13.1 Formwork, Falsework, Scaffolding, Shoring/Reshoring, Bracing, and Anchorage

PE Civil: Structural Exam

Track your progress as you read

Finished sections get a check mark.

1 Exam Identity and Reference Workflow

2026 PE Civil: Structural Identity, Format, and Scoring Electronic Handbook, Design Standards, Units, and Version Control

2 Chapter 2: Gravity and Construction Loads

2.1 Dead Loads and Self-Weight 2.2 Live Loads, Reduction, and Load Placement 2.3 Construction-Stage Loads

3 Environmental Loads

Wind Loads and Pressure Paths Seismic Loads and Lateral Force Distribution Snow, Rain, and Ice Loads

4 Moving, Impact, and Lateral Soil Loads

Vehicular, Crane, and Other Moving Loads Impact and Dynamic Allowances Earth Pressure and Surcharge Loads

5 Chapter 5: Load Paths and Combinations

5.1 Tributary Areas and Complete Vertical/Lateral Load Paths 5.2 Strength and Service Load Combinations

6 Reactions, Diagrams, and Basic Axial Effects

Free-Body Diagrams, Reactions, Shear, and Moment Qualitative Diagrams, Influence Lines, and Critical Placement Axial Tension, Compression, and Deformation

7 Chapter 7: Axial Systems and Shear Effects

7.1 Trusses, Braces, and Column Axial Force 7.2 Shear Stress, Shear Flow, and Built-Up Sections 7.3 One-Way, Two-Way, Punching, and Interface Shear Effects

8 Flexure

Section Properties and Elastic Flexural Stress Beam and Slab Flexural Load Effects Biaxial and Unsymmetrical Flexure

9 Combined Stress and Deflection

Combined Axial and Flexural Stress Principal Stress, Mohr's Circle, and Combined Shear Elastic Deflection Methods

10 Chapter 10: Serviceability, Torsion, and Stability

10.1 Serviceability: Deflection, Drift, Vibration, and Ponding 10.2 Torsion and Warping Effects 10.3 Buckling, Effective Length, and Second-Order Stability

11 Fatigue, Robustness, Thermal, and Bearing Effects

Fatigue and Progressive-Collapse Concepts Thermal Deformation and Bearing/Contact Stress

12 Inspections, Submittals, and Adjacent Facilities

Special Inspections and Verification Duties Shop Drawings, Submittals, RFIs, and Delegated Design Construction Effects on Adjacent Facilities

13 Chapter 13: Temporary Works and Safety

13.1 Formwork, Falsework, Scaffolding, Shoring/Reshoring, Bracing, and Anchorage 13.2 Construction, Roadside, and Work-Zone Safety

14 Soils and Core Concrete Properties

Soil Phase Relationships and Classification Soil Strength, Permeability, and Compressibility Fresh and Hardened Concrete Properties

15 Chapter 15: Prestressed Concrete and Steel Properties

15.1 Reinforced, Precast, Pretensioned, and Post-Tensioned Concrete Materials 15.2 Structural and Cold-Formed Steel Properties 15.3 Steel Toughness, Weldability, Corrosion, and Temperature Effects

16 Timber, Masonry, and Material Conformance

Timber Properties and ASD Design Values Masonry, CMU, Mortar, Grout, and Brick Veneer Properties Concrete and Masonry Test Methods Steel, Timber, and Other Material Specification Conformance

17 Horizontal Members I

Steel Beams and Girders Reinforced Concrete Beams and Slabs Timber and Masonry Horizontal Members

18 Chapter 18: Diaphragms and Vertical Members

18.1 Diaphragms, Collectors, Struts, and Composite Slabs 18.2 Steel Columns and Beam-Columns 18.3 Concrete Columns and Bearing Walls

19 Shear Walls, Trusses, and Frames

Shear Walls and Vertical Lateral Members Trusses and Braced Systems Moment Frames and Stability Systems

20 Composite/Bridge Systems and Bolted Connections

Composite Construction and Structural System Selection Bridge Systems and Load Distribution Bolted Steel Connections

21 Chapter 21: Welded, Embedded, and Anchored Connections

21.1 Welded Steel Connections 21.2 Bearing, Embedded, and Precast Connections 21.3 Anchors, Post-Installed Anchors, and Wood/Masonry Connections

22 Shallow Foundations

Isolated, Spread, and Strip Footings Combined and Strap Footings Mat Foundations and Foundation Slabs

23 Deep Foundations

Driven Piles: Axial Capacity and Settlement Drilled Shafts, Piers, and Caissons Pile Groups, Caps, and Lateral Deep-Foundation Response

24 Chapter 24: Retaining Structures

24.1 Lateral Earth/Water Pressure and Drainage 24.2 Sliding, Overturning, Bearing, and Global Stability 24.3 Concrete Cantilever, Gravity, and Basement Walls 24.4 Sheet-Pile, Anchored, and Mechanically Stabilized Earth Walls

13.1 Formwork, Falsework, Scaffolding, Shoring/Reshoring, Bracing, and Anchorage

Key Takeaways Explain This Topic AI

Every construction stage needs a complete temporary load path to the ground, using the geometry, material strength, connections, and bracing that actually exist at that time.

Formwork shapes and supports fresh concrete; falsework supports incomplete structures; scaffolding supports people and access; none should be assumed to perform another role without design.

Shoring and reshoring redistribute placement loads through multiple floors, so concrete age, stiffness, sequence, and the capacity of every supporting level matter.

Temporary bracing and anchorage must resist the expected directions of instability, wind, erection eccentricity, uplift, sliding, and connection force through a verified substrate.

Removal of a shore, brace, tie, or anchor is a structural load-transfer event controlled by verified readiness and the engineered sequence, not by schedule alone.

OSHA safety compliance and calculated structural adequacy are complementary requirements; neither automatically proves the other.

Last updated: July 2026

Temporary works carry real structural load while the permanent system is incomplete. Their short service life does not excuse an incomplete load path or unstable stage. For July 2026, use the April 2024 PE Civil: Structural specification , ACI 318-14 , the AISC Steel Construction Manual 15th edition , PCI Design Handbook 7th edition , and only the NCEES-supplied July 2020 Title 29 CFR excerpts . Do not substitute April 2027 editions or current-web OSHA language for the exam excerpts.

Name Each Temporary System Correctly

Formwork gives fresh concrete its shape and supports it until the concrete can carry the intended load. Sheathing, joists, studs, walers, ties, shores, and their connections transfer fluid pressure, wet-concrete weight, placement loads, and form self-weight. Wall-form pressure is lateral and depends on the stated placement conditions; it is not automatically equal to a floor slab's vertical weight model.

Falsework is temporary structural support for an incomplete permanent element, such as a girder, arch, precast unit, or cast-in-place span. It includes towers, caps, beams, foundations, connections, and bracing. Differential settlement or an eccentric bearing can destabilize the system even if axial capacity appears adequate.

Scaffolding provides a working platform and access. It carries workers, tools, stored material, and environmental loads under the supplied OSHA provisions. A scaffold is not a shore or falsework tower unless it has been specifically engineered for that structural function. Platform support, base conditions, ties, braces, access, and fall or falling-object protection remain part of its safety system.

Shoring temporarily supports new work or an existing structure. Reshoring is installed as shores are removed so construction loads continue through slabs or framing below. Reshores do not erase load; they change its distribution among levels with different ages, strengths, and stiffnesses.

Bracing restrains translation, rotation, sidesway, or out-of-plane movement during erection. Steel frames, wall panels, precast members, form towers, and falsework may be unstable before permanent diaphragms and connections exist.

Anchorage transfers temporary tension, shear, uplift, and overturning forces into concrete, masonry, steel, soil, or another support. Capacity depends on the anchor, spacing and edges, installation, embedment, substrate condition and strength, and the receiving element's load path. An anchor bolt without a verified foundation is not a completed restraint.

One Workflow for Every Stage

Define the stage and transition. List what is installed, cured, connected, braced, and about to change.

Inventory simultaneous loads. Include wet materials, forms, workers, equipment, stockpiles, delivery or impact effects, and applicable wind or other environmental action.

Draw the path to ground. Follow sheathing to joists, shores or towers, lower floors, mudsills or foundations, and soil. Include every connection.

Use stage properties. Do not assume final concrete strength, composite action, diaphragm restraint, or completed welds and bolts.

Check strength, stiffness, and stability. Evaluate bearing, buckling, overturning, sliding, uplift, settlement, deflection, and local connection modes.

Inspect and control changes. Define hold points, tolerances, monitoring, and who can authorize placement or release.

Analyze removal. Shore stripping, reshoring, brace release, or anchor removal is a new load case.

Worked Form-and-Shore Calculation

An 8 in concrete slab is placed on forms supported by interior shores spaced 5 ft by 6 ft. Use fresh-concrete unit weight 150 pcf, formwork self-weight 10 psf, and a problem-specified construction live load of 50 psf. Find the service axial load delivered to one interior shore, before shore self-weight or any eccentricity.

Fresh concrete:

q_c = (8/12 ft)(150 pcf) = 100 psf

Total stated placement load:

q = 100 + 10 + 50 = 160 psf

Interior shore tributary area:

A_t = (5 ft)(6 ft) = 30 ft^2

Shore load:

P = qA_t = (160 psf)(30 ft^2) = 4,800 lb = 4.80 kips

If the problem supplies a compatible allowable shore load of 6.00 kips, the axial utilization is 4.80/6.00 = 0.80 . That comparison does not complete the design. Check the shore's unbraced length and plumbness, head and base bearing, horizontal bracing, connection eccentricity, mudsill or floor capacity, concentrated equipment loads, and load combinations required by the controlling documents. An end or corner shore also has different tributary geometry.

Sequence Scenarios

During multistory concrete construction, a newly placed slab may send load through shores into a young floor, then through reshores to additional levels. Removing all shores from one level before installing or confirming reshores can create an unintended load transfer. Concrete cylinder or field-cured test information, engineering criteria, and the approved sequence—not elapsed calendar time alone—govern readiness.

During steel or precast erection, a member may have adequate final strength but little lateral stability before deck attachment, weld completion, diaphragm connection, or brace installation. Temporary braces require anchors and foundations capable of both brace force directions. Release only after the permanent stabilizing path is complete and verified.

Falsework near traffic or water also needs impact, scour, settlement, clearance, and protection considered as the problem directs. Scaffolds altered for access must be reevaluated rather than treated as unchanged. Field substitutions, relocated shores, drilled anchors, damaged components, or an altered placement rate require communication and review by the responsible party.

Final Stage Audit

For every exam scenario, circle the next construction action and ask what force moves when it occurs. Confirm all six categories: formwork, falsework, scaffolding, shoring/reshoring, bracing, and anchorage. Then verify a continuous path, adequate stage properties, lateral stability, foundation support, inspection, and a controlled release sequence.