8.1 Per-Unit System Fundamentals & Base Conversion Formulas

PE Electrical and Computer: Power Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Overview, Strategy & Reference Handbook

1.1 PE Power Exam Format, CBT Navigation & Reference Handbook 1.2 2026 Reference Standards (NEC 2020, NFPA 70E-2021, NESC) & Scoring Mechanics 1.3 CBT Pacing, AIT Question Formats & Formula Sheet Mastery

2 Chapter 2: Measurement, Metering & Field Testing

2.1 Current Transformers (CTs), Potential Transformers (PTs) & Meter Connections 2.2 Instrument Transformer Burdens, Saturation Curves & Ratio Correction Factors 2.3 Insulation Resistance Testing (Megger, Polarization Index, Dielectric Absorption) 2.4 Ground Resistance Testing (Fall-of-Potential 62% Rule & Clamp-on Methods)

3 Chapter 3: General Applications — Grounding & Surge Protection

3.1 Substation Ground Grid Design & IEEE 80 Touch/Step Voltage Criteria 3.2 Lightning Protection Systems & Rolling Sphere / Cone of Protection Methods 3.3 Surge Protective Devices (SPDs) & Voltage Surge Arresters

4 Chapter 4: General Applications — Lighting & Energy Management

4.1 Illumination Engineering & Zonal Cavity / Lumen Method Calculations 4.2 Energy Management, Demand Factors & Load Factor Calculations 4.3 Economic Dispatch, Energy Efficiency & Load Profile Analysis

5 Chapter 5: Electrical Safety & NFPA Standards

5.1 NFPA 70E Shock Protection, Approach Boundaries & PPE Requirements 5.2 Arc-Flash Hazard Analysis & IEEE 1584-2018 Incident Energy Calculations 5.3 Hazardous (Classified) Locations (Class I, II, III & Division/Zone Systems) 5.4 Special Occupancies & Critical Systems (NEC Articles 517 Health Care, 700/701/702 Emergency)

6 Chapter 6: NEC Wiring Methods & Installation Requirements

6.1 Conductor Ampacity & NEC Table 310.16 Derating Adjustments 6.2 Raceway Fill, Box Sizing & Conduit Bending Calculations (Chapter 9 Tables) 6.3 Equipment Grounding Conductors & Grounding Electrode Sizing (NEC Article 250)

7 Chapter 7: Circuit Analysis — Fundamentals & Symmetrical Components

7.1 DC & Single-Phase AC Network Analysis (Thevenin, Norton, Superposition) 7.2 Balanced Three-Phase Circuits (Wye-Delta Configurations & Power Formulas) 7.3 Symmetrical Components & Fortescue Sequence Transformation Matrices 7.4 Sequence Impedances & Positive, Negative, Zero Sequence Network Construction

8 Chapter 8: Circuit Analysis — Per-Unit & Phasor Analysis

8.1 Per-Unit System Fundamentals & Base Conversion Formulas 8.2 Three-Phase Per-Unit Network Modeling & Equipment Impedance Conversion 8.3 Phasor Diagrams, Complex Power & Power Triangle Relationships

9 Chapter 9: Power Electronics & Logic Controls

9.1 Power Electronic Converters (Rectifiers, Inverters & DC-DC Topologies) 9.2 Inverter-Based Resources (IBRs), Grid-Forming & Grid-Following Controls 9.3 Variable Frequency Drives (VFDs), PWM Operation & Harmonic Mitigation 9.4 Boolean Algebra, Logic Gates, De Morgan's Laws & Ladder Logic Control Diagrams

10 Chapter 10: Rotating Machines — Induction & Synchronous

10.1 Three-Phase Induction Motors (Equivalent Circuits, Slip & Performance) 10.2 Induction Motor Torque-Speed Characteristics & NEMA Design Classes 10.3 Synchronous Machines (Operating Principles, Power-Angle Curves & V-Curves) 10.4 Motor Starting Methods (DOL, Wye-Delta, Autotransformer, Soft-Start) & Voltage Dip

11 Chapter 11: Electric Power Devices & Renewable Energy

11.1 Power Transformers (Equivalent Circuits, Efficiency & Voltage Regulation) 11.2 Power Factor Correction Capacitors & Shunt Bank Sizing 11.3 Battery Energy Storage Systems (BESS) & Ultracapacitors 11.4 Renewable Energy Generation (Solar Photovoltaic Systems & Wind Turbines)

12 Chapter 12: Transmission & Distribution — Steady-State & Power Quality

12.1 Transmission Line Modeling, Voltage Drop & Conductor Sizing 12.2 Voltage Regulation, Reactive Power Support & Tap-Changer Controls 12.3 Power Quality, Harmonics, THD & IEEE 519 Compliance 12.4 Power Flow Analysis & System Stability (Steady-State, Transient & Swing Equation)

13 Chapter 13: Transmission & Distribution — Fault Analysis & Transformer Shifts

13.1 Symmetrical Three-Phase Bolted Fault Calculations 13.2 Unsymmetrical Fault Analysis (SLG, L-L, DLG Fault Calculations) 13.3 Transformer Connection Types, Zero-Sequence Paths & 30-Degree Phase Shifts

14 Chapter 14: Protection Systems & Device Coordination

14.1 Overcurrent Protection & Time-Current Characteristic (TCC) Curves 14.2 Protective Relaying Schemes (Differential 87, Distance 21, Undervoltage 27) 14.3 Circuit Breakers, Fuses & Automatic Reclosers 14.4 Protection Coordination, Selectivity & Coordination Time Intervals (CTI)

8.1 Per-Unit System Fundamentals & Base Conversion Formulas

Key Takeaways Explain This Topic AI

The per-unit (pu) normalization simplifies multi-voltage power system analysis by eliminating ideal transformer turns ratios and standardizing electrical parameters across diverse equipment ratings.

In balanced three-phase systems, selecting system base three-phase apparent power ( S b a s e , 3 ϕ S_{base,3\phi} S ba se , 3 ϕ ​ ) and line-to-line voltage ( V b a s e , L L V_{base,LL} V ba se , LL ​ ) establishes base impedance Z b a s e = ( V b a s e , L L ) 2 / S b a s e , 3 ϕ = ( k V b a s e , L L ) 2 / M V A b a s e , 3 ϕ Z_{base} = (V_{base,LL})^2 / S_{base,3\phi} = (kV_{base,LL})^2 / MVA_{base,3\phi} Z ba se ​ = ( V ba se , LL ​ ) 2 / S ba se , 3 ϕ ​ = ( k V ba se , LL ​ ) 2 / M V A ba se , 3 ϕ ​ and base current I b a s e = S b a s e , 3 ϕ / ( 3 V b a s e , L L ) I_{base} = S_{base,3\phi} / (\sqrt{3} V_{base,LL}) I ba se ​ = S ba se , 3 ϕ ​ / ( 3 ​ V ba se , LL ​ ) .

Equipment nameplate impedance must be converted to system base values using Z p u , n e w = Z p u , o l d × ( V b a s e , o l d / V b a s e , n e w ) 2 × ( S b a s e , n e w / S b a s e , o l d ) Z_{pu,new} = Z_{pu,old} \times (V_{base,old} / V_{base,new})^2 \times (S_{base,new} / S_{base,old}) Z p u , n e w ​ = Z p u , o l d ​ × ( V ba se , o l d ​ / V ba se , n e w ​ ) 2 × ( S ba se , n e w ​ / S ba se , o l d ​ ) .

Per-unit impedance is identical whether viewed from the primary or secondary winding of an ideal transformer when base voltages match the transformer rated turns ratio.

Last updated: August 2026

8.1 Per-Unit System Fundamentals & Base Conversion Formulas

Key Exam Takeaway: In balanced three-phase power system calculations, base impedance is derived exclusively from the three-phase power base and the line-to-line voltage base: Z b a s e = ( k V b a s e , L L ) 2 M V A b a s e , 3 ϕ Z_{base} = \frac{(kV_{base,LL})^2}{MVA_{base,3\phi}} Z ba se ​ = M V A ba se , 3 ϕ ​ ( k V ba se , LL ​ ) 2 ​ . When converting equipment impedance to a new system base, always apply the ratio of voltages squared and the inverse ratio of power ratings: Z p u , n e w = Z p u , o l d ( V b a s e , o l d V b a s e , n e w ) 2 ( S b a s e , n e w S b a s e , o l d ) Z_{pu,new} = Z_{pu,old} \left(\frac{V_{base,old}}{V_{base,new}}\right)^2 \left(\frac{S_{base,new}}{S_{base,old}}\right) Z p u , n e w ​ = Z p u , o l d ​ ( V ba se , n e w ​ V ba se , o l d ​ ​ ) 2 ( S ba se , o l d ​ S ba se , n e w ​ ​ ) .

1. Rationale of the Per-Unit System

Modern electrical power networks span multiple voltage levels—ranging from generation ( 13.8 kV 13.8\text{ kV} 13.8 kV to 24 kV 24\text{ kV} 24 kV ), extra-high-voltage transmission ( 138 kV 138\text{ kV} 138 kV , 230 kV 230\text{ kV} 230 kV , 500 kV 500\text{ kV} 500 kV ), sub-transmission ( 69 kV 69\text{ kV} 69 kV , 34.5 kV 34.5\text{ kV} 34.5 kV ), distribution ( 12.47 kV 12.47\text{ kV} 12.47 kV , 4.16 kV 4.16\text{ kV} 4.16 kV ), down to utilization ( 480 V 480\text{ V} 480 V , 208 V 208\text{ V} 208 V , 120 V 120\text{ V} 120 V ). Analyzing these networks using actual physical quantities (Ohms, Volts, Amperes) requires reflecting impedances across transformer boundaries using the square of the turns ratio ( a 2 = ( N 1 / N 2 ) 2 a^2 = (N_1/N_2)^2 a 2 = ( N 1 ​ / N 2 ​ ) 2 ). In multi-bus interconnected networks with tens or hundreds of transformers, manual impedance reflection becomes intensely error-prone.

The per-unit (pu) system normalizes electrical quantities by expressing them as dimensionless decimal fractions or ratios of carefully defined base reference parameters: Per-Unit Value = Actual Quantity (in Physical Units) Base Value (in Same Physical Units) \text{Per-Unit Value} = \frac{\text{Actual Quantity (in Physical Units)}}{\text{Base Value (in Same Physical Units)}} Per-Unit Value = Base Value (in Same Physical Units) Actual Quantity (in Physical Units) ​

Primary Advantages in Power Engineering

Elimination of Transformer Turns Ratios: When base voltages in adjacent zones are selected in proportion to transformer turns ratios, the per-unit equivalent impedance of a transformer is identical whether calculated from the high-voltage or low-voltage winding.

Parameter Standardization: Apparatus of similar design and construction exhibit per-unit impedances within narrow, predictable bands regardless of physical size or MVA rating. For example, large two-pole synchronous generator subtransient reactances consistently fall between 0.12 pu 0.12\text{ pu} 0.12 pu and 0.25 pu 0.25\text{ pu} 0.25 pu , and two-winding substation transformers typically have leakage reactances between 0.06 pu 0.06\text{ pu} 0.06 pu and 0.10 pu 0.10\text{ pu} 0.10 pu .

Simplification of 3-Phase Formulations: Factors of 3 \sqrt{3} 3 ​ and 3 3 3 vanish from balanced three-phase voltage, current, and complex power equations when standard three-phase base conventions are applied.

Immediate Insight into Operating Limits: Operating at V = 0.94 pu V = 0.94\text{ pu} V = 0.94 pu instantly conveys a 6 % 6\% 6% undervoltage condition without needing to recall whether the nominal bus voltage is 13.8 kV 13.8\text{ kV} 13.8 kV or 115 kV 115\text{ kV} 115 kV .

2. Fundamental Base Relationships in Three-Phase Networks

To establish a per-unit system for a three-phase network, two independent base quantities must be selected. By universal utility and NCEES convention, these two quantities are:

System Three-Phase Apparent Power Base ( S b a s e , 3 ϕ S_{base,3\phi} S ba se , 3 ϕ ​ or M V A b a s e , 3 ϕ MVA_{base,3\phi} M V A ba se , 3 ϕ ​ ): A single common value selected for the entire power system (most commonly 100 MVA 100\text{ MVA} 100 MVA or 10 MVA 10\text{ MVA} 10 MVA ).

Line-to-Line Voltage Base ( V b a s e , L L V_{base,LL} V ba se , LL ​ or k V b a s e , L L kV_{base,LL} k V ba se , LL ​ ): Specified for a reference zone and transferred across transformer boundaries according to nominal voltage ratings.

All remaining base parameters (Base Current, Base Impedance, and Base Admittance) are strictly derived from these two fundamental quantities. ┌────────────────────────┐

  • │ Selected System Base │
  • │ S_base,3φ & V_base,LL │
  • └───────────┬────────────┘
  • │
  • ┌────────────────────────┴────────────────────────┐
  • ▼ ▼
  • ┌─────────────────────────┐ ┌─────────────────────────┐
  • │ Base Current │ │ Base Impedance │
  • │ S_base │ │ (V_base,LL)^2 │
  • │ I_base = ───────────── │ │ Z_base = ───────────── │
  • │ √3 · V_base │ │ S_base,3φ │
  • └─────────────────────────┘ └───────────┬─────────────┘
  • │
  • ▼
  • ┌─────────────────────────┐
  • │ Base Admittance │
  • │ Y_base = 1 / Z_base │
  • └─────────────────────────┘
  • Mathematical Derivations of Derived Bases
  • Base Current ( I b a s e I_{base} I ba se ​ )

Starting from the balanced three-phase apparent power relation S 3 ϕ = 3 V L L I L S_{3\phi} = \sqrt{3} V_{LL} I_L S 3 ϕ ​ = 3 ​ V LL ​ I L ​ : I b a s e = S b a s e , 3 ϕ 3 ⋅ V b a s e , L L = M V A b a s e , 3 ϕ × 10 3 3 ⋅ k V b a s e , L L [ in Amperes or kA ] I_{base} = \frac{S_{base,3\phi}}{\sqrt{3} \cdot V_{base,LL}} = \frac{MVA_{base,3\phi} \times 10^3}{\sqrt{3} \cdot kV_{base,LL}} \quad [\text{in Amperes or kA}] I ba se ​ = 3 ​ ⋅ V ba se , LL ​ S ba se , 3 ϕ ​ ​ = 3 ​ ⋅ k V ba se , LL ​ M V A ba se , 3 ϕ ​ × 1 0 3 ​ [ in Amperes or kA ]

Base Impedance ( Z b a s e Z_{base} Z ba se ​ )

Base impedance per phase is defined as the ratio of base line-to-neutral voltage ( V b a s e , L N = V b a s e , L L / 3 V_{base,LN} = V_{base,LL} / \sqrt{3} V ba se , L N ​ = V ba se , LL ​ / 3 ​ ) to base line current ( I b a s e I_{base} I ba se ​ ): Z b a s e = V b a s e , L N I b a s e = V b a s e , L L / 3 S b a s e , 3 ϕ 3 ⋅ V b a s e , L L = ( V b a s e , L L ) 2 S b a s e , 3 ϕ Z_{base} = \frac{V_{base,LN}}{I_{base}} = \frac{V_{base,LL} / \sqrt{3}}{\frac{S_{base,3\phi}}{\sqrt{3} \cdot V_{base,LL}}} = \frac{(V_{base,LL})^2}{S_{base,3\phi}} Z ba se ​ = I ba se ​ V ba se , L N ​ ​ = 3 ​ ⋅ V ba se , LL ​ S ba se , 3 ϕ ​ ​ V ba se , LL ​ / 3 ​ ​ = S ba se , 3 ϕ ​ ( V ba se , LL ​ ) 2 ​

Expressing line-to-line voltage in kilovolts ( k V kV kV ) and three-phase power in megavolt-amperes ( M V A MVA M V A ): Z b a s e = ( k V b a s e , L L × 10 3 ) 2 M V A b a s e , 3 ϕ × 10 6 = ( k V b a s e , L L ) 2 M V A b a s e , 3 ϕ [ Ω ] Z_{base} = \frac{(kV_{base,LL} \times 10^3)^2}{MVA_{base,3\phi} \times 10^6} = \frac{(kV_{base,LL})^2}{MVA_{base,3\phi}} \quad [\Omega] Z ba se ​ = M V A ba se , 3 ϕ ​ × 1 0 6 ( k V ba se , LL ​ × 1 0 3 ) 2 ​ = M V A ba se , 3 ϕ ​ ( k V ba se , LL ​ ) 2 ​ [ Ω ]

Base Admittance ( Y b a s e Y_{base} Y ba se ​ )

Base admittance is the exact reciprocal of base impedance: Y b a s e = 1 Z b a s e = S b a s e , 3 ϕ ( V b a s e , L L ) 2 = M V A b a s e , 3 ϕ ( k V b a s e , L L ) 2 [ Siemens / ℧ ] Y_{base} = \frac{1}{Z_{base}} = \frac{S_{base,3\phi}}{(V_{base,LL})^2} = \frac{MVA_{base,3\phi}}{(kV_{base,LL})^2} \quad [\text{Siemens / }\mho] Y ba se ​ = Z ba se ​ 1 ​ = ( V ba se , LL ​ ) 2 S ba se , 3 ϕ ​ ​ = ( k V ba se , LL ​ ) 2 M V A ba se , 3 ϕ ​ ​ [ Siemens / ℧ ]

Parameter Formula (Fundamental) Formula (Practical Engineering Units) Physical Unit

Base Power S b a s e , 3 ϕ = 3 S b a s e , 1 ϕ S_{base,3\phi} = 3 S_{base,1\phi} S ba se , 3 ϕ ​ = 3 S ba se , 1 ϕ ​ Specified ( 100 MVA 100\text{ MVA} 100 MVA , 10 MVA 10\text{ MVA} 10 MVA , etc.) MVA \text{MVA} MVA

Base Voltage V b a s e , L L = 3 V b a s e , L N V_{base,LL} = \sqrt{3} V_{base,LN} V ba se , LL ​ = 3 ​ V ba se , L N ​ Specified per voltage zone kV \text{kV} kV

Base Current I b a s e = S b a s e , 3 ϕ 3 V b a s e , L L I_{base} = \frac{S_{base,3\phi}}{\sqrt{3} V_{base,LL}} I ba se ​ = 3 ​ V ba se , LL ​ S ba se , 3 ϕ ​ ​ I b a s e = M V A b a s e , 3 ϕ × 1000 3 ⋅ k V b a s e , L L I_{base} = \frac{MVA_{base,3\phi} \times 1000}{\sqrt{3} \cdot kV_{base,LL}} I ba se ​ = 3 ​ ⋅ k V ba se , LL ​ M V A ba se , 3 ϕ ​ × 1000 ​ Amperes (A) \text{Amperes (A)} Amperes (A)

Base Impedance Z b a s e = ( V b a s e , L L ) 2 S b a s e , 3 ϕ Z_{base} = \frac{(V_{base,LL})^2}{S_{base,3\phi}} Z ba se ​ = S ba se , 3 ϕ ​ ( V ba se , LL ​ ) 2 ​ Z b a s e = ( k V b a s e , L L ) 2 M V A b a s e , 3 ϕ Z_{base} = \frac{(kV_{base,LL})^2}{MVA_{base,3\phi}} Z ba se ​ = M V A ba se , 3 ϕ ​ ( k V ba se , LL ​ ) 2 ​ Ohms ( Ω ) \text{Ohms (}\Omega\text{)} Ohms ( Ω )

Base Admittance Y b a s e = S b a s e , 3 ϕ ( V b a s e , L L ) 2 Y_{base} = \frac{S_{base,3\phi}}{(V_{base,LL})^2} Y ba se ​ = ( V ba se , LL ​ ) 2 S ba se , 3 ϕ ​ ​ Y b a s e = M V A b a s e , 3 ϕ ( k V b a s e , L L ) 2 Y_{base} = \frac{MVA_{base,3\phi}}{(kV_{base,LL})^2} Y ba se ​ = ( k V ba se , LL ​ ) 2 M V A ba se , 3 ϕ ​ ​ Siemens (S) \text{Siemens (S)} Siemens (S)

3. Converting Between Physical Units and Per-Unit

Converting between physical engineering units and per-unit quantities is governed by the following direct relations: Z p u = Z a c t u a l ( Ω ) Z b a s e ( Ω ) = Z a c t u a l ( Ω ) × M V A b a s e , 3 ϕ ( k V b a s e , L L ) 2 Z_{pu} = \frac{Z_{actual\ (\Omega)}}{Z_{base\ (\Omega)}} = Z_{actual\ (\Omega)} \times \frac{MVA_{base,3\phi}}{(kV_{base,LL})^2} Z p u ​ = Z ba se ( Ω ) ​ Z a c t u a l ( Ω ) ​ ​ = Z a c t u a l ( Ω ) ​ × ( k V ba se , LL ​ ) 2 M V A ba se , 3 ϕ ​ ​ Z a c t u a l ( Ω ) = Z p u × Z b a s e ( Ω ) = Z p u × ( k V b a s e , L L ) 2 M V A b a s e , 3 ϕ Z_{actual\ (\Omega)} = Z_{pu} \times Z_{base\ (\Omega)} = Z_{pu} \times \frac{(kV_{base,LL})^2}{MVA_{base,3\phi}} Z a c t u a l ( Ω ) ​ = Z p u ​ × Z ba se ( Ω ) ​ = Z p u ​ × M V A ba se , 3 ϕ ​ ( k V ba se , LL ​ ) 2 ​ V p u = V a c t u a l ( k V ) k V b a s e , L L , I p u = I a c t u a l ( A ) I b a s e ( A ) , S p u = S a c t u a l ( M V A ) M V A b a s e , 3 ϕ V_{pu} = \frac{V_{actual\ (kV)}}{kV_{base,LL}}, \quad I_{pu} = \frac{I_{actual\ (A)}}{I_{base\ (A)}}, \quad S_{pu} = \frac{S_{actual\ (MVA)}}{MVA_{base,3\phi}} V p u ​ = k V ba se , LL ​ V a c t u a l ( kV ) ​ ​ , I p u ​ = I ba se ( A ) ​ I a c t u a l ( A ) ​ ​ , S p u ​ = M V A ba se , 3 ϕ ​ S a c t u a l ( M V A ) ​ ​

4. Equipment Base Impedance Conversion Formula

Electrical equipment (generators, transformers, motors, reactors) is tested and stamped by manufacturers with per-unit or percent impedance ( X ′ ′ X'' X ′′ , X d X_d X d ​ , % Z \%Z % Z ) based on its own nameplate ratings ( S r a t e d , V r a t e d S_{rated}, V_{rated} S r a t e d ​ , V r a t e d ​ ): % Z = Z p u × 100 % ⟹ Z p u , o l d = % Z 100 \%Z = Z_{pu} \times 100\% \implies Z_{pu,old} = \frac{\%Z}{100} % Z = Z p u ​ × 100% ⟹ Z p u , o l d ​ = 100 % Z ​

When incorporating equipment into a system-wide study with a common system power base ( S b a s e , n e w S_{base,new} S ba se , n e w ​ ) and zone voltage base ( V b a s e , n e w V_{base,new} V ba se , n e w ​ ), the per-unit impedance must be adjusted to the new base.

Derivation of the Base Conversion Formula

Because the actual ohmic impedance Z a c t u a l ( Ω ) Z_{actual\ (\Omega)} Z a c t u a l ( Ω ) ​ of the physical device is a constant physical property: Z a c t u a l = Z p u , o l d × Z b a s e , o l d = Z p u , n e w × Z b a s e , n e w Z_{actual} = Z_{pu,old} \times Z_{base,old} = Z_{pu,new} \times Z_{base,new} Z a c t u a l ​ = Z p u , o l d ​ × Z ba se , o l d ​ = Z p u , n e w ​ × Z ba se , n e w ​

Solving for Z p u , n e w Z_{pu,new} Z p u , n e w ​ : Z p u , n e w = Z p u , o l d × Z b a s e , o l d Z b a s e , n e w = Z p u , o l d × ( V b a s e , o l d ) 2 / S b a s e , o l d ( V b a s e , n e w ) 2 / S b a s e , n e w Z_{pu,new} = Z_{pu,old} \times \frac{Z_{base,old}}{Z_{base,new}} = Z_{pu,old} \times \frac{(V_{base,old})^2 / S_{base,old}}{(V_{base,new})^2 / S_{base,new}} Z p u , n e w ​ = Z p u , o l d ​ × Z ba se , n e w ​ Z ba se , o l d ​ ​ = Z p u , o l d ​ × ( V ba se , n e w ​ ) 2 / S ba se , n e w ​ ( V ba se , o l d ​ ) 2 / S ba se , o l d ​ ​

Rearranging into the standard base conversion equation: Z p u , n e w = Z p u , o l d × ( V b a s e , o l d V b a s e , n e w ) 2 × ( S b a s e , n e w S b a s e , o l d ) Z_{pu,new} = Z_{pu,old} \times \left(\frac{V_{base,old}}{V_{base,new}}\right)^2 \times \left(\frac{S_{base,new}}{S_{base,old}}\right) Z p u , n e w ​ = Z p u , o l d ​ × ( V ba se , n e w ​ V ba se , o l d ​ ​ ) 2 × ( S ba se , o l d ​ S ba se , n e w ​ ​ )

Where:

  • Z p u , o l d Z_{pu,old} Z p u , o l d ​ = Nameplate per-unit impedance of the equipment
  • V b a s e , o l d V_{base,old} V ba se , o l d ​ = Nameplate rated voltage of the equipment (kV)

V b a s e , n e w V_{base,new} V ba se , n e w ​ = System base voltage of the specific zone where equipment resides (kV)

  • S b a s e , o l d S_{base,old} S ba se , o l d ​ = Nameplate rated apparent power of the equipment (MVA)
  • S b a s e , n e w S_{base,new} S ba se , n e w ​ = Common system base apparent power (MVA)

Important

If the equipment rated voltage exactly equals the zone base voltage ( V b a s e , o l d = V b a s e , n e w V_{base,old} = V_{base,new} V ba se , o l d ​ = V ba se , n e w ​ ), the voltage ratio is 1.0 1.0 1.0 , and the conversion simplifies to scaling by the power ratio: Z p u , n e w = Z p u , o l d × ( S b a s e , n e w S b a s e , o l d ) Z_{pu,new} = Z_{pu,old} \times \left(\frac{S_{base,new}}{S_{base,old}}\right) Z p u , n e w ​ = Z p u , o l d ​ × ( S ba se , o l d ​ S ba se , n e w ​ ​ ) .

  • 5. Comprehensive Step-by-Step Worked Calculation Example
  • Problem Statement

A radial three-phase utility interconnection consists of:

Generator G1: Rated 50 MVA 50\text{ MVA} 50 MVA , 13.8 kV 13.8\text{ kV} 13.8 kV , with subtransient reactance X d ′ ′ = 0.18 pu X_d'' = 0.18\text{ pu} X d ′′ ​ = 0.18 pu .

Step-Up Transformer T1: Rated 60 MVA 60\text{ MVA} 60 MVA , 13.2 kV Δ − 115 kV Y 13.2\text{ kV} \Delta - 115\text{ kV}\text{ Y} 13.2 kV Δ − 115 kV Y , with leakage reactance X T 1 = 0.09 pu X_{T1} = 0.09\text{ pu} X T 1 ​ = 0.09 pu ( 9 % 9\% 9% ).

Transmission Line TL1: 115 kV 115\text{ kV} 115 kV , 20 miles 20\text{ miles} 20 miles in length, with series impedance z = 0.12 + j 0.48 Ω / mile z = 0.12 + j0.48\ \Omega/\text{mile} z = 0.12 + j 0.48 Ω/ mile .

Task: Using a system base of S b a s e , 3 ϕ = 100 MVA S_{base,3\phi} = 100\text{ MVA} S ba se , 3 ϕ ​ = 100 MVA and V b a s e , 1 = 13.8 kV V_{base,1} = 13.8\text{ kV} V ba se , 1 ​ = 13.8 kV at the generator bus (Zone 1), calculate the per-unit impedance of all components on the system base. Zone 1 (13.8 kV) Zone 2 (120.23 kV or 115 kV)

  • ┌───────────────┐ ┌────────────────────────────────┐
  • │ Generator G1 │ T1 │ Line TL1 (20 mi) │
  • │ 50 MVA ├───[88]───┬┼───────────────────────────────■ Load Bus
  • │ 13.8 kV │ 13.2/115 ││ z = 0.12 + j0.48 Ω/mi │
  • │ X'' = 0.18 │ 60 MVA ││ │
  • └───────────────┘ X = 0.09│└────────────────────────────────┘
  • │
  • Zone Boundary
  • Step-by-Step Solution
  • Step 1: Establish System Voltage Zones

Zone 1 (Generator Zone): Given V b a s e , 1 = 13.8 kV V_{base,1} = 13.8\text{ kV} V ba se , 1 ​ = 13.8 kV .

Zone 2 (Transmission Line Zone): Determined by transformer T1 turns ratio ( 13.2 kV : 115 kV 13.2\text{ kV} : 115\text{ kV} 13.2 kV : 115 kV ): V b a s e , 2 = V b a s e , 1 × ( V T 1 , s e c V T 1 , p r i ) = 13.8 kV × ( 115 kV 13.2 kV ) = 120.227 kV V_{base,2} = V_{base,1} \times \left(\frac{V_{T1,sec}}{V_{T1,pri}}\right) = 13.8\text{ kV} \times \left(\frac{115\text{ kV}}{13.2\text{ kV}}\right) = 120.227\text{ kV} V ba se , 2 ​ = V ba se , 1 ​ × ( V T 1 , p r i ​ V T 1 , sec ​ ​ ) = 13.8 kV × ( 13.2 kV 115 kV ​ ) = 120.227 kV

Step 2: Convert Generator G1 Reactance

S b a s e , o l d = 50 MVA S_{base,old} = 50\text{ MVA} S ba se , o l d ​ = 50 MVA , V b a s e , o l d = 13.8 kV V_{base,old} = 13.8\text{ kV} V ba se , o l d ​ = 13.8 kV , X o l d = 0.18 pu X_{old} = 0.18\text{ pu} X o l d ​ = 0.18 pu

S b a s e , n e w = 100 MVA S_{base,new} = 100\text{ MVA} S ba se , n e w ​ = 100 MVA , V b a s e , n e w = 13.8 kV V_{base,new} = 13.8\text{ kV} V ba se , n e w ​ = 13.8 kV X G 1 , p u = 0.18 × ( 13.8 kV 13.8 kV ) 2 × ( 100 MVA 50 MVA ) = 0.18 × ( 1.0 ) 2 × 2.0 = 0.3600 pu X_{G1,pu} = 0.18 \times \left(\frac{13.8\text{ kV}}{13.8\text{ kV}}\right)^2 \times \left(\frac{100\text{ MVA}}{50\text{ MVA}}\right) = 0.18 \times (1.0)^2 \times 2.0 = 0.3600\text{ pu} X G 1 , p u ​ = 0.18 × ( 13.8 kV 13.8 kV ​ ) 2 × ( 50 MVA 100 MVA ​ ) = 0.18 × ( 1.0 ) 2 × 2.0 = 0.3600 pu

Step 3: Convert Transformer T1 Reactance

Let us evaluate the conversion from both the primary (LV) and secondary (HV) sides to prove mathematical invariance:

From Primary (LV) Side: V b a s e , o l d = 13.2 kV V_{base,old} = 13.2\text{ kV} V ba se , o l d ​ = 13.2 kV , V b a s e , n e w = 13.8 kV V_{base,new} = 13.8\text{ kV} V ba se , n e w ​ = 13.8 kV , S o l d = 60 MVA S_{old} = 60\text{ MVA} S o l d ​ = 60 MVA , S n e w = 100 MVA S_{new} = 100\text{ MVA} S n e w ​ = 100 MVA : X T 1 , p u = 0.09 × ( 13.2 kV 13.8 kV ) 2 × ( 100 MVA 60 MVA ) = 0.09 × 0.91493 × 1.6667 = 0.1372 pu X_{T1,pu} = 0.09 \times \left(\frac{13.2\text{ kV}}{13.8\text{ kV}}\right)^2 \times \left(\frac{100\text{ MVA}}{60\text{ MVA}}\right) = 0.09 \times 0.91493 \times 1.6667 = 0.1372\text{ pu} X T 1 , p u ​ = 0.09 × ( 13.8 kV 13.2 kV ​ ) 2 × ( 60 MVA 100 MVA ​ ) = 0.09 × 0.91493 × 1.6667 = 0.1372 pu

From Secondary (HV) Side: V b a s e , o l d = 115 kV V_{base,old} = 115\text{ kV} V ba se , o l d ​ = 115 kV , V b a s e , n e w = 120.227 kV V_{base,new} = 120.227\text{ kV} V ba se , n e w ​ = 120.227 kV , S o l d = 60 MVA S_{old} = 60\text{ MVA} S o l d ​ = 60 MVA , S n e w = 100 MVA S_{new} = 100\text{ MVA} S n e w ​ = 100 MVA : X T 1 , p u = 0.09 × ( 115 kV 120.227 kV ) 2 × ( 100 MVA 60 MVA ) = 0.09 × 0.91493 × 1.6667 = 0.1372 pu X_{T1,pu} = 0.09 \times \left(\frac{115\text{ kV}}{120.227\text{ kV}}\right)^2 \times \left(\frac{100\text{ MVA}}{60\text{ MVA}}\right) = 0.09 \times 0.91493 \times 1.6667 = 0.1372\text{ pu} X T 1 , p u ​ = 0.09 × ( 120.227 kV 115 kV ​ ) 2 × ( 60 MVA 100 MVA ​ ) = 0.09 × 0.91493 × 1.6667 = 0.1372 pu

Both perspectives yield the exact same per-unit impedance ( 0.1372 pu 0.1372\text{ pu} 0.1372 pu ).

Step 4: Convert Transmission Line TL1 Impedance

Calculate total actual ohmic impedance: Z l i n e , a c t u a l = 20 miles × ( 0.12 + j 0.48 Ω / mile ) = 2.40 + j 9.60 Ω Z_{line,actual} = 20\text{ miles} \times (0.12 + j0.48\ \Omega/\text{mile}) = 2.40 + j9.60\ \Omega Z l in e , a c t u a l ​ = 20 miles × ( 0.12 + j 0.48 Ω/ mile ) = 2.40 + j 9.60 Ω

Calculate Zone 2 Base Impedance: Z b a s e , 2 = ( V b a s e , 2 ) 2 S b a s e , 3 ϕ = ( 120.227 kV ) 2 100 MVA = 14454.53 100 = 144.545 Ω Z_{base,2} = \frac{(V_{base,2})^2}{S_{base,3\phi}} = \frac{(120.227\text{ kV})^2}{100\text{ MVA}} = \frac{14454.53}{100} = 144.545\ \Omega Z ba se , 2 ​ = S ba se , 3 ϕ ​ ( V ba se , 2 ​ ) 2 ​ = 100 MVA ( 120.227 kV ) 2 ​ = 100 14454.53 ​ = 144.545 Ω

Convert actual ohms to per-unit: R l i n e , p u = 2.40 Ω 144.545 Ω = 0.0166 pu R_{line,pu} = \frac{2.40\ \Omega}{144.545\ \Omega} = 0.0166\text{ pu} R l in e , p u ​ = 144.545 Ω 2.40 Ω ​ = 0.0166 pu X l i n e , p u = 9.60 Ω 144.545 Ω = 0.0664 pu X_{line,pu} = \frac{9.60\ \Omega}{144.545\ \Omega} = 0.0664\text{ pu} X l in e , p u ​ = 144.545 Ω 9.60 Ω ​ = 0.0664 pu Z l i n e , p u = 0.0166 + j 0.0664 pu Z_{line,pu} = 0.0166 + j0.0664\text{ pu} Z l in e , p u ​ = 0.0166 + j 0.0664 pu

  • Summary of Network Impedances on 100 MVA Base
  • X G 1 = j 0.3600 pu X_{G1} = j0.3600\text{ pu} X G 1 ​ = j 0.3600 pu
  • X T 1 = j 0.1372 pu X_{T1} = j0.1372\text{ pu} X T 1 ​ = j 0.1372 pu
  • Z T L 1 = 0.0166 + j 0.0664 pu Z_{TL1} = 0.0166 + j0.0664\text{ pu} Z T L 1 ​ = 0.0166 + j 0.0664 pu

Total Series Impedance Z t o t a l = 0.0166 + j ( 0.3600 + 0.1372 + 0.0664 ) = 0.0166 + j 0.5636 pu Z_{total} = 0.0166 + j(0.3600 + 0.1372 + 0.0664) = 0.0166 + j0.5636\text{ pu} Z t o t a l ​ = 0.0166 + j ( 0.3600 + 0.1372 + 0.0664 ) = 0.0166 + j 0.5636 pu

6. Common NCEES Exam Pitfalls & Traps

Warning

Exam Trap 1: Forgetting to Square the Voltage Ratio. Candidates frequently write V b a s e , o l d V b a s e , n e w \frac{V_{base,old}}{V_{base,new}} V ba se , n e w ​ V ba se , o l d ​ ​ instead of ( V b a s e , o l d V b a s e , n e w ) 2 \left(\frac{V_{base,old}}{V_{base,new}}\right)^2 ( V ba se , n e w ​ V ba se , o l d ​ ​ ) 2 . Remember that impedance is proportional to voltage squared ( Z ∝ V 2 / S Z \propto V^2 / S Z ∝ V 2 / S ).

Caution

Exam Trap 2: Mixing Single-Phase and Three-Phase Formulas. When applying Z b a s e = V b a s e 2 S b a s e Z_{base} = \frac{V_{base}^2}{S_{base}} Z ba se ​ = S ba se ​ V ba se 2 ​ ​ , always use Line-to-Line kV with Three-Phase MVA . If using Line-to-Neutral kV, you must divide by single-phase MVA ( Z b a s e = ( k V L N ) 2 M V A 1 ϕ Z_{base} = \frac{(kV_{LN})^2}{MVA_{1\phi}} Z ba se ​ = M V A 1 ϕ ​ ( k V L N ​ ) 2 ​ ), which yields the identical numeric value.

Note

Exam Trap 3: Percent vs. Per-Unit Confusion. Transformer nameplate impedance is almost always given as a percentage (e.g., 7.5 % Z 7.5\%Z 7.5% Z ). You must divide by 100 100 100 ( 0.075 pu 0.075\text{ pu} 0.075 pu ) before entering it into any base conversion formula.

Loading diagram... Per-Unit Base Conversion Workflow Across System Voltage Zones