3.1 Earthwork Quality Control & Compaction Verification

PE Civil Geotechnical Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Site Characterization

1.1 Site Data Interpretation & Boring Plans 1.2 In Situ Testing & Field Exploration 1.3 Soil and Rock Classification Systems 1.4 Groundwater Characterization & Hydrogeology

2 Chapter 2: Soil Mechanics, Laboratory Testing, and Analysis

2.1 Weight-Volume Phase Relationships & Index Properties 2.2 Effective Stress & Pore Water Pressure Dynamics 2.3 Shear Strength Principles & Laboratory Testing 2.4 Permeability, Hydraulic Conductivity & Seepage Properties 2.5 Consolidation & Compressibility Analysis

3 Chapter 3: Construction Observation, Monitoring, QA/QC, and Safety

3.1 Earthwork Quality Control & Compaction Verification 3.2 Geotechnical Instrumentation & Field Monitoring 3.3 Trenching, Excavation Safety & OSHA Shoring Requirements 3.4 Erosion, Scour Protection & Slope Protection During Construction

4 Chapter 4: Earthquake Engineering and Dynamic Loads

4.1 Seismic Site Characterization & Ground Motion Hazards 4.2 Soil Liquefaction Triggering & Post-Liquefaction Assessment 4.3 Dynamic Soil Properties & Ground Response Analysis 4.4 Pseudostatic Analysis & Seismic Geotechnical Design

5 Chapter 5: Earth Structures, Ground Improvement, and Pavement

5.1 Slope Stability Analysis & Limit Equilibrium Methods 5.2 Embankments, Earth Dams & Levee Geotechnics 5.3 Ground Improvement Techniques & Design 5.4 Geosynthetics in Geotechnical Engineering 5.5 Flexible & Rigid Pavement Subgrades & Buried Utilities 5.6 Landfills, Caps & Containment Systems

6 Chapter 6: Groundwater and Seepage

6.1 Dewatering System Design & Well Drawdown 6.2 Flow Nets & Two-Dimensional Seepage Analysis 6.3 Uplift Pressure, Piping & Heave Safety 6.4 Subsurface Drainage Systems & Filter Criteria

7 Chapter 7: Problematic Soil and Rock Conditions

7.1 Expansive & Collapsible Soil Engineering 7.2 Organic Soils, Sensitive Clays & Soft Marine Deposits 7.3 Corrosive, Frost-Susceptible & Degradable Formations 7.4 Karst Topography, Rock Slopes & Rockfall Hazards

8 Chapter 8: Retaining Structures

8.1 Lateral Earth Pressure Theories 8.2 Rigid Retaining Wall Design 8.3 Flexible Retaining Walls & Sheet Pile Bulkheads 8.4 Temporary Support of Excavations 8.5 Mechanically Stabilized Earth (MSE) Walls & Soil Nail Structures 8.6 Cofferdams, Underpinning & Adjacent Infrastructure Effects

9 Chapter 9: Shallow Foundations

9.1 Ultimate & Allowable Bearing Capacity Theories 9.2 Effective Footing Area, Eccentricity & Combined Footings 9.3 Induced Stress Distribution & Immediate Elastic Settlement 9.4 Consolidation Settlement & Mat/Raft Foundation Design

10 Chapter 10: Deep Foundations

10.1 Driven Pile Axial Capacity & Settlement 10.2 Drilled Shaft Axial Design & Construction Methods 10.3 Lateral Load Behavior of Deep Foundations 10.4 Pile Group Dynamics, Efficiency & Downdrag 10.5 Dynamic Load Testing & Pile Integrity Evaluation

3.1 Earthwork Quality Control & Compaction Verification

Key Takeaways Explain This Topic AI

Standard Proctor (ASTM D698, energy = 12,400 ft-lbf/ft³) and Modified Proctor (ASTM D1557, energy = 56,250 ft-lbf/ft³) establish the baseline dry density (γd,max) and optimum moisture content (w_opt) for earthwork specifications.

Relative Compaction (RC = γd,field / γd,max × 100%) must achieve design thresholds (typically 95% Modified Proctor for structural fills and foundation subgrades).

Field density testing relies on direct methods (Sand Cone ASTM D1556, Rubber Balloon ASTM D2167) and nuclear gauge methods (ASTM D6938), which require site-specific calibration offsets.

Compaction moisture control (w_opt - 2% to w_opt + 2%) is vital to prevent post-construction swelling in expansive clays or collapsible settlement upon wetting in loose silts.

Continuous Compaction Control (CCC) and Intelligent Compaction (IC) integrate roller accelerometer feedback with GPS tracking to provide 100% spatial coverage of compaction stiffness.

Last updated: July 2026

Soil Compaction Physics & Laboratory Standards

Compaction is the mechanical process by which soil dry density ( γ d \gamma_d γ d ​ ) is increased through the expulsion of air voids with negligible change in water content. In geotechnical engineering quality assurance and quality control (QA/QC), compaction improves soil shear strength, reduces hydraulic conductivity (permeability), and minimizes post-construction settlement.

The Mechanics of Densification

Soil consists of solid particles, water, and air. Applying mechanical energy (by tamping, kneading, rolling, or impact) forces soil grains into a tighter structural arrangement. At low moisture contents, soil particles exhibit high friction due to surface forces and capillary tension, resisting rearrangement. As water is added, it acts as a lubricant, enabling soil grains to slide past one another into a denser configuration under the same compactive effort.

However, beyond a critical moisture threshold—the Optimum Moisture Content ( w opt w_{\text{opt}} w opt ​ ) —water begins to occupy void space that would otherwise be filled by soil solids. Because water is incompressible under transient compaction forces, further additions of water displace solid particles, decreasing the achievable dry density ( γ d \gamma_d γ d ​ ).

Laboratory Proctor Test Standards

Laboratory compaction characteristics are established using standard test procedures defined by ASTM standards:

Standard Proctor Test (ASTM D698 / AASHTO T 99):

Mold Volume: 1 / 30 ft 3 1/30 \text{ ft}^3 1/30 ft 3 ( 944 cm 3 944 \text{ cm}^3 944 cm 3 ) for Method A/B (4-inch diameter mold).

Rammer Weight: 5.5 lbf 5.5 \text{ lbf} 5.5 lbf ( 2.49 kg 2.49 \text{ kg} 2.49 kg ).

Drop Height: 12 in. 12 \text{ in.} 12 in. ( 304.8 mm 304.8 \text{ mm} 304.8 mm ).

Compaction Procedure: 3 equal layers, 25 blows per layer.

Compactive Effort: E Standard = ( 3 layers ) ( 25 blows/layer ) ( 5.5 lbf ) ( 1.0 ft ) 1 / 30 ft 3 = 12 , 400 ft-lbf/ft 3 ( 592 kJ/m 3 ) E_{\text{Standard}} = \frac{(3 \text{ layers})(25 \text{ blows/layer})(5.5 \text{ lbf})(1.0 \text{ ft})}{1/30 \text{ ft}^3} = 12,400 \text{ ft-lbf/ft}^3 \quad (592 \text{ kJ/m}^3) E Standard ​ = 1/30 ft 3 ( 3 layers ) ( 25 blows/layer ) ( 5.5 lbf ) ( 1.0 ft ) ​ = 12 , 400 ft-lbf/ft 3 ( 592 kJ/m 3 )

Modified Proctor Test (ASTM D1557 / AASHTO T 180):

Developed for heavy aircraft and highway loadings requiring greater soil stiffness.

Rammer Weight: 10.0 lbf 10.0 \text{ lbf} 10.0 lbf ( 4.54 kg 4.54 \text{ kg} 4.54 kg ).

Drop Height: 18 in. 18 \text{ in.} 18 in. ( 457.2 mm 457.2 \text{ mm} 457.2 mm ).

Compaction Procedure: 5 equal layers, 25 blows per layer.

Compactive Effort: E Modified = ( 5 layers ) ( 25 blows/layer ) ( 10.0 lbf ) ( 1.5 ft ) 1 / 30 ft 3 = 56 , 250 ft-lbf/ft 3 ( 2 , 693 kJ/m 3 ) E_{\text{Modified}} = \frac{(5 \text{ layers})(25 \text{ blows/layer})(10.0 \text{ lbf})(1.5 \text{ ft})}{1/30 \text{ ft}^3} = 56,250 \text{ ft-lbf/ft}^3 \quad (2,693 \text{ kJ/m}^3) E Modified ​ = 1/30 ft 3 ( 5 layers ) ( 25 blows/layer ) ( 10.0 lbf ) ( 1.5 ft ) ​ = 56 , 250 ft-lbf/ft 3 ( 2 , 693 kJ/m 3 )

Increasing compactive effort from Standard to Modified Proctor produces two key effects on the compaction curve:

Higher Maximum Dry Density ( γ d , max ⁡ \gamma_{d,\max} γ d , m a x ​ ): The peak of the moisture-density curve shifts upward.

Lower Optimum Moisture Content ( w opt w_{\text{opt}} w opt ​ ): The optimum moisture content shifts to the left (drier). Compaction Energy Effect

  • Dry Density
  • (γd) ^ Zero Air Voids (ZAV) Curve
  • | /
  • | /-----\ /
  • | / Modified \ / <-- Higher Energy (ASTM D1557)
  • | / Proctor /
  • |/ /-----\ /
  • | / Standard\/ <-- Lower Energy (ASTM D698)
  • | / Proctor /
  • |/__________/
  • +-------------------------> Moisture Content (w %)
  • The Zero-Air-Voids (ZAV) Line

The Zero-Air-Voids (ZAV) curve (or 100% saturation line) represents the theoretical maximum dry density achievable at a given moisture content if all air voids were completely purged ( S = 100 % S = 100\% S = 100% ). Physical soil compaction curves can approach but never cross the ZAV line. The ZAV dry density ( γ zav \gamma_{\text{zav}} γ zav ​ ) is calculated as: γ zav = γ w 1 G s + w 100 = G s ⋅ γ w 1 + w ⋅ G s 100 \gamma_{\text{zav}} = \frac{\gamma_w}{\frac{1}{G_s} + \frac{w}{100}} = \frac{G_s \cdot \gamma_w}{1 + \frac{w \cdot G_s}{100}} γ zav ​ = G s ​ 1 ​ + 100 w ​ γ w ​ ​ = 1 + 100 w ⋅ G s ​ ​ G s ​ ⋅ γ w ​ ​

where:

γ w \gamma_w γ w ​ = unit weight of water ( 62.4 pcf 62.4 \text{ pcf} 62.4 pcf or 9.81 kN/m 3 9.81 \text{ kN/m}^3 9.81 kN/m 3 )

  • G s G_s G s ​ = specific gravity of soil solids (typically 2.65 − 2.72 2.65 - 2.72 2.65 − 2.72 )
  • w w w = moisture content (%)

Earthwork Field Operations & Compaction Equipment

Matching field compaction equipment to soil classification is essential for efficient densification. Soil type dictates whether compaction relies on static weight, pressure, impact, kneading action, or vibration.

Equipment Selection Matrix

Equipment Type Dominant Action Best Soil Types Typical Lift Thickness Application

Sheepsfoot / Tamping Foot Roller Kneading & Pressure Heavy Clays, Silty Clays (Cohesive) 6 to 8 in. (loose) Embankments, clay liners, dam cores

Smooth Drum Vibratory Roller Vibration & Impact Sands, Gravels (Cohesionless) 8 to 12 in. (loose) Subgrades, base courses, structural fills

Pneumatic-Tired Roller Pressure & Kneading Cohesive and Fine Granular 4 to 8 in. (compacted) Subgrade finishing, seal lifts, asphalt

Vibratory Plate Compactor High-Frequency Vibration Clean Sands, Coarse Gravels 4 to 6 in. (loose) Utility trenches, footings, confined areas

Trench Rammer ('Jumping Jack') Impact / Tamping Cohesive & Mixed Soils 4 to 6 in. (loose) Narrow utility trenches, backfill around pipes

Field Lift Thickness and Placement Rules

Loose Lift Thickness: Specifications generally mandate maximum loose lift thicknesses of 6 to 8 inches 6 \text{ to } 8 \text{ inches} 6 to 8 inches ( 150 to 200 mm 150 \text{ to } 200 \text{ mm} 150 to 200 mm ). If lifts are too thick, compaction energy attenuates with depth, resulting in a soft, uncompacted layer at the bottom of the lift.

Kneading vs. Vibratory Mechanisms: Cohesive soils (clays) require high contact stress and kneading action (sheepsfoot feet penetrating into the lift) to break down clods and remold clay micro-fabric. Cohesionless soils (sands and gravels) require vibratory forces to overcome interparticle friction and induce grain rearrangement.

Moisture Conditioning: If field moisture is dry of optimum ( w < w opt − 2 % w < w_{\text{opt}} - 2\% w < w opt ​ − 2% ), water must be added via water trucks and disc-harrowed into the lift. If wet of optimum ( w > w opt + 2 % w > w_{\text{opt}} + 2\% w > w opt ​ + 2% ), the soil must be scarified and disc-aerated to dry before rolling.

Quality Assurance & Field Verification Testing

Geotechnical field QA/QC verifies two primary parameters: Relative Compaction ( R C RC RC ) and Moisture Deviation ( Δ w \Delta w Δ w ) .

Specifications Definitions

Relative Compaction ( R C RC RC ): R C = γ d , field γ d , max ⁡ × 100 % RC = \frac{\gamma_{d,\text{field}}}{\gamma_{d,\max}} \times 100\% RC = γ d , m a x ​ γ d , field ​ ​ × 100%

Standard Structural Specification: R C ≥ 95 % RC \ge 95\% RC ≥ 95% of Modified Proctor ( ASTM D1557 \text{ASTM D1557} ASTM D1557 ) or R C ≥ 98 % RC \ge 98\% RC ≥ 98% of Standard Proctor ( ASTM D698 \text{ASTM D698} ASTM D698 ) for building pads, highway subgrades, and wall backfill.

Moisture Specification Window: w field ∈ [ w opt − 2 % , w opt + 2 % ] w_{\text{field}} \in [w_{\text{opt}} - 2\%, \, w_{\text{opt}} + 2\%] w field ​ ∈ [ w opt ​ − 2% , w opt ​ + 2% ]

Expansive Clays Exception: Specifications often require compaction on the wet side of optimum ( w opt to w opt + 3 % w_{\text{opt}} \text{ to } w_{\text{opt}} + 3\% w opt ​ to w opt ​ + 3% ) at slightly lower dry density ( 90 % − 92 % 90\% - 92\% 90% − 92% ) to minimize swelling pressure and heave potential upon future wetting.

  • Field Verification Test Methods
  • 1. Sand Cone Method (ASTM D1556 / AASHTO T 191)

A physical destructive test where a hole ( 6 in. 6 \text{ in.} 6 in. diameter, 6 in. 6 \text{ in.} 6 in. deep) is excavated in the compacted lift. All excavated soil is bagged and weighed immediately ( W moist W_{\text{moist}} W moist ​ ). The hole is filled with standardized, pre-calibrated Ottawa sand (density ρ sand \rho_{\text{sand}} ρ sand ​ ) from a calibrated double-cone container. Volume of Hole ( V hole ) = W sand, total − W cone − W sand, remaining ρ sand \text{Volume of Hole } (V_{\text{hole}}) = \frac{W_{\text{sand, total}} - W_{\text{cone}} - W_{\text{sand, remaining}}}{\rho_{\text{sand}}} Volume of Hole ( V hole ​ ) = ρ sand ​ W sand, total ​ − W cone ​ − W sand, remaining ​ ​ γ wet, field = W moist V hole \gamma_{\text{wet, field}} = \frac{W_{\text{moist}}}{V_{\text{hole}}} γ wet, field ​ = V hole ​ W moist ​ ​ γ d , field = γ wet, field 1 + w 100 \gamma_{d,\text{field}} = \frac{\gamma_{\text{wet, field}}}{1 + \frac{w}{100}} γ d , field ​ = 1 + 100 w ​ γ wet, field ​ ​

2. Nuclear Density Gauge (ASTM D6938 / AASHTO T 310)

Uses radioactive isotopes to measure wet density and moisture content non-destructively or semi-destructively:

Wet Density Measurement: A Cesium-137 ( Cs 137 \text{Cs}^{137} Cs 137 ) gamma-radiation source is lowered into a drilled probe hole ( 2 to 12 in. 2 \text{ to } 12 \text{ in.} 2 to 12 in. depth, Direct Transmission Mode ) or positioned at the surface ( Backscatter Mode ). Photon attenuation detected by Geiger-Müller tubes correlates directly with wet bulk density.

Moisture Content Measurement: An Americium-241/Beryllium ( Am 241 / Be \text{Am}^{241}/\text{Be} Am 241 / Be ) neutron source emits fast neutrons from the gauge base. Fast neutrons collide with hydrogen atoms (primarily in soil pore water) and slow down ('thermalize'). Thermalized neutron detectors quantify mass water content per unit volume.

Calibration Correction: Nuclear gauges must be calibrated against sand-cone physical tests or laboratory oven drying to establish a site-specific offset factor ( k k k -value), especially in soils containing organic matter, iron ore, or heavy minerals.

3. Intelligent Compaction (IC) & Continuous Compaction Control (CCC)

Modern earthwork uses smart rollers equipped with accelerometers mounted on the vibratory drum axle, integrated with high-precision RTK-GPS. As the drum vibrates, the soil's dynamic reaction forces alter the drum's vertical acceleration waveform. The ratio of harmonic overtones yields a real-time stiffness parameter known as the Compaction Meter Value ( C M V CMV CM V ) : C M V = C ⋅ A 2 ω A ω CMV = C \cdot \frac{A_{2\omega}}{A_{\omega}} CM V = C ⋅ A ω ​ A 2 ω ​ ​

where A ω A_{\omega} A ω ​ is the fundamental vibration amplitude, A 2 ω A_{2\omega} A 2 ω ​ is the first harmonic amplitude, and C C C is a dimensional constant. IC maps provide 100 % 100\% 100% spatial coverage, identifying soft spots ('pumping zones') instantly.

Loading diagram... Earthwork Compaction QA/QC Verification Workflow

  • Worked PE Engineering Example
  • Problem Statement

A geotechnical quality control engineer is verifying the compaction of a highway structural fill lift consisting of silty sand ( SM \text{SM} SM ). The project specifications mandate:

Minimum Relative Compaction ( R C RC RC ) of 95.0 % 95.0\% 95.0% relative to Modified Proctor (ASTM D1557) .

Moisture content within w opt ± 2.0 % w_{\text{opt}} \pm 2.0\% w opt ​ ± 2.0% .

Laboratory Modified Proctor Data:

  • Maximum Dry Density ( γ d , max ⁡ \gamma_{d,\max} γ d , m a x ​ ) = 124.5 pcf 124.5 \text{ pcf} 124.5 pcf
  • Optimum Moisture Content ( w opt w_{\text{opt}} w opt ​ ) = 10.5 % 10.5\% 10.5%
  • Specific Gravity of Solids ( G s G_s G s ​ ) = 2.68 2.68 2.68

Field Sand Cone Test Data (ASTM D1556):

Weight of Ottawa sand to fill cone + plate ( W cone W_{\text{cone}} W cone ​ ) = 3.45 lbf 3.45 \text{ lbf} 3.45 lbf

Bulk density of calibrated Ottawa sand ( ρ sand \rho_{\text{sand}} ρ sand ​ ) = 98.0 pcf 98.0 \text{ pcf} 98.0 pcf

  • Total weight of sand container before test = 18.20 lbf 18.20 \text{ lbf} 18.20 lbf
  • Total weight of sand container after filling test hole = 7.15 lbf 7.15 \text{ lbf} 7.15 lbf

Wet weight of soil excavated from test hole ( W wet W_{\text{wet}} W wet ​ ) = 8.92 lbf 8.92 \text{ lbf} 8.92 lbf

  • Moist soil sample mass before drying = 245.0 grams 245.0 \text{ grams} 245.0 grams
  • Dry soil sample mass after oven drying = 224.8 grams 224.8 \text{ grams} 224.8 grams

Evaluate:

Field moisture content ( w field w_{\text{field}} w field ​ ).

Volume of test hole ( V hole V_{\text{hole}} V hole ​ ) and field wet density ( γ wet \gamma_{\text{wet}} γ wet ​ ).

Field dry density ( γ d , field \gamma_{d,\text{field}} γ d , field ​ ) and Relative Compaction ( R C RC RC ).

Zero-Air-Voids dry density ( γ zav \gamma_{\text{zav}} γ zav ​ ) at field moisture content.

Whether the lift meets project QA/QC specifications.

Step-by-Step Solution

Step 1: Calculate Field Moisture Content ( w field w_{\text{field}} w field ​ ) w field = W moist − W dry W dry × 100 % = 245.0 − 224.8 224.8 × 100 % = 20.2 224.8 × 100 % = 8.985 % ≈ 8.99 % w_{\text{field}} = \frac{W_{\text{moist}} - W_{\text{dry}}}{W_{\text{dry}}} \times 100\% = \frac{245.0 - 224.8}{224.8} \times 100\% = \frac{20.2}{224.8} \times 100\% = 8.985\% \approx 8.99\% w field ​ = W dry ​ W moist ​ − W dry ​ ​ × 100% = 224.8 245.0 − 224.8 ​ × 100% = 224.8 20.2 ​ × 100% = 8.985% ≈ 8.99%

Step 2: Determine Volume of Sand Used and Test Hole Volume ( V hole V_{\text{hole}} V hole ​ ) Total Sand Used = 18.20 − 7.15 = 11.05 lbf \text{Total Sand Used} = 18.20 - 7.15 = 11.05 \text{ lbf} Total Sand Used = 18.20 − 7.15 = 11.05 lbf Sand in Test Hole = Total Sand Used − W cone = 11.05 − 3.45 = 7.60 lbf \text{Sand in Test Hole} = \text{Total Sand Used} - W_{\text{cone}} = 11.05 - 3.45 = 7.60 \text{ lbf} Sand in Test Hole = Total Sand Used − W cone ​ = 11.05 − 3.45 = 7.60 lbf V hole = W sand, hole ρ sand = 7.60 lbf 98.0 pcf = 0.07755 ft 3 V_{\text{hole}} = \frac{W_{\text{sand, hole}}}{\rho_{\text{sand}}} = \frac{7.60 \text{ lbf}}{98.0 \text{ pcf}} = 0.07755 \text{ ft}^3 V hole ​ = ρ sand ​ W sand, hole ​ ​ = 98.0 pcf 7.60 lbf ​ = 0.07755 ft 3

Step 3: Calculate Field Wet Density ( γ wet \gamma_{\text{wet}} γ wet ​ ) and Field Dry Density ( γ d , field \gamma_{d,\text{field}} γ d , field ​ ) γ wet = W wet V hole = 8.92 lbf 0.07755 ft 3 = 115.02 pcf \gamma_{\text{wet}} = \frac{W_{\text{wet}}}{V_{\text{hole}}} = \frac{8.92 \text{ lbf}}{0.07755 \text{ ft}^3} = 115.02 \text{ pcf} γ wet ​ = V hole ​ W wet ​ ​ = 0.07755 ft 3 8.92 lbf ​ = 115.02 pcf γ d , field = γ wet 1 + w 100 = 115.02 1 + 0.08985 = 115.02 1.08985 = 105.54 pcf \gamma_{d,\text{field}} = \frac{\gamma_{\text{wet}}}{1 + \frac{w}{100}} = \frac{115.02}{1 + 0.08985} = \frac{115.02}{1.08985} = 105.54 \text{ pcf} γ d , field ​ = 1 + 100 w ​ γ wet ​ ​ = 1 + 0.08985 115.02 ​ = 1.08985 115.02 ​ = 105.54 pcf

Step 4: Calculate Relative Compaction ( R C RC RC ) R C = γ d , field γ d , max ⁡ × 100 % = 105.54 pcf 124.50 pcf × 100 % = 84.77 % RC = \frac{\gamma_{d,\text{field}}}{\gamma_{d,\max}} \times 100\% = \frac{105.54 \text{ pcf}}{124.50 \text{ pcf}} \times 100\% = 84.77\% RC = γ d , m a x ​ γ d , field ​ ​ × 100% = 124.50 pcf 105.54 pcf ​ × 100% = 84.77%

Step 5: Calculate Zero-Air-Voids Dry Density ( γ zav \gamma_{\text{zav}} γ zav ​ ) γ zav = G s ⋅ γ w 1 + w ⋅ G s 100 = 2.68 × 62.4 pcf 1 + 8.985 × 2.68 100 = 167.232 1 + 0.2408 = 167.232 1.2408 = 134.78 pcf \gamma_{\text{zav}} = \frac{G_s \cdot \gamma_w}{1 + \frac{w \cdot G_s}{100}} = \frac{2.68 \times 62.4 \text{ pcf}}{1 + \frac{8.985 \times 2.68}{100}} = \frac{167.232}{1 + 0.2408} = \frac{167.232}{1.2408} = 134.78 \text{ pcf} γ zav ​ = 1 + 100 w ⋅ G s ​ ​ G s ​ ⋅ γ w ​ ​ = 1 + 100 8.985 × 2.68 ​ 2.68 × 62.4 pcf ​ = 1 + 0.2408 167.232 ​ = 1.2408 167.232 ​ = 134.78 pcf

Note: γ d , field ( 105.54 pcf ) < γ zav ( 134.78 pcf ) \gamma_{d,\text{field}} (105.54 \text{ pcf}) < \gamma_{\text{zav}} (134.78 \text{ pcf}) γ d , field ​ ( 105.54 pcf ) < γ zav ​ ( 134.78 pcf ) , which is physically valid.

Step 6: QA/QC Specification Compliance Check

Moisture Requirement: Specified range = 10.5 % ± 2.0 % = [ 8.5 % , 12.5 % ] = 10.5\% \pm 2.0\% = [8.5\%, 12.5\%] = 10.5% ± 2.0% = [ 8.5% , 12.5% ] . Field moisture w = 8.99 % w = 8.99\% w = 8.99% is COMPLIANT .

Relative Compaction Requirement: Specified R C ≥ 95.0 % RC \ge 95.0\% RC ≥ 95.0% . Actual field R C = 84.8 % RC = 84.8\% RC = 84.8% is NON-COMPLIANT (deficient by 10.2 % 10.2\% 10.2% ).

Recommendation: Reject the lift. The fill layer requires additional compactive passes with a smooth drum vibratory roller (or sheepsfoot depending on fines content) and re-testing.