Study guide

3.3 Engineering Economy: Time Value of Money and Interest Formulas

PRC Civil Engineer Licensure Examination CELE

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Examination Overview, RA 544 & Professional Practice

1.1 CELE Structure, Format, Scoring, and 2026 Subject Order 1.2 Republic Act No. 544: The Civil Engineering Law and Board Regulations 1.3 Civil Engineering Ethics, Contracts, and Professional Practice

2 Chapter 2: Engineering Mathematics, Numerical Methods & Physics

2.1 Advanced Algebra, Progressions & Word Problems 2.2 Trigonometry and Analytical Geometry 2.3 Differential and Integral Calculus 2.4 Differential Equations and Numerical Methods 2.5 Series, Hyperbolic Functions, Multivariable Calculus, and Laplace Transforms 2.6 Numerical Methods: Linear Systems, Interpolation, Curve Fitting, and ODE Solvers 2.7 Physics for Engineers: Kinematics, Newton's Laws, Work-Energy, and Momentum

3 Chapter 3: Engineering Data Analysis & Engineering Economy

3.1 Engineering Data Analysis and Statistical Applications 3.2 Parameter Estimation, Linear Regression, Correlation, and Queuing Models 3.3 Engineering Economy: Time Value of Money and Interest Formulas 3.4 Project Evaluation, Depreciation, and Benefit-Cost Analysis

4 Chapter 4: Surveying Fundamentals, Construction Layout & Route Surveying

4.1 Errors, Corrections, and Pacing/Taping 4.2 Leveling, Earthworks, and Mass Haul Diagrams 4.3 Traverse Computations, Balancing, and Area Determinations 4.4 Route Surveying: Horizontal and Vertical Curves

5 Chapter 5: Highway & Transportation Engineering

5.1 Highway Geometric Design and Sight Distances 5.2 Traffic Engineering, Flow Fundamentals, and Pavement Design 5.3 Highway Policy, Route Location, Drainage, and Earthwork Slopes 5.4 Transportation Planning, Network Analysis, and Intermodal Systems

6 Chapter 6: Construction Materials, Methods, Management & Safety

6.1 Materials for Construction: Concrete, Formwork, Masonry, Steel, and Wood Products 6.2 Construction Equipment, Formwork, and Construction Methods 6.3 Construction Occupational Safety and Health: RA 11058 and DOLE DO 13 6.4 Construction Project Management, CPM/PERT, and Resource Scheduling 6.5 Construction Principles: Design Requirements, Project Organization, Cost Control, and Value Engineering 6.6 Quantity Surveying, Unit Cost Analysis, and Project Cost Estimates 6.7 Construction Trades and Specialties: Plumbing, Plastics, Doors and Windows, Finishes, and Electrical

7 Chapter 7: Fluid Properties, Hydrostatics & Buoyancy

7.1 Fluid Properties, Units, and Pressure Measurement 7.2 Hydrostatic Pressure on Plane and Curved Surfaces 7.3 Buoyancy, Flotation, and Accelerated Fluid Masses

8 Chapter 8: Hydrodynamics, Pipe Flow, Open Channels & Water Supply

8.1 Fluid Dynamics: Continuity and Energy Equations 8.2 Flow Measurement: Orifices, Weirs, and Venturi Meters 8.3 Fluid Flow in Pipes, Friction Losses, and Pipe Networks 8.4 Open Channel Flow, Manning's Equation, and Hydraulic Jump 8.5 Water Supply: Demand, Storage, Pumping, Distribution, and Treatment

9 Chapter 9: Soil Properties, Seepage & Stresses in Soil Mass

9.1 Soil Composition, Weight-Volume Phase Relationships 9.2 Soil Classification Systems (USCS & AASHTO) and Atterberg Limits 9.3 Soil Permeability, Seepage, Flow Nets, and Effective Stress 9.4 Stresses in Soil Mass, Stress Distribution, and Immediate and Secondary Settlement

10 Chapter 10: Consolidation, Soil Strength, Earth Pressures & Foundations

10.1 Soil Compaction and Soil Compressibility/Consolidation 10.2 Shear Strength of Soils and Mohr-Coulomb Failure Criteria 10.3 Lateral Earth Pressures (Rankine & Coulomb) and Retaining Walls 10.4 Shallow and Deep Foundation Bearing Capacity and Slope Stability

11 Chapter 11: Engineering Mechanics & Statics

11.1 Force Systems, Resultants, and Equilibrium of Rigid Bodies 11.2 Centroids, Moments of Inertia, and Friction 11.3 Cables, Trusses, and Internal Forces in Members

12 Chapter 12: Strength of Materials

12.1 Axial Stress, Strain, and Deformation 12.2 Torsion, Flanged Bolt Couplings, and Thin-Walled Pressure Vessels 12.3 Beam Stresses: Flexural and Transverse Shear 12.4 Beam Deflections, Combined Stresses, and Mohr's Circle

13 Chapter 13: Structural Analysis & NSCP Load Criteria

13.1 Indeterminate Structures: Approximate and Classical Methods 13.2 Moment Distribution Method and Slope Deflection 13.3 Influence Lines for Determinate and Indeterminate Structures 13.4 NSCP Minimum Design Loads: Dead, Live, Wind, and Earthquake

14 Chapter 14: Reinforced Concrete Design (NSCP 2015 / USD)

14.1 Ultimate Strength Design (USD) Principles and Singly Reinforced Beams 14.2 Doubly Reinforced Beams and T-Beams 14.3 Shear and Diagonal Tension, Stirrup Design, and Development Length 14.4 Reinforced Concrete Columns and Isolated Footing Design

15 Chapter 15: Steel, Timber & Prestressed Design and Materials Testing

15.1 Structural Steel Tension Members and Connections 15.2 Structural Steel Compression Members and Beam Design 15.3 Timber Design Principles, Working Stress, and Sawn Lumber Beams 15.4 Prestressed Concrete Fundamentals and Prestress Losses 15.5 Construction Materials Testing and Concrete Mix Proportioning

3.3 Engineering Economy: Time Value of Money and Interest Formulas

Key Takeaways Explain This Topic AI

The nominal interest rate r ignores intra-year compounding, whereas the effective annual interest rate ie = (1 + r/m)^m - 1 accounts for compounding frequency m, reflecting true economic cost.

Cash flow diagrams establish financial equivalence from a defined perspective, with upward arrows representing receipts/revenues and downward arrows representing disbursements/costs.

Uniform series factors link single present/future sums with annuities: the Capital Recovery factor (A/P, i, n) converts an initial capital expenditure into equivalent uniform annual costs, satisfying A/P = A/F + i.

Capitalized cost evaluates perpetual infrastructure (n → ∞), summing first cost, capitalized annual maintenance (A / i), and capitalized periodic overhaul costs (RC / ((1+i)^k - 1)).

Last updated: October 2026

3.3 Engineering Economy: Time Value of Money and Interest Formulas

Civil engineering projects represent substantial capital commitments with operational horizons spanning decades. Because a given sum of money available today possesses greater earning capacity than the identical numerical sum received in the future, engineers must account for the time value of money . Engineering economy provides the quantitative framework to determine economic equivalence, evaluate competing design alternatives, structure financing for heavy equipment acquisitions, and manage infrastructure asset life cycles.

  • Principles of Engineering Economy & Cash Flow Diagrams
  • Economic Equivalence

Two sums of money or cash flow streams occurring at different points in time are economically equivalent if they yield identical economic effect under a specified interest rate i i i . Equivalence depends upon three interrelated variables: the magnitude of cash flows, the timing of transactions, and the applicable interest rate.

Cash Flow Diagrams (CFD)

A Cash Flow Diagram visually maps receipts and disbursements across discrete time periods:

Time Axis: A horizontal line divided into equal time increments (typically years, quarters, or months), with t = 0 t = 0 t = 0 designating the present.

End-of-Period Convention: By standard financial convention, all cash flows occurring throughout a period are consolidated and assumed to occur at the end of that period (except for initial capital expenditure at t = 0 t = 0 t = 0 ).

Sign Convention: Upward vertical arrows designate positive cash flows (receipts, revenues, savings, salvage values); downward vertical arrows designate negative cash flows (disbursements, capital investments, operating expenses, tax payments).

  • Simple vs. Compound Interest
  • Simple Interest

In simple interest , interest is calculated exclusively on the original principal sum P P P throughout the entire duration n n n . Earned interest does not accrue interest in subsequent periods: I = P ⋅ i ⋅ n I = P \cdot i \cdot n I = P ⋅ i ⋅ n F = P + I = P ( 1 + i ⋅ n ) F = P + I = P(1 + i \cdot n) F = P + I = P ( 1 + i ⋅ n ) where P P P is the principal, i i i is the interest rate per period, n n n is the number of interest periods, and F F F is the total accumulated future worth.

Ordinary Simple Interest (Banker's Rule): Based on a commercial year consisting of 12 months of 30 days each ( 360 days 360\text{ days} 360 days ): I = P ⋅ i ⋅ ( d 360 ) I = P \cdot i \cdot \left(\frac{d}{360}\right) I = P ⋅ i ⋅ ( 360 d ​ )

Exact Simple Interest: Based on the actual calendar year ( 365 days 365\text{ days} 365 days , or 366 days 366\text{ days} 366 days in leap years): I = P ⋅ i ⋅ ( d 365 ) I = P \cdot i \cdot \left(\frac{d}{365}\right) I = P ⋅ i ⋅ ( 365 d ​ )

Compound Interest

In compound interest , the interest accrued over any interest period is added to the principal to form the new principal base for subsequent interest calculations ("interest earned on interest"): F = P ( 1 + i ) n F = P(1 + i)^n F = P ( 1 + i ) n Compound interest represents the mandatory standard for all civil engineering project evaluations and commercial banking transactions.

Nominal vs. Effective Interest Rates

When interest compounds more frequently than once per calendar year (e.g., semi-annually, quarterly, monthly, or daily), the quoted annual rate must be distinguished from the true annual yield:

Nominal Annual Interest Rate ( r r r ): The stated contractual annual rate without accounting for intermediate intra-year compounding. If compounding occurs m m m times per year, the interest rate per sub-period is: i sub = r m i_{\text{sub}} = \frac{r}{m} i sub ​ = m r ​

Effective Annual Interest Rate ( i e i_e i e ​ ): The true annual rate produced when compounding is recognized across all m m m sub-periods within a full year: i e = ( 1 + r m ) m − 1 i_e = \left(1 + \frac{r}{m}\right)^m - 1 i e ​ = ( 1 + m r ​ ) m − 1

Comparison of Compounding Frequencies (for Nominal r = 12 % r = 12\% r = 12% )

Compounding Frequency Sub-Periods per Year ( m m m ) Sub-Period Rate ( r / m r/m r / m ) Effective Annual Rate ( i e i_e i e ​ )

Annually 1 1 1 12.000 % 12.000\% 12.000% 12.000 % 12.000\% 12.000%

Semi-Annually 2 2 2 6.000 % 6.000\% 6.000% ( 1.06 ) 2 − 1 = 12.360 % (1.06)^2 - 1 = 12.360\% ( 1.06 ) 2 − 1 = 12.360%

Quarterly 4 4 4 3.000 % 3.000\% 3.000% ( 1.03 ) 4 − 1 = 12.551 % (1.03)^4 - 1 = 12.551\% ( 1.03 ) 4 − 1 = 12.551%

Monthly 12 12 12 1.000 % 1.000\% 1.000% ( 1.01 ) 12 − 1 = 12.683 % (1.01)^{12} - 1 = 12.683\% ( 1.01 ) 12 − 1 = 12.683%

Daily (365 days) 365 365 365 0.03288 % 0.03288\% 0.03288% ( 1 + 0.12 / 365 ) 365 − 1 = 12.747 % (1 + 0.12/365)^{365} - 1 = 12.747\% ( 1 + 0.12/365 ) 365 − 1 = 12.747%

Continuous ( m → ∞ m \to \infty m → ∞ ) ∞ \infty ∞ → 0 \to 0 → 0 e 0.12 − 1 = 12.750 % e^{0.12} - 1 = 12.750\% e 0.12 − 1 = 12.750%

Continuous Compounding

As the compounding frequency m m m approaches infinity, compounding becomes continuous. By the definition of the mathematical constant e = lim ⁡ k → ∞ ( 1 + 1 / k ) k e = \lim_{k \to \infty} (1 + 1/k)^k e = lim k → ∞ ​ ( 1 + 1/ k ) k : i e = e r − 1 i_e = e^r - 1 i e ​ = e r − 1

  • Continuous Single Payment Future Worth: F = P e r n F = P e^{r n} F = P e r n
  • Continuous Single Payment Present Worth: P = F e − r n P = F e^{-r n} P = F e − r n
  • Standard Discrete Compounding Factors (Uniform Series)

To move money across time, engineering economics utilizes six standard factor formulas that connect single sums ( P , F P, F P , F ) and uniform end-of-period series ( A A A ):

Factor Name Standard Functional Notation Algebraic Formula Purpose / Application

Single Payment Compound Amount ( F / P , i , n ) (F/P, i, n) ( F / P , i , n ) ( 1 + i ) n (1 + i)^n ( 1 + i ) n Finds future sum F F F given present sum P P P

Single Payment Present Worth ( P / F , i , n ) (P/F, i, n) ( P / F , i , n ) ( 1 + i ) − n (1 + i)^{-n} ( 1 + i ) − n Finds present worth P P P discounted from future sum F F F

Uniform Series Compound Amount ( F / A , i , n ) (F/A, i, n) ( F / A , i , n ) ( 1 + i ) n − 1 i \frac{(1 + i)^n - 1}{i} i ( 1 + i ) n − 1 ​ Finds accumulated future fund F F F from annual deposits A A A

Sinking Fund Factor ( A / F , i , n ) (A/F, i, n) ( A / F , i , n ) i ( 1 + i ) n − 1 \frac{i}{(1 + i)^n - 1} ( 1 + i ) n − 1 i ​ Finds annual deposit A A A required to accumulate future sum F F F

Capital Recovery Factor ( A / P , i , n ) (A/P, i, n) ( A / P , i , n ) i ( 1 + i ) n ( 1 + i ) n − 1 = i 1 − ( 1 + i ) − n \frac{i(1 + i)^n}{(1 + i)^n - 1} = \frac{i}{1 - (1 + i)^{-n}} ( 1 + i ) n − 1 i ( 1 + i ) n ​ = 1 − ( 1 + i ) − n i ​ Finds annual payment A A A to recover initial investment P P P

Uniform Series Present Worth ( P / A , i , n ) (P/A, i, n) ( P / A , i , n ) ( 1 + i ) n − 1 i ( 1 + i ) n = 1 − ( 1 + i ) − n i \frac{(1 + i)^n - 1}{i(1 + i)^n} = \frac{1 - (1 + i)^{-n}}{i} i ( 1 + i ) n ( 1 + i ) n − 1 ​ = i 1 − ( 1 + i ) − n ​ Finds present value P P P equivalent to annual series A A A

Fundamental Factor Identities

Engineers frequently exploit inverse and additive relationships during licensure exams to streamline calculations:

Inverse Relationships: ( P / F , i , n ) = 1 ( F / P , i , n ) , ( A / F , i , n ) = 1 ( F / A , i , n ) , ( A / P , i , n ) = 1 ( P / A , i , n ) (P/F, i, n) = \frac{1}{(F/P, i, n)}, \quad (A/F, i, n) = \frac{1}{(F/A, i, n)}, \quad (A/P, i, n) = \frac{1}{(P/A, i, n)} ( P / F , i , n ) = ( F / P , i , n ) 1 ​ , ( A / F , i , n ) = ( F / A , i , n ) 1 ​ , ( A / P , i , n ) = ( P / A , i , n ) 1 ​

Capital Recovery & Sinking Fund Identity: ( A / P , i , n ) = ( A / F , i , n ) + i (A/P, i, n) = (A/F, i, n) + i ( A / P , i , n ) = ( A / F , i , n ) + i

Gradient Series: Arithmetic & Geometric

Real-world operating and maintenance costs rarely remain constant; they typically escalate due to mechanical wear and inflation.

1. Arithmetic Gradient Series ( G G G )

An arithmetic gradient represents cash flows that increase or decrease by a constant monetary amount G G G in each successive period:

  • Period 1: A 1 A_1 A 1 ​
  • Period 2: A 1 + G A_1 + G A 1 ​ + G
  • Period 3: A 1 + 2 G A_1 + 2G A 1 ​ + 2 G
  • Period n n n : A 1 + ( n − 1 ) G A_1 + (n - 1)G A 1 ​ + ( n − 1 ) G

Important

By convention, the gradient increment G G G begins at the end of period 2 ( t = 2 t = 2 t = 2 ). At t = 1 t = 1 t = 1 , the cash flow contains zero gradient contribution ( 0 × G 0 \times G 0 × G ).

The present worth of an arithmetic gradient series is evaluated as: P = A 1 ( P / A , i , n ) ± G ( P / G , i , n ) P = A_1(P/A, i, n) \pm G(P/G, i, n) P = A 1 ​ ( P / A , i , n ) ± G ( P / G , i , n ) where the Arithmetic Gradient Present Worth Factor is: ( P / G , i , n ) = ( 1 + i ) n − 1 − n i i 2 ( 1 + i ) n = 1 i [ ( P / A , i , n ) − n ( P / F , i , n ) ] (P/G, i, n) = \frac{(1 + i)^n - 1 - n i}{i^2 (1 + i)^n} = \frac{1}{i} \left[ (P/A, i, n) - n(P/F, i, n) \right] ( P / G , i , n ) = i 2 ( 1 + i ) n ( 1 + i ) n − 1 − ni ​ = i 1 ​ [ ( P / A , i , n ) − n ( P / F , i , n ) ] The equivalent uniform annual series A A A of the arithmetic gradient is: A = A 1 ± G ( A / G , i , n ) where ( A / G , i , n ) = 1 i − n ( 1 + i ) n − 1 A = A_1 \pm G(A/G, i, n) \quad \text{where} \quad (A/G, i, n) = \frac{1}{i} - \frac{n}{(1 + i)^n - 1} A = A 1 ​ ± G ( A / G , i , n ) where ( A / G , i , n ) = i 1 ​ − ( 1 + i ) n − 1 n ​

2. Geometric Gradient Series ( g g g )

A geometric gradient represents cash flows that grow or decline at a constant percentage rate g g g per period, such that cash flow in year t t t is A t = A 1 ( 1 + g ) t − 1 A_t = A_1 (1 + g)^{t-1} A t ​ = A 1 ​ ( 1 + g ) t − 1 :

Case 1: When i ≠ g i \neq g i  = g : P = A 1 [ 1 − ( 1 + g ) n ( 1 + i ) − n i − g ] = A 1 [ 1 − ( 1 + g 1 + i ) n i − g ] P = A_1 \left[ \frac{1 - (1 + g)^n (1 + i)^{-n}}{i - g} \right] = A_1 \left[ \frac{1 - \left(\frac{1 + g}{1 + i}\right)^n}{i - g} \right] P = A 1 ​ [ i − g 1 − ( 1 + g ) n ( 1 + i ) − n ​ ] = A 1 ​ [ i − g 1 − ( 1 + i 1 + g ​ ) n ​ ]

Case 2: When i = g i = g i = g : P = n A 1 ( 1 + i ) − 1 = n A 1 1 + i P = n A_1 (1 + i)^{-1} = \frac{n A_1}{1 + i} P = n A 1 ​ ( 1 + i ) − 1 = 1 + i n A 1 ​ ​

Capitalized Cost and Perpetuities ( n → ∞ n \to \infty n → ∞ )

Capitalized Cost ( C C CC CC ) represents the present worth of an engineering asset intended to provide continuous service indefinitely ( n → ∞ n \to \infty n → ∞ ). It is primarily applied to civil infrastructure such as dams, irrigation aqueducts, municipal bridges, tunnels, and cemetery endowments.

Components of Capitalized Cost

First Cost ( F C FC FC ): Non-recurring initial capital expenditure spent at t = 0 t = 0 t = 0 .

Perpetual Annual O&M ( A A A ): As n → ∞ n \to \infty n → ∞ , the factor ( P / A , i , ∞ ) (P/A, i, \infty) ( P / A , i , ∞ ) simplifies to 1 / i 1/i 1/ i : P annual = A i P_{\text{annual}} = \frac{A}{i} P annual ​ = i A ​

Perpetual Periodic Replacement ( R C RC RC ): For major overhauls or asset replacements occurring every k k k years perpetually (e.g., bridge deck replacement every 15 years), the equivalent uniform annual amount is A k = R C ( A / F , i , k ) = R C ⋅ i ( 1 + i ) k − 1 A_k = RC(A/F, i, k) = \frac{RC \cdot i}{(1 + i)^k - 1} A k ​ = RC ( A / F , i , k ) = ( 1 + i ) k − 1 RC ⋅ i ​ . Capitalizing this perpetual annual amount yields: P periodic = A k i = R C ( 1 + i ) k − 1 P_{\text{periodic}} = \frac{A_k}{i} = \frac{RC}{(1 + i)^k - 1} P periodic ​ = i A k ​ ​ = ( 1 + i ) k − 1 RC ​

Master Capitalized Cost Formula

C C = F C + A i + R C ( 1 + i ) k − 1 CC = FC + \frac{A}{i} + \frac{RC}{(1 + i)^k - 1} CC = FC + i A ​ + ( 1 + i ) k − 1 RC ​

  • Worked Engineering Economy Examples
  • Example 1: Construction Equipment Loan Amortization

A civil engineering contractor secures a heavy equipment loan of PHP 3 , 600 , 000 \text{PHP }3,600,000 PHP 3 , 600 , 000 to purchase a mobile hydraulic crane. The commercial loan carries an interest rate of 10 % 10\% 10% compounded quarterly and requires equal amortized payments at the end of each quarter for 4 years 4\text{ years} 4 years . Determine:

The required quarterly amortization payment.

The effective annual interest rate of the loan.

Solution:

Quarterly Amortization Payment:

Number of quarterly compounding periods: n = 4 × 4 = 16 quarters n = 4 \times 4 = 16\text{ quarters} n = 4 × 4 = 16 quarters

Quarterly interest rate: i = 10 % / 4 = 2.5 % = 0.025 i = 10\% / 4 = 2.5\% = 0.025 i = 10%/4 = 2.5% = 0.025

Using Capital Recovery formula: A = P ( A / P , i , n ) = P [ i ( 1 + i ) n ( 1 + i ) n − 1 ] A = P(A/P, i, n) = P \left[ \frac{i(1 + i)^n}{(1 + i)^n - 1} \right] A = P ( A / P , i , n ) = P [ ( 1 + i ) n − 1 i ( 1 + i ) n ​ ] ( 1 + 0.025 ) 16 = ( 1.025 ) 16 = 1.484506 (1 + 0.025)^{16} = (1.025)^{16} = 1.484506 ( 1 + 0.025 ) 16 = ( 1.025 ) 16 = 1.484506 ( A / P , 2.5 % , 16 ) = 0.025 ( 1.484506 ) 1.484506 − 1 = 0.037113 0.484506 = 0.076599 (A/P, 2.5\%, 16) = \frac{0.025(1.484506)}{1.484506 - 1} = \frac{0.037113}{0.484506} = 0.076599 ( A / P , 2.5% , 16 ) = 1.484506 − 1 0.025 ( 1.484506 ) ​ = 0.484506 0.037113 ​ = 0.076599 A = 3 , 600 , 000 × 0.076599 = PHP 275 , 756.40 A = 3,600,000 \times 0.076599 = \text{PHP }275,756.40 A = 3 , 600 , 000 × 0.076599 = PHP 275 , 756.40

Effective Annual Rate ( i e i_e i e ​ ): i e = ( 1 + 0.10 4 ) 4 − 1 = ( 1.025 ) 4 − 1 = 1.103813 − 1 = 0.103813 = 10.38 % i_e = \left(1 + \frac{0.10}{4}\right)^4 - 1 = (1.025)^4 - 1 = 1.103813 - 1 = 0.103813 = 10.38\% i e ​ = ( 1 + 4 0.10 ​ ) 4 − 1 = ( 1.025 ) 4 − 1 = 1.103813 − 1 = 0.103813 = 10.38%

Example 2: Capitalized Cost of a Municipal Bridge

A precast prestressed concrete river bridge requires an initial construction investment of PHP 45 , 000 , 000 \text{PHP }45,000,000 PHP 45 , 000 , 000 . Annual maintenance and inspection costs are estimated at PHP 800 , 000 \text{PHP }800,000 PHP 800 , 000 per year. In addition, the asphalt wearing course and expansion joints must be milled and replaced every 10 years 10\text{ years} 10 years at a cost of PHP 5 , 000 , 000 \text{PHP }5,000,000 PHP 5 , 000 , 000 . Assuming an effective discount rate of 8 % 8\% 8% , determine the total capitalized cost of the bridge project.

Solution:

Initial First Cost: F C = PHP 45 , 000 , 000 FC = \text{PHP }45,000,000 FC = PHP 45 , 000 , 000

Present Worth of Perpetual Annual Maintenance: P annual = A i = 800 , 000 0.08 = PHP 10 , 000 , 000 P_{\text{annual}} = \frac{A}{i} = \frac{800,000}{0.08} = \text{PHP }10,000,000 P annual ​ = i A ​ = 0.08 800 , 000 ​ = PHP 10 , 000 , 000

Present Worth of Perpetual Periodic Resurfacing ( k = 10 years k = 10\text{ years} k = 10 years ): ( 1 + i ) k − 1 = ( 1 + 0.08 ) 10 − 1 = 2.158925 − 1 = 1.158925 (1 + i)^k - 1 = (1 + 0.08)^{10} - 1 = 2.158925 - 1 = 1.158925 ( 1 + i ) k − 1 = ( 1 + 0.08 ) 10 − 1 = 2.158925 − 1 = 1.158925 P periodic = R C ( 1 + i ) k − 1 = 5 , 000 , 000 1.158925 = PHP 4 , 314 , 343 P_{\text{periodic}} = \frac{RC}{(1 + i)^k - 1} = \frac{5,000,000}{1.158925} = \text{PHP }4,314,343 P periodic ​ = ( 1 + i ) k − 1 RC ​ = 1.158925 5 , 000 , 000 ​ = PHP 4 , 314 , 343

Total Capitalized Cost ( C C CC CC ): C C = 45 , 000 , 000 + 10 , 000 , 000 + 4 , 314 , 343 = PHP 59 , 314 , 343 CC = 45,000,000 + 10,000,000 + 4,314,343 = \text{PHP }59,314,343 CC = 45 , 000 , 000 + 10 , 000 , 000 + 4 , 314 , 343 = PHP 59 , 314 , 343

Board Exam Traps & Common Errors

Warning

Common Exam Trap 1: Forgetting to divide nominal interest rate r r r by compounding frequency m m m . If an exam problem states "12% compounded monthly for 5 years", candidates frequently plug i = 0.12 i = 0.12 i = 0.12 and n = 5 n = 5 n = 5 into formulas. The correct inputs are i = 0.12 / 12 = 0.01 i = 0.12 / 12 = 0.01 i = 0.12/12 = 0.01 and n = 5 × 12 = 60 n = 5 \times 12 = 60 n = 5 × 12 = 60 periods.

Warning

Common Exam Trap 2: Misplacing the start of an arithmetic gradient series. In an arithmetic gradient, the increase begins at period t = 2 t = 2 t = 2 . If maintenance costs are PHP 100,000 in year 1, PHP 120,000 in year 2, and increase by PHP 20,000 annually through year 10, then A 1 = 100 , 000 A_1 = 100,000 A 1 ​ = 100 , 000 , G = 20 , 000 G = 20,000 G = 20 , 000 , and n = 10 n = 10 n = 10 . Do not set A 1 = 120 , 000 A_1 = 120,000 A 1 ​ = 120 , 000 .

Warning

Common Exam Trap 3: Conflating Sinking Fund ( A / F A/F A / F ) with Capital Recovery ( A / P A/P A / P ). Remember that ( A / P ) = ( A / F ) + i (A/P) = (A/F) + i ( A / P ) = ( A / F ) + i . Because money must be repaid earlier in a loan amortization than in an end-of-horizon lump-sum sinking fund, ( A / P ) (A/P) ( A / P ) is always strictly greater than ( A / F ) (A/F) ( A / F ) by exactly the interest rate i i i .

Loading diagram... Time Value of Money Transformations and Compounding Relationships