4.2 Energy Management, Demand Factors & Load Factor Calculations

PE Electrical and Computer: Power Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Overview, Strategy & Reference Handbook

1.1 PE Power Exam Format, CBT Navigation & Reference Handbook 1.2 2026 Reference Standards (NEC 2020, NFPA 70E-2021, NESC) & Scoring Mechanics 1.3 CBT Pacing, AIT Question Formats & Formula Sheet Mastery

2 Chapter 2: Measurement, Metering & Field Testing

2.1 Current Transformers (CTs), Potential Transformers (PTs) & Meter Connections 2.2 Instrument Transformer Burdens, Saturation Curves & Ratio Correction Factors 2.3 Insulation Resistance Testing (Megger, Polarization Index, Dielectric Absorption) 2.4 Ground Resistance Testing (Fall-of-Potential 62% Rule & Clamp-on Methods)

3 Chapter 3: General Applications — Grounding & Surge Protection

3.1 Substation Ground Grid Design & IEEE 80 Touch/Step Voltage Criteria 3.2 Lightning Protection Systems & Rolling Sphere / Cone of Protection Methods 3.3 Surge Protective Devices (SPDs) & Voltage Surge Arresters

4 Chapter 4: General Applications — Lighting & Energy Management

4.1 Illumination Engineering & Zonal Cavity / Lumen Method Calculations 4.2 Energy Management, Demand Factors & Load Factor Calculations 4.3 Economic Dispatch, Energy Efficiency & Load Profile Analysis

5 Chapter 5: Electrical Safety & NFPA Standards

5.1 NFPA 70E Shock Protection, Approach Boundaries & PPE Requirements 5.2 Arc-Flash Hazard Analysis & IEEE 1584-2018 Incident Energy Calculations 5.3 Hazardous (Classified) Locations (Class I, II, III & Division/Zone Systems) 5.4 Special Occupancies & Critical Systems (NEC Articles 517 Health Care, 700/701/702 Emergency)

6 Chapter 6: NEC Wiring Methods & Installation Requirements

6.1 Conductor Ampacity & NEC Table 310.16 Derating Adjustments 6.2 Raceway Fill, Box Sizing & Conduit Bending Calculations (Chapter 9 Tables) 6.3 Equipment Grounding Conductors & Grounding Electrode Sizing (NEC Article 250)

7 Chapter 7: Circuit Analysis — Fundamentals & Symmetrical Components

7.1 DC & Single-Phase AC Network Analysis (Thevenin, Norton, Superposition) 7.2 Balanced Three-Phase Circuits (Wye-Delta Configurations & Power Formulas) 7.3 Symmetrical Components & Fortescue Sequence Transformation Matrices 7.4 Sequence Impedances & Positive, Negative, Zero Sequence Network Construction

8 Chapter 8: Circuit Analysis — Per-Unit & Phasor Analysis

8.1 Per-Unit System Fundamentals & Base Conversion Formulas 8.2 Three-Phase Per-Unit Network Modeling & Equipment Impedance Conversion 8.3 Phasor Diagrams, Complex Power & Power Triangle Relationships

9 Chapter 9: Power Electronics & Logic Controls

9.1 Power Electronic Converters (Rectifiers, Inverters & DC-DC Topologies) 9.2 Inverter-Based Resources (IBRs), Grid-Forming & Grid-Following Controls 9.3 Variable Frequency Drives (VFDs), PWM Operation & Harmonic Mitigation 9.4 Boolean Algebra, Logic Gates, De Morgan's Laws & Ladder Logic Control Diagrams

10 Chapter 10: Rotating Machines — Induction & Synchronous

10.1 Three-Phase Induction Motors (Equivalent Circuits, Slip & Performance) 10.2 Induction Motor Torque-Speed Characteristics & NEMA Design Classes 10.3 Synchronous Machines (Operating Principles, Power-Angle Curves & V-Curves) 10.4 Motor Starting Methods (DOL, Wye-Delta, Autotransformer, Soft-Start) & Voltage Dip

11 Chapter 11: Electric Power Devices & Renewable Energy

11.1 Power Transformers (Equivalent Circuits, Efficiency & Voltage Regulation) 11.2 Power Factor Correction Capacitors & Shunt Bank Sizing 11.3 Battery Energy Storage Systems (BESS) & Ultracapacitors 11.4 Renewable Energy Generation (Solar Photovoltaic Systems & Wind Turbines)

12 Chapter 12: Transmission & Distribution — Steady-State & Power Quality

12.1 Transmission Line Modeling, Voltage Drop & Conductor Sizing 12.2 Voltage Regulation, Reactive Power Support & Tap-Changer Controls 12.3 Power Quality, Harmonics, THD & IEEE 519 Compliance 12.4 Power Flow Analysis & System Stability (Steady-State, Transient & Swing Equation)

13 Chapter 13: Transmission & Distribution — Fault Analysis & Transformer Shifts

13.1 Symmetrical Three-Phase Bolted Fault Calculations 13.2 Unsymmetrical Fault Analysis (SLG, L-L, DLG Fault Calculations) 13.3 Transformer Connection Types, Zero-Sequence Paths & 30-Degree Phase Shifts

14 Chapter 14: Protection Systems & Device Coordination

14.1 Overcurrent Protection & Time-Current Characteristic (TCC) Curves 14.2 Protective Relaying Schemes (Differential 87, Distance 21, Undervoltage 27) 14.3 Circuit Breakers, Fuses & Automatic Reclosers 14.4 Protection Coordination, Selectivity & Coordination Time Intervals (CTI)

4.2 Energy Management, Demand Factors & Load Factor Calculations

Key Takeaways Explain This Topic AI

Demand Factor (DF = Peak Demand / Connected Load ≤ 1.0) measures the fraction of total connected equipment operating simultaneously at maximum demand.

Load Factor (LF = Average Demand / Peak Demand = Total kWh / (Peak kW * Hours) ≤ 1.0) quantifies load profile flatness and electrical asset utilization.

Diversity Factor (DivF = Sum of Individual Max Demands / Coincident Max Demand ≥ 1.0) is always greater than or equal to 1.0; its reciprocal is Coincidence Factor (CF ≤ 1.0).

Industrial utility tariffs separate energy consumption charges ($/kWh) from peak demand charges ($/kW), often applying ratchet clauses and power factor penalty adjustments.

Demand-Side Management (DSM) and peak shaving strategies flatten facility load profiles to reduce billed demand kW without diminishing industrial productivity.

Last updated: August 2026

Energy Management, Demand Factors & Load Factor Calculations

Energy management and electrical utility billing analysis are core competencies on the NCEES PE Electrical: Power exam. Power systems are sized to handle peak power demand, while utility revenue and operating fuel costs are driven by energy consumption. Engineers must understand how to quantify system utilization, calculate dimensionless operational ratios, and optimize facility demand profiles.

  • 1. Core Power and Energy Definitions
  • To analyze power systems and billing tariffs, three primary operational parameters are defined: Power (kW)
  • ^
  • | +-- Peak Demand (D_max) [15-min or 30-min window]
  • | /|
  • Dmax|======+ |
  • | /| | Total Energy (kWh) = Area Under Load Curve
  • Davg|----+ | | D_avg = Total kWh / Total Period Hours (T)
  • | | | |
  • | | | | Connected Load = Sum of all nameplate ratings
  • +----+---+---------------------------------------------> Time (Hours)
  • 0 T
  • 1. Connected Load

The continuous nameplate rating sum of all electrical equipment, motors, lighting, and appliances connected to the electrical distribution system (expressed in kW \text{kW} kW or kVA \text{kVA} kVA ).

2. Maximum (Peak) Demand ( D m a x D_{max} D ma x ​ )

The maximum average power load consumed over a standardized demand interval (typically a 15 -minute 15\text{-minute} 15 -minute or 30 -minute 30\text{-minute} 30 -minute rolling or block integration window): D ( t ) = 1 Δ t ∫ t t + Δ t p ( τ ) d τ D(t) = \frac{1}{\Delta t} \int_{t}^{t + \Delta t} p(\tau)\, d\tau D ( t ) = Δ t 1 ​ ∫ t t + Δ t ​ p ( τ ) d τ D m a x = max ⁡ { D ( t ) } D_{max} = \max\{ D(t) \} D ma x ​ = max { D ( t )}

3. Average Demand ( D a v g D_{avg} D a vg ​ )

The constant power level that would consume the identical total electrical energy over a specified time period T T T (hours): D a v g = Total Energy Consumed (kWh) T (hours) = 1 T ∫ 0 T p ( t ) d t D_{avg} = \frac{\text{Total Energy Consumed (kWh)}}{T\text{ (hours)}} = \frac{1}{T} \int_{0}^{T} p(t)\, dt D a vg ​ = T (hours) Total Energy Consumed (kWh) ​ = T 1 ​ ∫ 0 T ​ p ( t ) d t

2. Dimensionless Performance Ratios

Five fundamental dimensionless ratios govern electrical load characterization and equipment sizing on the PE exam:

Ratio Name Symbol Mathematical Formulation Typical Range Physical Significance

Demand Factor D F DF D F D F = D m a x Connected Load DF = \frac{D_{max}}{\text{Connected Load}} D F = Connected Load D ma x ​ ​ 0 < D F ≤ 1.0 0 < DF \le 1.0 0 < D F ≤ 1.0 Fraction of total connected load operating simultaneously at peak. Used for sizing service transformers and switchgear.

Load Factor L F LF L F L F = D a v g D m a x = Total kWh D m a x × T LF = \frac{D_{avg}}{D_{max}} = \frac{\text{Total kWh}}{D_{max} \times T} L F = D ma x ​ D a vg ​ ​ = D ma x ​ × T Total kWh ​ 0 < L F ≤ 1.0 0 < LF \le 1.0 0 < L F ≤ 1.0 Measures load profile flatness and capacity utilization over period T T T . Higher L F LF L F yields lower average unit electricity cost.

Diversity Factor D i v F DivF D i v F D i v F = ∑ D m a x , i n d i v i d u a l D m a x , c o i n c i d e n t DivF = \frac{\sum D_{max,individual}}{D_{max,coincident}} D i v F = D ma x , co in c i d e n t ​ ∑ D ma x , in d i v i d u a l ​ ​ D i v F ≥ 1.0 \mathbf{DivF \ge 1.0} DivF ≥ 1.0 Quantifies the non-coincidence of individual sub-load peaks. Always ≥ 1.0 \ge 1.0 ≥ 1.0 because individual loads peak at different times.

Coincidence Factor C F CF CF C F = 1 D i v F = D m a x , c o i n c i d e n t ∑ D m a x , i n d i v i d u a l CF = \frac{1}{DivF} = \frac{D_{max,coincident}}{\sum D_{max,individual}} CF = D i v F 1 ​ = ∑ D ma x , in d i v i d u a l ​ D ma x , co in c i d e n t ​ ​ 0 < C F ≤ 1.0 0 < CF \le 1.0 0 < CF ≤ 1.0 Reciprocal of Diversity Factor. Used in distribution feeder aggregation.

Utilization Factor U F UF U F U F = D m a x Rated Capacity of System UF = \frac{D_{max}}{\text{Rated Capacity of System}} U F = Rated Capacity of System D ma x ​ ​ 0 < U F ≤ 1.0 0 < UF \le 1.0 0 < U F ≤ 1.0 Ratio of maximum observed demand to the maximum continuous thermal rating of the supplying equipment.

Mathematical Interrelationship

When a distribution system feeds multiple customer loads, the total energy consumed is related to the individual load factors ( L F i LF_i L F i ​ ), individual peak demands ( D i , m a x D_{i,max} D i , ma x ​ ), and the system coincident peak ( D s y s , m a x D_{sys,max} D sys , ma x ​ ): Total kWh = ∑ i = 1 n ( D i , m a x × L F i × T ) \text{Total kWh} = \sum_{i=1}^{n} (D_{i,max} \times LF_i \times T) Total kWh = i = 1 ∑ n ​ ( D i , ma x ​ × L F i ​ × T ) L F s y s t e m = ∑ ( D i , m a x × L F i ) D s y s , m a x = ∑ ( D i , m a x × L F i ) ∑ D i , m a x D i v F = D i v F × ∑ ( D i , m a x × L F i ) ∑ D i , m a x LF_{system} = \frac{\sum (D_{i,max} \times LF_i)}{D_{sys,max}} = \frac{\sum (D_{i,max} \times LF_i)}{\frac{\sum D_{i,max}}{DivF}} = DivF \times \frac{\sum (D_{i,max} \times LF_i)}{\sum D_{i,max}} L F sys t e m ​ = D sys , ma x ​ ∑ ( D i , ma x ​ × L F i ​ ) ​ = D i v F ∑ D i , ma x ​ ​ ∑ ( D i , ma x ​ × L F i ​ ) ​ = D i v F × ∑ D i , ma x ​ ∑ ( D i , ma x ​ × L F i ​ ) ​

Exam Key Principle: If all individual loads have the same load factor ( L F i = L F a v g LF_i = LF_{avg} L F i ​ = L F a vg ​ ), then the system load factor increases directly with diversity: L F s y s t e m = L F a v g × D i v F LF_{system} = LF_{avg} \times DivF L F sys t e m ​ = L F a vg ​ × D i v F

3. Industrial Rate Structures & Billing Mechanics

Commercial and industrial electricity customers pay under multi-part tariffs designed to recover both energy generation costs and transmission/distribution infrastructure capacity costs. Industrial Electric Bill Components

  • +---------------------------+---------------------------+---------------------------+
  • | Energy Charge | Demand Charge | Power Factor Penalty |
  • | ($/kWh) | ($/kW) | or Adjustment |
  • | Recovers fuel & operating | Recovers generation & | Penalizes low PF (< 0.90) |
  • | costs of energy consumed | transmission capital size | by billing on kVA or |
  • | Block or TOU pricing | Ratchet clauses apply | adjusting billed kW |
  • +---------------------------+---------------------------+---------------------------+
  • 1. Energy Charges (Consumption, $/kWh)

Charged per total kilowatt-hour consumed. Often structured as Time-of-Use (TOU) pricing (On-Peak, Mid-Peak, Off-Peak) or Inverted Block / Declining Block rates.

2. Demand Charges (Capacity, $/kW or $/kVA)

Charged on the highest average 15 -min 15\text{-min} 15 -min or 30 -min 30\text{-min} 30 -min demand recorded during the monthly billing period (e.g., 15.00 USD per kW). This compensates the utility for maintaining sufficient generator, substation, and line capacity.

3. Ratchet Clauses

A billing ratchet prevents customers with seasonal peaks from paying minimal demand charges during off-peak months. Under a ratchet clause: Billed Demand (kW) = max ⁡ ( D a c t u a l , k × D p e a k , h i s t o r i c a l ) \text{Billed Demand (kW)} = \max\left( D_{actual},\ k \times D_{peak,historical} \right) Billed Demand (kW) = max ( D a c t u a l ​ , k × D p e ak , hi s t or i c a l ​ )

Where:

D a c t u a l D_{actual} D a c t u a l ​ = Actual measured peak demand in the current billing month ( kW \text{kW} kW )

k k k = Ratchet percentage (typically 0.70 – 0.85 0.70\text{--}0.85 0.70 – 0.85 , or 70 % – 85 % 70\%\text{--}85\% 70% – 85%

D p e a k , h i s t o r i c a l D_{peak,historical} D p e ak , hi s t or i c a l ​ = Maximum peak demand established during the preceding 11 or 12 months (typically summer peak)

4. Power Factor Penalty Adjustments

Low power factor increases reactive current ( I = P / ( 3 V P F ) I = P / (\sqrt{3} V PF) I = P / ( 3 ​ V PF ) ), causing higher line losses and loading utility equipment. Utilities enforce power factor compliance through two primary billing mechanisms:

Billing on Apparent Power ( kVA \text{kVA} kVA Demand): Billed Demand (kVA) = D a c t u a l (kW) P F \text{Billed Demand (kVA)} = \frac{D_{actual}\text{ (kW)}}{PF} Billed Demand (kVA) = PF D a c t u a l ​ (kW) ​

Adjusted kW Demand Formula: Adjusted Demand (kW) = D a c t u a l (kW) × ( P F b a s e P F a c t u a l ) \text{Adjusted Demand (kW)} = D_{actual}\text{ (kW)} \times \left( \frac{PF_{base}}{PF_{actual}} \right) Adjusted Demand (kW) = D a c t u a l ​ (kW) × ( P F a c t u a l ​ P F ba se ​ ​ ) Where P F b a s e PF_{base} P F ba se ​ is the utility benchmark threshold (typically 0.90 0.90 0.90 or 0.95 0.95 0.95 ). If P F a c t u a l < P F b a s e PF_{actual} < PF_{base} P F a c t u a l ​ < P F ba se ​ , billed demand is increased.

4. Demand-Side Management & Peak Shaving Strategies

Because demand charges often represent 30 % – 60 % 30\%\text{--}60\% 30% – 60% of an industrial facility's total monthly electric bill, reducing peak demand provides immediate economic returns. Power (kW)

  • ^
  • Dmax|~~~~~ Uncontrolled Load Profile (High Demand Charge)
  • | ___
  • Dnew|===== Peak Shaving Cut-off Threshold ====
  • |/ \ /\ /\ Peak Shaving by BESS / Generator
  • | \ / \ / \
  • | \___________/ \___________/ \_ Base Load
  • +---------------------------------------------> Time (Hours)
  • Peak Shaving Economics

If a facility installs a Battery Energy Storage System (BESS) or peak-shaving generator to reduce monthly peak demand by Δ P (kW) \Delta P\text{ (kW)} Δ P (kW) , the annual demand cost savings are: Annual Savings = Δ P (kW) × Demand Rate (USD/kW-month) × 12 months \text{Annual Savings} = \Delta P\text{ (kW)} \times \text{Demand Rate (USD/kW-month)} \times 12\text{ months} Annual Savings = Δ P (kW) × Demand Rate (USD/kW-month) × 12 months

  • 5. Step-by-Step Worked Calculation Example
  • Problem Statement

An industrial manufacturing facility operates on a 30-day billing month ( T = 30 × 24 = 720 hours T = 30 \times 24 = 720\text{ hours} T = 30 × 24 = 720 hours ). The facility has a total connected load of 2500 kW 2500\text{ kW} 2500 kW .

During the billing month, utility revenue meters record:

Total energy consumption: E t o t a l = 540,000 kWh E_{total} = 540{,}000\text{ kWh} E t o t a l ​ = 540 , 000 kWh

  • Maximum 15-minute integrated demand: D m a x = 1200 kW D_{max} = 1200\text{ kW} D ma x ​ = 1200 kW
  • Average operating power factor at peak: P F = 0.80 lagging PF = 0.80\text{ lagging} PF = 0.80 lagging

Utility Rate Schedule:

Energy Charge: 0.080 USD/kWh 0.080\text{ USD/kWh} 0.080 USD/kWh for the first 300,000 kWh 300{,}000\text{ kWh} 300 , 000 kWh ; 0.055 USD/kWh 0.055\text{ USD/kWh} 0.055 USD/kWh for all excess kWh \text{kWh} kWh .

Demand Charge: 16.00 USD/kW 16.00\text{ USD/kW} 16.00 USD/kW of Billed Demand.

Power Factor Provision: The utility adjusts demand for any power factor below P F b a s e = 0.90 PF_{base} = 0.90 P F ba se ​ = 0.90 lagging using Demand P F = D m a x × ( 0.90 P F ) \text{Demand}_{PF} = D_{max} \times \left(\frac{0.90}{PF}\right) Demand PF ​ = D ma x ​ × ( PF 0.90 ​ ) .

Ratchet Clause: Billed demand shall not be less than 80 % 80\% 80% of the highest peak demand recorded in the prior 11 months ( D p r i o r , p e a k = 1450 kW D_{prior,peak} = 1450\text{ kW} D p r i or , p e ak ​ = 1450 kW ).

Calculate:

The facility's Demand Factor ( D F DF D F ) and Load Factor ( L F LF L F ).

The power-factor-adjusted demand and ratchet-minimum demand to establish the final Billed Demand.

The total monthly electrical utility bill.

Sizing of a shunt capacitor bank (in kVAR \text{kVAR} kVAR ) required to raise the peak power factor from 0.80 0.80 0.80 to 0.95 0.95 0.95 lagging, and calculate the resulting monthly demand charge savings.

Solution Walkthrough

Step 1: Calculate Demand Factor ( D F DF D F ) and Load Factor ( L F LF L F ) D F = D m a x Connected Load = 1200 kW 2500 kW = 0.480 ( 48.0 % ) DF = \frac{D_{max}}{\text{Connected Load}} = \frac{1200\text{ kW}}{2500\text{ kW}} = \mathbf{0.480\quad (48.0\%)} D F = Connected Load D ma x ​ ​ = 2500 kW 1200 kW ​ = 0.480 ( 48.0% ) D a v g = E t o t a l T = 540,000 kWh 720 hours = 750.0 kW D_{avg} = \frac{E_{total}}{T} = \frac{540{,}000\text{ kWh}}{720\text{ hours}} = 750.0\text{ kW} D a vg ​ = T E t o t a l ​ ​ = 720 hours 540 , 000 kWh ​ = 750.0 kW L F = D a v g D m a x = 750.0 kW 1200.0 kW = 0.625 ( 62.5 % ) LF = \frac{D_{avg}}{D_{max}} = \frac{750.0\text{ kW}}{1200.0\text{ kW}} = \mathbf{0.625\quad (62.5\%)} L F = D ma x ​ D a vg ​ ​ = 1200.0 kW 750.0 kW ​ = 0.625 ( 62.5% )

Step 2: Determine Final Billed Demand

Power Factor Adjusted Demand: Demand P F = D m a x × ( 0.90 P F ) = 1200 kW × ( 0.90 0.80 ) = 1200 × 1.125 = 1350.0 kW \text{Demand}_{PF} = D_{max} \times \left(\frac{0.90}{PF}\right) = 1200\text{ kW} \times \left(\frac{0.90}{0.80}\right) = 1200 \times 1.125 = 1350.0\text{ kW} Demand PF ​ = D ma x ​ × ( PF 0.90 ​ ) = 1200 kW × ( 0.80 0.90 ​ ) = 1200 × 1.125 = 1350.0 kW

Ratchet Clause Minimum Demand: Demand r a t c h e t = 0.80 × D p r i o r , p e a k = 0.80 × 1450 kW = 1160.0 kW \text{Demand}_{ratchet} = 0.80 \times D_{prior,peak} = 0.80 \times 1450\text{ kW} = 1160.0\text{ kW} Demand r a t c h e t ​ = 0.80 × D p r i or , p e ak ​ = 0.80 × 1450 kW = 1160.0 kW

Governing Billed Demand: Billed Demand = max ⁡ ( Demand P F , Demand r a t c h e t ) = max ⁡ ( 1350.0 kW , 1160.0 kW ) = 1350.0 kW \text{Billed Demand} = \max\left( \text{Demand}_{PF},\ \text{Demand}_{ratchet} \right) = \max(1350.0\text{ kW},\ 1160.0\text{ kW}) = \mathbf{1350.0\text{ kW}} Billed Demand = max ( Demand PF ​ , Demand r a t c h e t ​ ) = max ( 1350.0 kW , 1160.0 kW ) = 1350.0 kW

Step 3: Calculate Total Monthly Utility Bill

Energy Consumption Charges:

Tier 1 ( 300,000 kWh 300{,}000\text{ kWh} 300 , 000 kWh ): 300,000 × 0.080 = 24,000.00 USD 300{,}000 \times 0.080 = 24{,}000.00\text{ USD} 300 , 000 × 0.080 = 24 , 000.00 USD

Tier 2 ( 240,000 kWh 240{,}000\text{ kWh} 240 , 000 kWh ): 240,000 × 0.055 = 13,200.00 USD 240{,}000 \times 0.055 = 13{,}200.00\text{ USD} 240 , 000 × 0.055 = 13 , 200.00 USD

Total Energy Cost: 24,000.00 + 13,200.00 = 37,200.00 USD 24{,}000.00 + 13{,}200.00 = 37{,}200.00\text{ USD} 24 , 000.00 + 13 , 200.00 = 37 , 200.00 USD

Demand Charges: Demand Cost = 1350.0 kW × 16.00 USD/kW = 21,600.00 USD \text{Demand Cost} = 1350.0\text{ kW} \times 16.00\text{ USD/kW} = 21{,}600.00\text{ USD} Demand Cost = 1350.0 kW × 16.00 USD/kW = 21 , 600.00 USD

Total Monthly Bill: Total Bill = 37,200.00 + 21,600.00 = 58,800.00 USD \text{Total Bill} = 37{,}200.00 + 21{,}600.00 = \mathbf{58{,}800.00\text{ USD}} Total Bill = 37 , 200.00 + 21 , 600.00 = 58 , 800.00 USD

Step 4: Shunt Capacitor Sizing & Savings

To correct P = 1200 kW P = 1200\text{ kW} P = 1200 kW from P F 1 = 0.80 PF_1 = 0.80 P F 1 ​ = 0.80 ( θ 1 = arccos ⁡ ( 0.80 ) = 36.87 ∘ \theta_1 = \arccos(0.80) = 36.87^\circ θ 1 ​ = arccos ( 0.80 ) = 36.8 7 ∘ ) to P F 2 = 0.95 PF_2 = 0.95 P F 2 ​ = 0.95 ( θ 2 = arccos ⁡ ( 0.95 ) = 18.19 ∘ \theta_2 = \arccos(0.95) = 18.19^\circ θ 2 ​ = arccos ( 0.95 ) = 18.1 9 ∘ ): Q c = P ( tan ⁡ θ 1 − tan ⁡ θ 2 ) Q_c = P \left( \tan\theta_1 - \tan\theta_2 \right) Q c ​ = P ( tan θ 1 ​ − tan θ 2 ​ ) tan ⁡ ( 36.87 ∘ ) = 0.7500 , tan ⁡ ( 18.19 ∘ ) = 0.3287 \tan(36.87^\circ) = 0.7500,\quad \tan(18.19^\circ) = 0.3287 tan ( 36.8 7 ∘ ) = 0.7500 , tan ( 18.1 9 ∘ ) = 0.3287 Q c = 1200 kW × ( 0.7500 − 0.3287 ) = 1200 × 0.4213 = 505.56 kVAR Q_c = 1200\text{ kW} \times (0.7500 - 0.3287) = 1200 \times 0.4213 = \mathbf{505.56\text{ kVAR}} Q c ​ = 1200 kW × ( 0.7500 − 0.3287 ) = 1200 × 0.4213 = 505.56 kVAR

With P F = 0.95 ≥ 0.90 PF = 0.95 \ge 0.90 PF = 0.95 ≥ 0.90 , no power factor penalty applies. The new billed demand becomes: New Billed Demand = max ⁡ ( 1200 kW , 1160 kW ) = 1200.0 kW \text{New Billed Demand} = \max(1200\text{ kW},\ 1160\text{ kW}) = 1200.0\text{ kW} New Billed Demand = max ( 1200 kW , 1160 kW ) = 1200.0 kW New Demand Cost = 1200.0 kW × 16.00 USD/kW = 19,200.00 USD \text{New Demand Cost} = 1200.0\text{ kW} \times 16.00\text{ USD/kW} = 19{,}200.00\text{ USD} New Demand Cost = 1200.0 kW × 16.00 USD/kW = 19 , 200.00 USD Monthly Demand Savings = 21,600.00 − 19,200.00 = 2,400.00 USD/month \text{Monthly Demand Savings} = 21{,}600.00 - 19{,}200.00 = \mathbf{2{,}400.00\text{ USD/month}} Monthly Demand Savings = 21 , 600.00 − 19 , 200.00 = 2 , 400.00 USD/month

  • 6. Common NCEES Exam Pitfalls
  • Pitfall 1: Confusing Diversity Factor with Demand or Coincidence Factor

Remember: Diversity Factor is ALWAYS ≥ 1.0 \ge 1.0 ≥ 1.0 (sum of individual peaks divided by coincident peak). Demand Factor and Coincidence Factor are always ≤ 1.0 \le 1.0 ≤ 1.0 . If your calculated diversity factor is less than 1.0 1.0 1.0 , you have inverted numerator and denominator!

Pitfall 2: Incorrect Number of Hours in Load Factor Calculations

Always verify the exact time period T T T : a standard 30-day month has 720 hours 720\text{ hours} 720 hours , a 31-day month has 744 hours 744\text{ hours} 744 hours , a 28-day month has 672 hours 672\text{ hours} 672 hours , and an annual calculation uses 8760 hours 8760\text{ hours} 8760 hours ( 8784 hours 8784\text{ hours} 8784 hours for leap year).

Pitfall 3: Applying Ratchet Percentage to Current Month Peak

The ratchet percentage ( k k k ) multiplies the historical annual peak demand , not the current month demand. The ratchet sets the minimum billing floor.

Loading diagram...