Study guide
1.3 Engineering Economics, Life Cycle Cost Analysis & Equipment Financial Evaluation
PE Mechanical: HVAC and Refrigeration Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview, Reference Handbook & Engineering Foundations
1.1 NCEES Exam Specification, CBT Delivery & Reference Handbook Strategy 1.2 Engineering Units, Dimensional Analysis & Physical Property Lookups 1.3 Engineering Economics, Life Cycle Cost Analysis & Equipment Financial Evaluation 1.4 Electrical Foundations, Motor Ratings & Variable Frequency Drives (VFDs)
2 Chapter 2: Thermodynamics & Energy Balances
2.1 First and Second Laws of Thermodynamics & Open/Closed System Energy Balances 2.2 Thermodynamic Cycles: Carnot, Rankine, Brayton & Reversed Carnot Limit 2.3 Gas & Vapor Property Evaluation: Steam Tables, Superheat & Subcooling 2.4 Mass, Energy & Combustion Balances for HVAC Equipment
3 Chapter 3: Psychrometrics, Moist Air Processes & Humidity Equipment
3.1 Psychrometric Properties: DBT, WBT, DPT, RH, Humidity Ratio & Enthalpy 3.2 Chart Reading & Psychrometric Equations at Sea Level vs. Altitude (5,000 ft) 3.3 Basic Psychrometric Processes: Sensible Heating/Cooling, Humidification & Dehumidification 3.4 Mixed Air Calculations & Complex Air Conditioning Cycles (Preheat, Reheat & Bypass) 3.5 Sensible Heat Ratio (SHR), Apparatus Dew Point (ADP) & Coil Bypass Factor 3.6 Humidification & Dehumidification Equipment: Steam, Adiabatic, Desiccant & Low-Temperature Processes
4 Chapter 4: Heat Transfer Principles & Sizing
4.1 Steady-State Conduction & Multilayer Thermal Resistance (R-Value & U-Factor) 4.2 Convective Heat Transfer & Forced/Natural Convection Coefficients 4.3 Radiation Heat Transfer, Surface Emissivity & View Factors 4.4 Overall Heat Transfer Coefficients, Fouling Factors & Transient/Thermal Mass Effects 4.5 Heat Exchanger Analysis: Log Mean Temperature Difference (LMTD) & Effectiveness-NTU (ε-NTU)
5 Chapter 5: Fluid Mechanics & Hydraulic Fundamentals
5.1 Fluid Statics, Incompressible Continuity & Bernoulli Energy Equation 5.2 Pipe Friction, Moody Diagram & Darcy-Weisbach / Hazen-Williams Calculations 5.3 Minor Losses: Equivalent Length, Loss Coefficients (K-factors) & Total System Head 5.4 Pump Sizing, Net Positive Suction Head (NPSHa vs NPSHr) & Cavitation Prevention 5.5 Affinity Laws & Parallel/Series Pump/Fan System Curves
6 Chapter 6: Heating & Cooling Load Calculations
6.1 Outdoor & Indoor Design Conditions (ASHRAE Fundamentals, Climatic Data & Indoor Setpoints) 6.2 Envelope Heat Transmission & Infiltration/Exfiltration Load Methods 6.3 Solar Heat Gain (SHGC), Fenestration & Cooling Load Temperature Difference / Radiant Time Series (CLTD/RTS) 6.4 Internal Heat Gains: Lighting, People, Equipment & Diversity Factors 6.5 Ventilation Loads & Sensible / Latent / Total Cooling Load Synthesis
7 Chapter 7: Refrigeration Principles, Cycles & Cold Storage Applications
7.1 Standard Vapor-Compression Refrigeration Cycle on P-h & T-s Diagrams 7.2 Refrigeration Cycle Performance Metrics: COP, EER, SEER, kW/ton & Ton of Refrigeration 7.3 Cycle Enhancements: Subcooling, Superheating, Liquid-Suction Heat Exchangers & Economizers 7.4 Multi-Stage & Cascade Refrigeration Systems: Intercooling & Flash Gas Removal 7.5 Absorption Refrigeration Cycles: Water-Lithium Bromide & Ammonia-Water Systems 7.6 Food Processing & Cold Storage Refrigeration: Product Load, Pull-Down & Storage Design
8 Chapter 8: Refrigerants, Environmental Regulations & Safety
8.1 Refrigerant Classifications, Nomenclature & Thermodynamic Properties (ASHRAE Standard 34) 8.2 AIM Act, EPA Technology Transitions Sector GWP Limits & Low-GWP Refrigerants (R-32, R-454B) 8.3 Refrigerant Safety Requirements & Machinery Room Design (ASHRAE Standard 15) 8.4 Refrigerant Piping Sizing, Oil Return, Traps & Double Risers
9 Chapter 9: HVAC Equipment & Primary Machinery
9.1 Compressors: Reciprocating, Rotary, Scroll, Screw & Centrifugal 9.2 Condensers: Air-Cooled, Water-Cooled & Evaporative Condensers 9.3 Evaporators & Direct Expansion (DX) vs Liquid Chilling Coils 9.4 Water Chillers: Centrifugal, Screw & Scroll with ASHRAE 90.1 Path A/B IPLV Ratings 9.5 Cooling Towers: Range, Approach, Evaporation, Blowdown & Legionella Control 9.6 Heat Pumps & Variable Refrigerant Flow (VRF): Balance Point, Defrost & Heat Recovery 9.7 Thermal Energy Storage: Full vs. Partial Storage, Chilled Water & Ice Systems
10 Chapter 10: Air-Side Systems & Distribution
10.1 Air Handling Units (AHUs), Dedicated Outdoor Air Systems (DOAS) & Fan-Coil Units 10.2 Duct Design Methodologies: Equal Friction, Static Regain & Velocity Reduction 10.3 Duct Fittings, Dynamic Pressure Losses & SMACNA Construction Standards 10.4 Fan Types, Performance Curves, System Effect Factors & Surge/Stall Dynamics 10.5 Variable Air Volume (VAV) Systems, Terminal Boxes & Space Air Diffusion (ADPI) 10.6 Cooling & Heating Coil Selection: Face Velocity, Rows, Circuiting & Freeze Protection
11 Chapter 11: Hydronic, Steam & Fuel Distribution and Heating Plant
11.1 Hydronic System Architectures: Primary-Only, Primary-Secondary & Variable Primary Flow (VPF) 11.2 Hydronic Pipe Sizing, Velocity Limits & Closed/Open Expansion Tank Sizing 11.3 Control Valves: 2-Way vs 3-Way, Valve Authority (N), Cv Calculations & Characteristic Curves 11.4 Boilers & Heating Hot Water Systems: Condensing vs Non-Condensing & Water Treatment 11.5 Furnaces & Gas-Fired Heating Equipment: AFUE, Temperature Rise, Combustion Air & Vent Categories 11.6 Steam & Condensate Distribution: Latent Heat, Trap Selection, Flash Steam & Stall 11.7 Fuel Gas & Fuel Oil Piping: Demand, Sizing Method, Pressure Drop & Storage Systems
12 Chapter 12: HVAC Control Concepts, Sensors & Sequences
12.1 Sensors, Actuators & Dampers: Selection, Placement, Fail-Safe Position & Damper Authority 12.2 Control Loops: Proportional Offset, PID Action, Reset Strategies & Standard Sequences
13 Chapter 13: Building Energy, Ventilation & Indoor Environmental Quality Codes
13.1 ASHRAE Standard 62.1: Ventilation Rate Procedure (VRP), Indoor Air Quality Procedure & DCV 13.2 ASHRAE Standard 90.1: Building Energy Envelope, Mechanical Efficiency & Economizer Mandates 13.3 ASHRAE Standard 55: Thermal Environmental Conditions, PMV/PPD & Adaptive Comfort Models 13.4 Energy Recovery Systems: Enthalpy Wheels, Fixed-Plate Exchangers, Heat Pipes & Runaround Loops
14 Chapter 14: Supportive Engineering Knowledge, Life Safety & Operations
14.1 Air Filtration Standards: MERV Ratings (ASHRAE 52.2), HEPA & Gas-Phase Adsorption 14.2 Life Safety Systems: Fire/Smoke Dampers, Stairwell Pressurization (NFPA 92) & Smoke Control (NFPA 90A) 14.3 Acoustical Control & Vibration Isolation in HVAC Systems (NC / RC Criteria)
1.3 Engineering Economics, Life Cycle Cost Analysis & Equipment Financial Evaluation
Key Takeaways Explain This Topic AI
Engineering economics applies discrete compound interest factors to evaluate the time value of money, converting between Present Worth (P), Future Worth (F), and Equivalent Uniform Annual Worth (A).
The Capital Recovery Factor (A/P, i, n) converts an initial capital outlay into an equivalent uniform annual cost over n years at interest rate i: (A/P, i, n) = [i(1+i)^n] / [(1+i)^n - 1].
Life Cycle Cost Analysis (LCCA) encompasses all cash flows over the equipment lifespan: initial equipment purchase, installation, recurring energy costs, scheduled maintenance, major overhaul/replacement, and residual salvage value.
Simple Payback Period (SPP = Initial Cost / Annual Savings) ignores the time value of money and cash flows beyond payback, whereas Net Present Value (NPV) and Incremental Rate of Return (Delta IRR) provide rigorous economic decision criteria for mutually exclusive alternatives.
When comparing HVAC equipment alternatives (e.g., standard vs premium high-efficiency chillers or RTUs), select the higher-cost option only if the incremental investment yields an incremental return greater than the Minimum Attractive Rate of Return (Delta IRR > MARR or Delta NPV > 0).
Last updated: August 2026
1.3 Engineering Economics, Life Cycle Cost Analysis & Equipment Financial Evaluation
HVAC design engineers are routinely tasked with evaluating competing mechanical system designs, sizing energy-efficiency retrofits, and justifying higher initial capital expenditures through lifetime operating energy savings. The NCEES PE Mechanical Reference Handbook provides discrete compounding interest tables and economic formulas to perform Life Cycle Cost Analysis (LCCA), Net Present Value (NPV) evaluations, and Equivalent Uniform Annual Cost (EUAC) determinations.
1. Time Value of Money & Cash Flow Notation
All engineering economic evaluations rest upon the principle that a dollar today is worth more than a dollar in the future due to its earning capacity (interest rate, i i i , or discount rate / Minimum Attractive Rate of Return, MARR \text{MARR} MARR ). Cash flows are modeled as discrete lump sums or annual series occurring at the end of discrete compounding periods ( n n n , in years). P (Present Worth at Year 0)
- |
- v
- -+-------+-------+-------+-------+-------+--> Time (Years)
- 0 1 2 3 ... n
- ^ ^ ^ ^
- | | | | + S (Salvage Value)
- A A A A (Uniform Annual Series: Energy + Maint)
- Primary Economic Variables
- P P P : Present worth or initial capital investment (at time t = 0 t = 0 t = 0 )
- F F F : Future worth or single lump-sum value (at end of period n n n )
- A A A : Equivalent Uniform Annual Worth / Cost occurring at the end of each period for n n n periods
- G G G : Uniform gradient series (annual cash flow increases/decreases by a constant amount G G G each period)
- S S S : Salvage or residual value of equipment at the end of its useful life ( t = n t = n t = n )
- i i i : Effective interest rate or discount rate per period (decimal or percentage)
- n n n : Number of interest periods (equipment service life in years)
- 2. Compound Interest Factors & Mathematical Formulations
The standard NCEES compound interest factors allow direct conversion between cash flow formats.
Complete Summary of NCEES Interest Factors
Factor Name Standard Notation Equation Purpose / Application
Single Payment Present Worth ( P / F , i , n ) (P/F, i, n) ( P / F , i , n ) ( 1 + i ) − n (1 + i)^{-n} ( 1 + i ) − n Find present value of future lump sum F F F (e.g., salvage value)
Single Payment Compound Amount ( F / P , i , n ) (F/P, i, n) ( F / P , i , n ) ( 1 + i ) n (1 + i)^n ( 1 + i ) n Find future accumulated value of initial investment P P P
Uniform Series Present Worth ( P / A , i , n ) (P/A, i, n) ( P / A , i , n ) ( 1 + i ) n − 1 i ( 1 + i ) n \frac{(1 + i)^n - 1}{i(1 + i)^n} i ( 1 + i ) n ( 1 + i ) n − 1 Find present value of annual recurring savings/cost A A A
Capital Recovery Factor ( A / P , i , n ) (A/P, i, n) ( A / P , i , n ) i ( 1 + i ) n ( 1 + i ) n − 1 \frac{i(1 + i)^n}{(1 + i)^n - 1} ( 1 + i ) n − 1 i ( 1 + i ) n Convert initial capital cost P P P to equivalent annual cost A A A
Sinking Fund Factor ( A / F , i , n ) (A/F, i, n) ( A / F , i , n ) i ( 1 + i ) n − 1 \frac{i}{(1 + i)^n - 1} ( 1 + i ) n − 1 i Find annual deposit A A A needed to accumulate future sum F F F
Uniform Series Compound Amount ( F / A , i , n ) (F/A, i, n) ( F / A , i , n ) ( 1 + i ) n − 1 i \frac{(1 + i)^n - 1}{i} i ( 1 + i ) n − 1 Find future accumulated sum F F F of annual series A A A
Uniform Gradient Present Worth ( P / G , i , n ) (P/G, i, n) ( P / G , i , n ) ( 1 + i ) n − i n − 1 i 2 ( 1 + i ) n \frac{(1 + i)^n - i n - 1}{i^2(1 + i)^n} i 2 ( 1 + i ) n ( 1 + i ) n − in − 1 Find present value of linearly escalating maintenance G G G
Uniform Gradient Uniform Series ( A / G , i , n ) (A/G, i, n) ( A / G , i , n ) 1 i − n ( 1 + i ) n − 1 \frac{1}{i} - \frac{n}{(1 + i)^n - 1} i 1 − ( 1 + i ) n − 1 n Convert linear gradient G G G into equivalent uniform annual series
3. Life Cycle Cost Analysis (LCCA) Framework
Life Cycle Cost Analysis evaluates the total cost of owning, operating, and maintaining an HVAC system over its designated service life. For a given mechanical system alternative, the total Present Worth Life Cycle Cost ( LCC P \text{LCC}_P LCC P ) is defined as: LCC P = C cap + C inst + PW ( C energy ) + PW ( C maint ) + PW ( C replace ) − PW ( S ) \text{LCC}_P = C_{\text{cap}} + C_{\text{inst}} + \text{PW}(C_{\text{energy}}) + \text{PW}(C_{\text{maint}}) + \text{PW}(C_{\text{replace}}) - \text{PW}(S) LCC P = C cap + C inst + PW ( C energy ) + PW ( C maint ) + PW ( C replace ) − PW ( S )
Where:
C cap + C inst C_{\text{cap}} + C_{\text{inst}} C cap + C inst : Total initial turnkey installed capital cost ( t = 0 t = 0 t = 0 )
PW ( C energy ) = C annual energy × ( P / A , i , n ) \text{PW}(C_{\text{energy}}) = C_{\text{annual energy}} \times (P/A, i, n) PW ( C energy ) = C annual energy × ( P / A , i , n )
PW ( C maint ) = C annual maint × ( P / A , i , n ) \text{PW}(C_{\text{maint}}) = C_{\text{annual maint}} \times (P/A, i, n) PW ( C maint ) = C annual maint × ( P / A , i , n ) (or includes ( P / G , i , n ) (P/G, i, n) ( P / G , i , n ) for escalating maintenance)
PW ( C replace ) = C overhaul × ( P / F , i , n replace ) \text{PW}(C_{\text{replace}}) = C_{\text{overhaul}} \times (P/F, i, n_{\text{replace}}) PW ( C replace ) = C overhaul × ( P / F , i , n replace ) (e.g., compressor rebuild at year 10)
PW ( S ) = S × ( P / F , i , n ) \text{PW}(S) = S \times (P/F, i, n) PW ( S ) = S × ( P / F , i , n ) (salvage value deducted)
Equivalent Uniform Annual Cost (EUAC)
To compare equipment alternatives with different service lives, convert total present worth into Equivalent Uniform Annual Cost: EUAC = LCC P × ( A / P , i , n ) \text{EUAC} = \text{LCC}_P \times (A/P, i, n) EUAC = LCC P × ( A / P , i , n )
The alternative with the lowest EUAC is the most cost-effective engineering choice.
4. Economic Evaluation Metrics: Payback, NPV & IRR +-------------------------------------------------------------------------------------+
- | COMPARISON OF FINANCIAL DECISION METRICS |
- +-------------------------------------------------------------------------------------+
- | Metric | Time Value of Money? | Reinvestment Rate? | Exam Decision Rule |
- | ------------------ | -------------------- | ------------------ | ------------------- |
- | Simple Payback | NO | N/A | Lower is better |
- | Discounted Payback | YES | Discount rate (i) | Lower is better |
- | Net Present Value | YES | MARR | Select Max NPV > 0 |
- | Internal Rate (IRR)| YES | Calculated IRR | Select if IRR > MARR|
- +-------------------------------------------------------------------------------------+
1. Simple Payback Period (SPP) SPP = Δ Initial Investment Δ Annual Operating Cost Savings \text{SPP} = \frac{\Delta \text{Initial Investment}}{\Delta \text{Annual Operating Cost Savings}} SPP = Δ Annual Operating Cost Savings Δ Initial Investment
Limitation: SPP completely ignores cash flows beyond the payback cutoff and disregards the time value of money.
2. Discounted Payback Period (DPP)
The smallest integer number of years k k k such that cumulative discounted annual savings equal or exceed the initial incremental investment: ∑ t = 1 k Δ A t ( 1 + i ) t ≥ Δ P \sum_{t=1}^{k} \frac{\Delta A_t}{(1 + i)^t} \ge \Delta P t = 1 ∑ k ( 1 + i ) t Δ A t ≥ Δ P
3. Net Present Value (NPV) & Incremental Analysis
For independent projects, select any project with NPV > 0 \text{NPV} > 0 NPV > 0 . For mutually exclusive alternatives (e.g., choosing between Standard Chiller A and High-Efficiency Chiller B):
Rank alternatives in order of increasing initial capital cost ( P A < P B P_A < P_B P A < P B ).
Compute incremental initial cost: Δ P = P B − P A \Delta P = P_B - P_A Δ P = P B − P A .
Compute incremental annual savings: Δ A = A A − A B \Delta A = A_A - A_B Δ A = A A − A B .
Compute incremental Net Present Value: Δ NPV = − Δ P + Δ A ⋅ ( P / A , i , n ) + Δ S ⋅ ( P / F , i , n ) \Delta \text{NPV} = -\Delta P + \Delta A \cdot (P/A, i, n) + \Delta S \cdot (P/F, i, n) Δ NPV = − Δ P + Δ A ⋅ ( P / A , i , n ) + Δ S ⋅ ( P / F , i , n )
If Δ NPV > 0 \Delta \text{NPV} > 0 Δ NPV > 0 (or Δ IRR > MARR \Delta \text{IRR} > \text{MARR} Δ IRR > MARR ), the extra investment in Alternative B is economically justified.
- 5. Comprehensive Worked Example: Chiller Financial Evaluation
- Problem Statement
A hospital facility is evaluating two competing 400-ton water-cooled centrifugal chillers for a central plant replacement. The facility operates 3,500 equivalent full-load hours (EFLH) annually, the cost of electricity is $0.12 / kWh , the discount rate ( MARR \text{MARR} MARR ) is 8.0% , and the project analysis horizon is 15 years .
Option A (Standard Efficiency Chiller):
- Installed Cost: $180,000
- Full-Load Efficiency: 0.62 kW/ton 0.62\text{ kW/ton} 0.62 kW/ton
- Annual Maintenance: $6,000 / year
- Salvage Value at Year 15: $15,000
Option B (Premium Magnetic-Bearing VFD Chiller):
- Installed Cost: $260,000
- Full-Load Efficiency: 0.48 kW/ton 0.48\text{ kW/ton} 0.48 kW/ton
- Annual Maintenance: $4,500 / year
- Salvage Value at Year 15: $25,000
Step 1: Calculate Annual Electrical Energy Consumption & Costs Annual Energy (kWh) = Tonnage × Efficiency (kW/ton) × EFLH (hrs) \text{Annual Energy (kWh)} = \text{Tonnage} \times \text{Efficiency (kW/ton)} \times \text{EFLH (hrs)} Annual Energy (kWh) = Tonnage × Efficiency (kW/ton) × EFLH (hrs)
Option A:
Power Demand = 400 tons × 0.62 kW/ton = 248 kW \text{Power Demand} = 400\text{ tons} \times 0.62\text{ kW/ton} = 248\text{ kW} Power Demand = 400 tons × 0.62 kW/ton = 248 kW
Annual kWh = 248 kW × 3 , 500 hrs = 868 , 000 kWh \text{Annual kWh} = 248\text{ kW} \times 3,500\text{ hrs} = 868,000\text{ kWh} Annual kWh = 248 kW × 3 , 500 hrs = 868 , 000 kWh
Annual Energy Cost = 868 , 000 kWh × $ 0.12 / kWh = $ 104 , 160 / year \text{Annual Energy Cost} = 868,000\text{ kWh} \times \text{\textdollar}0.12/\text{kWh} = \text{\textdollar}104,160 / \text{year} Annual Energy Cost = 868 , 000 kWh × $ 0.12/ kWh = $ 104 , 160/ year
Total Annual Operating Cost A = $ 104 , 160 + $ 6 , 000 = $ 110 , 160 / year \text{Total Annual Operating Cost}_A = \text{\textdollar}104,160 + \text{\textdollar}6,000 = \text{\textdollar}110,160 / \text{year} Total Annual Operating Cost A = $ 104 , 160 + $ 6 , 000 = $ 110 , 160/ year
Option B:
Power Demand = 400 tons × 0.48 kW/ton = 192 kW \text{Power Demand} = 400\text{ tons} \times 0.48\text{ kW/ton} = 192\text{ kW} Power Demand = 400 tons × 0.48 kW/ton = 192 kW
Annual kWh = 192 kW × 3 , 500 hrs = 672 , 000 kWh \text{Annual kWh} = 192\text{ kW} \times 3,500\text{ hrs} = 672,000\text{ kWh} Annual kWh = 192 kW × 3 , 500 hrs = 672 , 000 kWh
Annual Energy Cost = 672 , 000 kWh × $ 0.12 / kWh = $ 80 , 640 / year \text{Annual Energy Cost} = 672,000\text{ kWh} \times \text{\textdollar}0.12/\text{kWh} = \text{\textdollar}80,640 / \text{year} Annual Energy Cost = 672 , 000 kWh × $ 0.12/ kWh = $ 80 , 640/ year
Total Annual Operating Cost B = $ 80 , 640 + $ 4 , 500 = $ 85 , 140 / year \text{Total Annual Operating Cost}_B = \text{\textdollar}80,640 + \text{\textdollar}4,500 = \text{\textdollar}85,140 / \text{year} Total Annual Operating Cost B = $ 80 , 640 + $ 4 , 500 = $ 85 , 140/ year
Step 2: Determine Compound Interest Factors ( i = 8 % i = 8\% i = 8% , n = 15 n = 15 n = 15 )
From NCEES interest tables (or formulas): ( P / A , 8 % , 15 ) = ( 1 + 0.08 ) 15 − 1 0.08 ( 1 + 0.08 ) 15 = 3.17217 − 1 0.08 × 3.17217 = 8.5595 (P/A, 8\%, 15) = \frac{(1 + 0.08)^{15} - 1}{0.08(1 + 0.08)^{15}} = \frac{3.17217 - 1}{0.08 \times 3.17217} = 8.5595 ( P / A , 8% , 15 ) = 0.08 ( 1 + 0.08 ) 15 ( 1 + 0.08 ) 15 − 1 = 0.08 × 3.17217 3.17217 − 1 = 8.5595 ( P / F , 8 % , 15 ) = ( 1 + 0.08 ) − 15 = 1 3.17217 = 0.31524 (P/F, 8\%, 15) = (1 + 0.08)^{-15} = \frac{1}{3.17217} = 0.31524 ( P / F , 8% , 15 ) = ( 1 + 0.08 ) − 15 = 3.17217 1 = 0.31524
Step 3: Compute Life Cycle Cost (Present Worth) for Both Options LCC P , A = $ 180 , 000 + ( $ 110 , 160 × 8.5595 ) − ( $ 15 , 000 × 0.31524 ) = $ 180 , 000 + $ 942 , 915 − $ 4 , 729 = $ 1 , 118 , 186 \text{LCC}_{P,A} = \$180,000 + (\$110,160 \times 8.5595) - (\$15,000 \times 0.31524) = \$180,000 + \$942,915 - \$4,729 = \$1,118,186 LCC P , A = $180 , 000 + ( $110 , 160 × 8.5595 ) − ( $15 , 000 × 0.31524 ) = $180 , 000 + $942 , 915 − $4 , 729 = $1 , 118 , 186 LCC P , B = $ 260 , 000 + ( $ 85 , 140 × 8.5595 ) − ( $ 25 , 000 × 0.31524 ) = $ 260 , 000 + $ 728 , 756 − $ 7 , 881 = $ 980 , 875 \text{LCC}_{P,B} = \$260,000 + (\$85,140 \times 8.5595) - (\$25,000 \times 0.31524) = \$260,000 + \$728,756 - \$7,881 = \$980,875 LCC P , B = $260 , 000 + ( $85 , 140 × 8.5595 ) − ( $25 , 000 × 0.31524 ) = $260 , 000 + $728 , 756 − $7 , 881 = $980 , 875
Step 4: Incremental Analysis & Decision Δ NPV B − A = LCC P , A − LCC P , B = $ 1 , 118 , 186 − $ 980 , 875 = + $ 137 , 311 \Delta \text{NPV}_{B-A} = \text{LCC}_{P,A} - \text{LCC}_{P,B} = \$1,118,186 - \$980,875 = +\$137,311 Δ NPV B − A = LCC P , A − LCC P , B = $1 , 118 , 186 − $980 , 875 = + $137 , 311 Δ Annual Operating Savings = $ 110 , 160 − $ 85 , 140 = $ 25 , 020 / year \Delta \text{Annual Operating Savings} = \$110,160 - \$85,140 = \$25,020 / \text{year} Δ Annual Operating Savings = $110 , 160 − $85 , 140 = $25 , 020/ year Simple Payback Period = Δ Capital Cost Δ Annual Savings = $ 260 , 000 − $ 180 , 000 $ 25 , 020 = $ 80 , 000 $ 25 , 020 = 3.20 years \text{Simple Payback Period} = \frac{\Delta \text{Capital Cost}}{\Delta \text{Annual Savings}} = \frac{\$260,000 - \$180,000}{\$25,020} = \frac{\$80,000}{\$25,020} = 3.20\text{ years} Simple Payback Period = Δ Annual Savings Δ Capital Cost = $25 , 020 $260 , 000 − $180 , 000 = $25 , 020 $80 , 000 = 3.20 years
Conclusion: Option B results in a net present value savings of $137,311 over 15 years with a simple payback of 3.2 years . Option B is strongly recommended.