Study guide

10.3 Shoring and Reshoring

NCEES PE Civil Construction Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Soil Mechanics

1.1 Lateral Earth Pressure 1.2 Soil Consolidation and Settlement 1.3 Effective and Total Stresses 1.4 Bearing Capacity 1.5 Slope Stability

2 Chapter 2: Site Layout and Development

2.1 Layout and Control 2.2 Horizontal and Vertical Curves 2.3 Site Investigations and Utilities

3 Chapter 3: Material Properties

3.1 Soils, Rock, and Aggregates 3.2 Concrete Material Properties 3.3 Steel Material Properties 3.4 Wood Material Properties

4 Chapter 4: Estimating Quantities and Costs

4.1 Quantity Take-Off Methods 4.2 Cost Estimating 4.3 Engineering Economics 4.4 Work Measurement and Productivity (Earned Value)

5 Chapter 5: Project Planning and Scheduling

5.1 Construction Sequencing 5.2 Activity Time Analysis 5.3 Critical Path Method and Network Analysis 5.4 Resource Scheduling and Leveling 5.5 Time–Cost Trade-Off and Crashing

6 Chapter 6: Material Production, Execution, and Quality Control

6.1 Specification Conformance and Hold-Points 6.2 Field Testing: Concrete, Soils, and Aggregates 6.3 Compaction: Principles, Calculations, and Equipment 6.4 Concrete Placement, Consolidation, and Finishing 6.5 Bolting and Welding: Structural Steel Connections 6.6 Acceptance Sampling and Statistical Quality Control

7 Chapter 7: Structural Mechanics

7.1 Loads (Dead, Live, Construction, Wind, and Preloading) 7.2 Statics and Stresses (Bending, Shear, Deflection) 7.3 Beams, Columns, and Slabs 7.4 Foundation and Retaining Wall Mechanics

8 Chapter 8: Hydraulics and Hydrology

8.1 Stormwater Collection and Drainage (Open-Channel Flow) 8.2 Runoff Analysis 8.3 Detention and Retention Ponds

9 Chapter 9: Operations and Methods

9.1 Lifting and Rigging 9.2 Crane Capacity and Stability 9.3 Dewatering and Pumping 9.4 Equipment Selection and Production Rates 9.5 Deep Foundation Installation 9.6 Excavation and Embankment (Cut and Fill)

10 Chapter 10: Support of Construction Loads

10.1 Formwork Design 10.2 Falsework and Scaffolding 10.3 Shoring and Reshoring 10.4 Bracing and Anchorage 10.5 Support of Excavation (Trenching, Cofferdams) 10.6 Erection and Equipment Loads on Permanent Structures

11 Chapter 11: Health and Safety

11.1 OSHA Construction Regulations and Safety Management 11.2 Work Zone and Public Safety (Traffic Control)

10.3 Shoring and Reshoring

Key Takeaways Explain This Topic AI

Shoring temporarily supports fresh concrete; reshoring is installed after forms are stripped to distribute loads across multiple floors.

Multi-story concrete construction requires an engineered schedule of stripping and reshoring to prevent overloading newly cast slabs.

The load on any given slab during the construction cycle depends on the weight of the fresh concrete, the number of interconnected slabs, and their relative stiffness.

Slab strip times are dictated by the concrete achieving a specified percentage of its 28-day design compressive strength ( f c ′ f'_c f c ′ ​ ).

Last updated: July 2026

The Mechanics of Shoring and Reshoring

In multi-story cast-in-place concrete construction, the cycle of pouring, stripping, and supporting slabs is a complex, high-risk sequence. Managing these operations dictates both the pace of construction and the structural safety of the project. As columns and walls are cast, horizontal floor slabs are poured on temporary formwork.

To maintain the schedule, formwork must be removed and moved to the next level as quickly as possible. However, young concrete takes 28 days to reach its full design strength ( f c ′ f'_c f c ′ ​ ) and cannot support the weight of subsequent pours immediately. To solve this, construction engineers design systems of shoring and reshoring:

Shoring: The initial vertical support system (wood or steel posts) erected to support the formwork and the weight of the freshly poured concrete slab.

Reshoring: The process of stripping the formwork and shores from under a partially cured slab, allowing it to deflect and carry its own self-weight, and then inserting snug-fitting vertical supports (reshores) back under the slab.

The primary structural purpose of reshoring is to link multiple floor slabs together. By interconnecting several levels, the massive load of a freshly poured slab and its associated construction live loads is shared among several lower slabs that have cured longer and possess greater load-bearing capacity.

Shoring/Reshoring Load Redistribution Principles

Calculating construction loads on interconnected slabs is essential to prevent cracking, serviceability issues, or structural failure. The standard analysis method, developed by Grundy and Kabaila (1963), relies on several key simplifying assumptions:

Infinite Shore Stiffness: Shores and reshores are considered infinitely stiff in axial compression compared to the bending stiffness of the concrete floor slabs.

Equal Deflection: Because the shores are rigid, all interconnected slabs deflect by the same amount under any newly applied construction load.

Stiffness-Proportional Sharing: Interconnected slabs share any new load in direct proportion to their relative bending stiffnesses. For slabs of identical thickness, span, and boundary conditions, this means the applied load is distributed equally among all supporting slabs in the system.

Self-Weight Release: When formwork and shores are stripped from a slab, that slab is forced to support its own self-weight. Any loads previously transferred to the shores are released and must be carried by the slab or shared through the remaining reshores.

Construction Sequence Notation

Engineers specify shoring systems using the notation N S + N R N_S + N_R N S ​ + N R ​ , where N S N_S N S ​ is the number of shoring levels and N R N_R N R ​ is the number of reshoring levels. For example, a 2 S + 1 R 2S+1R 2 S + 1 R system utilizes two levels of active shores and one level of reshores.

Influence of Early-Age Concrete Properties

While the Grundy and Kabaila method assumes equal stiffness for all slabs, young slabs have a lower Modulus of Elasticity ( E c E_c E c ​ ) than older slabs. The concrete elastic modulus at time t t t can be estimated using ACI guidelines: E c ( t ) = w c 1.5 33 f c ′ ( t ) E_c(t) = w_c^{1.5} 33 \sqrt{f'_c(t)} E c ​ ( t ) = w c 1.5 ​ 33 f c ′ ​ ( t ) ​

Since a younger slab is more flexible, it actually carries slightly less load than the older, stiffer slabs in the system. However, the simplified method assuming equal sharing remains the standard conservative design baseline for the PE Construction exam.

Worked Construction Load Calculation

Scenario: A multi-story commercial building is constructed using identical 8-inch thick concrete slabs (dead weight D = 100 psf D = 100\text{ psf} D = 100 psf ). The construction live load during a pour is L = 50 psf L = 50\text{ psf} L = 50 psf . The weight of the shoring system is negligible. The construction sequence utilizes a 2 S + 1 R 2S+1R 2 S + 1 R system (two levels of shores and one level of reshores). Slabs 1, 2, and 3 have been poured, and the reshores under Slab 1 have been removed. Slabs 1, 2, and 3 are interconnected. We are now preparing to pour Slab 4.

Determine the maximum construction load carried by Slab 1 during the pouring of Slab 4.

Step 1: Determine the load state before the pour. Before Slab 4 is poured, Slabs 1, 2, and 3 support their own self-weights. Since they are identical and linked by active shores, they share the total weight of the system:

Total weight in the system: W t o t a l = D 1 + D 2 + D 3 = 100 + 100 + 100 = 300 psf W_{total} = D_1 + D_2 + D_3 = 100 + 100 + 100 = 300\text{ psf} W t o t a l ​ = D 1 ​ + D 2 ​ + D 3 ​ = 100 + 100 + 100 = 300 psf .

Load on each slab: P = 300 3 = 100 psf P = \frac{300}{3} = 100\text{ psf} P = 3 300 ​ = 100 psf .

So, Slabs 1, 2, and 3 are currently carrying exactly their own weight ( 100 psf 100\text{ psf} 100 psf each).

Step 2: Calculate the new load applied by Slab 4. The new load consists of the wet concrete of Slab 4 ( 100 psf 100\text{ psf} 100 psf ) and the construction live load ( 50 psf 50\text{ psf} 50 psf ):

W n e w = 100 + 50 = 150 psf W_{new} = 100 + 50 = 150\text{ psf} W n e w ​ = 100 + 50 = 150 psf .

Step 3: Distribute the new load. This new load is distributed equally among the interconnected cured slabs. Note that Slab 4 is fresh (fluid) and does not contribute any bending stiffness to the system.

Shared load per supporting slab: P s h a r e d = 150 psf 3 = 50 psf P_{shared} = \frac{150\text{ psf}}{3} = 50\text{ psf} P s ha re d ​ = 3 150 psf ​ = 50 psf .

Step 4: Calculate the total load on Slab 1.

Total load: P t o t a l = P i n i t i a l + P s h a r e d = 100 psf + 50 psf = 150 psf P_{total} = P_{initial} + P_{shared} = 100\text{ psf} + 50\text{ psf} = 150\text{ psf} P t o t a l ​ = P ini t ia l ​ + P s ha re d ​ = 100 psf + 50 psf = 150 psf .

Conclusion: Slab 1 must carry a total construction load of 150 psf 150\text{ psf} 150 psf (a load ratio of 1.5 D 1.5 D 1.5 D ). The construction engineer must verify that Slab 1 has cured sufficiently to safely withstand this load without cracking or excessive deflection.

Scheduling Safe Stripping and Stripping Strength

Stripping shores too early is a leading cause of construction collapses and serviceability failures (excessive long-term deflections). The decision to strip forms must be based on verified compressive strength , not calendar days.

Vertical Elements: Wall and column forms can typically be stripped within 12 to 24 hours, as they carry minimal gravity loads.

Horizontal Elements: Slabs and beams must typically achieve 70% to 85% of their 28-day design compressive strength ( f c ′ f'_c f c ′ ​ ) before stripping.

Contractors verify in-place concrete strength using field-cured cylinders broken in a compression machine or non-destructive methods like concrete maturity meters (ASTM C1074), which correlate the slab's time-temperature history to strength development.