4.3 Economic Dispatch, Energy Efficiency & Load Profile Analysis
PE Electrical and Computer: Power Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview, Strategy & Reference Handbook
1.1 PE Power Exam Format, CBT Navigation & Reference Handbook 1.2 2026 Reference Standards (NEC 2020, NFPA 70E-2021, NESC) & Scoring Mechanics 1.3 CBT Pacing, AIT Question Formats & Formula Sheet Mastery
2 Chapter 2: Measurement, Metering & Field Testing
2.1 Current Transformers (CTs), Potential Transformers (PTs) & Meter Connections 2.2 Instrument Transformer Burdens, Saturation Curves & Ratio Correction Factors 2.3 Insulation Resistance Testing (Megger, Polarization Index, Dielectric Absorption) 2.4 Ground Resistance Testing (Fall-of-Potential 62% Rule & Clamp-on Methods)
3 Chapter 3: General Applications — Grounding & Surge Protection
3.1 Substation Ground Grid Design & IEEE 80 Touch/Step Voltage Criteria 3.2 Lightning Protection Systems & Rolling Sphere / Cone of Protection Methods 3.3 Surge Protective Devices (SPDs) & Voltage Surge Arresters
4 Chapter 4: General Applications — Lighting & Energy Management
4.1 Illumination Engineering & Zonal Cavity / Lumen Method Calculations 4.2 Energy Management, Demand Factors & Load Factor Calculations 4.3 Economic Dispatch, Energy Efficiency & Load Profile Analysis
5 Chapter 5: Electrical Safety & NFPA Standards
5.1 NFPA 70E Shock Protection, Approach Boundaries & PPE Requirements 5.2 Arc-Flash Hazard Analysis & IEEE 1584-2018 Incident Energy Calculations 5.3 Hazardous (Classified) Locations (Class I, II, III & Division/Zone Systems) 5.4 Special Occupancies & Critical Systems (NEC Articles 517 Health Care, 700/701/702 Emergency)
6 Chapter 6: NEC Wiring Methods & Installation Requirements
6.1 Conductor Ampacity & NEC Table 310.16 Derating Adjustments 6.2 Raceway Fill, Box Sizing & Conduit Bending Calculations (Chapter 9 Tables) 6.3 Equipment Grounding Conductors & Grounding Electrode Sizing (NEC Article 250)
7 Chapter 7: Circuit Analysis — Fundamentals & Symmetrical Components
7.1 DC & Single-Phase AC Network Analysis (Thevenin, Norton, Superposition) 7.2 Balanced Three-Phase Circuits (Wye-Delta Configurations & Power Formulas) 7.3 Symmetrical Components & Fortescue Sequence Transformation Matrices 7.4 Sequence Impedances & Positive, Negative, Zero Sequence Network Construction
8 Chapter 8: Circuit Analysis — Per-Unit & Phasor Analysis
8.1 Per-Unit System Fundamentals & Base Conversion Formulas 8.2 Three-Phase Per-Unit Network Modeling & Equipment Impedance Conversion 8.3 Phasor Diagrams, Complex Power & Power Triangle Relationships
9 Chapter 9: Power Electronics & Logic Controls
9.1 Power Electronic Converters (Rectifiers, Inverters & DC-DC Topologies) 9.2 Inverter-Based Resources (IBRs), Grid-Forming & Grid-Following Controls 9.3 Variable Frequency Drives (VFDs), PWM Operation & Harmonic Mitigation 9.4 Boolean Algebra, Logic Gates, De Morgan's Laws & Ladder Logic Control Diagrams
10 Chapter 10: Rotating Machines — Induction & Synchronous
10.1 Three-Phase Induction Motors (Equivalent Circuits, Slip & Performance) 10.2 Induction Motor Torque-Speed Characteristics & NEMA Design Classes 10.3 Synchronous Machines (Operating Principles, Power-Angle Curves & V-Curves) 10.4 Motor Starting Methods (DOL, Wye-Delta, Autotransformer, Soft-Start) & Voltage Dip
11 Chapter 11: Electric Power Devices & Renewable Energy
11.1 Power Transformers (Equivalent Circuits, Efficiency & Voltage Regulation) 11.2 Power Factor Correction Capacitors & Shunt Bank Sizing 11.3 Battery Energy Storage Systems (BESS) & Ultracapacitors 11.4 Renewable Energy Generation (Solar Photovoltaic Systems & Wind Turbines)
12 Chapter 12: Transmission & Distribution — Steady-State & Power Quality
12.1 Transmission Line Modeling, Voltage Drop & Conductor Sizing 12.2 Voltage Regulation, Reactive Power Support & Tap-Changer Controls 12.3 Power Quality, Harmonics, THD & IEEE 519 Compliance 12.4 Power Flow Analysis & System Stability (Steady-State, Transient & Swing Equation)
13 Chapter 13: Transmission & Distribution — Fault Analysis & Transformer Shifts
13.1 Symmetrical Three-Phase Bolted Fault Calculations 13.2 Unsymmetrical Fault Analysis (SLG, L-L, DLG Fault Calculations) 13.3 Transformer Connection Types, Zero-Sequence Paths & 30-Degree Phase Shifts
14 Chapter 14: Protection Systems & Device Coordination
14.1 Overcurrent Protection & Time-Current Characteristic (TCC) Curves 14.2 Protective Relaying Schemes (Differential 87, Distance 21, Undervoltage 27) 14.3 Circuit Breakers, Fuses & Automatic Reclosers 14.4 Protection Coordination, Selectivity & Coordination Time Intervals (CTI)
4.3 Economic Dispatch, Energy Efficiency & Load Profile Analysis
Key Takeaways Explain This Topic AI
Load Duration Curves (LDCs) sort chronological load demands in descending order, establishing generation requirements for Base Load (100% capacity factor), Intermediate/Cycling, and Peaking generation.
Classical Economic Dispatch minimizes total system fuel cost by operating all unconstrained generating units at Equal Incremental Cost (λ_1 = λ_2 = ... = λ_N = λ).
When transmission losses are included, generator incremental costs are weighted by Penalty Factors (L_i = 1 / [1 - ∂P_loss / ∂P_i]) such that λ_i * L_i = λ_sys.
Centrifugal pump and fan operating power scales with the cube of speed (P_1 / P_2 = [n_1 / n_2]³) per Affinity Laws, making Variable Frequency Drives (VFDs) vastly more energy-efficient than mechanical throttling valves.
Electric motors account for over 95% of their total life cycle cost (LCC) in electrical energy consumption; NEMA Premium and IEEE 841 high-efficiency motors reduce stator and core I²R losses.
Last updated: August 2026
Economic Dispatch, Energy Efficiency & Load Profile Analysis
Economic dispatch and industrial energy optimization bridge power generation operations with facility-level energy management. On the NCEES PE Electrical: Power examination, engineers are tested on allocating electrical generation across multiple units at minimum total operating cost, analyzing system load curves, and applying fluid machine affinity laws to calculate drive energy savings.
1. System Load Curves & Generation Classification
Power system demand fluctuates dynamically throughout the day, month, and year. Two primary graphical tools characterize these fluctuations: CHRONOLOGICAL LOAD CURVE (24-Hour) LOAD DURATION CURVE (LDC)
- Power (MW) Power (MW)
- ^
- Pmax| /\ Pmax|~~~\ <-- Peaking (SCGT / Hydro)
- | / \ /\ | \
- | / \ / \ |=====\ <-- Intermediate (CCGT)
- |___/ \_/ \_ | \
- Pmin|==================== Pmin|=======\__ <-- Base Load (Nuclear)
- +------------------------> Time (Hours) +------------------------> Hours / %
- 0 12 24 0 8760 (100%)
- 1. Chronological Load Curve
Plots system electrical power demand ( P P P in MW \text{MW} MW ) as a function of chronological time (hours). The integral (area under the curve) represents total electrical energy generated in megawatt-hours ( MWh \text{MWh} MWh ): E t o t a l = ∫ 0 T P ( t ) d t E_{total} = \int_{0}^{T} P(t)\, dt E t o t a l = ∫ 0 T P ( t ) d t
2. Load Duration Curve (LDC)
Constructed by rearranging the chronological load data in descending order of magnitude . The vertical axis represents power ( MW \text{MW} MW ), and the horizontal axis represents the number of hours (or percentage of time) during the year that system load equaled or exceeded that value.
Generation Categories on the LDC
Generation Class Operating Regime Typical Generation Technologies Capital vs. Operating Cost Heat Rate & Efficiency
Base Load Operates continuously ( 8000 – 8760 h/yr 8000\text{--}8760\text{ h/yr} 8000 – 8760 h/yr , 100 % 100\% 100% capacity factor). Bottom of LDC. Nuclear, Supercritical Coal, Large Run-of-River Hydro, Geothermal. High capital cost, very low incremental fuel cost ($/MWh) . High thermal efficiency, slow ramp rate ( < 1 % /min < 1\%\text{/min} < 1% /min ).
Intermediate (Cycling) Follows daily load rises ( 2000 – 5000 h/yr 2000\text{--}5000\text{ h/yr} 2000 – 5000 h/yr ). Middle of LDC. Combined Cycle Gas Turbines (CCGT), Biomass, Hydroelectric. Moderate capital cost, moderate incremental fuel cost. High thermal efficiency ( > 55 % > 55\% > 55% ), moderate ramp rate.
Peaking Operates only during extreme peak hours ( 100 – 1500 h/yr 100\text{--}1500\text{ h/yr} 100 – 1500 h/yr ). Top peak of LDC. Simple Cycle Gas Turbines (SCGT/Aeroderivatives), Diesel Gensets, Battery BESS. Low capital cost, high incremental fuel cost ($/MWh) . Lower thermal efficiency, fast start ( < 10 min < 10\text{ min} < 10 min ) and high ramp rate.
2. Classical Economic Dispatch (Equal Incremental Cost Criterion)
The objective of Economic Dispatch is to allocate a total power demand ( P D P_D P D ) among N N N operating generating units such that total fuel cost is minimized without violating operational limits.
Generator Fuel Cost Curves
The operating cost of a thermal generating unit is conventionally modeled as a quadratic function of its real electrical power output ( P i P_i P i in MW \text{MW} MW ): C i ( P i ) = a i P i 2 + b i P i + c i [ USD / hour ] C_i(P_i) = a_i P_i^2 + b_i P_i + c_i\quad [\text{USD}/\text{hour}] C i ( P i ) = a i P i 2 + b i P i + c i [ USD / hour ]
Where a i a_i a i ( USD / MW 2 h \text{USD}/\text{MW}^2\text{h} USD / MW 2 h ), b i b_i b i ( USD / MWh \text{USD}/\text{MWh} USD / MWh ), and c i c_i c i ( USD / h \text{USD}/\text{h} USD / h , no-load cost) are empirical cost coefficients.
Incremental Fuel Cost ( λ i \lambda_i λ i )
The incremental fuel cost is the first derivative of the cost curve with respect to power output, representing the cost to produce one additional MWh \text{MWh} MWh of electrical energy: λ i = d C i d P i = 2 a i P i + b i [ USD / MWh ] \lambda_i = \frac{dC_i}{dP_i} = 2 a_i P_i + b_i\quad [\text{USD}/\text{MWh}] λ i = d P i d C i = 2 a i P i + b i [ USD / MWh ]
The Equal Incremental Cost Criterion (Neglecting Losses)
To minimize total fuel cost ∑ C i ( P i ) \sum C_i(P_i) ∑ C i ( P i ) subject to the power balance constraint ∑ P i = P D \sum P_i = P_D ∑ P i = P D , the Lagrangian multiplier method dictates that all units not at a generation limit must operate at the identical incremental cost ( λ \lambda λ ) : λ 1 = λ 2 = ⋯ = λ N = λ s y s t e m \lambda_1 = \lambda_2 = \cdots = \lambda_N = \lambda_{system} λ 1 = λ 2 = ⋯ = λ N = λ sys t e m d C 1 d P 1 = d C 2 d P 2 = ⋯ = d C N d P N = λ \frac{dC_1}{dP_1} = \frac{dC_2}{dP_2} = \cdots = \frac{dC_N}{dP_N} = \lambda d P 1 d C 1 = d P 2 d C 2 = ⋯ = d P N d C N = λ Incremental Cost λ ($/MWh)
- ^
- | / Unit 2: λ2 = 2 a2 P2 + b2
- λsys|-------------------------+---------
- | /| /
- | Unit 1: λ1 / | / λ1 = 2 a1 P1 + b1
- | ======+/ | /
- | /| | /
- b2|.................../ | | /
- b1|................../ | | /
- +---------------------+---+-------------------------> Generation (MW)
- 0 P1 P2 P_total = P1 + P2 = PD
- Handling Generator Operational Constraints
Each generator is constrained by mechanical and thermal limits: P i , m i n ≤ P i ≤ P i , m a x P_{i,min} \le P_i \le P_{i,max} P i , min ≤ P i ≤ P i , ma x .
If an unconstrained solution yields P i < P i , m i n P_i < P_{i,min} P i < P i , min , set P i = P i , m i n P_i = P_{i,min} P i = P i , min (unit operates at maximum allowed efficiency floor; λ i > λ \lambda_i > \lambda λ i > λ ).
If an unconstrained solution yields P i > P i , m a x P_i > P_{i,max} P i > P i , ma x , set P i = P i , m a x P_i = P_{i,max} P i = P i , ma x (unit is pinned at its ceiling; λ i < λ \lambda_i < \lambda λ i < λ ).
The remaining unconstrained units are then redispatched to supply the balance of load: P D , r e m a i n i n g = P D − ∑ P p i n n e d P_{D,remaining} = P_D - \sum P_{pinned} P D , re mainin g = P D − ∑ P p inn e d .
3. Economic Dispatch with Transmission Losses
In large transmission networks, transmission line I 2 R I^2 R I 2 R losses ( P l o s s P_{loss} P l oss ) cannot be neglected. Kron's Loss Formula models transmission losses using B B B -coefficients: P l o s s = ∑ i = 1 N ∑ j = 1 N P i B i j P j + ∑ i = 1 N B 0 i P i + B 00 P_{loss} = \sum_{i=1}^{N} \sum_{j=1}^{N} P_i B_{ij} P_j + \sum_{i=1}^{N} B_{0i} P_i + B_{00} P l oss = i = 1 ∑ N j = 1 ∑ N P i B ij P j + i = 1 ∑ N B 0 i P i + B 00
The Exact Coordination Equation & Penalty Factors
When transmission losses are included, the economic dispatch coordination equation becomes: λ i × L i = λ s y s t e m \lambda_i \times L_i = \lambda_{system} λ i × L i = λ sys t e m
Where L i L_i L i is the Transmission Loss Penalty Factor for generator i i i : L i = 1 1 − ∂ P l o s s ∂ P i L_i = \frac{1}{1 - \frac{\partial P_{loss}}{\partial P_i}} L i = 1 − ∂ P i ∂ P l oss 1 ( 2 a i P i + b i ) × ( 1 1 − ∂ P l o s s ∂ P i ) = λ s y s t e m \left( 2 a_i P_i + b_i \right) \times \left( \frac{1}{1 - \frac{\partial P_{loss}}{\partial P_i}} \right) = \lambda_{system} ( 2 a i P i + b i ) × ( 1 − ∂ P i ∂ P l oss 1 ) = λ sys t e m
Where ∂ P l o s s ∂ P i \frac{\partial P_{loss}}{\partial P_i} ∂ P i ∂ P l oss is the incremental transmission loss (ITL) of unit i i i . Generators close to major load centers have small or negative ITLs ( L i ≈ 1.0 L_i \approx 1.0 L i ≈ 1.0 ), while remote generators have large positive ITLs ( L i > 1.0 L_i > 1.0 L i > 1.0 ), forcing them to generate less power than in the lossless case.
4. Industrial Energy Efficiency: Motors & Affinity Laws
In industrial facilities, electric motor-driven systems (pumps, fans, compressors) account for over 65 % 65\% 65% of all consumed electrical energy.
Motor Life Cycle Cost (LCC) & NEMA Premium Efficiency
Over an average 15- to 20-year operating life of an industrial induction motor:
- Purchase Price: ≈ 2 % – 4 % \approx 2\%\text{--}4\% ≈ 2% – 4% of total life cycle cost
- Maintenance & Repair: ≈ 1 % – 3 % \approx 1\%\text{--}3\% ≈ 1% – 3% of total life cycle cost
Electrical Energy Consumed: ≈ 93 % – 97 % \approx 93\%\text{--}97\% ≈ 93% – 97% of total life cycle cost!
NEMA Premium (NEMA MG 1 Table 12-12) and IEEE 841 severe-duty motors achieve higher efficiency by using thinner, higher-grade silicon steel laminations (reducing core hysteresis/eddy losses), larger copper conductor cross-sections (reducing stator I 2 R I^2 R I 2 R losses), and optimized rotor bar geometries. Induction Motor Loss Breakdown
- +--------------------------------------------------------------------------+
- | Stator I²R (35-40%) | Rotor I²R (15-20%) | Core (15-20%) | F&W | Stray (10%)|
- +--------------------------------------------------------------------------+
- Affinity Laws for Centrifugal Pumps and Fans
For centrifugal machines (pumps, fans, blowers), operating parameters vary with rotational speed ( n n n , in RPM or Hz) according to the Affinity Laws : Law 1 (Volumetric Flow Rate, Q ): Q 1 Q 2 = n 1 n 2 \text{Law 1 (Volumetric Flow Rate, } Q\text{):}\quad \frac{Q_1}{Q_2} = \frac{n_1}{n_2} Law 1 (Volumetric Flow Rate, Q ): Q 2 Q 1 = n 2 n 1 Law 2 (Head / Differential Pressure, H ): H 1 H 2 = ( n 1 n 2 ) 2 \text{Law 2 (Head / Differential Pressure, } H\text{):}\quad \frac{H_1}{H_2} = \left( \frac{n_1}{n_2} \right)^2 Law 2 (Head / Differential Pressure, H ): H 2 H 1 = ( n 2 n 1 ) 2 Law 3 (Brake Shaft Power, P ): P 1 P 2 = ( n 1 n 2 ) 3 \text{Law 3 (Brake Shaft Power, } P\text{):}\quad \frac{P_1}{P_2} = \left( \frac{n_1}{n_2} \right)^3 Law 3 (Brake Shaft Power, P ): P 2 P 1 = ( n 2 n 1 ) 3 Power (kW / hp)
- ^
- 100%|----------------------------------------- Full Speed (Throttling Valve)
- | /
- 80%| / Wasted Throttling Energy
- | /
- 50%| +..............+ <-- VFD Power (Cube Law: P ∝ n³)
- | / (51.2% Power at 80% Speed)
- | /
- +------------------+---------------------------------> Flow Rate (Q)
- 0 80% 100%
- VFD Variable Speed Control vs. Mechanical Throttling
Mechanical Throttling (Control Valve / Damper): Motor runs at full speed ( 100 % 100\% 100% RPM). Throttling introduces a large pressure drop across the valve. Power drops only marginally ( P ∝ Q 0.8 – 1.0 P \propto Q^{0.8\text{--}1.0} P ∝ Q 0.8 – 1.0 ).
Variable Frequency Drive (VFD): Modulates motor inverter frequency ( f f f ), reducing shaft speed ( n n n ). Shaft power drops with the cube of speed ( P ∝ n 3 P \propto n^3 P ∝ n 3 ) .
Energy Savings Calculation: Reducing flow to 80 % 80\% 80% ( Q 2 / Q 1 = 0.80 Q_2/Q_1 = 0.80 Q 2 / Q 1 = 0.80 ) via VFD requires: P 2 = P 1 × ( 0.80 ) 3 = 0.512 × P 1 ( 51.2 % of rated power ) P_2 = P_1 \times (0.80)^3 = 0.512 \times P_1\quad (51.2\%\text{ of rated power}) P 2 = P 1 × ( 0.80 ) 3 = 0.512 × P 1 ( 51.2% of rated power ) Energy savings = 100 % − 51.2 % = 48.8 % 100\% - 51.2\% = 48.8\% 100% − 51.2% = 48.8% !
- 5. Step-by-Step Worked Calculation Example
- Problem Statement
Two thermal generating units supply a total system load demand of P D = 400.0 MW P_D = 400.0\text{ MW} P D = 400.0 MW . Transmission losses are neglected.
Generator 1:
Cost function: C 1 ( P 1 ) = 0.004 P 1 2 + 8.0 P 1 + 200.0 [ USD / h ] C_1(P_1) = 0.004\, P_1^2 + 8.0\, P_1 + 200.0\quad [\text{USD}/\text{h}] C 1 ( P 1 ) = 0.004 P 1 2 + 8.0 P 1 + 200.0 [ USD / h ]
Operating limits: 50.0 MW ≤ P 1 ≤ 300.0 MW 50.0\text{ MW} \le P_1 \le 300.0\text{ MW} 50.0 MW ≤ P 1 ≤ 300.0 MW
Generator 2:
Cost function: C 2 ( P 2 ) = 0.006 P 2 2 + 7.0 P 2 + 150.0 [ USD / h ] C_2(P_2) = 0.006\, P_2^2 + 7.0\, P_2 + 150.0\quad [\text{USD}/\text{h}] C 2 ( P 2 ) = 0.006 P 2 2 + 7.0 P 2 + 150.0 [ USD / h ]
Operating limits: 40.0 MW ≤ P 2 ≤ 250.0 MW 40.0\text{ MW} \le P_2 \le 250.0\text{ MW} 40.0 MW ≤ P 2 ≤ 250.0 MW
Calculate:
The incremental cost functions ( λ 1 \lambda_1 λ 1 and λ 2 \lambda_2 λ 2 ).
The system incremental cost ( λ s y s \lambda_{sys} λ sys ) and the optimal power dispatch ( P 1 P_1 P 1 and P 2 P_2 P 2 ).
Verify that operating limits are satisfied.
The total hourly operating cost ( C t o t a l C_{total} C t o t a l ) of the system.
Solution Walkthrough
Step 1: Formulate Incremental Cost Functions λ 1 = d C 1 d P 1 = 2 ( 0.004 ) P 1 + 8.0 = 0.008 P 1 + 8.0 [ USD / MWh ] \lambda_1 = \frac{dC_1}{dP_1} = 2(0.004) P_1 + 8.0 = 0.008\, P_1 + 8.0\quad [\text{USD}/\text{MWh}] λ 1 = d P 1 d C 1 = 2 ( 0.004 ) P 1 + 8.0 = 0.008 P 1 + 8.0 [ USD / MWh ] λ 2 = d C 2 d P 2 = 2 ( 0.006 ) P 2 + 7.0 = 0.012 P 2 + 7.0 [ USD / MWh ] \lambda_2 = \frac{dC_2}{dP_2} = 2(0.006) P_2 + 7.0 = 0.012\, P_2 + 7.0\quad [\text{USD}/\text{MWh}] λ 2 = d P 2 d C 2 = 2 ( 0.006 ) P 2 + 7.0 = 0.012 P 2 + 7.0 [ USD / MWh ]
Step 2: Apply Equal Incremental Cost Criterion
Set λ 1 = λ 2 = λ \lambda_1 = \lambda_2 = \lambda λ 1 = λ 2 = λ and solve for each generator's output as a function of λ \lambda λ : P 1 = λ − 8.0 0.008 = 125.0 λ − 1000.0 P_1 = \frac{\lambda - 8.0}{0.008} = 125.0\, \lambda - 1000.0 P 1 = 0.008 λ − 8.0 = 125.0 λ − 1000.0 P 2 = λ − 7.0 0.012 = 83.3333 λ − 583.3333 P_2 = \frac{\lambda - 7.0}{0.012} = 83.3333\, \lambda - 583.3333 P 2 = 0.012 λ − 7.0 = 83.3333 λ − 583.3333
Apply the total power balance constraint ( P 1 + P 2 = P D = 400.0 MW P_1 + P_2 = P_D = 400.0\text{ MW} P 1 + P 2 = P D = 400.0 MW ): ( 125.0 λ − 1000.0 ) + ( 83.3333 λ − 583.3333 ) = 400.0 (125.0\, \lambda - 1000.0) + (83.3333\, \lambda - 583.3333) = 400.0 ( 125.0 λ − 1000.0 ) + ( 83.3333 λ − 583.3333 ) = 400.0 208.3333 λ − 1583.3333 = 400.0 208.3333\, \lambda - 1583.3333 = 400.0 208.3333 λ − 1583.3333 = 400.0 208.3333 λ = 1983.3333 208.3333\, \lambda = 1983.3333 208.3333 λ = 1983.3333 λ s y s = 1983.3333 208.3333 = 9.520 USD/MWh \lambda_{sys} = \frac{1983.3333}{208.3333} = \mathbf{9.520\text{ USD/MWh}} λ sys = 208.3333 1983.3333 = 9.520 USD/MWh
Now calculate individual generator power outputs: P 1 = 125.0 ( 9.520 ) − 1000.0 = 1190.0 − 1000.0 = 190.0 MW P_1 = 125.0(9.520) - 1000.0 = 1190.0 - 1000.0 = \mathbf{190.0\text{ MW}} P 1 = 125.0 ( 9.520 ) − 1000.0 = 1190.0 − 1000.0 = 190.0 MW P 2 = 83.3333 ( 9.520 ) − 583.3333 = 793.333 − 583.333 = 210.0 MW P_2 = 83.3333(9.520) - 583.3333 = 793.333 - 583.333 = \mathbf{210.0\text{ MW}} P 2 = 83.3333 ( 9.520 ) − 583.3333 = 793.333 − 583.333 = 210.0 MW
Power Balance Check: P 1 + P 2 = 190.0 MW + 210.0 MW = 400.0 MW P_1 + P_2 = 190.0\text{ MW} + 210.0\text{ MW} = 400.0\text{ MW} P 1 + P 2 = 190.0 MW + 210.0 MW = 400.0 MW (Exact match).
Step 3: Verify Unit Operating Limits
Generator 1: 50.0 MW ≤ 190.0 MW ≤ 300.0 MW 50.0\text{ MW} \le 190.0\text{ MW} \le 300.0\text{ MW} 50.0 MW ≤ 190.0 MW ≤ 300.0 MW (Within limits).
Generator 2: 40.0 MW ≤ 210.0 MW ≤ 250.0 MW 40.0\text{ MW} \le 210.0\text{ MW} \le 250.0\text{ MW} 40.0 MW ≤ 210.0 MW ≤ 250.0 MW (Within limits).
Since neither limit is violated, the unconstrained optimal dispatch is valid.
Step 4: Calculate Total Hourly Operating Cost C 1 ( 190.0 ) = 0.004 ( 190.0 ) 2 + 8.0 ( 190.0 ) + 200.0 = 0.004 ( 36,100 ) + 1520.0 + 200.0 = 144.40 + 1520.0 + 200.0 = 1,864.40 USD/h C_1(190.0) = 0.004(190.0)^2 + 8.0(190.0) + 200.0 = 0.004(36{,}100) + 1520.0 + 200.0 = 144.40 + 1520.0 + 200.0 = 1{,}864.40\text{ USD/h} C 1 ( 190.0 ) = 0.004 ( 190.0 ) 2 + 8.0 ( 190.0 ) + 200.0 = 0.004 ( 36 , 100 ) + 1520.0 + 200.0 = 144.40 + 1520.0 + 200.0 = 1 , 864.40 USD/h C 2 ( 210.0 ) = 0.006 ( 210.0 ) 2 + 7.0 ( 210.0 ) + 150.0 = 0.006 ( 44,100 ) + 1470.0 + 150.0 = 264.60 + 1470.0 + 150.0 = 1,884.60 USD/h C_2(210.0) = 0.006(210.0)^2 + 7.0(210.0) + 150.0 = 0.006(44{,}100) + 1470.0 + 150.0 = 264.60 + 1470.0 + 150.0 = 1{,}884.60\text{ USD/h} C 2 ( 210.0 ) = 0.006 ( 210.0 ) 2 + 7.0 ( 210.0 ) + 150.0 = 0.006 ( 44 , 100 ) + 1470.0 + 150.0 = 264.60 + 1470.0 + 150.0 = 1 , 884.60 USD/h C t o t a l = C 1 + C 2 = 1,864.40 + 1,884.60 = 3,749.00 USD/hour ( 3,749.00 USD/hour ) C_{total} = C_1 + C_2 = 1{,}864.40 + 1{,}884.60 = \mathbf{3{,}749.00\text{ USD/hour}}\quad (3{,}749.00\text{ USD/hour}) C t o t a l = C 1 + C 2 = 1 , 864.40 + 1 , 884.60 = 3 , 749.00 USD/hour ( 3 , 749.00 USD/hour )
- 6. Common NCEES Exam Pitfalls
- Pitfall 1: Equating Total Costs Rather Than Incremental Costs
Never set total cost functions equal ( C 1 = C 2 C_1 = C_2 C 1 = C 2 ). Economic dispatch requires equating the derivatives (marginal costs λ 1 = λ 2 \lambda_1 = \lambda_2 λ 1 = λ 2 ). Total cost values have no bearing on marginal optimality.
Pitfall 2: Ignoring Generation Boundary Violations
Always check unit limits! If the equal lambda equation yields P 1 = 320 MW P_1 = 320\text{ MW} P 1 = 320 MW for a unit rated at 300 MW 300\text{ MW} 300 MW , you must fix P 1 = 300 MW P_1 = 300\text{ MW} P 1 = 300 MW and redispatch remaining units to supply P D − 300 MW P_D - 300\text{ MW} P D − 300 MW .
Pitfall 3: Applying Linear Flow Relationships to Fan/Pump Power
Remember the Affinity Laws: Flow varies linearly ( Q ∝ n Q \propto n Q ∝ n ), Pressure varies quadratically ( H ∝ n 2 H \propto n^2 H ∝ n 2 ), and Power varies cubically ( P ∝ n 3 P \propto n^3 P ∝ n 3 ) . Halving flow ($50% flow) reduces power to ( 0.5 ) 3 = 0.125 (0.5)^3 = 0.125 ( 0.5 ) 3 = 0.125 ($12.5% of original), NOT 50 % ! 50\%! 50% !
Loading diagram...