3.4 Erosion, Scour Protection & Slope Protection During Construction

PE Civil Geotechnical Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Site Characterization

1.1 Site Data Interpretation & Boring Plans 1.2 In Situ Testing & Field Exploration 1.3 Soil and Rock Classification Systems 1.4 Groundwater Characterization & Hydrogeology

2 Chapter 2: Soil Mechanics, Laboratory Testing, and Analysis

2.1 Weight-Volume Phase Relationships & Index Properties 2.2 Effective Stress & Pore Water Pressure Dynamics 2.3 Shear Strength Principles & Laboratory Testing 2.4 Permeability, Hydraulic Conductivity & Seepage Properties 2.5 Consolidation & Compressibility Analysis

3 Chapter 3: Construction Observation, Monitoring, QA/QC, and Safety

3.1 Earthwork Quality Control & Compaction Verification 3.2 Geotechnical Instrumentation & Field Monitoring 3.3 Trenching, Excavation Safety & OSHA Shoring Requirements 3.4 Erosion, Scour Protection & Slope Protection During Construction

4 Chapter 4: Earthquake Engineering and Dynamic Loads

4.1 Seismic Site Characterization & Ground Motion Hazards 4.2 Soil Liquefaction Triggering & Post-Liquefaction Assessment 4.3 Dynamic Soil Properties & Ground Response Analysis 4.4 Pseudostatic Analysis & Seismic Geotechnical Design

5 Chapter 5: Earth Structures, Ground Improvement, and Pavement

5.1 Slope Stability Analysis & Limit Equilibrium Methods 5.2 Embankments, Earth Dams & Levee Geotechnics 5.3 Ground Improvement Techniques & Design 5.4 Geosynthetics in Geotechnical Engineering 5.5 Flexible & Rigid Pavement Subgrades & Buried Utilities 5.6 Landfills, Caps & Containment Systems

6 Chapter 6: Groundwater and Seepage

6.1 Dewatering System Design & Well Drawdown 6.2 Flow Nets & Two-Dimensional Seepage Analysis 6.3 Uplift Pressure, Piping & Heave Safety 6.4 Subsurface Drainage Systems & Filter Criteria

7 Chapter 7: Problematic Soil and Rock Conditions

7.1 Expansive & Collapsible Soil Engineering 7.2 Organic Soils, Sensitive Clays & Soft Marine Deposits 7.3 Corrosive, Frost-Susceptible & Degradable Formations 7.4 Karst Topography, Rock Slopes & Rockfall Hazards

8 Chapter 8: Retaining Structures

8.1 Lateral Earth Pressure Theories 8.2 Rigid Retaining Wall Design 8.3 Flexible Retaining Walls & Sheet Pile Bulkheads 8.4 Temporary Support of Excavations 8.5 Mechanically Stabilized Earth (MSE) Walls & Soil Nail Structures 8.6 Cofferdams, Underpinning & Adjacent Infrastructure Effects

9 Chapter 9: Shallow Foundations

9.1 Ultimate & Allowable Bearing Capacity Theories 9.2 Effective Footing Area, Eccentricity & Combined Footings 9.3 Induced Stress Distribution & Immediate Elastic Settlement 9.4 Consolidation Settlement & Mat/Raft Foundation Design

10 Chapter 10: Deep Foundations

10.1 Driven Pile Axial Capacity & Settlement 10.2 Drilled Shaft Axial Design & Construction Methods 10.3 Lateral Load Behavior of Deep Foundations 10.4 Pile Group Dynamics, Efficiency & Downdrag 10.5 Dynamic Load Testing & Pile Integrity Evaluation

3.4 Erosion, Scour Protection & Slope Protection During Construction

Key Takeaways Explain This Topic AI

Soil erosion by water follows a four-stage process: raindrop impact detachment, sheet erosion, rill erosion, and gully formation, modeled quantitatively by RUSLE (A = R·K·LS·C·P).

Stormwater Pollution Prevention Plans (SWPPP) under EPA NPDES general permits require temporary BMPs (silt fences, sediment traps, interceptor dikes) for construction disturbances ≥ 1 acre.

Slope protection relies on Erosion Control Blankets (ECBs) for temporary stabilization and Turf Reinforcement Mats (TRMs) or Hydroseeding with Bonded Fiber Matrix (BFM) for high shear channels.

Riprap channel armoring is sized based on hydrodynamic critical shear stress and median stone diameter (d50) equations (e.g., FHWA HEC-11 / HEC-23).

Sediment retention basins must be sized using Stokes' Law settling velocities (As = Q / vs) to capture target silt and clay fractions prior to off-site discharge.

Last updated: July 2026

Soil Erosion Physics & RUSLE Modeling

Construction activities disturb natural vegetative cover, expose bare soil matrix, and alter natural drainage paths, increasing soil erosion rates by up to 100 to 1 , 000 times 100 \text{ to } 1,000 \text{ times} 100 to 1 , 000 times baseline agricultural conditions. Controlling erosion and sediment runoff is a regulatory requirement under the Clean Water Act.

The Four Stages of Soil Erosion by Water

Raindrop (Splash) Detachment: High-velocity raindrops hit bare soil, dislodging fine soil particles and destroying soil structure.

Sheet Erosion: Shallow, uniform overland runoff transports detached particles down un-vegetated slopes in thin sheets.

Rill Erosion: Runoff concentrates into small micro-channels (rills) a few inches deep, accelerating flow velocity and soil detachment.

Gully Erosion: Rills coalesce into large, deep channels (gullies) that cannot be smoothed over by normal earthmoving equipment. Progression of Soil Erosion

  • [Raindrop Splash] ---> [Sheet Flow] ---> [Rill Formation] ---> [Gully Erosion]
  • (Particle Detachment) (Thin Overland) (Micro-Channels) (Deep Channels)
  • The Revised Universal Soil Loss Equation (RUSLE)

The Revised Universal Soil Loss Equation (RUSLE) calculates average annual sheet and rill soil loss ( A A A ): A = R ⋅ K ⋅ L S ⋅ C ⋅ P A = R \cdot K \cdot LS \cdot C \cdot P A = R ⋅ K ⋅ L S ⋅ C ⋅ P

where:

A A A = computed spatial soil loss per unit area (typically tons / acre / year \text{tons / acre / year} tons / acre / year or metric tonnes / hectare / year \text{metric tonnes / hectare / year} metric tonnes / hectare / year ).

R R R = Rainfall-Runoff Erosivity Factor: Quantifies kinetic energy and peak intensity of storm events.

K K K = Soil Erodibility Factor: Measures inherent soil susceptibility to erosion ( K K K ranges from 0.05 0.05 0.05 for coarse gravels to 0.65 0.65 0.65 for highly erodible silts).

L S LS L S = Topographic Factor: Combined factor for slope length ( L L L ) and slope steepness ( S S S ).

C C C = Cover Management Factor: Ratio of soil loss from land under specific vegetation/mulch relative to bare soil ( C = 1.0 C = 1.0 C = 1.0 for bare tilled soil; C = 0.005 − 0.05 C = 0.005 - 0.05 C = 0.005 − 0.05 for erosion control blankets).

P P P = Support Practice Factor: Ratio of soil loss with erosion control practices (contouring, silt fences, terracing) relative to straight up-and-down slope cultivation.

Construction SWPPP & Temporary Best Management Practices (BMPs)

Under EPA National Pollutant Discharge Elimination System ( NPDES ) Construction General Permits (CGP), any project disturbing 1.0 acre 1.0 \text{ acre} 1.0 acre or more of land must implement a written Stormwater Pollution Prevention Plan (SWPPP) .

  • Temporary Erosion & Sediment Control BMP Categories SWPPP BMPs
  • |
  • +-----------------------------+-----------------------------+
  • | |
  • [Erosion Control BMPs (Source Control)] [Sediment Control BMPs (Trapping)]
  • Prevent soil particle detachment - Traps detached sediment on site
  • Temporary seeding & Hydroseeding - Silt Fences (ASTM D6459/D6462)
  • Erosion Control Blankets (ECBs) - Straw Wattles & Fiber Rolls
  • Hydraulic Mulch / Bonded Fiber Matrix - Sediment Basins & Sediment Traps
  • Interceptor Swales & Slope Drains - Inlet Protection & Construction Entrances
  • Silt Fence Specification Rules (ASTM D6459 / D6462)

Silt fences are temporary sediment barriers consisting of synthetic geotextile fabric mounted on wooden or steel posts. They filter runoff and promote ponding so sediment settles out.

Maximum Tributary Slope Length: Silt fences are limited to sheet flow applications with maximum slope length tributary of 100 ft 100 \text{ ft} 100 ft ( 30 m 30 \text{ m} 30 m ).

Trench Key-In Depth: The bottom flap of the geotextile MUST be buried in a trench at least 6 inches 6 \text{ inches} 6 inches ( 150 mm 150 \text{ mm} 150 mm ) deep and backfilled with compacted soil to prevent undercutting flow ('washouts').

Post Spacing: Maximum post spacing is 6 ft 6 \text{ ft} 6 ft ( 1.8 m 1.8 \text{ m} 1.8 m ) for un-backed fabric, or 10 ft 10 \text{ ft} 10 ft ( 3.0 m 3.0 \text{ m} 3.0 m ) if reinforced with wire mesh backing.

  • Slope Protection Materials & Hydroseeding
  • Turf Reinforcement Mats (TRMs) vs. Erosion Control Blankets (ECBs)

Erosion Control Blankets (ECBs): Temporary degradable organic mats composed of straw, wood coconut fibers, or jute matrix stitched between photodegradable polypropylene netting. Designed to protect slopes ( 3 H : 1 V to 2 H : 1 V 3H:1V \text{ to } 2H:1V 3 H : 1 V to 2 H : 1 V ) for 6 to 24 months while vegetation establishes.

Turf Reinforcement Mats (TRMs): Permanent, non-degradable synthetic 3D matrices engineered to reinforce plant root zones. TRMs sustain high hydraulic shear stresses ( τ > 10 psf \tau > 10 \text{ psf} τ > 10 psf or 480 Pa 480 \text{ Pa} 480 Pa ) and flow velocities ( V > 15 ft/s V > 15 \text{ ft/s} V > 15 ft/s or 4.5 m/s 4.5 \text{ m/s} 4.5 m/s ), providing a flexible green alternative to rigid concrete lining.

Hydroseeding & Bonded Fiber Matrix (BFM)

Hydroseeding applies a slurry of seed, fertilizer, tackifier, and mulch pneumatically. Bonded Fiber Matrix (BFM) uses thermally refined wood fibers combined with cross-linked hydro-colloid tackifiers. Upon drying, BFM forms a water-resistant, breathable crust over steep, inaccessible slopes ( 1 H : 1 V 1H:1V 1 H : 1 V ), reducing C C C -factors to < 0.01 < 0.01 < 0.01 .

Scour Protection & Riprap Armoring Design

Channel scour and slope erosion occur when hydrodynamic bed shear stress ( τ 0 \tau_0 τ 0 ​ ) exerted by flowing water exceeds the critical shear stress ( τ c \tau_c τ c ​ ) of soil particles.

Hydrodynamic Shear Stress Equation

For open channel flow with hydraulic radius R h R_h R h ​ and slope S 0 S_0 S 0 ​ : τ 0 = γ w ⋅ R h ⋅ S 0 \tau_0 = \gamma_w \cdot R_h \cdot S_0 τ 0 ​ = γ w ​ ⋅ R h ​ ⋅ S 0 ​

where γ w = 62.4 pcf \gamma_w = 62.4 \text{ pcf} γ w ​ = 62.4 pcf ( 9.81 kN/m 3 9.81 \text{ kN/m}^3 9.81 kN/m 3 ).

Riprap Sizing Equation (FHWA HEC-11 / HEC-23)

To prevent scour around bridge abutments, culvert outlets, and drainage channels, angular stone riprap is sized based on median particle diameter ( d 50 d_{50} d 50 ​ ): d 50 = C ⋅ V 2 2 g ( S s − 1 ) d_{50} = C \cdot \frac{V^2}{2 g (S_s - 1)} d 50 ​ = C ⋅ 2 g ( S s ​ − 1 ) V 2 ​

where:

V V V = mean channel velocity ( ft/s \text{ft/s} ft/s or m/s \text{m/s} m/s )

g g g = acceleration due to gravity ( 32.2 ft/s 2 32.2 \text{ ft/s}^2 32.2 ft/s 2 or 9.81 m/s 2 9.81 \text{ m/s}^2 9.81 m/s 2 )

S s S_s S s ​ = specific gravity of stone (typically 2.65 2.65 2.65 )

C C C = stability coefficient ( C = 1.2 C = 1.2 C = 1.2 for straight channels; C = 1.5 C = 1.5 C = 1.5 for steep bends or severe turbulence)

Filter Layer Criteria Beneath Riprap

Riprap MUST be underlain by a geotextile filter fabric or graded granular filter layer to prevent high-velocity water from piping and washing out fine subgrade soil particles beneath the stone. The Terzaghi retention criteria must be met: D 15 , filter D 85 , soil ≤ 5 (Retention Criteria; prevents piping) \frac{D_{15,\text{filter}}}{D_{85,\text{soil}}} \le 5 \quad \text{(Retention Criteria; prevents piping)} D 85 , soil ​ D 15 , filter ​ ​ ≤ 5 (Retention Criteria; prevents piping) D 15 , filter D 15 , soil ≥ 5 (Permeability Criteria; prevents excess uplift pore pressure) \frac{D_{15,\text{filter}}}{D_{15,\text{soil}}} \ge 5 \quad \text{(Permeability Criteria; prevents excess uplift pore pressure)} D 15 , soil ​ D 15 , filter ​ ​ ≥ 5 (Permeability Criteria; prevents excess uplift pore pressure)

Sediment Basin Hydraulics & Stokes' Law Settling

Sediment retention basins retain sediment-laden stormwater, reducing flow velocity so suspended soil solids settle out before effluent discharges off site.

Particle Settling Velocity (Stokes' Law)

For spherical soil particles falling through laminar fluid, settling velocity ( v s v_s v s ​ ) is: v s = g ⋅ D p 2 ⋅ ( ρ s − ρ w ) 18 μ v_s = \frac{g \cdot D_p^2 \cdot (\rho_s - \rho_w)}{18 \mu} v s ​ = 18 μ g ⋅ D p 2 ​ ⋅ ( ρ s ​ − ρ w ​ ) ​

where:

  • D p D_p D p ​ = particle diameter ( m \text{m} m or ft \text{ft} ft )
  • ρ s \rho_s ρ s ​ = density of soil solids ( 2 , 650 kg/m 3 2,650 \text{ kg/m}^3 2 , 650 kg/m 3 )
  • ρ w \rho_w ρ w ​ = density of water ( 1 , 000 kg/m 3 1,000 \text{ kg/m}^3 1 , 000 kg/m 3 )

μ \mu μ = dynamic viscosity of water ( 1.002 × 10 − 3 N ⋅ s/m 2 1.002 \times 10^{-3} \text{ N}\cdot\text{s/m}^2 1.002 × 1 0 − 3 N ⋅ s/m 2 at 20 ∘ C 20^\circ\text{C} 2 0 ∘ C )

Sediment Basin Surface Area Sizing

To capture particles with settling velocity v s v_s v s ​ at peak design inflow rate Q design Q_{\text{design}} Q design ​ : A s = Q design v s A_s = \frac{Q_{\text{design}}}{v_s} A s ​ = v s ​ Q design ​ ​

where A s A_s A s ​ is the minimum required basin surface area at the outlet crest elevation.

  • Worked PE Engineering Example
  • Problem Statement

A construction site contractor is excavating a temporary discharge channel to convey stormwater runoff around an earthwork site. The channel hydraulic parameters for the peak 10-year storm design flow are:

  • Mean channel velocity ( V V V ) = 11.5 ft/s 11.5 \text{ ft/s} 11.5 ft/s
  • Channel bed slope ( S 0 S_0 S 0 ​ ) = 0.025 ft/ft 0.025 \text{ ft/ft} 0.025 ft/ft
  • Hydraulic radius ( R h R_h R h ​ ) = 2.2 ft 2.2 \text{ ft} 2.2 ft
  • Specific gravity of available angular granite riprap ( S s S_s S s ​ ) = 2.65 2.65 2.65
  • Stability factor for channel bend ( C C C ) = 1.40 1.40 1.40

Additionally, stormwater runoff draining into a temporary sediment basin has a peak flow rate of Q = 15.0 cfs Q = 15.0 \text{ cfs} Q = 15.0 cfs . The basin must capture silt particles down to D p = 0.02 mm D_p = 0.02 \text{ mm} D p ​ = 0.02 mm ( 0.00002 m 0.00002 \text{ m} 0.00002 m ).

Acceleration of gravity g = 9.81 m/s 2 g = 9.81 \text{ m/s}^2 g = 9.81 m/s 2 ( 32.2 ft/s 2 32.2 \text{ ft/s}^2 32.2 ft/s 2 )

Water density ρ w = 1 , 000 kg/m 3 \rho_w = 1,000 \text{ kg/m}^3 ρ w ​ = 1 , 000 kg/m 3 , soil density ρ s = 2 , 650 kg/m 3 \rho_s = 2,650 \text{ kg/m}^3 ρ s ​ = 2 , 650 kg/m 3

Dynamic viscosity of water μ = 1.00 × 10 − 3 Pa ⋅ s \mu = 1.00 \times 10^{-3} \text{ Pa}\cdot\text{s} μ = 1.00 × 1 0 − 3 Pa ⋅ s

Evaluate:

Hydrodynamic shear stress ( τ 0 \tau_0 τ 0 ​ ) along the channel bed.

Minimum required median riprap diameter ( d 50 d_{50} d 50 ​ ) in inches.

Settling velocity ( v s v_s v s ​ ) of the target silt particle in ft/s \text{ft/s} ft/s .

Minimum required sediment basin surface area ( A s A_s A s ​ ) in square feet \text{square feet} square feet and in acres \text{acres} acres .

Step-by-Step Solution

Step 1: Calculate Channel Hydrodynamic Shear Stress ( τ 0 \tau_0 τ 0 ​ ) τ 0 = γ w ⋅ R h ⋅ S 0 = ( 62.4 pcf ) × ( 2.2 ft ) × ( 0.025 ) = 3.432 psf ( 164.3 Pa ) \tau_0 = \gamma_w \cdot R_h \cdot S_0 = (62.4 \text{ pcf}) \times (2.2 \text{ ft}) \times (0.025) = 3.432 \text{ psf} \quad (164.3 \text{ Pa}) τ 0 ​ = γ w ​ ⋅ R h ​ ⋅ S 0 ​ = ( 62.4 pcf ) × ( 2.2 ft ) × ( 0.025 ) = 3.432 psf ( 164.3 Pa )

Because τ 0 = 3.43 psf \tau_0 = 3.43 \text{ psf} τ 0 ​ = 3.43 psf exceeds the allowable shear stress of bare soil ( ≈ 0.1 − 0.4 psf \approx 0.1 - 0.4 \text{ psf} ≈ 0.1 − 0.4 psf ), riprap armoring is mandatory.

Step 2: Calculate Riprap Median Diameter ( d 50 d_{50} d 50 ​ )

Using the FHWA HEC-11 riprap sizing equation: d 50 = C ⋅ V 2 2 g ( S s − 1 ) = 1.40 × ( 11.5 ) 2 2 × 32.2 × ( 2.65 − 1 ) = 1.40 × 132.25 64.4 × 1.65 = 1.40 × 132.25 106.26 d_{50} = C \cdot \frac{V^2}{2 g (S_s - 1)} = 1.40 \times \frac{(11.5)^2}{2 \times 32.2 \times (2.65 - 1)} = 1.40 \times \frac{132.25}{64.4 \times 1.65} = 1.40 \times \frac{132.25}{106.26} d 50 ​ = C ⋅ 2 g ( S s ​ − 1 ) V 2 ​ = 1.40 × 2 × 32.2 × ( 2.65 − 1 ) ( 11.5 ) 2 ​ = 1.40 × 64.4 × 1.65 132.25 ​ = 1.40 × 106.26 132.25 ​ d 50 = 1.40 × 1.2446 ft = 1.7424 ft d_{50} = 1.40 \times 1.2446 \text{ ft} = 1.7424 \text{ ft} d 50 ​ = 1.40 × 1.2446 ft = 1.7424 ft In Inches: d 50 = 1.7424 ft × 12 in./ft = 20.91 inches ≈ 21 inches \text{In Inches: } d_{50} = 1.7424 \text{ ft} \times 12 \text{ in./ft} = 20.91 \text{ inches} \approx 21 \text{ inches} In Inches: d 50 ​ = 1.7424 ft × 12 in./ft = 20.91 inches ≈ 21 inches

Step 3: Calculate Particle Settling Velocity ( v s v_s v s ​ ) using Stokes' Law

Convert inputs to SI units:

D p = 0.02 mm = 2.0 × 10 − 5 m D_p = 0.02 \text{ mm} = 2.0 \times 10^{-5} \text{ m} D p ​ = 0.02 mm = 2.0 × 1 0 − 5 m

Δ ρ = ρ s − ρ w = 2 , 650 − 1 , 000 = 1 , 650 kg/m 3 \Delta \rho = \rho_s - \rho_w = 2,650 - 1,000 = 1,650 \text{ kg/m}^3 Δ ρ = ρ s ​ − ρ w ​ = 2 , 650 − 1 , 000 = 1 , 650 kg/m 3 v s = 9.81 × ( 2.0 × 10 − 5 ) 2 × 1 , 650 18 × 1.00 × 10 − 3 = 9.81 × ( 4.0 × 10 − 10 ) × 1 , 650 0.018 = 6.4746 × 10 − 6 0.018 = 3.597 × 10 − 4 m/s v_s = \frac{9.81 \times (2.0 \times 10^{-5})^2 \times 1,650}{18 \times 1.00 \times 10^{-3}} = \frac{9.81 \times (4.0 \times 10^{-10}) \times 1,650}{0.018} = \frac{6.4746 \times 10^{-6}}{0.018} = 3.597 \times 10^{-4} \text{ m/s} v s ​ = 18 × 1.00 × 1 0 − 3 9.81 × ( 2.0 × 1 0 − 5 ) 2 × 1 , 650 ​ = 0.018 9.81 × ( 4.0 × 1 0 − 10 ) × 1 , 650 ​ = 0.018 6.4746 × 1 0 − 6 ​ = 3.597 × 1 0 − 4 m/s

Convert settling velocity v s v_s v s ​ to ft/s \text{ft/s} ft/s : v s = 3.597 × 10 − 4 m/s × 3.28084 ft/m = 0.00118 ft/s v_s = 3.597 \times 10^{-4} \text{ m/s} \times 3.28084 \text{ ft/m} = 0.00118 \text{ ft/s} v s ​ = 3.597 × 1 0 − 4 m/s × 3.28084 ft/m = 0.00118 ft/s

Step 4: Determine Minimum Sediment Basin Surface Area ( A s A_s A s ​ ) A s = Q v s = 15.0 cfs 0.00118 ft/s = 12 , 711.86 ft 2 A_s = \frac{Q}{v_s} = \frac{15.0 \text{ cfs}}{0.00118 \text{ ft/s}} = 12,711.86 \text{ ft}^2 A s ​ = v s ​ Q ​ = 0.00118 ft/s 15.0 cfs ​ = 12 , 711.86 ft 2

Convert surface area to acres ( 1 acre = 43 , 560 ft 2 1 \text{ acre} = 43,560 \text{ ft}^2 1 acre = 43 , 560 ft 2 ): A s = 12 , 711.86 ft 2 43 , 560 ft 2 / acre = 0.2918 acres ≈ 0.29 acres ( 12 , 712 sq ft ) A_s = \frac{12,711.86 \text{ ft}^2}{43,560 \text{ ft}^2/\text{acre}} = 0.2918 \text{ acres} \approx 0.29 \text{ acres} \quad (12,712 \text{ sq ft}) A s ​ = 43 , 560 ft 2 / acre 12 , 711.86 ft 2 ​ = 0.2918 acres ≈ 0.29 acres ( 12 , 712 sq ft )

Design Summary: Specify Class III riprap with median diameter d 50 = 21 inches d_{50} = 21 \text{ inches} d 50 ​ = 21 inches underlain by a geotextile filter fabric, and construct a sediment basin with a minimum water surface area of 12 , 712 sq ft 12,712 \text{ sq ft} 12 , 712 sq ft ( 0.29 acres 0.29 \text{ acres} 0.29 acres ).