Study guide
Composite Construction and Structural System Selection
PE Civil: Structural Exam
Track your progress as you read
Finished sections get a check mark.
1 Exam Identity and Reference Workflow
2026 PE Civil: Structural Identity, Format, and Scoring Electronic Handbook, Design Standards, Units, and Version Control
2 Chapter 2: Gravity and Construction Loads
2.1 Dead Loads and Self-Weight 2.2 Live Loads, Reduction, and Load Placement 2.3 Construction-Stage Loads
3 Environmental Loads
Wind Loads and Pressure Paths Seismic Loads and Lateral Force Distribution Snow, Rain, and Ice Loads
4 Moving, Impact, and Lateral Soil Loads
Vehicular, Crane, and Other Moving Loads Impact and Dynamic Allowances Earth Pressure and Surcharge Loads
5 Chapter 5: Load Paths and Combinations
5.1 Tributary Areas and Complete Vertical/Lateral Load Paths 5.2 Strength and Service Load Combinations
6 Reactions, Diagrams, and Basic Axial Effects
Free-Body Diagrams, Reactions, Shear, and Moment Qualitative Diagrams, Influence Lines, and Critical Placement Axial Tension, Compression, and Deformation
7 Chapter 7: Axial Systems and Shear Effects
7.1 Trusses, Braces, and Column Axial Force 7.2 Shear Stress, Shear Flow, and Built-Up Sections 7.3 One-Way, Two-Way, Punching, and Interface Shear Effects
8 Flexure
Section Properties and Elastic Flexural Stress Beam and Slab Flexural Load Effects Biaxial and Unsymmetrical Flexure
9 Combined Stress and Deflection
Combined Axial and Flexural Stress Principal Stress, Mohr's Circle, and Combined Shear Elastic Deflection Methods
10 Chapter 10: Serviceability, Torsion, and Stability
10.1 Serviceability: Deflection, Drift, Vibration, and Ponding 10.2 Torsion and Warping Effects 10.3 Buckling, Effective Length, and Second-Order Stability
11 Fatigue, Robustness, Thermal, and Bearing Effects
Fatigue and Progressive-Collapse Concepts Thermal Deformation and Bearing/Contact Stress
12 Inspections, Submittals, and Adjacent Facilities
Special Inspections and Verification Duties Shop Drawings, Submittals, RFIs, and Delegated Design Construction Effects on Adjacent Facilities
13 Chapter 13: Temporary Works and Safety
13.1 Formwork, Falsework, Scaffolding, Shoring/Reshoring, Bracing, and Anchorage 13.2 Construction, Roadside, and Work-Zone Safety
14 Soils and Core Concrete Properties
Soil Phase Relationships and Classification Soil Strength, Permeability, and Compressibility Fresh and Hardened Concrete Properties
15 Chapter 15: Prestressed Concrete and Steel Properties
15.1 Reinforced, Precast, Pretensioned, and Post-Tensioned Concrete Materials 15.2 Structural and Cold-Formed Steel Properties 15.3 Steel Toughness, Weldability, Corrosion, and Temperature Effects
16 Timber, Masonry, and Material Conformance
Timber Properties and ASD Design Values Masonry, CMU, Mortar, Grout, and Brick Veneer Properties Concrete and Masonry Test Methods Steel, Timber, and Other Material Specification Conformance
17 Horizontal Members I
Steel Beams and Girders Reinforced Concrete Beams and Slabs Timber and Masonry Horizontal Members
18 Chapter 18: Diaphragms and Vertical Members
18.1 Diaphragms, Collectors, Struts, and Composite Slabs 18.2 Steel Columns and Beam-Columns 18.3 Concrete Columns and Bearing Walls
19 Shear Walls, Trusses, and Frames
Shear Walls and Vertical Lateral Members Trusses and Braced Systems Moment Frames and Stability Systems
20 Composite/Bridge Systems and Bolted Connections
Composite Construction and Structural System Selection Bridge Systems and Load Distribution Bolted Steel Connections
21 Chapter 21: Welded, Embedded, and Anchored Connections
21.1 Welded Steel Connections 21.2 Bearing, Embedded, and Precast Connections 21.3 Anchors, Post-Installed Anchors, and Wood/Masonry Connections
22 Shallow Foundations
Isolated, Spread, and Strip Footings Combined and Strap Footings Mat Foundations and Foundation Slabs
23 Deep Foundations
Driven Piles: Axial Capacity and Settlement Drilled Shafts, Piers, and Caissons Pile Groups, Caps, and Lateral Deep-Foundation Response
24 Chapter 24: Retaining Structures
24.1 Lateral Earth/Water Pressure and Drainage 24.2 Sliding, Overturning, Bearing, and Global Stability 24.3 Concrete Cantilever, Gravity, and Basement Walls 24.4 Sheet-Pile, Anchored, and Mechanically Stabilized Earth Walls
Composite Construction and Structural System Selection
Key Takeaways Explain This Topic AI
Steel–concrete composite action requires a defined interface and adequate longitudinal shear transfer; contact alone does not create composite resistance
Unshored steel carries wet concrete and construction loads before the slab develops, so those stresses remain when later loads act on the composite section
Full and partial composite action depend on connector strength and distribution, effective slab width, material strength, and construction details
Construction-stage stability and deflection can govern even when the final composite member has ample strength
System selection must compare load path, depth, fire, vibration, erection, shoring, openings, schedule, and connection demands rather than flexural capacity alone
Last updated: July 2026
Composite Construction and Structural System Selection
Sequence creates the section: Concrete that has not hardened cannot provide the final composite stiffness. For an unshored beam, steel-only construction stress remains after the slab cures and must be superimposed with later composite stress.
What Makes a Composite Beam
In positive bending, a concrete slab can act primarily in compression while the steel beam supplies much of the tension resistance. Longitudinal shear develops along their interface because the two materials would otherwise slip relative to one another. Headed studs or another approved connection transfer that shear and maintain compatible action. Mere bearing contact, deck attachment, or friction not recognized by the design provisions is not enough.
- Composite input Design role Frequent mistake
- Effective slab width Limits concrete participating with one beam Using the entire floor width
Modular ratio/strength model Relates steel and concrete response Mixing elastic transformed and strength properties
Shear connectors Transfer longitudinal interface force Assuming full composite action from a few studs
Construction sequence Assigns loads to steel-only or composite section Applying final stiffness to wet-concrete load
Use the AISC Steel Construction Manual, 15th edition, with ACI 318-14 and PCI Design Handbook, 7th edition, where applicable for a 2026 exam. Later editions are not valid substitutes.
Construction Stages
For an unshored beam, bare steel commonly supports its self-weight, metal deck, wet concrete, workers, and construction equipment. Check steel flexure, shear, lateral-torsional buckling, local web forces, and deflection in that stage. After concrete reaches the strength required for composite action, later dead and live loads may act on the composite section. Camber can offset predicted initial deflection but does not remove stress or provide stiffness.
With shored construction, temporary supports carry some early load, but shore placement, stiffness, settlement, and removal sequence determine how load enters the completed system. Do not call every shored load “composite”; trace which section exists when each support reaction changes. Deck spanning between beams and concrete placement sequence also require construction-stage checks.
Worked Staged-Stress Comparison
At a selected bottom-steel fiber, a problem gives bare-steel inertia I_s = 1,500 in⁴ and distance y_s = 10 in . The unshored construction-stage moment is M_1 = 180 kip-ft . After curing and verified shear connection, the transformed composite section has I_comp = 4,200 in⁴ and the same physical fiber is y_comp = 14 in from the composite neutral axis. Later superimposed moment is M_2 = 240 kip-ft . Assume both stresses have the same sign.
Construction-stage steel stress is
f_1 = M_1y_s/I_s = 180(12)(10)/1,500 = 14.4 ksi .
Later composite-stage transformed stress at that steel fiber is
f_2 = M_2y_comp/I_comp = 240(12)(14)/4,200 = 9.6 ksi .
Total steel stress from staged superposition is
f_total = 14.4 + 9.6 = 24.0 ksi .
- If someone incorrectly applies the final composite properties to the total 420 kip-ft , the result is
- 420(12)(14)/4,200 = 16.8 ksi ,
which erases the steel-only construction history and substantially underestimates this fiber stress. In a complete check, use the correct load combinations, transformed-material convention, strength limits, creep/shrinkage effects, and construction-stage bracing.
Full and Partial Composite Action
Full composite action means enough connector strength is provided to develop the governing longitudinal force defined by AISC for that region. Partial action uses a permitted smaller connector force and correspondingly reduced flexural resistance. It is not an arbitrary percentage applied to the full-composite moment. Connector design also depends on deck orientation, stud position, concrete properties, connector strength, fatigue where applicable, and spacing/edge/detailing requirements.
Suppose the applicable calculation requires Q_req = 960 kips of longitudinal shear transfer between a zero-moment point and a maximum-moment point. If each installed connector has problem-given design strength 80 kips , the arithmetic minimum is
N = 960/80 = 12 connectors .
Twelve is not automatically a complete layout. Apply AISC minimum/maximum spacing, distribution, deck, constructability, and regional requirements; round up when division is not exact. Verify that studs can be welded, inspected, and surrounded by sound concrete.
Other Composite and Hybrid Systems
Composite action also appears in concrete-filled steel members, composite deck/slab systems, precast toppings and diaphragms, and members with encased steel. Each requires an explicit transfer mechanism for shear, bearing, anchorage, and separation forces. Precast components need temporary stability, erection seats, ties, and connections before the final diaphragm or topping becomes effective.
System Selection and Load Path
Compare systems on more than member tonnage:
- span and floor depth, including penetrations and ceilings;
- vibration and service deflection;
- fire protection and durability;
- erection speed, crane access, deck capacity, shoring, and temporary bracing;
- diaphragm behavior and connections to the lateral system;
repetition, fabrication, tolerances, inspection, and future adaptation.
Trace gravity load from slab to connectors, beam, girder, column, and foundation. Trace diaphragm load through slab/deck attachment, collectors, and lateral elements. A locally strong composite beam is not a complete system if the interface, support, or diaphragm connection interrupts that path.
Design Workflow
List loads by the stage in which they occur.
Check bare-steel or precast erection strength, stability, and deflection.
Define effective concrete participation and the applicable transformed or strength model.
Calculate interface force and design connector quantity and layout.
Superimpose staged stresses/effects and check final strength and serviceability.
Verify deck, slab, reinforcing, fire, vibration, connection, diaphragm, and support behavior.
Composite action is an engineered load-transfer condition, not a label attached to two touching materials.