Study guide

9.3 Time Study Fundamentals, Performance Rating & Allowance Factors

PE Industrial and Systems Exam

Track your progress as you read

Finished sections get a check mark.

1 Exam Overview, Strategy & Systems Foundations

1.1 PE Industrial Exam Format, Official Specification & Reference Handbook Strategy 1.2 System Analysis Tools, Process Definition, Requirements Engineering & QFD 1.3 Performance Measures: Output, Productivity, OEE, Cost & Environmental Sustainability 1.4 Process Types (Discrete, Continuous, Manufacturing, Service) & Value Analysis/Engineering

2 Optimization, Queueing, Simulation, Networks & Markov Chains

2.1 Linear Programming Formulation, Graphical Solutions & Sensitivity Analysis 2.2 Queueing Theory Models (M/M/1, M/M/s) & Little's Law Applications 2.3 Discrete-Event Simulation, Random Variates & Model Validation 2.4 Graph Theory & Network Models: Shortest Path, Minimal Spanning Tree & Maximum Flow 2.5 Markov Chains: Transition Matrices, Steady-State Probabilities & Absorbing States 2.6 Decision Trees, Expected Value & Bottleneck Analysis (Theory of Constraints)

3 Project Management & Planning

3.1 Project Scheduling with CPM and PERT: Critical Path, Float, Probability & Crashing 3.2 Project Planning & Control: Scope and WBS, Gantt Charts, Critical Chain (CCPM), Risk & Earned Value

4 Facility Layout, Space, Capacity & Material Handling

4.1 Systematic Layout Planning (SLP) & Activity Relationship (REL) Analysis 4.2 Workstation Design, Aisle Sizing & Space Requirements Planning 4.3 Capacity Analysis: Machine Requirements, Scrap Allowances & Personnel Requirements 4.4 Material Handling Equipment Selection, Unit Loads & Handling Principles

5 Site Location, Warehousing & Facility Economics

5.1 Facility Location Models: Center of Gravity & Minisum / Minimax Distance 5.2 Warehousing Systems, Storage Assignment & Order Picking Operations 5.3 Facility Life-Cycle Economics, Replacement Analysis & Rearrangement Costs

6 Demand Forecasting, Production Planning, MRP & JIT

6.1 Demand Forecasting Methods: Moving Averages, Exponential Smoothing & Error Metrics 6.2 Aggregate Planning Strategies & Master Production Scheduling (MPS) 6.3 Material Requirements Planning (MRP), Bill of Materials & Capacity Planning 6.4 Just-in-Time & Lean Production Planning: Pull Systems, Kanban Sizing, Heijunka & SMED

7 Inventory Systems, Scheduling, Logistics & Transportation Modes

7.1 Deterministic Inventory Control: Classical EOQ, EPQ & Quantity Discounts 7.2 Stochastic Inventory Management: Safety Stock, Continuous / Periodic Review & Newsvendor 7.3 Production Sequencing, Dispatching Rules & Johnson's Algorithm 7.4 Supply Chain Logistics, Transportation Simplex & Distribution Network Design 7.5 Transportation Modes, Freight Economics & the Transshipment Model

8 Engineering Economics, Break-Even Analysis & Costing Systems

8.1 Equivalence, Cash Flow Analysis & Discounted Cash Flow Metrics (PW, FW, EAC) 8.2 Rate of Return Analysis (IRR, Incremental IRR) & Benefit-Cost (B/C) Ratios 8.3 Asset Depreciation (MACRS, Straight-Line), Tax Effects & Replacement Decisions 8.4 Break-Even Analysis, Technical Capability Assessment & Costing Systems (Traditional, ABC & Standard Costs)

9 Methods Engineering, Work Measurement, Learning Curves, Line Balancing & Process Planning

9.1 Methods Analysis, Process Charting & Motion Study (Therbligs, 5S) 9.2 Worker–Machine (Man–Machine) Charts, Multiple Activity Analysis & Synchronous Servicing 9.3 Time Study Fundamentals, Performance Rating & Allowance Factors 9.4 Predetermined Motion Time Systems (PMTS, MTM, MOST) & Work Sampling 9.5 Learning Curves: Unit and Cumulative-Average Models, Learning Rates & Applications 9.6 Assembly Line Balancing, Precedence Constraints & Efficiency Heuristics 9.7 Manufacturing & Service Process Planning: Operation Selection, Sequencing, Route Sheets, Fixturing & Mistake Proofing

10 Ergonomics, Human Capacity, Occupational Safety & DART Rates

10.1 Anthropometry, Percentile Design, Workstation Ergonomics & Link Analysis 10.2 Industrial Biomechanics, the NIOSH Lifting Equation & Lifting Aids 10.3 Limits of Human Capacity & Risk-Factor Tools: Work Physiology, Strength, Range of Motion, Vision, RULA & Slip Resistance 10.4 Environmental Ergonomics (Noise, Heat, Illumination), Human-Machine Systems & OSHA Safety 10.5 Safety Codes, Standards & Voluntary Guidelines (OSHA, ANSI, NIOSH, MIL-STD) and DART Rate Calculations

11 Statistical Process Control & Process Capability

11.1 Statistical Process Control for Variables (X-bar/R and X-bar/s Charts) 11.2 Statistical Process Control for Attributes (p, np, c, and u Charts) 11.3 Process Capability Indices (Cp, Cpk, Cpm, Pp, Ppk) & Sigma Levels

12 Design of Experiments, Acceptance Sampling & Quality Systems

12.1 Design of Experiments: 2^k Factorials, ANOVA & Taguchi Robust Design 12.2 Acceptance Sampling: OC Curves, AQL, LTPD, AOQL, Z1.4/MIL-STD-105E & Dodge-Romig 12.3 Quality Systems (Deming, TQM, ISO 9000, Benchmarking), Root Cause Analysis & DMAIC

13 Reliability Engineering & Maintenance Systems

13.1 Reliability Modeling, Failure Rates (lambda) & Life Distributions (Exponential, Weibull) 13.2 System Reliability Architecture: Series, Parallel, k-out-of-n & Redundancy 13.3 Equipment Maintenance Engineering, Availability (A), MTBF/MTTR & RCM

9.3 Time Study Fundamentals, Performance Rating & Allowance Factors

Key Takeaways Explain This Topic AI

Direct stopwatch time study measures elemental task durations through continuous timing (uninterrupted watch reading with subtractions) or snapback timing (resetting watch to zero at each breakpoint), requiring unambiguous sensory element breakpoints.

Observed Time ( O T OT OT ) is transformed into Normal Time ( N T NT NT ) via performance rating ( P R PR PR ): N T = O T × P R NT = OT \times PR NT = OT × PR , where 100% represents the pace of a qualified, experienced worker working under standard conditions (e.g., walking 3 mph or dealing 52 cards into four piles in 0.50 minutes).

The Westinghouse rating system objectively quantifies performance rating across four behavioral dimensions: Skill, Effort, Conditions, and Consistency, each contributing an additive adjustment factor to baseline 1.00.

Standard Time ( S T ST ST ) incorporates Personal, Fatigue, and Delay (PFD) allowances. When allowances are applied as a percentage of normal time, S T = N T ( 1 + A total ) ST = NT(1 + A_{\text{total}}) ST = NT ( 1 + A total ​ ) ; when expressed as a percentage of the total working day, S T = N T 1 − A day ST = \frac{NT}{1 - A_{\text{day}}} ST = 1 − A day ​ NT ​ .

The statistical sample size ( n n n ) required to guarantee a specified relative precision k k k at confidence level 1 − α 1 - \alpha 1 − α is derived from the Student's t t t or normal z z z distribution: n = ( z α / 2 ⋅ s k ⋅ x ˉ ) 2 n = \left(\frac{z_{\alpha/2} \cdot s}{k \cdot \bar{x}}\right)^2 n = ( k ⋅ x ˉ z α /2 ​ ⋅ s ​ ) 2 .

Last updated: October 2026

9.3 Time Study Fundamentals, Performance Rating & Allowance Factors

Work measurement is the industrial engineering discipline tasked with determining the time required by a qualified, well-trained operator, working at a normal pace under standard operating conditions, to complete a specified task. Establishing robust labor standards is fundamental to capacity planning, assembly line balancing, production scheduling, labor cost accounting, and employee incentive compensation.

1. Direct Stopwatch Time Study Methodology

Direct time study utilizes a stopwatch (electronic or mechanical) to observe and record the elapsed time of operational elements directly on the factory floor.

Element Breakdown Principles

An operation cannot be timed as a single monolithic block. It must be partitioned into distinct elements —short, homogeneous segments of work that have clear beginnings and endpoints. Dividing operations into elements serves critical engineering functions:

Isolates Operational Variability: Distinguishes between highly consistent elements and variable, error-prone elements.

Separates Operator and Machine Durations: Allows manual handling time (subject to pace rating) to be evaluated separately from machine processing time (fixed by feeds, speeds, and controllers).

Facilitates Standard Data Synthesis: Elemental times can be archived into a standard data repository to predict times for future operations.

Enhances Rating Accuracy: An observer can evaluate operator pace more objectively over a 15-second element than across a 5-minute cycle.

Guidelines for Establishing Element Boundaries

Elements should be as short as can be reliably timed by the observer (typically between 0.04 minutes / 2.4 seconds and 0.50 minutes / 30 seconds).

Breakpoints (Terminal Points): The transition between successive elements must be marked by an unambiguous, sensory breakpoint —preferably an audible or distinct visual event (e.g., the sharp metallic sound of a clamp locking, or the instant fingers release a workpiece).

Elements must be categorized as regular elements (occurring every cycle) or irregular / periodic elements (occurring once every N N N cycles, such as changing a deburring blade every 50 parts or clearing chips every 20 parts).

Continuous Timing vs. Snapback Timing

Two classical timing techniques exist for direct stopwatch studies:

Timing Technique Operating Mechanics Advantages Disadvantages

Continuous Timing The watch starts at the beginning of the study and runs continuously without stopping. The observer records cumulative clock readings at each element breakpoint. Captures 100% of elapsed time; prevents omissions; records all delays and foreign elements; accepted in legal, labor, and union arbitration audits. Requires post-study clerical arithmetic to subtract successive readings ( O T i = R i − R i − 1 OT_i = R_i - R_{i-1} O T i ​ = R i ​ − R i − 1 ​ ) to extract individual elemental durations.

Snapback (Flyback) Timing At each breakpoint, the observer reads the elapsed time and instantly resets the stopwatch to zero, restarting it for the next element. Directly displays elemental observed times ( O T i OT_i O T i ​ ); eliminates post-study subtraction arithmetic; easily isolates irregular elements. Observer anticipation bias; minor cumulative lost time during mechanical reset; fails to account for total elapsed shift time if delays are unrecorded.

Foreign Elements and Outlier Management

A foreign element is an unexpected, non-cyclical event that occurs during the study (e.g., dropping a component, answering a supervisor question, or untangling power cords). The observer logs the foreign element with a letter code, records its duration, and excludes it from the calculation of the regular cycle's average observed time ( O T OT OT ).

Outliers must not be deleted arbitrarily. An observation may only be discarded if an identifiable, documented operational abnormality occurred (e.g., raw material defect, tool chatter). If statistical filtering is required, tests such as Dixon's Q-test or Chauvenet's criterion should be applied and documented.

2. Performance Rating (Pace Rating)

Because operators do not work at the identical pace during an observation, the recorded Average Observed Time ( x ˉ O T \bar{x}_{OT} x ˉ OT ​ ) must be calibrated to represent the time required by an operator working at a standard, normal pace. This adjustment is termed Performance Rating ( P R PR PR ) .

Calculating Normal Time ( N T NT NT )

The Normal Time ( N T NT NT ) represents the duration an experienced operator requires to execute the element when working at 100% standard pace:

N T = O T × P R = x ˉ O T × ( Rating Percentage 100 ) NT = OT \times PR = \bar{x}_{OT} \times \left( \frac{\text{Rating Percentage}}{100} \right) NT = OT × PR = x ˉ OT ​ × ( 100 Rating Percentage ​ )

For a multi-element task with m m m discrete manual elements:

N T cycle = ∑ j = 1 m N T j = ∑ j = 1 m ( x ˉ O T , j × P R j ) NT_{\text{cycle}} = \sum_{j=1}^m NT_j = \sum_{j=1}^m \left( \bar{x}_{OT, j} \times PR_j \right) N T cycle ​ = ∑ j = 1 m ​ N T j ​ = ∑ j = 1 m ​ ( x ˉ OT , j ​ × P R j ​ )

The Standard Benchmark Pace (100% Pace)

Methods engineering texts (for example Niebel and Freivalds, Methods, Standards, and Work Design ) use classic physical benchmarks to define 100% normal pace:

Walking Benchmark: Walking unburdened on smooth, level ground at exactly 3.0 miles per hour (4.4 ft/s or 4.83 km/h) .

Card Dealing Benchmark: Dealing a standard 52-card playing deck into four distinct piles (located at the corners of a 1-foot square) in exactly 0.50 minutes (30.0 seconds) .

Pegboard Benchmark: Assembling 30 cylindrical pins into a standard two-handed pegboard in exactly 0.41 minutes (24.6 seconds) .

An operator working at 120% pace moves 20% faster than the benchmark, requiring a normal time adjustment of N T = O T × 1.20 NT = OT \times 1.20 NT = OT × 1.20 . Conversely, an operator moving at 80% pace has an adjustment of N T = O T × 0.80 NT = OT \times 0.80 NT = OT × 0.80 .

The Westinghouse Rating System

Developed by the Westinghouse Electric Corporation, this system reduces observer subjectivity by evaluating performance across four independent behavioral categories:

Skill: Facility in following a given method, coordination, and rhythm (+0.15 Superskill A1 to -0.22 Poor F2).

Effort: The will to work, energy expenditure, and mental focus (+0.13 Excessive A1 to -0.17 Poor F2).

Conditions: Temperature, lighting, ventilation, and physical environment affecting the operator (+0.06 Ideal A to -0.07 Poor F).

Consistency: Regularity of successive cycle times (+0.04 Perfect A to -0.04 Poor F).

The composite performance rating is computed additively relative to the 1.00 baseline:

P R = 1.00 + Δ Skill + Δ Effort + Δ Conditions + Δ Consistency PR = 1.00 + \Delta_{\text{Skill}} + \Delta_{\text{Effort}} + \Delta_{\text{Conditions}} + \Delta_{\text{Consistency}} PR = 1.00 + Δ Skill ​ + Δ Effort ​ + Δ Conditions ​ + Δ Consistency ​

3. Allowance Factors (PFD Allowances)

An operator cannot sustain 100% normal pace continuously across an entire 8-hour shift without experiencing fatigue, attending to bodily needs, or encountering minor operational delays. Therefore, industrial engineers add Allowances to Normal Time to compute Standard Time ( S T ST ST ) .

Allowances are partitioned into three primary components, collectively termed PFD (Personal, Fatigue, and Delay) Allowances : PFD Allowance Architecture

  • ├── Personal Needs Allowance (A_p) [~5% constant; restroom, hydration, hygiene]
  • ├── Basic Fatigue Allowance (A_f) [~4% constant; basic physiological recovery]
  • ├── Variable Fatigue Allowance (A_vf) [Task-dependent ergonomics]
  • │ ├── Working posture (standing, crouching, awkward bending)
  • │ ├── Muscular force exerted / weight of lifted objects
  • │ ├── Atmospheric heat stress (WBGT) and high humidity
  • │ ├── Visual optical strain and glare
  • │ └── Excessive ambient noise and mental concentration
  • └── Unavoidable Delays (A_d) [Minor machine adjustments, material transit waiting]

Important

Avoidable Delays ( A a d A_{ad} A a d ​ ) —such as unauthorized phone usage, social chatting, or personal idling—are strictly excluded from allowance calculations. Standards compensate only for productive work, physiological recovery, and unavoidable system disruptions.

Total Allowance Percentage

The total allowance fraction ( A total A_{\text{total}} A total ​ ) is the algebraic sum of the individual allowance categories:

A total = A p + A f + A v f + A d A_{\text{total}} = A_p + A_f + A_{vf} + A_d A total ​ = A p ​ + A f ​ + A v f ​ + A d ​

4. Standard Time Calculations and Production Rates

In industrial engineering practice, allowances are mathematically incorporated using one of two distinct conventions. Candidates must verify how the examination question states allowances.

Method 1: Allowances Based on Normal Time (Industry Standard)

In the vast majority of manufacturing operations, allowances are expressed as a direct percentage multiplier applied to the Normal Time:

S T = N T × ( 1 + A total ) = N T × ( 1 + A p + A f + A v f + A d ) ST = NT \times (1 + A_{\text{total}}) = NT \times (1 + A_p + A_f + A_{vf} + A_d) ST = NT × ( 1 + A total ​ ) = NT × ( 1 + A p ​ + A f ​ + A v f ​ + A d ​ )

Method 2: Allowances Based on the Total Working Day (Shift Basis)

Under this convention, allowances are established as a percentage of the total working shift ( T shift T_{\text{shift}} T shift ​ , e.g., 480 minutes). The total working shift is partitioned into productive standard time and allowance downtime ( T allowance = A day × T shift T_{\text{allowance}} = A_{\text{day}} \times T_{\text{shift}} T allowance ​ = A day ​ × T shift ​ ):

S T = N T 1 − A day ST = \frac{NT}{1 - A_{\text{day}}} ST = 1 − A day ​ NT ​

Note

For any positive allowance percentage ( A > 0 A > 0 A > 0 ), Method 2 yields a larger Standard Time than Method 1 because 1 1 − A > 1 + A \frac{1}{1 - A} > 1 + A 1 − A 1 ​ > 1 + A . For example, with a 15% allowance ( A = 0.15 A = 0.15 A = 0.15 ):

Method 1: 1 + 0.15 = 1.150 1 + 0.15 = 1.150 1 + 0.15 = 1.150

Method 2: 1 1 − 0.15 = 1 0.85 = 1.1765 \frac{1}{1 - 0.15} = \frac{1}{0.85} = 1.1765 1 − 0.15 1 ​ = 0.85 1 ​ = 1.1765 (a 2.3% difference).

Standard Production Rate ( R R R )

Once the Standard Time ( S T ST ST ) per unit is determined, the standard production output rate is the mathematical inverse:

R = 1 S T [ units minute ] or R hour = 60 S T [ units hour ] R = \frac{1}{ST} \quad \left[ \frac{\text{units}}{\text{minute}} \right] \qquad \text{or} \qquad R_{\text{hour}} = \frac{60}{ST} \quad \left[ \frac{\text{units}}{\text{hour}} \right] R = ST 1 ​ [ minute units ​ ] or R hour ​ = ST 60 ​ [ hour units ​ ]

5. Statistical Sample Size Determination

Because time study is an inductive sampling procedure, a finite sample of n n n cycles is used to estimate the true population mean cycle time μ \mu μ . To guarantee that the sample mean x ˉ \bar{x} x ˉ estimates μ \mu μ within an allowable relative error percentage k k k (e.g., ± 5 % \pm 5\% ± 5% ) at a specified confidence level ( 1 − α ) (1 - \alpha) ( 1 − α ) (e.g., 95%), the sample size must satisfy statistical rigor.

Derivation from Confidence Interval Formulation

The half-width margin of error e e e is expressed as:

e = k ⋅ x ˉ = z α / 2 ⋅ s n e = k \cdot \bar{x} = z_{\alpha/2} \cdot \frac{s}{\sqrt{n}} e = k ⋅ x ˉ = z α /2 ​ ⋅ n ​ s ​

Solving explicitly for the required number of observations n n n :

n = ( z α / 2 ⋅ s k ⋅ x ˉ ) 2 = ( z α / 2 ⋅ s e ) 2 n = \left( \frac{z_{\alpha/2} \cdot s}{k \cdot \bar{x}} \right)^2 = \left( \frac{z_{\alpha/2} \cdot s}{e} \right)^2 n = ( k ⋅ x ˉ z α /2 ​ ⋅ s ​ ) 2 = ( e z α /2 ​ ⋅ s ​ ) 2

Where:

n n n = Minimum required sample size (number of cycles).

z α / 2 z_{\alpha/2} z α /2 ​ = Standard normal distribution critical value corresponding to confidence level 1 − α 1 - \alpha 1 − α ( z = 1.96 z = 1.96 z = 1.96 for 95% confidence; z = 2.576 z = 2.576 z = 2.576 for 99% confidence).

s s s = Sample standard deviation computed from a preliminary pilot study: s = ∑ i = 1 n ( x i − x ˉ ) 2 n − 1 s = \sqrt{\frac{\sum_{i=1}^n (x_i - \bar{x})^2}{n - 1}} s = n − 1 ∑ i = 1 n ​ ( x i ​ − x ˉ ) 2 ​ ​ .

x ˉ \bar{x} x ˉ = Sample mean observed time from the pilot study: x ˉ = ∑ x i n \bar{x} = \frac{\sum x_i}{n} x ˉ = n ∑ x i ​ ​ .

k k k = Desired relative precision percentage expressed as a decimal (e.g., ± 5 % ⟹ k = 0.05 \pm 5\% \implies k = 0.05 ± 5% ⟹ k = 0.05 ).

e e e = Absolute precision margin of error ( e = k ⋅ x ˉ e = k \cdot \bar{x} e = k ⋅ x ˉ ).

Caution

If the pilot sample size is small ( n < 30 n < 30 n < 30 ), statistical accuracy requires replacing the standard normal z z z with the Student's t t t -statistic with n − 1 n - 1 n − 1 degrees of freedom: n = ( t α / 2 , n − 1 ⋅ s k ⋅ x ˉ ) 2 n = \left( \frac{t_{\alpha/2, n-1} \cdot s}{k \cdot \bar{x}} \right)^2 n = ( k ⋅ x ˉ t α /2 , n − 1 ​ ⋅ s ​ ) 2 . If the calculated n n n exceeds the pilot size, the engineer must collect additional cycles until the cumulative sample size meets or exceeds the required n n n .

  • 6. Comprehensive Worked Numerical Problem
  • Problem Statement

An industrial engineer conducts a time study on a semi-automated medical device assembly operation consisting of three distinct manual elements. The preliminary pilot study evaluates 10 cycles for each element.

Data gathered from the pilot study:

Element 1 (Pick up base housing and secure into fixture): x ˉ 1 = 0.24 \bar{x}_1 = 0.24 x ˉ 1 ​ = 0.24 min, s 1 = 0.024 s_1 = 0.024 s 1 ​ = 0.024 min, Performance Rating P R 1 = 110 % PR_1 = 110\% P R 1 ​ = 110% .

Element 2 (Insert PCB, attach ribbon cable, and drive 4 micro-screws): x ˉ 2 = 0.75 \bar{x}_2 = 0.75 x ˉ 2 ​ = 0.75 min, s 2 = 0.060 s_2 = 0.060 s 2 ​ = 0.060 min, Performance Rating P R 2 = 90 % PR_2 = 90\% P R 2 ​ = 90% .

Element 3 (Inspect optical alignment, release clamp, drop into tote): x ˉ 3 = 0.31 \bar{x}_3 = 0.31 x ˉ 3 ​ = 0.31 min, s 3 = 0.031 s_3 = 0.031 s 3 ​ = 0.031 min, Performance Rating P R 3 = 100 % PR_3 = 100\% P R 3 ​ = 100% .

Company policy requires a 95% confidence level ( z = 1.96 z = 1.96 z = 1.96 ) with a relative precision of ± 5 % \pm 5\% ± 5% ( k = 0.05 k = 0.05 k = 0.05 ) across all elements.

Allowances applied to the operation are established as follows:

  • Personal needs allowance: A p = 5 % A_p = 5\% A p ​ = 5%
  • Basic fatigue allowance: A f = 4 % A_f = 4\% A f ​ = 4%
  • Variable fatigue (standing posture + fine visual strain): A v f = 3 % A_{vf} = 3\% A v f ​ = 3%
  • Unavoidable delays: A d = 2 % A_d = 2\% A d ​ = 2%
  • Step-by-Step Calculation
  • Step 1: Verify Sample Size Adequacy

Calculate the required sample size for each element using n = ( 1.96 ⋅ s 0.05 ⋅ x ˉ ) 2 n = \left( \frac{1.96 \cdot s}{0.05 \cdot \bar{x}} \right)^2 n = ( 0.05 ⋅ x ˉ 1.96 ⋅ s ​ ) 2 :

Element 1: n 1 = ( 1.96 × 0.024 0.05 × 0.24 ) 2 = ( 0.04704 0.012 ) 2 = ( 3.92 ) 2 = 15.37 ⟹ 16 observations n_1 = \left( \frac{1.96 \times 0.024}{0.05 \times 0.24} \right)^2 = \left( \frac{0.04704}{0.012} \right)^2 = (3.92)^2 = 15.37 \implies 16 \text{ observations} n 1 ​ = ( 0.05 × 0.24 1.96 × 0.024 ​ ) 2 = ( 0.012 0.04704 ​ ) 2 = ( 3.92 ) 2 = 15.37 ⟹ 16 observations

Element 2: n 2 = ( 1.96 × 0.060 0.05 × 0.75 ) 2 = ( 0.1176 0.0375 ) 2 = ( 3.136 ) 2 = 9.83 ⟹ 10 observations n_2 = \left( \frac{1.96 \times 0.060}{0.05 \times 0.75} \right)^2 = \left( \frac{0.1176}{0.0375} \right)^2 = (3.136)^2 = 9.83 \implies 10 \text{ observations} n 2 ​ = ( 0.05 × 0.75 1.96 × 0.060 ​ ) 2 = ( 0.0375 0.1176 ​ ) 2 = ( 3.136 ) 2 = 9.83 ⟹ 10 observations

Element 3: n 3 = ( 1.96 × 0.031 0.05 × 0.31 ) 2 = ( 0.06076 0.0155 ) 2 = ( 3.92 ) 2 = 15.37 ⟹ 16 observations n_3 = \left( \frac{1.96 \times 0.031}{0.05 \times 0.31} \right)^2 = \left( \frac{0.06076}{0.0155} \right)^2 = (3.92)^2 = 15.37 \implies 16 \text{ observations} n 3 ​ = ( 0.05 × 0.31 1.96 × 0.031 ​ ) 2 = ( 0.0155 0.06076 ​ ) 2 = ( 3.92 ) 2 = 15.37 ⟹ 16 observations

Conclusion: While Element 2 satisfies the precision requirement with the initial 10 cycles, Elements 1 and 3 require at least 16 observations to guarantee the desired statistical precision.

Step 2: Compute Normal Time ( N T NT NT )

Using the full sample data where average observed times remain stable:

N T 1 = x ˉ 1 × P R 1 = 0.24 × 1.10 = 0.264 minutes NT_1 = \bar{x}_1 \times PR_1 = 0.24 \times 1.10 = 0.264 \text{ minutes} N T 1 ​ = x ˉ 1 ​ × P R 1 ​ = 0.24 × 1.10 = 0.264 minutes

N T 2 = x ˉ 2 × P R 2 = 0.75 × 0.90 = 0.675 minutes NT_2 = \bar{x}_2 \times PR_2 = 0.75 \times 0.90 = 0.675 \text{ minutes} N T 2 ​ = x ˉ 2 ​ × P R 2 ​ = 0.75 × 0.90 = 0.675 minutes

N T 3 = x ˉ 3 × P R 3 = 0.31 × 1.00 = 0.310 minutes NT_3 = \bar{x}_3 \times PR_3 = 0.31 \times 1.00 = 0.310 \text{ minutes} N T 3 ​ = x ˉ 3 ​ × P R 3 ​ = 0.31 × 1.00 = 0.310 minutes

Total Cycle Normal Time: N T cycle = N T 1 + N T 2 + N T 3 = 0.264 + 0.675 + 0.310 = 1.249 minutes NT_{\text{cycle}} = NT_1 + NT_2 + NT_3 = 0.264 + 0.675 + 0.310 = 1.249 \text{ minutes} N T cycle ​ = N T 1 ​ + N T 2 ​ + N T 3 ​ = 0.264 + 0.675 + 0.310 = 1.249 minutes

Step 3: Compute Total Allowance Percentage ( A total A_{\text{total}} A total ​ )

A total = 5 % + 4 % + 3 % + 2 % = 14 % = 0.14 A_{\text{total}} = 5\% + 4\% + 3\% + 2\% = 14\% = 0.14 A total ​ = 5% + 4% + 3% + 2% = 14% = 0.14

Step 4: Compute Standard Time ( S T ST ST ) under Both Methods

Method 1 (Allowance on Normal Time): S T 1 = N T cycle × ( 1 + A total ) = 1.249 × ( 1 + 0.14 ) = 1.249 × 1.14 = 1.42386 ≈ 1.424 minutes ST_1 = NT_{\text{cycle}} \times (1 + A_{\text{total}}) = 1.249 \times (1 + 0.14) = 1.249 \times 1.14 = 1.42386 \approx 1.424 \text{ minutes} S T 1 ​ = N T cycle ​ × ( 1 + A total ​ ) = 1.249 × ( 1 + 0.14 ) = 1.249 × 1.14 = 1.42386 ≈ 1.424 minutes

Method 2 (Allowance on Working Shift): S T 2 = N T cycle 1 − A day = 1.249 1 − 0.14 = 1.249 0.86 = 1.45233 ≈ 1.452 minutes ST_2 = \frac{NT_{\text{cycle}}}{1 - A_{\text{day}}} = \frac{1.249}{1 - 0.14} = \frac{1.249}{0.86} = 1.45233 \approx 1.452 \text{ minutes} S T 2 ​ = 1 − A day ​ N T cycle ​ ​ = 1 − 0.14 1.249 ​ = 0.86 1.249 ​ = 1.45233 ≈ 1.452 minutes

Step 5: Compute Standard Hourly Production Rates

Under Method 1: R 1 = 60 min/hr 1.42386 min/unit = 42.14 units per hour R_1 = \frac{60 \text{ min/hr}}{1.42386 \text{ min/unit}} = 42.14 \text{ units per hour} R 1 ​ = 1.42386 min/unit 60 min/hr ​ = 42.14 units per hour

Under Method 2: R 2 = 60 min/hr 1.45233 min/unit = 41.31 units per hour R_2 = \frac{60 \text{ min/hr}}{1.45233 \text{ min/unit}} = 41.31 \text{ units per hour} R 2 ​ = 1.45233 min/unit 60 min/hr ​ = 41.31 units per hour