Study guide
Drilled Shafts, Piers, and Caissons
PE Civil: Structural Exam
Track your progress as you read
Finished sections get a check mark.
1 Exam Identity and Reference Workflow
2026 PE Civil: Structural Identity, Format, and Scoring Electronic Handbook, Design Standards, Units, and Version Control
2 Chapter 2: Gravity and Construction Loads
2.1 Dead Loads and Self-Weight 2.2 Live Loads, Reduction, and Load Placement 2.3 Construction-Stage Loads
3 Environmental Loads
Wind Loads and Pressure Paths Seismic Loads and Lateral Force Distribution Snow, Rain, and Ice Loads
4 Moving, Impact, and Lateral Soil Loads
Vehicular, Crane, and Other Moving Loads Impact and Dynamic Allowances Earth Pressure and Surcharge Loads
5 Chapter 5: Load Paths and Combinations
5.1 Tributary Areas and Complete Vertical/Lateral Load Paths 5.2 Strength and Service Load Combinations
6 Reactions, Diagrams, and Basic Axial Effects
Free-Body Diagrams, Reactions, Shear, and Moment Qualitative Diagrams, Influence Lines, and Critical Placement Axial Tension, Compression, and Deformation
7 Chapter 7: Axial Systems and Shear Effects
7.1 Trusses, Braces, and Column Axial Force 7.2 Shear Stress, Shear Flow, and Built-Up Sections 7.3 One-Way, Two-Way, Punching, and Interface Shear Effects
8 Flexure
Section Properties and Elastic Flexural Stress Beam and Slab Flexural Load Effects Biaxial and Unsymmetrical Flexure
9 Combined Stress and Deflection
Combined Axial and Flexural Stress Principal Stress, Mohr's Circle, and Combined Shear Elastic Deflection Methods
10 Chapter 10: Serviceability, Torsion, and Stability
10.1 Serviceability: Deflection, Drift, Vibration, and Ponding 10.2 Torsion and Warping Effects 10.3 Buckling, Effective Length, and Second-Order Stability
11 Fatigue, Robustness, Thermal, and Bearing Effects
Fatigue and Progressive-Collapse Concepts Thermal Deformation and Bearing/Contact Stress
12 Inspections, Submittals, and Adjacent Facilities
Special Inspections and Verification Duties Shop Drawings, Submittals, RFIs, and Delegated Design Construction Effects on Adjacent Facilities
13 Chapter 13: Temporary Works and Safety
13.1 Formwork, Falsework, Scaffolding, Shoring/Reshoring, Bracing, and Anchorage 13.2 Construction, Roadside, and Work-Zone Safety
14 Soils and Core Concrete Properties
Soil Phase Relationships and Classification Soil Strength, Permeability, and Compressibility Fresh and Hardened Concrete Properties
15 Chapter 15: Prestressed Concrete and Steel Properties
15.1 Reinforced, Precast, Pretensioned, and Post-Tensioned Concrete Materials 15.2 Structural and Cold-Formed Steel Properties 15.3 Steel Toughness, Weldability, Corrosion, and Temperature Effects
16 Timber, Masonry, and Material Conformance
Timber Properties and ASD Design Values Masonry, CMU, Mortar, Grout, and Brick Veneer Properties Concrete and Masonry Test Methods Steel, Timber, and Other Material Specification Conformance
17 Horizontal Members I
Steel Beams and Girders Reinforced Concrete Beams and Slabs Timber and Masonry Horizontal Members
18 Chapter 18: Diaphragms and Vertical Members
18.1 Diaphragms, Collectors, Struts, and Composite Slabs 18.2 Steel Columns and Beam-Columns 18.3 Concrete Columns and Bearing Walls
19 Shear Walls, Trusses, and Frames
Shear Walls and Vertical Lateral Members Trusses and Braced Systems Moment Frames and Stability Systems
20 Composite/Bridge Systems and Bolted Connections
Composite Construction and Structural System Selection Bridge Systems and Load Distribution Bolted Steel Connections
21 Chapter 21: Welded, Embedded, and Anchored Connections
21.1 Welded Steel Connections 21.2 Bearing, Embedded, and Precast Connections 21.3 Anchors, Post-Installed Anchors, and Wood/Masonry Connections
22 Shallow Foundations
Isolated, Spread, and Strip Footings Combined and Strap Footings Mat Foundations and Foundation Slabs
23 Deep Foundations
Driven Piles: Axial Capacity and Settlement Drilled Shafts, Piers, and Caissons Pile Groups, Caps, and Lateral Deep-Foundation Response
24 Chapter 24: Retaining Structures
24.1 Lateral Earth/Water Pressure and Drainage 24.2 Sliding, Overturning, Bearing, and Global Stability 24.3 Concrete Cantilever, Gravity, and Basement Walls 24.4 Sheet-Pile, Anchored, and Mechanically Stabilized Earth Walls
Drilled Shafts, Piers, and Caissons
Key Takeaways Explain This Topic AI
Drilled-foundation resistance combines usable side and base components under the applicable resistance factors and load–movement compatibility limits
Rock-socket side resistance and toe resistance are not automatically fully additive when their mobilization requires different displacements
Groundwater, slurry, casing, drilling tools, base cleanliness, and concrete placement can change the resistance available from nominal geometry
The reinforcement cage must resist axial, flexural, shear, handling, and development demands while remaining constructible during concrete placement
Inspection records must verify actual strata, dimensions, cleanliness, cage position, concrete continuity, and anomalies rather than merely confirm design diameter
Last updated: July 2026
Drilled Shafts, Piers, and Caissons
As-built condition controls: A clean, sound 4-ft-diameter shaft and a nominal 4-ft hole with soft base debris, contaminated sidewall, or defective concrete do not have the same usable resistance.
Terminology and Load Transfer
A drilled shaft is a cast-in-place deep foundation constructed in an excavated hole, often with a reinforcement cage. “Drilled pier” commonly describes a similar large-diameter element, sometimes with a smaller depth-to-diameter ratio. “Caisson” has regional and historical meanings. On the exam, use the geometry and construction stated rather than inferring capacity from the name.
Axial compression resistance is organized into side and tip components:
Q_n = Q_s + Q_p ,
subject to the applicable method, limiting values, compatibility, and construction assumptions. Side resistance depends on soil/rock strength, effective stress, roughness, socket quality, and load direction. Tip resistance depends on bearing material, base area, cleanliness, and the movement needed to mobilize it. Structural shaft capacity and geotechnical resistance remain separate.
- Construction feature Possible consequence Verification focus
- Slurry or casing Supports excavation; can alter side interface Properties, level, removal sequence
- Groundwater inflow Instability, base disturbance, concrete contamination Head control and placement method
- Base sediment Reduces usable tip resistance/increases settlement Cleanout and measured cleanliness
- Cage congestion Blocks concrete flow or shifts bars Spacing, centralizers, rigidity
- Tremie placement Maintains concrete continuity below fluid Embedment, uninterrupted flow, volume
For a 2026 exam, use the active PE Civil handbook, AASHTO LRFD 8th edition with May 2018 errata, and ACI 318-14 where structural concrete provisions apply.
Worked Side-and-Tip Resistance
A drilled shaft has diameter D = 4.0 ft and 30 ft of usable side-resistance length. The problem provides uniform nominal side resistance q_s = 1.5 ksf and nominal toe resistance q_p = 35 ksf . Side and base resistance factors are stated as φ_s = 0.55 and φ_p = 0.45 .
- Shaft perimeter and base area are
- p = πD = 12.566 ft
- and
A_p = πD²/4 = 12.566 ft² .
Nominal side resistance is
Q_s = q_s pL = 1.5(12.566)(30) = 565.5 kips .
Nominal tip resistance is
Q_p = q_p A_p = 35(12.566) = 439.8 kips .
- Using the separately supplied factors, total factored geotechnical resistance is
- R_r = φ_sQ_s + φ_pQ_p
R_r = 0.55(565.5) + 0.45(439.8) = 508.9 kips .
For factored axial demand P_u = 480 kips , utilization is 480/508.9 = 0.943 , so this axial geotechnical screen passes. A separate problem-given structural design strength must also exceed 480 kips, and settlement must be acceptable. If base cleanliness or sidewall quality invalidates the provided unit resistances, nominal diameter cannot rescue the calculation.
Rock Sockets
Rock sockets can transfer load through side shear, base bearing, or both. Characterize rock mass, discontinuities, weathering, strength, socket roughness, diameter, and cleaning. Core recovery or intact compressive strength alone may not represent jointed rock-mass behavior.
Full side and tip resistances may require different displacements to mobilize. Follow the applicable AASHTO compatibility and combination provisions rather than automatically summing both maxima. Soft seams below a socket can govern settlement or punching. Uplift reverses the side-transfer direction and requires cage/development and rock/soil checks under the tension model.
Construction Method and Groundwater
A dry method requires a stable excavation and controlled water. Casing supports unstable ground but removal can neck the shaft or disturb concrete if poorly sequenced. Slurry supports the hole through fluid pressure, but its density, viscosity, sand content, and level must be controlled; a filter cake or contaminated interface can reduce side transfer. Under-water concrete placement normally requires a controlled tremie or pump procedure that avoids mixing fresh concrete with fluid.
Overbreak changes concrete volume and possibly stiffness, but it does not automatically increase design diameter or resistance. Underbreak, caving, inclusions, necking, or segregated concrete can reduce both structural section and geotechnical contact. Construction specifications and inspection are part of the resistance model.
Structural Cage Design
Treat the shaft as a reinforced-concrete member under axial load, bending, and shear. Lateral soil response can move peak moment below grade. Use ACI 318-14 for strength, reinforcement, splice/development, transverse reinforcement, and cover under the stated exposure. Check minimum longitudinal reinforcement, bar spacing, confinement, and cage termination.
The cage must also survive lifting, splicing, lowering, centralizing, casing extraction, and concrete flow without distortion. Reinforcement must develop into the pile cap or column. A cage adequate in the final analysis may be unbuildable if bars and cross ties block aggregate and tremie flow.
Inspection and Integrity
Maintain a shaft log documenting tools, elevations, strata, groundwater, casing/slurry observations, final depth and diameter, socket, base cleaning, cage, and concrete placement. Compare theoretical with actual concrete volume to flag anomalies; volume alone cannot locate or classify a defect. Applicable integrity tests can supplement records, while load tests measure load–movement response.
Complete Workflow
Define axial, lateral, uplift, and construction demands.
Establish subsurface profile and construction method.
Calculate side/tip resistance using verified usable geometry and compatibility.
Apply the stated factors and compare with structural strength and settlement.
Design cage, cover, splices, confinement, and cap development.
Specify inspection, cleanout, slurry/casing, concrete placement, and anomaly evaluation.
Geotechnical equations assume a construction quality that must actually be achieved and documented.