6.2 Crest Vertical Curve Geometry and Sight Distance
PE Civil: Transportation Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Project Management
1.1 Quantity and Cost Estimating 1.2 Project Scheduling and CPM 1.3 Engineering Economic Analysis
2 Chapter 2: Traffic Engineering - Capacity and Flow
2.1 Uninterrupted Flow Capacity and Level of Service (LOS) 2.2 Interrupted Flow on Segment Streets 2.3 Intersection Capacity and LOS 2.4 Nonmotorized Facilities Analysis
3 Chapter 3: Traffic Engineering - Studies and Safety
3.1 Traffic Volume, Speed, and Planning Studies 3.2 Traffic Forecasts and Monitoring 3.3 Traffic Safety and Collision Analysis 3.4 Highway Safety and Crash Modification Factors (CMFs)
4 Chapter 4: Roadside and Cross-Section Design
4.1 Forgiving Roadside and Clear Zone Design 4.2 Barrier Design and Length of Need 4.3 Cross-Section Design Elements 4.4 Nonmotorized Design Considerations
5 Chapter 5: Horizontal Alignment Design
5.1 Circular Curve Elements and Calculations 5.2 Design Speed and Superelevation Design 5.3 Horizontal Sight Distance and Obstructions
6 Chapter 6: Vertical Alignment Design
6.1 Grades, Slopes, and Profile Design 6.2 Crest Vertical Curve Geometry and Sight Distance 6.3 Sag Vertical Curve Geometry and Sight Distance 6.4 Vertical Clearance Under Structures
7 Chapter 7: Intersection Geometry and Layout
7.1 At-Grade Intersection Design and Roundabouts 7.2 Intersection Sight Distance and Sight Triangles 7.3 Interchange Ramps and Terminal Geometry
8 Chapter 8: Traffic Signals
8.1 Traffic Signal Timing and Phasing 8.2 Traffic Signal Warrants (MUTCD) 8.3 Traffic Signal Design and Preemption
9 Chapter 9: Traffic Control Design
9.1 Permanent Signing Design and Standards 9.2 Pavement Marking Layout and Rules 9.3 Temporary Traffic Control and Work Zones
10 Chapter 10: Geotechnical and Pavements
10.1 Sampling, Testing, and Soil Stabilization 10.2 Fundamental Soil Properties and Mass Balance 10.3 Compaction, Excavation, and Mass Diagrams 10.4 Flexible and Rigid Pavement Design and ESALs
11 Chapter 11: Hydrology and Open-Channel Drainage
11.1 Rainfall Hydrology and Rational Method 11.2 Open-Channel Flow and Manning's Equation 11.3 Peak Flow Mitigation and Water-Quality
12 Chapter 12: Drainage Structures and Systems
12.1 Culvert Design and Inlet/Outlet Control 12.2 Stormwater Collection Systems and Inlet Capacities
6.2 Crest Vertical Curve Geometry and Sight Distance
Key Takeaways Explain This Topic AI
Crest vertical curves connect an upgrade to a downgrade or a gentler upgrade, forming a convex profile.
The minimum length of a crest vertical curve is determined by Stopping Sight Distance (SSD) requirements.
For US Customary units with standard heights (h1 = 3.5 ft, h2 = 2.0 ft), the design equations are L = A*S^2 / 2158 (for S <= L) and L = 2S - 2158/A (for S > L).
The rate of vertical curvature is K = L/A, representing the horizontal distance required for a 1% change in grade.
The station of the high point on a crest vertical curve occurs at xm = G1 * L / A feet from the PVC, where G1 is the initial grade in percent and A is |G2 - G1|.
Last updated: July 2026
- 6.2 Crest Vertical Curve Geometry and Sight Distance
- Geometry of Crest Curves
A crest vertical curve is a convex transition between two tangent grades. These curves are designed using equal-tangent parabolas. In an equal-tangent curve, the horizontal distance from the Point of Vertical Curvature (PVC) to the Point of Vertical Intersection (PVI) is equal to the horizontal distance from the PVI to the Point of Vertical Tangency (PVT). Thus, the total length of the curve ( L L L ) is divided into two equal halves of length L / 2 L/2 L /2 .
The primary design parameter is the rate of vertical curvature, K K K , defined as: K = L A K = \frac{L}{A} K = A L
Where:
L L L = Length of vertical curve (feet or meters)
A A A = Algebraic difference in grades ( ∣ G 2 − G 1 ∣ |G_2 - G_1| ∣ G 2 − G 1 ∣ , expressed in percent, e.g., A = 5 A = 5 A = 5 for a change from + 3 % +3\% + 3% to − 2 % -2\% − 2% )
The K K K -value represents the horizontal distance required to effect a 1 % 1\% 1% change in grade. It is a convenient index used by designers to quickly calculate the minimum curve length required for a given design speed: L min = K ⋅ A L_{\min} = K \cdot A L m i n = K ⋅ A .
Sight Distance Criteria
The minimum length of a crest vertical curve is dictated by the need to provide adequate Stopping Sight Distance (SSD) . When a vehicle traverses a crest, the roadway itself acts as a vertical obstruction blocking the driver's line of sight to an object on the road ahead.
Mathematical Formulation
The relationship between sight distance ( S S S ), curve length ( L L L ), and the heights of the driver's eye and the object are modeled mathematically using two cases:
Case 1: Sight Distance is Less Than or Equal to Curve Length ( S ≤ L S \le L S ≤ L )
In this case, both the driver and the object are within the limits of the vertical curve. The minimum length of the curve is given by: L = A S 2 100 ( 2 h 1 + 2 h 2 ) 2 L = \frac{A S^2}{100 \left( \sqrt{2 h_1} + \sqrt{2 h_2} \right)^2} L = 100 ( 2 h 1 + 2 h 2 ) 2 A S 2
Where:
- h 1 h_1 h 1 = Driver's eye height above the road surface
- h 2 h_2 h 2 = Object height above the road surface
Using standard AASHTO design criteria for Stopping Sight Distance (SSD):
Driver's eye height: h 1 = 3.5 ft h_1 = 3.5\text{ ft} h 1 = 3.5 ft ( 1.08 m 1.08\text{ m} 1.08 m )
Object height (representing a hazard like a stalled car): h 2 = 2.0 ft h_2 = 2.0\text{ ft} h 2 = 2.0 ft ( 0.60 m 0.60\text{ m} 0.60 m )
Substituting these values into the general equation yields:
- US Customary Units : L = A S 2 2158 L = \frac{A S^2}{2158} L = 2158 A S 2
- Metric Units : L = A S 2 658 L = \frac{A S^2}{658} L = 658 A S 2
- Case 2: Sight Distance is Greater Than Curve Length ( S > L S > L S > L )
In this case, one or both of the vehicles/objects are located on the tangent grades outside the curve. The equation is: L = 2 S − 100 ( 2 h 1 + 2 h 2 ) 2 A L = 2S - \frac{100 \left( \sqrt{2 h_1} + \sqrt{2 h_2} \right)^2}{A} L = 2 S − A 100 ( 2 h 1 + 2 h 2 ) 2
Substituting standard AASHTO values yields:
- US Customary Units : L = 2 S − 2158 A L = 2S - \frac{2158}{A} L = 2 S − A 2158
- Metric Units : L = 2 S − 658 A L = 2S - \frac{658}{A} L = 2 S − A 658
Exam Tip: When solving exam problems, always assume S ≤ L S \le L S ≤ L first and calculate L L L . If the resulting L L L is greater than or equal to S S S , your assumption is correct. If the calculated L L L is less than S S S , you must re-calculate using the S > L S > L S > L equation.
Passing Sight Distance (PSD)
If the highway is a two-lane facility where passing is permitted, the design must provide Passing Sight Distance (PSD) . For PSD, the object height ( h 2 h_2 h 2 ) is replaced by the height of an oncoming passenger car, which AASHTO defines as 3.5 ft 3.5\text{ ft} 3.5 ft ( 1.08 m 1.08\text{ m} 1.08 m ).
Substituting h 1 = 3.5 ft h_1 = 3.5\text{ ft} h 1 = 3.5 ft and h 2 = 3.5 ft h_2 = 3.5\text{ ft} h 2 = 3.5 ft yields:
US Customary (PSD) : L = A S 2 2800 L = \frac{A S^2}{2800} L = 2800 A S 2 (for S ≤ L S \le L S ≤ L ) and L = 2 S − 2800 A L = 2S - \frac{2800}{A} L = 2 S − A 2800 (for S > L S > L S > L )
Metric (PSD) : L = A S 2 864 L = \frac{A S^2}{864} L = 864 A S 2 (for S ≤ L S \le L S ≤ L ) and L = 2 S − 864 A L = 2S - \frac{864}{A} L = 2 S − A 864 (for S > L S > L S > L )
Because PSD requires significantly larger sight distances than SSD, designing a crest curve for passing sight distance results in a much longer curve, which is often economically impractical. Passing is typically prohibited over crests unless terrain is exceptionally flat.
High Point Location and Elevation
Locating the highest point (vertex) of a crest vertical curve is critical for drainage design. To ensure that surface water does not pool on the roadway, catch basins or drainage inlets must be located at or near the high point.
Station of the High Point
For a curve with an equal-tangent parabola, the horizontal distance ( x m x_m x m ) from the PVC to the high point is calculated using: x m = G 1 L G 1 − G 2 = G 1 L A x_m = \frac{G_1 L}{G_1 - G_2} = \frac{G_1 L}{A} x m = G 1 − G 2 G 1 L = A G 1 L
Where:
- G 1 G_1 G 1 = Slope of the entering tangent (in percent)
- L L L = Total length of the vertical curve (in feet or meters)
- A A A = Algebraic difference in grades ( G 1 − G 2 G_1 - G_2 G 1 − G 2 , in percent)
Note: This equation only applies when the high point lies within the curve limits. If both grades are positive ( G 1 > 0 G_1 > 0 G 1 > 0 and G 2 > 0 G_2 > 0 G 2 > 0 ), the highest point is at the PVT ( x m = L x_m = L x m = L ). If both are negative, the highest point is at the PVC ( x m = 0 x_m = 0 x m = 0 ).
Once x m x_m x m is determined, the station of the high point is: Sta H P = Sta P V C + x m \text{Sta}_{HP} = \text{Sta}_{PVC} + x_m Sta H P = Sta P V C + x m
Elevation of the High Point
The elevation of the high point ( E H P E_{HP} E H P ) can be calculated by applying the standard parabolic offset equation: E H P = E P V C + ( G 1 100 ) x m − A x m 2 200 L E_{HP} = E_{PVC} + \left( \frac{G_1}{100} \right) x_m - \frac{A x_m^2}{200 L} E H P = E P V C + ( 100 G 1 ) x m − 200 L A x m 2
Alternatively, a simplified shortcut formula can be used: E H P = E P V C + G 1 2 L 200 A E_{HP} = E_{PVC} + \frac{G_1^2 L}{200 A} E H P = E P V C + 200 A G 1 2 L
Where G 1 G_1 G 1 and A A A are expressed in percent (e.g., 3 for 3 % 3\% 3% grade).
Step-by-Step Design Example
Consider a crest curve connecting a + 3 % +3\% + 3% grade ( G 1 G_1 G 1 ) to a − 2 % -2\% − 2% grade ( G 2 G_2 G 2 ). The PVC station is 20 + 00 20+00 20 + 00 and its elevation is 100.00 ft 100.00\text{ ft} 100.00 ft . The design speed of 60 mph requires a stopping sight distance of 570 feet.
Calculate Grade Difference (A) : A = ∣ G 2 − G 1 ∣ = ∣ − 2 − 3 ∣ = 5.0 % A = |G_2 - G_1| = |-2 - 3| = 5.0\% A = ∣ G 2 − G 1 ∣ = ∣ − 2 − 3∣ = 5.0%
Find Minimum Curve Length (L) :
Assume S ≤ L S \le L S ≤ L and use US Customary SSD formula: L = A S 2 2158 = 5.0 ⋅ 570 2 2158 = 1 , 624 , 500 2158 ≈ 752.8 ft L = \frac{A S^2}{2158} = \frac{5.0 \cdot 570^2}{2158} = \frac{1,624,500}{2158} \approx 752.8\text{ ft} L = 2158 A S 2 = 2158 5.0 ⋅ 57 0 2 = 2158 1 , 624 , 500 ≈ 752.8 ft Since 570 ft ≤ 752.8 ft 570\text{ ft} \le 752.8\text{ ft} 570 ft ≤ 752.8 ft , our assumption is correct. The design curve length is chosen as 800 ft 800\text{ ft} 800 ft (rounded up to a standard value).
Locate the High Point : x m = G 1 L A = 3.0 ⋅ 800 5.0 = 480 ft x_m = \frac{G_1 L}{A} = \frac{3.0 \cdot 800}{5.0} = 480\text{ ft} x m = A G 1 L = 5.0 3.0 ⋅ 800 = 480 ft Sta H P = ( 20 + 00 ) + 480 = 24 + 80 \text{Sta}_{HP} = (20+00) + 480 = 24+80 Sta H P = ( 20 + 00 ) + 480 = 24 + 80
Calculate High Point Elevation : E H P = E P V C + G 1 2 L 200 A = 100.00 + 3.0 2 ⋅ 800 200 ⋅ 5.0 = 100.00 + 7200 1000 = 107.20 ft E_{HP} = E_{PVC} + \frac{G_1^2 L}{200 A} = 100.00 + \frac{3.0^2 \cdot 800}{200 \cdot 5.0} = 100.00 + \frac{7200}{1000} = 107.20\text{ ft} E H P = E P V C + 200 A G 1 2 L = 100.00 + 200 ⋅ 5.0 3. 0 2 ⋅ 800 = 100.00 + 1000 7200 = 107.20 ft