Study guide
4.2 Leveling, Earthworks, and Mass Haul Diagrams
PRC Civil Engineer Licensure Examination CELE
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Examination Overview, RA 544 & Professional Practice
1.1 CELE Structure, Format, Scoring, and 2026 Subject Order 1.2 Republic Act No. 544: The Civil Engineering Law and Board Regulations 1.3 Civil Engineering Ethics, Contracts, and Professional Practice
2 Chapter 2: Engineering Mathematics, Numerical Methods & Physics
2.1 Advanced Algebra, Progressions & Word Problems 2.2 Trigonometry and Analytical Geometry 2.3 Differential and Integral Calculus 2.4 Differential Equations and Numerical Methods 2.5 Series, Hyperbolic Functions, Multivariable Calculus, and Laplace Transforms 2.6 Numerical Methods: Linear Systems, Interpolation, Curve Fitting, and ODE Solvers 2.7 Physics for Engineers: Kinematics, Newton's Laws, Work-Energy, and Momentum
3 Chapter 3: Engineering Data Analysis & Engineering Economy
3.1 Engineering Data Analysis and Statistical Applications 3.2 Parameter Estimation, Linear Regression, Correlation, and Queuing Models 3.3 Engineering Economy: Time Value of Money and Interest Formulas 3.4 Project Evaluation, Depreciation, and Benefit-Cost Analysis
4 Chapter 4: Surveying Fundamentals, Construction Layout & Route Surveying
4.1 Errors, Corrections, and Pacing/Taping 4.2 Leveling, Earthworks, and Mass Haul Diagrams 4.3 Traverse Computations, Balancing, and Area Determinations 4.4 Route Surveying: Horizontal and Vertical Curves
5 Chapter 5: Highway & Transportation Engineering
5.1 Highway Geometric Design and Sight Distances 5.2 Traffic Engineering, Flow Fundamentals, and Pavement Design 5.3 Highway Policy, Route Location, Drainage, and Earthwork Slopes 5.4 Transportation Planning, Network Analysis, and Intermodal Systems
6 Chapter 6: Construction Materials, Methods, Management & Safety
6.1 Materials for Construction: Concrete, Formwork, Masonry, Steel, and Wood Products 6.2 Construction Equipment, Formwork, and Construction Methods 6.3 Construction Occupational Safety and Health: RA 11058 and DOLE DO 13 6.4 Construction Project Management, CPM/PERT, and Resource Scheduling 6.5 Construction Principles: Design Requirements, Project Organization, Cost Control, and Value Engineering 6.6 Quantity Surveying, Unit Cost Analysis, and Project Cost Estimates 6.7 Construction Trades and Specialties: Plumbing, Plastics, Doors and Windows, Finishes, and Electrical
7 Chapter 7: Fluid Properties, Hydrostatics & Buoyancy
7.1 Fluid Properties, Units, and Pressure Measurement 7.2 Hydrostatic Pressure on Plane and Curved Surfaces 7.3 Buoyancy, Flotation, and Accelerated Fluid Masses
8 Chapter 8: Hydrodynamics, Pipe Flow, Open Channels & Water Supply
8.1 Fluid Dynamics: Continuity and Energy Equations 8.2 Flow Measurement: Orifices, Weirs, and Venturi Meters 8.3 Fluid Flow in Pipes, Friction Losses, and Pipe Networks 8.4 Open Channel Flow, Manning's Equation, and Hydraulic Jump 8.5 Water Supply: Demand, Storage, Pumping, Distribution, and Treatment
9 Chapter 9: Soil Properties, Seepage & Stresses in Soil Mass
9.1 Soil Composition, Weight-Volume Phase Relationships 9.2 Soil Classification Systems (USCS & AASHTO) and Atterberg Limits 9.3 Soil Permeability, Seepage, Flow Nets, and Effective Stress 9.4 Stresses in Soil Mass, Stress Distribution, and Immediate and Secondary Settlement
10 Chapter 10: Consolidation, Soil Strength, Earth Pressures & Foundations
10.1 Soil Compaction and Soil Compressibility/Consolidation 10.2 Shear Strength of Soils and Mohr-Coulomb Failure Criteria 10.3 Lateral Earth Pressures (Rankine & Coulomb) and Retaining Walls 10.4 Shallow and Deep Foundation Bearing Capacity and Slope Stability
11 Chapter 11: Engineering Mechanics & Statics
11.1 Force Systems, Resultants, and Equilibrium of Rigid Bodies 11.2 Centroids, Moments of Inertia, and Friction 11.3 Cables, Trusses, and Internal Forces in Members
12 Chapter 12: Strength of Materials
12.1 Axial Stress, Strain, and Deformation 12.2 Torsion, Flanged Bolt Couplings, and Thin-Walled Pressure Vessels 12.3 Beam Stresses: Flexural and Transverse Shear 12.4 Beam Deflections, Combined Stresses, and Mohr's Circle
13 Chapter 13: Structural Analysis & NSCP Load Criteria
13.1 Indeterminate Structures: Approximate and Classical Methods 13.2 Moment Distribution Method and Slope Deflection 13.3 Influence Lines for Determinate and Indeterminate Structures 13.4 NSCP Minimum Design Loads: Dead, Live, Wind, and Earthquake
14 Chapter 14: Reinforced Concrete Design (NSCP 2015 / USD)
14.1 Ultimate Strength Design (USD) Principles and Singly Reinforced Beams 14.2 Doubly Reinforced Beams and T-Beams 14.3 Shear and Diagonal Tension, Stirrup Design, and Development Length 14.4 Reinforced Concrete Columns and Isolated Footing Design
15 Chapter 15: Steel, Timber & Prestressed Design and Materials Testing
15.1 Structural Steel Tension Members and Connections 15.2 Structural Steel Compression Members and Beam Design 15.3 Timber Design Principles, Working Stress, and Sawn Lumber Beams 15.4 Prestressed Concrete Fundamentals and Prestress Losses 15.5 Construction Materials Testing and Concrete Mix Proportioning
4.2 Leveling, Earthworks, and Mass Haul Diagrams
Key Takeaways Explain This Topic AI
Differential leveling establishes vertical control through height of instrument (HI = Elev + BS) and foresight reductions (Elev = HI - FS), with the mandatory mathematical check: ∑ BS − ∑ FS = Last Elev − First Elev \sum \text{BS} - \sum \text{FS} = \text{Last Elev} - \text{First Elev} ∑ BS − ∑ FS = Last Elev − First Elev .
The combined effect of earth curvature and atmospheric refraction displaces optical sightlines upward, requiring a subtractive rod correction of h c r = 0.0675 K 2 h_{cr} = 0.0675 K^2 h cr = 0.0675 K 2 (with h c r h_{cr} h cr in meters and sight distance K K K in kilometers).
Three-level cross-sectional areas are evaluated via A = 1 2 [ c ( w L + w R ) + b 2 ( h L + h R ) ] A = \frac{1}{2}[c(w_L + w_R) + \frac{b}{2}(h_L + h_R)] A = 2 1 [ c ( w L + w R ) + 2 b ( h L + h R )] , and prismoidal volumes between successive stations are computed via V p = V e − C p V_p = V_e - C_p V p = V e − C p , where C p = L 12 ( c 1 − c 2 ) ( w 1 − w 2 ) C_p = \frac{L}{12}(c_1 - c_2)(w_1 - w_2) C p = 12 L ( c 1 − c 2 ) ( w 1 − w 2 ) .
Borrow pit excavations are computed using the unit base method: V = A unit 4 ( ∑ h 1 + 2 ∑ h 2 + 3 ∑ h 3 + 4 ∑ h 4 ) V = \frac{A_{\text{unit}}}{4}(\sum h_1 + 2\sum h_2 + 3\sum h_3 + 4\sum h_4) V = 4 A unit ( ∑ h 1 + 2 ∑ h 2 + 3 ∑ h 3 + 4 ∑ h 4 ) , where corner heights are weighted by the number of adjoining grid squares.
On a mass haul diagram, ascending sections indicate excavation (cut) and descending sections indicate embankment (fill); the limit of economic haul is governed by LEH = FHD + C borrow C overhaul \text{LEH} = \text{FHD} + \frac{C_{\text{borrow}}}{C_{\text{overhaul}}} LEH = FHD + C overhaul C borrow .
Last updated: October 2026
4.2 Leveling, Earthworks, and Mass Haul Diagrams
Vertical control and volumetric computations constitute the core of highway geometric design, railway grading, site development, and drainage infrastructure. This section reviews differential leveling protocols, curvature and refraction corrections, three-level cross-section area formulas, prismoidal volume adjustments, borrow pit grading, and the economic optimization of mass haul diagrams.
1. Principles of Differential Leveling
Differential leveling determines elevation differences between points by measuring vertical distances on graduated leveling rods relative to a horizontal line of sight established by an automatic level, digital level, or tilting level.
Essential Definitions
Bench Mark (BM): A permanent or semi-permanent physical marker of precisely known elevation above a reference datum (e.g., Mean Sea Level).
Turning Point (TP): An intermediate, stable ground point used to advance the level line forward, serving successively as a foresight and a backsight.
Backsight (BS or Plus Sight): A rod reading taken on a point of known elevation to determine the Height of Instrument (HI) .
Height of Instrument (HI): The elevation of the horizontal line of sight passing through the optical center of the telescope: HI = Elevation + BS \text{HI} = \text{Elevation} + \text{BS} HI = Elevation + BS
Foresight (FS or Minus Sight): A rod reading taken on a turning point or benchmark of unknown elevation to transfer the vertical datum: Elevation new = HI − FS \text{Elevation}_{\text{new}} = \text{HI} - \text{FS} Elevation new = HI − FS
Intermediate Foresight (IFS): Rod readings taken along cross-sections, building corners, or topography from a single instrument setup where no subsequent backsight is made.
Leveling Field Book Structure & Arithmetic Check
In professional surveying and board exam evaluations, leveling notes must satisfy a strict mathematical identity. The algebraic sum of all backsights minus the algebraic sum of all foresights must equal the final elevation minus the initial elevation: ∑ BS − ∑ FS = Elevation Final − Elevation Initial \sum \text{BS} - \sum \text{FS} = \text{Elevation}_{\text{Final}} - \text{Elevation}_{\text{Initial}} ∑ BS − ∑ FS = Elevation Final − Elevation Initial
- Station BS (m) HI (m) FS (m) Elevation (m) Remarks
- BM-1 1.842 101.842 — 100.000 Known datum point
- TP-1 2.115 102.721 1.236 100.606 Turning point 1
- TP-2 0.954 101.810 1.865 100.856 Turning point 2
- BM-2 — — 2.418 99.392 Closing benchmark
- SUM 4.911 — 5.519 — Check: 4.911 − 5.519 = − 0.608 m 4.911 - 5.519 = -0.608\text{ m} 4.911 − 5.519 = − 0.608 m
Check Verification: 99.392 − 100.000 = − 0.608 m 99.392 - 100.000 = -0.608\text{ m} 99.392 − 100.000 = − 0.608 m . The notes are mathematically closed.
2. Earth Curvature and Atmospheric Refraction
Over sight distances exceeding 100 m 100\text{ m} 100 m , the earth's curvature and atmospheric refraction introduce systematic optical errors:
Earth Curvature ( h c h_c h c ): The earth's surface curves away from the tangent line of sight. The rod reading is displaced upward by: h c = K 2 2 R ≈ 0.0785 K 2 ( m, with K in km ) h_c = \frac{K^2}{2R} \approx 0.0785 K^2 \quad (\text{m, with } K \text{ in km}) h c = 2 R K 2 ≈ 0.0785 K 2 ( m, with K in km )
Atmospheric Refraction ( h r h_r h r ): Density gradients in the atmosphere bend optical rays downward toward denser air, causing the sightline to hit the rod lower than the geometric tangent line by approximately one-seventh of curvature: h r ≈ 0.0110 K 2 ( m, with K in km ) h_r \approx 0.0110 K^2 \quad (\text{m, with } K \text{ in km}) h r ≈ 0.0110 K 2 ( m, with K in km )
Combined Correction ( h c r h_{cr} h cr ): Combining both effects yields the standard net correction: h c r = h c − h r = 0.0785 K 2 − 0.0110 K 2 = 0.0675 K 2 ( or 0.067 K 2 ) h_{cr} = h_c - h_r = 0.0785 K^2 - 0.0110 K^2 = 0.0675 K^2 \quad (\text{or } 0.067 K^2) h cr = h c − h r = 0.0785 K 2 − 0.0110 K 2 = 0.0675 K 2 ( or 0.067 K 2 ) Where K K K is the horizontal sight distance in kilometers ( K = D / 1000 K = D / 1000 K = D /1000 ).
Application to Rod Readings
Because curvature dominates refraction, the optical line of sight strikes the rod too high. Therefore, the corrected rod reading is: Corrected Reading = Observed Reading − h c r \text{Corrected Reading} = \text{Observed Reading} - h_{cr} Corrected Reading = Observed Reading − h cr True Elevation = HI − ( FS − h c r ) = HI − FS + h c r \text{True Elevation} = \text{HI} - (\text{FS} - h_{cr}) = \text{HI} - \text{FS} + h_{cr} True Elevation = HI − ( FS − h cr ) = HI − FS + h cr
Tip
In differential leveling loops, balancing backsight and foresight distances ( ∑ K BS = ∑ K FS \sum K_{\text{BS}} = \sum K_{\text{FS}} ∑ K BS = ∑ K FS ) automatically cancels out curvature and refraction errors completely.
- 3. Three-Wire Leveling & Cross-Sectional Geometry
- Three-Wire Leveling
Precision leveling employs reticles equipped with upper, middle, and lower stadia hairs:
Stadia Interval ( s s s ): s = Upper Reading − Lower Reading s = \text{Upper Reading} - \text{Lower Reading} s = Upper Reading − Lower Reading .
Sight Distance ( D D D ): D = 100 × s D = 100 \times s D = 100 × s (using standard internal focusing instrument stadia constant K s = 100 K_s = 100 K s = 100 ).
Rod Reading Check: To detect misreadings, ensure that Middle = Upper + Lower 2 \text{Middle} = \frac{\text{Upper} + \text{Lower}}{2} Middle = 2 Upper + Lower . The tolerance is typically ± 1 mm \pm 1\text{ mm} ± 1 mm to 2 mm 2\text{ mm} 2 mm .
Three-Level Road Cross-Sections
A standard three-level highway section consists of a roadbed of width b b b , a centerline cut or fill c c c , and slope stakes set where the side slopes intersect original ground:
Left slope stake: height h L h_L h L , horizontal offset w L = b 2 + s s h L w_L = \frac{b}{2} + s_s h_L w L = 2 b + s s h L
Right slope stake: height h R h_R h R , horizontal offset w R = b 2 + s s h R w_R = \frac{b}{2} + s_s h_R w R = 2 b + s s h R
Dividing the cross-section into four triangles (two with base c c c and heights w L , w R w_L, w_R w L , w R ; two with base b / 2 b/2 b /2 and heights h L , h R h_L, h_R h L , h R ), the exact area formula is: A = 1 2 [ c ( w L + w R ) + b 2 ( h L + h R ) ] A = \frac{1}{2} \left[ c(w_L + w_R) + \frac{b}{2}(h_L + h_R) \right] A = 2 1 [ c ( w L + w R ) + 2 b ( h L + h R ) ]
4. Earthwork Volume Computations
Between consecutive cross-sections separated by horizontal distance L L L , earthwork volume is calculated via prismoidal geometry.
Average End-Area Method ( V e V_e V e )
The average end-area formula assumes the volume varies linearly between end sections: V e = ( A 1 + A 2 2 ) L V_e = \left( \frac{A_1 + A_2}{2} \right) L V e = ( 2 A 1 + A 2 ) L While simple and accepted in standard DPWH contracts, this formula systematically overestimates volume whenever A 1 ≠ A 2 A_1 \neq A_2 A 1 = A 2 .
Prismoidal Formula ( V p V_p V p )
The mathematically rigorous prismoidal formula accounts for parabolic warping: V p = L 6 ( A 1 + 4 A m + A 2 ) V_p = \frac{L}{6} \left( A_1 + 4 A_m + A_2 \right) V p = 6 L ( A 1 + 4 A m + A 2 ) Where A m A_m A m is the middle area computed from linear dimensions averaged between Station 1 and Station 2 : c m = c 1 + c 2 2 , w L , m = w L 1 + w L 2 2 , w R , m = w R 1 + w R 2 2 , h L , m = h L 1 + h L 2 2 , h R , m = h R 1 + h R 2 2 c_m = \frac{c_1 + c_2}{2}, \quad w_{L, m} = \frac{w_{L1} + w_{L2}}{2}, \quad w_{R, m} = \frac{w_{R1} + w_{R2}}{2}, \quad h_{L, m} = \frac{h_{L1} + h_{L2}}{2}, \quad h_{R, m} = \frac{h_{R1} + h_{R2}}{2} c m = 2 c 1 + c 2 , w L , m = 2 w L 1 + w L 2 , w R , m = 2 w R 1 + w R 2 , h L , m = 2 h L 1 + h L 2 , h R , m = 2 h R 1 + h R 2
Caution
Never compute A m A_m A m as A 1 + A 2 2 \frac{A_1 + A_2}{2} 2 A 1 + A 2 ! Doing so reduces the prismoidal formula back to the end-area formula.
Prismoidal Correction ( C p C_p C p )
For three-level sections, the difference between the average end-area volume and the exact prismoidal volume is the Prismoidal Correction ( C p C_p C p ) : C p = V e − V p = L 12 ( c 1 − c 2 ) ( w 1 − w 2 ) C_p = V_e - V_p = \frac{L}{12} (c_1 - c_2)(w_1 - w_2) C p = V e − V p = 12 L ( c 1 − c 2 ) ( w 1 − w 2 ) Where w 1 = ( w L 1 + w R 1 ) w_1 = (w_{L1} + w_{R1}) w 1 = ( w L 1 + w R 1 ) and w 2 = ( w L 2 + w R 2 ) w_2 = (w_{L2} + w_{R2}) w 2 = ( w L 2 + w R 2 ) .
Then: V p = V e − C p V_p = V_e - C_p V p = V e − C p Because ( c 1 − c 2 ) (c_1 - c_2) ( c 1 − c 2 ) and ( w 1 − w 2 ) (w_1 - w_2) ( w 1 − w 2 ) almost always share the same sign, C p C_p C p is positive, confirming that V e > V p V_e > V_p V e > V p .
5. Borrow Pit Excavation (Unit Base / Grid Method)
For large foundation excavations, basements, and site leveling, the site is staked in a uniform grid of square or rectangular prisms of horizontal area A unit A_{\text{unit}} A unit . Corner elevations are surveyed before and after excavation to determine net vertical cuts ( h h h ):
V = A unit 4 ( ∑ h 1 + 2 ∑ h 2 + 3 ∑ h 3 + 4 ∑ h 4 ) V = \frac{A_{\text{unit}}}{4} \left( \sum h_1 + 2 \sum h_2 + 3 \sum h_3 + 4 \sum h_4 \right) V = 4 A unit ( ∑ h 1 + 2 ∑ h 2 + 3 ∑ h 3 + 4 ∑ h 4 ) Where:
- h 1 h_1 h 1 = corner cuts common to exactly one grid unit
- h 2 h_2 h 2 = corner cuts common to two adjoining grid units
- h 3 h_3 h 3 = corner cuts common to three adjoining grid units
- h 4 h_4 h 4 = corner cuts common to four adjoining grid units
- 6. Mass Haul Diagrams & Economic Analysis
A Mass Haul Diagram (MHD) is a continuous graphical plot of stationing along the horizontal axis versus cumulative net earthwork volume along the vertical axis.
Fundamental Properties of the Mass Curve
Cut (Excavation): Slopes upward from left to right (cumulative volume increases).
Fill (Embankment): Slopes downward from left to right (cumulative volume decreases).
Peak (Summit): Represents the transition point from cut to fill (maximum net cut).
Trough (Valley): Represents the transition point from fill to cut (maximum net fill).
Zero Slope: Indicates zero earthwork cross-section (grade point).
Haul Terminology and Definitions
Haul: The work performed in transporting material: Haul = Volume ( m 3 ) × Distance ( m or stations ) \text{Haul} = \text{Volume } (\text{m}^3) \times \text{Distance } (\text{m or stations}) Haul = Volume ( m 3 ) × Distance ( m or stations ) .
Balance Line: A horizontal line drawn across the mass curve. Where the balance line intersects the curve, cut equals fill ( V cut = V fill V_{\text{cut}} = V_{\text{fill}} V cut = V fill ).
Free Haul Distance (FHD): The fixed distance (typically 50 m 50\text{ m} 50 m to 100 m 100\text{ m} 100 m , or 4 to 5 stations 4\text{ to }5\text{ stations} 4 to 5 stations ) within which the contractor moves earth without additional transportation payment beyond the unit excavation price.
Overhaul (OH): The transport of excavated material beyond the Free Haul Distance. Measured in m 3 -stations \text{m}^3\text{-stations} m 3 -stations or m 3 -meters \text{m}^3\text{-meters} m 3 -meters : Overhaul Distance (OHD) = Distance between Cut/Fill Centroids − FHD \text{Overhaul Distance (OHD)} = \text{Distance between Cut/Fill Centroids} - \text{FHD} Overhaul Distance (OHD) = Distance between Cut/Fill Centroids − FHD
Borrow: Material imported from external borrow pits when local excavation is insufficient to satisfy embankment requirements.
Waste: Surplus excavation dumped off-site when cut exceeds nearby fill and haul costs exceed disposal costs.
Limit of Economic Haul (LEH)
The Limit of Economic Haul (LEH) represents the maximum haul distance at which it is economically preferable to haul on-site cut rather than wasting the cut and purchasing borrow: Cost of Hauling = Cost of Borrowing \text{Cost of Hauling} = \text{Cost of Borrowing} Cost of Hauling = Cost of Borrowing C overhaul × ( LEH − FHD ) = C borrow C_{\text{overhaul}} \times (\text{LEH} - \text{FHD}) = C_{\text{borrow}} C overhaul × ( LEH − FHD ) = C borrow LEH = FHD + C borrow C overhaul \text{LEH} = \text{FHD} + \frac{C_{\text{borrow}}}{C_{\text{overhaul}}} LEH = FHD + C overhaul C borrow Where:
C borrow C_{\text{borrow}} C borrow = unit cost of borrow (₱/ m 3 \text{m}^3 m 3 )
C overhaul C_{\text{overhaul}} C overhaul = unit cost of overhaul (₱/ m 3 -station \text{m}^3\text{-station} m 3 -station or ₱/ m 3 -m \text{m}^3\text{-m} m 3 -m )
- 7. Comprehensive Worked Example
- Problem: Three-Level Earthwork & Prismoidal Correction
Given: Two consecutive highway stations separated by L = 60.00 m L = 60.00\text{ m} L = 60.00 m have base width b = 10.00 m b = 10.00\text{ m} b = 10.00 m , side slopes 1.5 : 1 1.5:1 1.5 : 1 (H:V). The cross-section notes are:
Station 1+000: Center cut c 1 = 2.00 m c_1 = 2.00\text{ m} c 1 = 2.00 m , Left: h L 1 w L 1 = 1.60 m 7.40 m \frac{h_{L1}}{w_{L1}} = \frac{1.60\text{ m}}{7.40\text{ m}} w L 1 h L 1 = 7.40 m 1.60 m , Right: h R 1 w R 1 = 2.40 m 8.60 m \frac{h_{R1}}{w_{R1}} = \frac{2.40\text{ m}}{8.60\text{ m}} w R 1 h R 1 = 8.60 m 2.40 m
Station 1+060: Center cut c 2 = 3.60 m c_2 = 3.60\text{ m} c 2 = 3.60 m , Left: h L 2 w L 2 = 2.80 m 9.20 m \frac{h_{L2}}{w_{L2}} = \frac{2.80\text{ m}}{9.20\text{ m}} w L 2 h L 2 = 9.20 m 2.80 m , Right: h R 2 w R 2 = 4.20 m 11.30 m \frac{h_{R2}}{w_{R2}} = \frac{4.20\text{ m}}{11.30\text{ m}} w R 2 h R 2 = 11.30 m 4.20 m
Calculate:
Cross-sectional areas A 1 A_1 A 1 and A 2 A_2 A 2 .
Volume by Average End-Area ( V e V_e V e ).
Prismoidal correction C p C_p C p and exact prismoidal volume V p V_p V p .
Solution:
Area Computations: A 1 = 1 2 [ c 1 ( w L 1 + w R 1 ) + b 2 ( h L 1 + h R 1 ) ] A_1 = \frac{1}{2} \left[ c_1(w_{L1} + w_{R1}) + \frac{b}{2}(h_{L1} + h_{R1}) \right] A 1 = 2 1 [ c 1 ( w L 1 + w R 1 ) + 2 b ( h L 1 + h R 1 ) ] w 1 = 7.40 + 8.60 = 16.00 m , h L 1 + h R 1 = 1.60 + 2.40 = 4.00 m w_1 = 7.40 + 8.60 = 16.00\text{ m}, \quad h_{L1} + h_{R1} = 1.60 + 2.40 = 4.00\text{ m} w 1 = 7.40 + 8.60 = 16.00 m , h L 1 + h R 1 = 1.60 + 2.40 = 4.00 m A 1 = 1 2 [ 2.00 ( 16.00 ) + 5.00 ( 4.00 ) ] = 1 2 [ 32.00 + 20.00 ] = 26.00 m 2 A_1 = \frac{1}{2} [ 2.00(16.00) + 5.00(4.00) ] = \frac{1}{2} [ 32.00 + 20.00 ] = 26.00\text{ m}^2 A 1 = 2 1 [ 2.00 ( 16.00 ) + 5.00 ( 4.00 )] = 2 1 [ 32.00 + 20.00 ] = 26.00 m 2
A 2 = 1 2 [ c 2 ( w L 2 + w R 2 ) + b 2 ( h L 2 + h R 2 ) ] A_2 = \frac{1}{2} \left[ c_2(w_{L2} + w_{R2}) + \frac{b}{2}(h_{L2} + h_{R2}) \right] A 2 = 2 1 [ c 2 ( w L 2 + w R 2 ) + 2 b ( h L 2 + h R 2 ) ] w 2 = 9.20 + 11.30 = 20.50 m , h L 2 + h R 2 = 2.80 + 4.20 = 7.00 m w_2 = 9.20 + 11.30 = 20.50\text{ m}, \quad h_{L2} + h_{R2} = 2.80 + 4.20 = 7.00\text{ m} w 2 = 9.20 + 11.30 = 20.50 m , h L 2 + h R 2 = 2.80 + 4.20 = 7.00 m A 2 = 1 2 [ 3.60 ( 20.50 ) + 5.00 ( 7.00 ) ] = 1 2 [ 73.80 + 35.00 ] = 54.40 m 2 A_2 = \frac{1}{2} [ 3.60(20.50) + 5.00(7.00) ] = \frac{1}{2} [ 73.80 + 35.00 ] = 54.40\text{ m}^2 A 2 = 2 1 [ 3.60 ( 20.50 ) + 5.00 ( 7.00 )] = 2 1 [ 73.80 + 35.00 ] = 54.40 m 2
Average End-Area Volume ( V e V_e V e ): V e = ( A 1 + A 2 2 ) L = ( 26.00 + 54.40 2 ) × 60.00 = 40.20 × 60.00 = 2 , 412.00 m 3 V_e = \left( \frac{A_1 + A_2}{2} \right) L = \left( \frac{26.00 + 54.40}{2} \right) \times 60.00 = 40.20 \times 60.00 = 2,412.00\text{ m}^3 V e = ( 2 A 1 + A 2 ) L = ( 2 26.00 + 54.40 ) × 60.00 = 40.20 × 60.00 = 2 , 412.00 m 3
Prismoidal Correction and Volume ( V p V_p V p ): C p = L 12 ( c 1 − c 2 ) ( w 1 − w 2 ) C_p = \frac{L}{12}(c_1 - c_2)(w_1 - w_2) C p = 12 L ( c 1 − c 2 ) ( w 1 − w 2 ) c 1 − c 2 = 2.00 − 3.60 = − 1.60 m c_1 - c_2 = 2.00 - 3.60 = -1.60\text{ m} c 1 − c 2 = 2.00 − 3.60 = − 1.60 m w 1 − w 2 = 16.00 − 20.50 = − 4.50 m w_1 - w_2 = 16.00 - 20.50 = -4.50\text{ m} w 1 − w 2 = 16.00 − 20.50 = − 4.50 m C p = 60.00 12 ( − 1.60 ) ( − 4.50 ) = 5.00 × 7.20 = 36.00 m 3 C_p = \frac{60.00}{12} (-1.60)(-4.50) = 5.00 \times 7.20 = 36.00\text{ m}^3 C p = 12 60.00 ( − 1.60 ) ( − 4.50 ) = 5.00 × 7.20 = 36.00 m 3 V p = V e − C p = 2 , 412.00 − 36.00 = 2 , 376.00 m 3 V_p = V_e - C_p = 2,412.00 - 36.00 = 2,376.00\text{ m}^3 V p = V e − C p = 2 , 412.00 − 36.00 = 2 , 376.00 m 3