is 316 L 316\text{L} 316 L rated for Class 300 rather than carbon steel rated for Class 150.
3. Scale-Up
Scale-up rests on three kinds of similarity, applied in order:
Geometric similarity — all length ratios preserved.
Dynamic similarity — the governing dimensionless groups ((Re), (Pr), (Fr), (Da), (Sc)) preserved.
Kinetic/thermal similarity — velocity, temperature, and concentration profiles preserved.
The permanent difficulty is that these conflict. Section 4.4 showed it for agitation: holding (P/V) constant necessarily raises tip speed, and no single speed holds (P/V), tip speed, blend time, and (Re) constant at once. The engineer's job is to identify which group actually controls the outcome and hold that one.
The surface-to-volume collapse. This is the most important quantitative fact in scale-up. Under geometric similarity, with characteristic length (L): V ∝ L 3 , A ∝ L 2 , A V ∝ 1 L V \propto L^3, \qquad A \propto L^2, \qquad \frac{A}{V} \propto \frac{1}{L} V ∝ L 3 , A ∝ L 2 , V A ∝ L 1
Worked example. A laboratory reactor is scaled up 100 × 100\times 100 × in volume with geometric similarity. L 2 L 1 = 100 1 / 3 = 4.642 A 2 A 1 = ( 4.642 ) 2 = 21.54 \frac{L_2}{L_1} = 100^{1/3} = 4.642 \qquad \frac{A_2}{A_1} = (4.642)^2 = 21.54 L 1 L 2 = 10 0 1/3 = 4.642 A 1 A 2 = ( 4.642 ) 2 = 21.54 ( A / V ) 2 ( A / V ) 1 = 21.54 100 = 0.2154 \frac{(A/V)_2}{(A/V)_1} = \frac{21.54}{100} = 0.2154 ( A / V ) 1 ( A / V ) 2 = 100 21.54 = 0.2154
Heat generation scales with volume, so it rose 100 × 100\times 100 × . Heat removal through the jacket scales with area, so it rose only 21.5 × 21.5\times 21.5 × . Cooling capacity per unit of heat generated fell to 21.5% of its laboratory value. A mildly exothermic reaction that a flask dissipates to the bench top with no cooling at all can, at plant scale with the same chemistry and the same jacket temperature, cross the point where heat generation outruns removal and go to thermal runaway — the mechanism developed in Section 14.2.
The design responses are to add internal heat transfer area (coils, external pump-around loops), to cut the rate (semi-batch addition so the reaction rate is set by the feed pump rather than by the inventory), or to change to a continuous reactor with an inherently high (A/V). Building the plant reactor "just like the lab one, only bigger" is the failure.
4. Layout and Siting
Plot plan decisions are dominated by a single question: when something releases, where does it go, and what does it reach?
Prevailing wind. Establish the wind rose first. Continuous ignition sources — fired heaters, flares, boiler houses, and the electrical substation — are placed upwind of units handling flammable inventory, so that a drifting vapor cloud moves away from them rather than into them. Control rooms and occupied buildings are likewise placed upwind, so that a toxic release travels away from the people who must manage it.
Occupied buildings. API 752 (permanent buildings) and API 753 (portable buildings) require a facility siting study evaluating explosion overpressure, fire radiation, and toxic exposure for credible release scenarios. Buildings that cannot be moved far enough away are designed blast resistant , and portable trailers are the classic finding: a trailer parked beside a unit for a turnaround is exactly the structure that collapses on its occupants.
Spacing and access. Working rules that repeatedly show up as exam judgment items:
Separation distances between process units, storage, utilities, and the property line come from NFPA 30 and insurer guidance, and they exist to limit fire and explosion propagation from one unit to the next.
Two means of egress from every elevated platform and every operating level, arranged so that a fire at one cannot block both.
Fire water and emergency access on at least two sides of every major unit; dead-end roads inside a process area are a finding.
Gravity flow and hydraulic gradient set elevations: reboiler thermosiphons, column reflux drums, and pump NPSH margins (Section 3.4) all require the vessel to sit high enough. Elevation is a process constraint, not an architectural preference.
Maintenance access: tube-bundle pull space in front of every shell-and-tube exchanger, crane access to compressors, and drop zones for relief valve removal.
Grading and drainage slope spills away from equipment supports toward a remote impounding basin, so that a burning pool does not sit under the structural steel that holds up the unit.