Study guide
10.5 Safety Codes, Standards & Voluntary Guidelines (OSHA, ANSI, NIOSH, MIL-STD) and DART Rate Calculations
PE Industrial and Systems Exam
Track your progress as you read
Finished sections get a check mark.
1 Exam Overview, Strategy & Systems Foundations
1.1 PE Industrial Exam Format, Official Specification & Reference Handbook Strategy 1.2 System Analysis Tools, Process Definition, Requirements Engineering & QFD 1.3 Performance Measures: Output, Productivity, OEE, Cost & Environmental Sustainability 1.4 Process Types (Discrete, Continuous, Manufacturing, Service) & Value Analysis/Engineering
2 Optimization, Queueing, Simulation, Networks & Markov Chains
2.1 Linear Programming Formulation, Graphical Solutions & Sensitivity Analysis 2.2 Queueing Theory Models (M/M/1, M/M/s) & Little's Law Applications 2.3 Discrete-Event Simulation, Random Variates & Model Validation 2.4 Graph Theory & Network Models: Shortest Path, Minimal Spanning Tree & Maximum Flow 2.5 Markov Chains: Transition Matrices, Steady-State Probabilities & Absorbing States 2.6 Decision Trees, Expected Value & Bottleneck Analysis (Theory of Constraints)
3 Project Management & Planning
3.1 Project Scheduling with CPM and PERT: Critical Path, Float, Probability & Crashing 3.2 Project Planning & Control: Scope and WBS, Gantt Charts, Critical Chain (CCPM), Risk & Earned Value
4 Facility Layout, Space, Capacity & Material Handling
4.1 Systematic Layout Planning (SLP) & Activity Relationship (REL) Analysis 4.2 Workstation Design, Aisle Sizing & Space Requirements Planning 4.3 Capacity Analysis: Machine Requirements, Scrap Allowances & Personnel Requirements 4.4 Material Handling Equipment Selection, Unit Loads & Handling Principles
5 Site Location, Warehousing & Facility Economics
5.1 Facility Location Models: Center of Gravity & Minisum / Minimax Distance 5.2 Warehousing Systems, Storage Assignment & Order Picking Operations 5.3 Facility Life-Cycle Economics, Replacement Analysis & Rearrangement Costs
6 Demand Forecasting, Production Planning, MRP & JIT
6.1 Demand Forecasting Methods: Moving Averages, Exponential Smoothing & Error Metrics 6.2 Aggregate Planning Strategies & Master Production Scheduling (MPS) 6.3 Material Requirements Planning (MRP), Bill of Materials & Capacity Planning 6.4 Just-in-Time & Lean Production Planning: Pull Systems, Kanban Sizing, Heijunka & SMED
7 Inventory Systems, Scheduling, Logistics & Transportation Modes
7.1 Deterministic Inventory Control: Classical EOQ, EPQ & Quantity Discounts 7.2 Stochastic Inventory Management: Safety Stock, Continuous / Periodic Review & Newsvendor 7.3 Production Sequencing, Dispatching Rules & Johnson's Algorithm 7.4 Supply Chain Logistics, Transportation Simplex & Distribution Network Design 7.5 Transportation Modes, Freight Economics & the Transshipment Model
8 Engineering Economics, Break-Even Analysis & Costing Systems
8.1 Equivalence, Cash Flow Analysis & Discounted Cash Flow Metrics (PW, FW, EAC) 8.2 Rate of Return Analysis (IRR, Incremental IRR) & Benefit-Cost (B/C) Ratios 8.3 Asset Depreciation (MACRS, Straight-Line), Tax Effects & Replacement Decisions 8.4 Break-Even Analysis, Technical Capability Assessment & Costing Systems (Traditional, ABC & Standard Costs)
9 Methods Engineering, Work Measurement, Learning Curves, Line Balancing & Process Planning
9.1 Methods Analysis, Process Charting & Motion Study (Therbligs, 5S) 9.2 Worker–Machine (Man–Machine) Charts, Multiple Activity Analysis & Synchronous Servicing 9.3 Time Study Fundamentals, Performance Rating & Allowance Factors 9.4 Predetermined Motion Time Systems (PMTS, MTM, MOST) & Work Sampling 9.5 Learning Curves: Unit and Cumulative-Average Models, Learning Rates & Applications 9.6 Assembly Line Balancing, Precedence Constraints & Efficiency Heuristics 9.7 Manufacturing & Service Process Planning: Operation Selection, Sequencing, Route Sheets, Fixturing & Mistake Proofing
10 Ergonomics, Human Capacity, Occupational Safety & DART Rates
10.1 Anthropometry, Percentile Design, Workstation Ergonomics & Link Analysis 10.2 Industrial Biomechanics, the NIOSH Lifting Equation & Lifting Aids 10.3 Limits of Human Capacity & Risk-Factor Tools: Work Physiology, Strength, Range of Motion, Vision, RULA & Slip Resistance 10.4 Environmental Ergonomics (Noise, Heat, Illumination), Human-Machine Systems & OSHA Safety 10.5 Safety Codes, Standards & Voluntary Guidelines (OSHA, ANSI, NIOSH, MIL-STD) and DART Rate Calculations
11 Statistical Process Control & Process Capability
11.1 Statistical Process Control for Variables (X-bar/R and X-bar/s Charts) 11.2 Statistical Process Control for Attributes (p, np, c, and u Charts) 11.3 Process Capability Indices (Cp, Cpk, Cpm, Pp, Ppk) & Sigma Levels
12 Design of Experiments, Acceptance Sampling & Quality Systems
12.1 Design of Experiments: 2^k Factorials, ANOVA & Taguchi Robust Design 12.2 Acceptance Sampling: OC Curves, AQL, LTPD, AOQL, Z1.4/MIL-STD-105E & Dodge-Romig 12.3 Quality Systems (Deming, TQM, ISO 9000, Benchmarking), Root Cause Analysis & DMAIC
13 Reliability Engineering & Maintenance Systems
13.1 Reliability Modeling, Failure Rates (lambda) & Life Distributions (Exponential, Weibull) 13.2 System Reliability Architecture: Series, Parallel, k-out-of-n & Redundancy 13.3 Equipment Maintenance Engineering, Availability (A), MTBF/MTTR & RCM
10.5 Safety Codes, Standards & Voluntary Guidelines (OSHA, ANSI, NIOSH, MIL-STD) and DART Rate Calculations
Key Takeaways Explain This Topic AI
OSHA standards (29 CFR 1910 for general industry, 1926 for construction) are enforceable law; ANSI and other consensus standards are voluntary unless a regulation or contract adopts them; NIOSH researches and recommends but does not enforce.
The hierarchy of controls, from most to least effective, is elimination, substitution, engineering controls, administrative controls, and personal protective equipment.
Incidence rates normalize to 200,000 hours, representing 100 full-time workers working 40 hours a week for 50 weeks: rate = number of cases × 200,000 ÷ total hours worked.
The DART rate counts recordable cases involving days away from work, restricted work, or job transfer (OSHA 300 log columns H and I) per 200,000 hours.
Employers must report a work-related fatality to OSHA within 8 hours and an in-patient hospitalization, amputation, or loss of an eye within 24 hours.
Last updated: October 2026
10.5 Safety Codes, Standards & DART Rate Calculations
The specification lists safety codes, standards, and voluntary guidelines (ANSI, OSHA, MIL STD, NIOSH) and DART rate calculations , including the information needed to compute the rate. Industrial engineers design work and workplaces, so they are responsible for building safety into the design and for measuring results.
1. Who Writes What
Source Nature Examples relevant to industrial engineers
OSHA (Occupational Safety and Health Administration, Department of Labor) Federal regulations, enforceable by inspection and penalty 29 CFR 1910 (general industry), 1926 (construction), 1904 (recordkeeping)
State plans State OSHA programs at least as effective as federal OSHA California, Washington, Michigan, and others
NIOSH (National Institute for Occupational Safety and Health, CDC) Research and recommendations, not enforceable Revised Lifting Equation, Recommended Exposure Limits (RELs), hierarchy of controls
ANSI-accredited consensus standards Voluntary unless adopted by regulation or contract ANSI/ASSP Z10.0 (safety management systems), ANSI Z535 (safety signs and colors), ANSI B11 (machine safety), ANSI/ISEA Z87.1 (eye protection), ANSI/ASSP Z359 (fall protection)
Other consensus bodies Voluntary; often incorporated by reference NFPA 70E (electrical safety in the workplace), ASME B30 (cranes and hoists), ISO 45001 (occupational health and safety management)
U.S. military standards Required on defense programs; widely used as guidance MIL-STD-882E (system safety), MIL-STD-1472H (human engineering design criteria)
The general duty clause. Section 5(a)(1) of the OSH Act requires each employer to provide a workplace free from recognized hazards likely to cause death or serious physical harm. OSHA uses it when no specific standard applies, often citing consensus standards as evidence that a hazard is recognized.
MIL-STD-882E defines system-safety risk with a matrix of severity (catastrophic, critical, marginal, negligible) and probability (frequent, probable, occasional, remote, improbable, eliminated) and requires hazards to be tracked to acceptance. MIL-STD-1472H gives human engineering design criteria such as control and display arrangement, anthropometric accommodation, workspace dimensions, labeling, and environmental limits.
2. The Hierarchy of Controls
NIOSH ranks hazard controls from most to least effective:
Elimination: remove the hazard, for example by redesigning a task so no one works at height.
Substitution: replace it with something less hazardous, such as a water-based solvent.
Engineering controls: isolate people from the hazard with guards, ventilation, lift assists, or interlocks.
Administrative controls: change how people work, through procedures, training, job rotation, or warning signs.
Personal protective equipment (PPE): gloves, hearing protection, respirators. These are the last line of defense.
Higher levels work regardless of human behavior. PPE fails silently when it is worn incorrectly.
3. Key OSHA General Industry Requirements
Topic Standard Core requirement
Walking-working surfaces and fall protection 1910.22, 1910.28, 1910.29 Protect workers at 4 ft or more above a lower level (6 ft in construction under 1926.501); guardrail top rails 42 in ± 3 in and able to withstand 200 lb
Exit routes 1910.36–1910.37 At least 28 in wide; unobstructed and marked
Hazardous energy (lockout/tagout) 1910.147 Written energy-control program, procedures, training, and periodic inspections
- Machine guarding 1910.212 Guard points of operation, nip points, and rotating parts
- Powered industrial trucks 1910.178 Operator training and evaluation, with re-evaluation at least every 3 years
- Overhead and gantry cranes 1910.179 Rated load marking, inspections, and operator qualification
- Noise 1910.95 90 dBA TWA PEL; hearing conservation program at 85 dBA
- Hazard communication 1910.1200 Labels, safety data sheets, and training under the GHS format
- PPE 1910.132 Written hazard assessment before selecting PPE
- 4. OSHA Recordkeeping (29 CFR Part 1904)
Recordable cases are work-related injuries and illnesses that result in any of:
- death
- days away from work
- restricted work or transfer to another job
- medical treatment beyond first aid
- loss of consciousness
- a significant injury or illness diagnosed by a physician or other licensed health care professional
Records:
Form 300 , the log of cases. Column H marks days-away cases, column I job transfer or restriction cases, and column J other recordable cases.
Form 300A , the annual summary, posted from February 1 to April 30 of the following year.
Form 301 , the incident report for each case.
Records are kept for 5 years . Many employers with 10 or fewer employees, and certain low-hazard industries, are partially exempt.
Day counting: count calendar days away or restricted, not including the day of injury, and cap each case at 180 days .
Reporting: call OSHA within 8 hours of a work-related fatality, and within 24 hours of an in-patient hospitalization, an amputation, or the loss of an eye.
5. Incidence Rate Calculations
All OSHA rates are normalized to 200,000 hours , the hours worked by 100 full-time employees in a year (40 hours/week × 50 weeks):
Rate = Number of cases (or days) × 200,000 Total hours worked by all employees \text{Rate} = \frac{\text{Number of cases (or days)} \times 200{,}000}{\text{Total hours worked by all employees}} Rate = Total hours worked by all employees Number of cases (or days) × 200 , 000
- Rate Numerator
- Total recordable case rate (TRC or TRIR) All recordable cases
- DART rate Cases with D ays A way, R estricted work, or job T ransfer (300 log columns H + I)
- Days-away case rate Cases with days away (column H only)
- Severity (lost-workday) rate Total days away (or away plus restricted)
Use actual hours worked from payroll records, including overtime and excluding vacation, holiday, and sick leave.
Worked example: A plant with about 450 employees worked 925,000 hours last year. Its 300 log shows 14 recordable cases: 5 with days away (78 days total), 3 with restricted work or transfer (40 days total), and 6 other recordable cases.
TRIR = 14 × 200,000 / 925,000 = 3.03 = 14 \times 200{,}000 / 925{,}000 = 3.03 = 14 × 200 , 000/925 , 000 = 3.03
DART = ( 5 + 3 ) × 200,000 / 925,000 = 1.73 = (5 + 3) \times 200{,}000 / 925{,}000 = 1.73 = ( 5 + 3 ) × 200 , 000/925 , 000 = 1.73
Days-away case rate = 5 × 200,000 / 925,000 = 1.08 = 5 \times 200{,}000 / 925{,}000 = 1.08 = 5 × 200 , 000/925 , 000 = 1.08
Lost-workday severity = 78 × 200,000 / 925,000 = 16.9 = 78 \times 200{,}000 / 925{,}000 = 16.9 = 78 × 200 , 000/925 , 000 = 16.9 days away per 100 full-time workers
Compare rates with the Bureau of Labor Statistics averages for the plant's NAICS industry, and track trends. A low TRIR with a high severity rate suggests fewer but more serious injuries.
Warning
Do not include first-aid-only cases, such as a bandage or a non-prescription medication at non-prescription strength, in any rate. Do not divide by the number of employees; the denominator is hours worked .