10.6 Erection and Equipment Loads on Permanent Structures
NCEES PE Civil Construction Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Soil Mechanics
1.1 Lateral Earth Pressure 1.2 Soil Consolidation and Settlement 1.3 Effective and Total Stresses 1.4 Bearing Capacity 1.5 Slope Stability
2 Chapter 2: Site Layout and Development
2.1 Layout and Control 2.2 Horizontal and Vertical Curves 2.3 Site Investigations and Utilities
3 Chapter 3: Material Properties
3.1 Soils, Rock, and Aggregates 3.2 Concrete Material Properties 3.3 Steel Material Properties 3.4 Wood Material Properties
4 Chapter 4: Estimating Quantities and Costs
4.1 Quantity Take-Off Methods 4.2 Cost Estimating 4.3 Engineering Economics 4.4 Work Measurement and Productivity (Earned Value)
5 Chapter 5: Project Planning and Scheduling
5.1 Construction Sequencing 5.2 Activity Time Analysis 5.3 Critical Path Method and Network Analysis 5.4 Resource Scheduling and Leveling 5.5 Time–Cost Trade-Off and Crashing
6 Chapter 6: Material Production, Execution, and Quality Control
6.1 Specification Conformance and Hold-Points 6.2 Field Testing: Concrete, Soils, and Aggregates 6.3 Compaction: Principles, Calculations, and Equipment 6.4 Concrete Placement, Consolidation, and Finishing 6.5 Bolting and Welding: Structural Steel Connections 6.6 Acceptance Sampling and Statistical Quality Control
7 Chapter 7: Structural Mechanics
7.1 Loads (Dead, Live, Construction, Wind, and Preloading) 7.2 Statics and Stresses (Bending, Shear, Deflection) 7.3 Beams, Columns, and Slabs 7.4 Foundation and Retaining Wall Mechanics
8 Chapter 8: Hydraulics and Hydrology
8.1 Stormwater Collection and Drainage (Open-Channel Flow) 8.2 Runoff Analysis 8.3 Detention and Retention Ponds
9 Chapter 9: Operations and Methods
9.1 Lifting and Rigging 9.2 Crane Capacity and Stability 9.3 Dewatering and Pumping 9.4 Equipment Selection and Production Rates 9.5 Deep Foundation Installation 9.6 Excavation and Embankment (Cut and Fill)
10 Chapter 10: Support of Construction Loads
10.1 Formwork Design 10.2 Falsework and Scaffolding 10.3 Shoring and Reshoring 10.4 Bracing and Anchorage 10.5 Support of Excavation (Trenching, Cofferdams) 10.6 Erection and Equipment Loads on Permanent Structures
11 Chapter 11: Health and Safety
11.1 OSHA Construction Regulations and Safety Management 11.2 Work Zone and Public Safety (Traffic Control)
10.6 Erection and Equipment Loads on Permanent Structures
Key Takeaways Explain This Topic AI
Permanent structures are often subjected to their highest localized stresses during the construction phase due to heavy equipment and staging.
Engineers must verify that partially completed structural elements possess adequate capacity to support construction loads like crawler cranes or material stockpiles.
Construction rigging involves complex load analyses, including dynamic impacts and tension variations based on sling angles.
Slab punch-through and localized shear failures are major risks when heavy equipment outriggers are placed on elevated decks.
Last updated: July 2026
Introduction to Construction and Erection Loads
A fundamental challenge in construction engineering is managing loads imposed on permanent structures during the erection phase. Structural design codes (such as ASCE 7 ) ensure completed buildings can safely support final service loads. However, during construction, the partially completed structure is often subjected to its most critical load cases. These temporary loads arise from staging materials (e.g., structural steel bundles, drywall pallets, concrete block stacks), operating heavy machinery (e.g., crawler cranes, concrete pumps, scissor lifts) on elevated decks, and lifting structural elements during assembly. The construction engineer must analyze these temporary loads to prevent localized damage, serviceability failures, or catastrophic collapses.
Outrigger Loads and Soil/Slab Bearing Pressure
When heavy mobile cranes or concrete pump trucks operate on soil or elevated concrete slabs, their total weight—plus the payload—is concentrated through outrigger pads.
The bearing pressure ( P b P_b P b ) exerted by a single outrigger is: P b = P o u t r i g g e r A m a t P_b = \frac{P_{outrigger}}{A_{mat}} P b = A ma t P o u t r i gg er
where P o u t r i g g e r P_{outrigger} P o u t r i gg er is the maximum outrigger force (lbs) and A m a t A_{mat} A ma t is the area of the supporting crane mat or timber cribbing ( sq ft \text{sq ft} sq ft ).
On soil, excessive outrigger pressure can cause bearing capacity failure, tilting the crane. On concrete slabs, it can trigger punching shear , where the outrigger punches directly through the slab. To mitigate this, contractors use thick timber mats or steel plates to distribute the load over a larger tributary area, reducing the bearing pressure to within the allowable limits of the soil or slab.
Rigging Mechanics and Sling Tension
Erection operations rely heavily on rigging assemblies to lift and place heavy precast concrete members, steel trusses, and mechanical equipment. Analyzing the forces in rigging hardware is critical for crane safety.
Sling Angle Tension Calculations
When a load is lifted using a multi-leg sling, the tension in each leg is not simply the weight of the load divided by the number of legs. The tension increases as the sling angle relative to the horizontal plane ( θ \theta θ ) decreases.
For a symmetrical two-leg sling system supporting a load of weight W W W : T = W 2 sin ( θ ) T = \frac{W}{2 \sin(\theta)} T = 2 sin ( θ ) W
where:
T T T is the tension in each sling leg (lbs or kips).
W W W is the total weight of the load, including rigging gear (lbs or kips).
θ \theta θ is the angle between the sling leg and the horizontal plane of the load.
As θ \theta θ decreases, W d e s i g n W_{design} W d es i g n must also be adjusted. As θ \theta θ approaches zero, the tension T T T increases exponentially.
At θ = 90 ∘ \theta = 90^\circ θ = 9 0 ∘ (vertical lift), the tension in each leg is exactly 0.5 W 0.5 W 0.5 W .
At θ = 30 ∘ \theta = 30^\circ θ = 3 0 ∘ , sin ( 30 ∘ ) = 0.5 \sin(30^\circ) = 0.5 sin ( 3 0 ∘ ) = 0.5 , and the tension in each leg equals W W W . Each leg must carry the entire weight of the load.
At θ = 20 ∘ \theta = 20^\circ θ = 2 0 ∘ , sin ( 20 ∘ ) = 0.342 \sin(20^\circ) = 0.342 sin ( 2 0 ∘ ) = 0.342 , and the tension is approximately 1.46 W 1.46 W 1.46 W , which is nearly three times the vertical load.
For this reason, rigging angles below 30 ∘ 30^\circ 3 0 ∘ are extremely dangerous and generally prohibited by OSHA standards. Furthermore, low sling angles introduce high horizontal compressive forces ( H = T cos ( θ ) H = T \cos(\theta) H = T cos ( θ ) ) into the lifted member, which can buckle long precast concrete girders or steel trusses.
Dynamic Impact Factors
Static load calculations do not account for the accelerations and decelerations of hoisting. Sudden movements (snatching a load or slamming a brake) introduce dynamic forces. To design safely, engineers apply a Dynamic Impact Factor ( I I I ) to the static load, typically ranging from 1.25 to 2.0 1.25\text{ to }2.0 1.25 to 2.0 : W d e s i g n = W × I W_{design} = W \times I W d es i g n = W × I
Worked Engineering Example: Outrigger Matting and Rigging
Problem Scenario: A mobile crane is lifting a precast concrete wall panel on an elevated concrete deck.
The crane's maximum outrigger reaction is 96 , 000 lbs 96,000\text{ lbs} 96 , 000 lbs . The structural engineer limits the allowable bearing pressure on the slab to 3 , 000 psf 3,000\text{ psf} 3 , 000 psf to prevent punching shear. Determine the minimum side dimension of a square timber mat required beneath the outrigger pad.
The precast wall panel weighs 16 , 000 lbs 16,000\text{ lbs} 16 , 000 lbs and is lifted using a symmetrical two-leg sling. The rigging configuration dictates a horizontal sling angle of θ = 45 ∘ \theta = 45^\circ θ = 4 5 ∘ . Calculate the tension in each sling leg and compare it to a vertical lift.
Part 1: Mat Dimension Calculation
Required Mat Area ( A m a t A_{mat} A ma t ): A m a t = P o u t r i g g e r P a l l o w = 96 , 000 lbs 3 , 000 psf = 32.0 sq ft A_{mat} = \frac{P_{outrigger}}{P_{allow}} = \frac{96,000\text{ lbs}}{3,000\text{ psf}} = 32.0\text{ sq ft} A ma t = P a ll o w P o u t r i gg er = 3 , 000 psf 96 , 000 lbs = 32.0 sq ft
For a square mat ( B × B B \times B B × B ): B = A m a t = 32.0 sq ft ≈ 5.66 feet B = \sqrt{A_{mat}} = \sqrt{32.0\text{ sq ft}} \approx 5.66\text{ feet} B = A ma t = 32.0 sq ft ≈ 5.66 feet
Answer: The contractor must use a square mat with a minimum side dimension of 5.7 feet 5.7\text{ feet} 5.7 feet (typically a standard 6 ft × 6 ft 6\text{ ft} \times 6\text{ ft} 6 ft × 6 ft mat).
Part 2: Sling Tension Calculation
Apply the sling tension formula for a two-leg sling: T = W 2 sin ( θ ) = 16 , 000 lbs 2 sin ( 45 ∘ ) = 16 , 000 2 × 0.7071 = 16 , 000 1.414 ≈ 11 , 314 lbs T = \frac{W}{2 \sin(\theta)} = \frac{16,000\text{ lbs}}{2 \sin(45^\circ)} = \frac{16,000}{2 \times 0.7071} = \frac{16,000}{1.414} \approx 11,314\text{ lbs} T = 2 sin ( θ ) W = 2 sin ( 4 5 ∘ ) 16 , 000 lbs = 2 × 0.7071 16 , 000 = 1.414 16 , 000 ≈ 11 , 314 lbs
Compare to vertical lift ( θ = 90 ∘ \theta = 90^\circ θ = 9 0 ∘ ): T v e r t i c a l = 16 , 000 2 sin ( 90 ∘ ) = 8 , 000 lbs T_{vertical} = \frac{16,000}{2 \sin(90^\circ)} = 8,000\text{ lbs} T v er t i c a l = 2 sin ( 9 0 ∘ ) 16 , 000 = 8 , 000 lbs
Answer: The tension in each sling leg is 11 , 314 lbs 11,314\text{ lbs} 11 , 314 lbs , which is a 41.4 % 41.4\% 41.4% increase in tension compared to the 8 , 000 lbs 8,000\text{ lbs} 8 , 000 lbs experienced during a vertical lift.
Critical Field Traps in Erection Operations
Neglecting Rigging Weight: A common trap is failing to include the weight of the spreader beam, hooks, and shackles in the total lift weight ( W W W ), which can lead to overloading the rigging or crane.
Outrigger Placement Hazards: Placing outriggers over underground utilities, vaulted voids, or near the edge of excavation trenches. The lateral pressure from the outrigger can collapse trench shoring or punch through utility vaults.
Underestimating Lateral Tension Forces: Lifting a flexible member (like a steel plate or truss) with a low sling angle generates massive horizontal compression in the member. Without a spreader bar, this compression can cause the member to buckle during the lift.