Study guide
4.3 Traverse Computations, Balancing, and Area Determinations
PRC Civil Engineer Licensure Examination CELE
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Examination Overview, RA 544 & Professional Practice
1.1 CELE Structure, Format, Scoring, and 2026 Subject Order 1.2 Republic Act No. 544: The Civil Engineering Law and Board Regulations 1.3 Civil Engineering Ethics, Contracts, and Professional Practice
2 Chapter 2: Engineering Mathematics, Numerical Methods & Physics
2.1 Advanced Algebra, Progressions & Word Problems 2.2 Trigonometry and Analytical Geometry 2.3 Differential and Integral Calculus 2.4 Differential Equations and Numerical Methods 2.5 Series, Hyperbolic Functions, Multivariable Calculus, and Laplace Transforms 2.6 Numerical Methods: Linear Systems, Interpolation, Curve Fitting, and ODE Solvers 2.7 Physics for Engineers: Kinematics, Newton's Laws, Work-Energy, and Momentum
3 Chapter 3: Engineering Data Analysis & Engineering Economy
3.1 Engineering Data Analysis and Statistical Applications 3.2 Parameter Estimation, Linear Regression, Correlation, and Queuing Models 3.3 Engineering Economy: Time Value of Money and Interest Formulas 3.4 Project Evaluation, Depreciation, and Benefit-Cost Analysis
4 Chapter 4: Surveying Fundamentals, Construction Layout & Route Surveying
4.1 Errors, Corrections, and Pacing/Taping 4.2 Leveling, Earthworks, and Mass Haul Diagrams 4.3 Traverse Computations, Balancing, and Area Determinations 4.4 Route Surveying: Horizontal and Vertical Curves
5 Chapter 5: Highway & Transportation Engineering
5.1 Highway Geometric Design and Sight Distances 5.2 Traffic Engineering, Flow Fundamentals, and Pavement Design 5.3 Highway Policy, Route Location, Drainage, and Earthwork Slopes 5.4 Transportation Planning, Network Analysis, and Intermodal Systems
6 Chapter 6: Construction Materials, Methods, Management & Safety
6.1 Materials for Construction: Concrete, Formwork, Masonry, Steel, and Wood Products 6.2 Construction Equipment, Formwork, and Construction Methods 6.3 Construction Occupational Safety and Health: RA 11058 and DOLE DO 13 6.4 Construction Project Management, CPM/PERT, and Resource Scheduling 6.5 Construction Principles: Design Requirements, Project Organization, Cost Control, and Value Engineering 6.6 Quantity Surveying, Unit Cost Analysis, and Project Cost Estimates 6.7 Construction Trades and Specialties: Plumbing, Plastics, Doors and Windows, Finishes, and Electrical
7 Chapter 7: Fluid Properties, Hydrostatics & Buoyancy
7.1 Fluid Properties, Units, and Pressure Measurement 7.2 Hydrostatic Pressure on Plane and Curved Surfaces 7.3 Buoyancy, Flotation, and Accelerated Fluid Masses
8 Chapter 8: Hydrodynamics, Pipe Flow, Open Channels & Water Supply
8.1 Fluid Dynamics: Continuity and Energy Equations 8.2 Flow Measurement: Orifices, Weirs, and Venturi Meters 8.3 Fluid Flow in Pipes, Friction Losses, and Pipe Networks 8.4 Open Channel Flow, Manning's Equation, and Hydraulic Jump 8.5 Water Supply: Demand, Storage, Pumping, Distribution, and Treatment
9 Chapter 9: Soil Properties, Seepage & Stresses in Soil Mass
9.1 Soil Composition, Weight-Volume Phase Relationships 9.2 Soil Classification Systems (USCS & AASHTO) and Atterberg Limits 9.3 Soil Permeability, Seepage, Flow Nets, and Effective Stress 9.4 Stresses in Soil Mass, Stress Distribution, and Immediate and Secondary Settlement
10 Chapter 10: Consolidation, Soil Strength, Earth Pressures & Foundations
10.1 Soil Compaction and Soil Compressibility/Consolidation 10.2 Shear Strength of Soils and Mohr-Coulomb Failure Criteria 10.3 Lateral Earth Pressures (Rankine & Coulomb) and Retaining Walls 10.4 Shallow and Deep Foundation Bearing Capacity and Slope Stability
11 Chapter 11: Engineering Mechanics & Statics
11.1 Force Systems, Resultants, and Equilibrium of Rigid Bodies 11.2 Centroids, Moments of Inertia, and Friction 11.3 Cables, Trusses, and Internal Forces in Members
12 Chapter 12: Strength of Materials
12.1 Axial Stress, Strain, and Deformation 12.2 Torsion, Flanged Bolt Couplings, and Thin-Walled Pressure Vessels 12.3 Beam Stresses: Flexural and Transverse Shear 12.4 Beam Deflections, Combined Stresses, and Mohr's Circle
13 Chapter 13: Structural Analysis & NSCP Load Criteria
13.1 Indeterminate Structures: Approximate and Classical Methods 13.2 Moment Distribution Method and Slope Deflection 13.3 Influence Lines for Determinate and Indeterminate Structures 13.4 NSCP Minimum Design Loads: Dead, Live, Wind, and Earthquake
14 Chapter 14: Reinforced Concrete Design (NSCP 2015 / USD)
14.1 Ultimate Strength Design (USD) Principles and Singly Reinforced Beams 14.2 Doubly Reinforced Beams and T-Beams 14.3 Shear and Diagonal Tension, Stirrup Design, and Development Length 14.4 Reinforced Concrete Columns and Isolated Footing Design
15 Chapter 15: Steel, Timber & Prestressed Design and Materials Testing
15.1 Structural Steel Tension Members and Connections 15.2 Structural Steel Compression Members and Beam Design 15.3 Timber Design Principles, Working Stress, and Sawn Lumber Beams 15.4 Prestressed Concrete Fundamentals and Prestress Losses 15.5 Construction Materials Testing and Concrete Mix Proportioning
4.3 Traverse Computations, Balancing, and Area Determinations
Key Takeaways Explain This Topic AI
Traverse lines are referenced by Azimuths (0° to 360° clockwise from North or South) or Bearings (0° to 90° within four quadrants); the theoretical sum of interior angles for a polygon of n n n sides is ( n − 2 ) × 180 ∘ (n - 2) \times 180^\circ ( n − 2 ) × 18 0 ∘ .
Latitudes ( L = D cos θ L = D \cos \theta L = D cos θ ) and Departures ( D e p = D sin θ Dep = D \sin \theta De p = D sin θ ) produce closure errors E L = ∑ L E_L = \sum L E L = ∑ L and E D = ∑ D e p E_D = \sum Dep E D = ∑ De p , yielding Linear Error of Closure LEC = E L 2 + E D 2 \text{LEC} = \sqrt{E_L^2 + E_D^2} LEC = E L 2 + E D 2 and Relative Precision R P = 1 / ( Perimeter / LEC ) RP = 1 / (\text{Perimeter} / \text{LEC}) RP = 1/ ( Perimeter / LEC ) .
Under the Compass (Bowditch) Rule, corrections are apportioned proportional to line lengths: c L , i = − E L ( D i / ∑ D ) c_{L, i} = - E_L (D_i / \sum D) c L , i = − E L ( D i / ∑ D ) and c D , i = − E D ( D i / ∑ D ) c_{D, i} = - E_D (D_i / \sum D) c D , i = − E D ( D i / ∑ D ) ; the Transit Rule balances proportional to individual latitude and departure magnitudes.
Polygon areas are evaluated using the Double Meridian Distance (DMD) algorithm ( 2 A = ∣ ∑ ( DMD i × L i ) ∣ 2A = |\sum (\text{DMD}_i \times L_i)| 2 A = ∣ ∑ ( DMD i × L i ) ∣ ), where DMD 1 = D e p 1 \text{DMD}_1 = Dep_1 DMD 1 = De p 1 , DMD k = DMD k − 1 + D e p k − 1 + D e p k \text{DMD}_k = \text{DMD}_{k-1} + Dep_{k-1} + Dep_k DMD k = DMD k − 1 + De p k − 1 + De p k , and DMD n = − D e p n \text{DMD}_n = -Dep_n DMD n = − De p n .
Missing traverse data (one course's bearing and distance, or two missing dimensions across different sides) are resolved by enforcing closure conditions ∑ L = 0 \sum L = 0 ∑ L = 0 and ∑ D e p = 0 \sum Dep = 0 ∑ De p = 0 or by applying the law of sines/cosines to the closing line triangle.
Last updated: October 2026
4.3 Traverse Computations, Balancing, and Area Determinations
A traverse consists of a series of connected survey lines whose lengths and directions are measured in the field. In civil engineering property surveys, highway alignments, and construction site layouts, closed traverses establish legal boundary coordinates and property land areas.
1. Reference Meridians, Angles, and Bearings
Directions of survey courses are established relative to four reference meridians:
True (Geographic) Meridian: The astronomic north-south line passing through the earth's geographic poles.
Magnetic Meridian: The direction indicated by a freely suspended magnetic needle, deviating from true north by the local magnetic declination .
Grid Meridian: A line parallel to the central meridian of a national map projection (such as the Philippine Transverse Mercator - PTM, PRS92).
Assumed Meridian: An arbitrary baseline chosen for local project convenience.
Bearings vs. Azimuths
Bearings: The acute horizontal angle between the reference meridian (North or South) and the line of interest, restricted to 0 ∘ ≤ θ ≤ 90 ∘ 0^\circ \le \theta \le 90^\circ 0 ∘ ≤ θ ≤ 9 0 ∘ within four quadrants: Northeast (NE), Southeast (SE), Southwest (SW), and Northwest (NW) (e.g., N 42 ∘ 30 ′ E \text{N } 42^\circ 30' \text{ E} N 4 2 ∘ 3 0 ′ E or S 18 ∘ 45 ′ W \text{S } 18^\circ 45' \text{ W} S 1 8 ∘ 4 5 ′ W ).
Azimuths: Horizontal angles measured continuously clockwise from 0 ∘ 0^\circ 0 ∘ to 360 ∘ 360^\circ 36 0 ∘ , referenced either from North (standard Philippine geomatics practice) or South (traditional astronomic practice).
Quadrant Bearing Range Azimuth from North ( A z N Az_N A z N ) Azimuth from South ( A z S Az_S A z S )
I (NE) N θ E \text{N } \theta \text{ E} N θ E A z N = θ Az_N = \theta A z N = θ A z S = 180 ∘ + θ Az_S = 180^\circ + \theta A z S = 18 0 ∘ + θ
II (SE) S θ E \text{S } \theta \text{ E} S θ E A z N = 180 ∘ − θ Az_N = 180^\circ - \theta A z N = 18 0 ∘ − θ A z S = 360 ∘ − θ Az_S = 360^\circ - \theta A z S = 36 0 ∘ − θ
III (SW) S θ W \text{S } \theta \text{ W} S θ W A z N = 180 ∘ + θ Az_N = 180^\circ + \theta A z N = 18 0 ∘ + θ A z S = θ Az_S = \theta A z S = θ
IV (NW) N θ W \text{N } \theta \text{ W} N θ W A z N = 360 ∘ − θ Az_N = 360^\circ - \theta A z N = 36 0 ∘ − θ A z S = 180 ∘ − θ Az_S = 180^\circ - \theta A z S = 18 0 ∘ − θ
Angular Geometric Closure for Closed Polygons
For an n n n -sided closed polygon traverse: ∑ Interior Angles = ( n − 2 ) × 180 ∘ \sum \text{Interior Angles} = (n - 2) \times 180^\circ ∑ Interior Angles = ( n − 2 ) × 18 0 ∘ ∑ Exterior Angles = ( n + 2 ) × 180 ∘ \sum \text{Exterior Angles} = (n + 2) \times 180^\circ ∑ Exterior Angles = ( n + 2 ) × 18 0 ∘ Before balancing latitudes and departures, any angular closure discrepancy within allowable limits must be distributed equally (or weighted inversely by sight distance) among all observed angles.
2. Latitudes, Departures, and Error of Closure
Every traverse course of length D D D and bearing θ \theta θ represents a planar vector:
Latitude ( L L L ): The north-south projection of the line: L = D cos θ L = D \cos \theta L = D cos θ Sign Convention: Positive ( + + + ) for North; Negative ( − - − ) for South.
Departure ( D e p Dep De p ): The east-west projection of the line: D e p = D sin θ Dep = D \sin \theta De p = D sin θ Sign Convention: Positive ( + + + ) for East; Negative ( − - − ) for West.
Linear Error of Closure (LEC)
In a theoretically perfect closed loop traverse, returning to the origin requires: ∑ L = 0 and ∑ D e p = 0 \sum L = 0 \quad \text{and} \quad \sum Dep = 0 ∑ L = 0 and ∑ De p = 0 Due to field measurement imperfections, non-zero residuals emerge: E L = ∑ L ( Closure error in latitude ) E_L = \sum L \quad (\text{Closure error in latitude}) E L = ∑ L ( Closure error in latitude ) E D = ∑ D e p ( Closure error in departure ) E_D = \sum Dep \quad (\text{Closure error in departure}) E D = ∑ De p ( Closure error in departure )
The total Linear Error of Closure (LEC) is the magnitude of the closing vector: LEC = E L 2 + E D 2 \text{LEC} = \sqrt{E_L^2 + E_D^2} LEC = E L 2 + E D 2
The bearing of the closing line is: tan θ closure = ∣ E D E L ∣ \tan \theta_{\text{closure}} = \left| \frac{E_D}{E_L} \right| tan θ closure = E L E D
Relative Precision (Precision Ratio)
The relative precision describes traverse quality as a fraction with a numerator of 1: Relative Precision = LEC Total Perimeter P = 1 P / LEC \text{Relative Precision} = \frac{\text{LEC}}{\text{Total Perimeter } P} = \frac{1}{P / \text{LEC}} Relative Precision = Total Perimeter P LEC = P / LEC 1 Example: If P = 1 , 200.00 m P = 1,200.00\text{ m} P = 1 , 200.00 m and LEC = 0.24 m \text{LEC} = 0.24\text{ m} LEC = 0.24 m , the relative precision is 1 1 , 200 / 0.24 = 1 5 , 000 \frac{1}{1,200 / 0.24} = \frac{1}{5,000} 1 , 200/0.24 1 = 5 , 000 1 (expressed as 1 : 5 , 000 1:5,000 1 : 5 , 000 ). Survey specifications set the minimum acceptable precision for each class of work; boundary and engineering control traverses are commonly required to close at 1 : 5 , 000 1:5,000 1 : 5 , 000 or better, so check the governing project or land-survey specification.
3. Balancing a Traverse: Compass Rule vs. Transit Rule
Balancing eliminates the closure error by adjusting latitudes and departures.
1. Compass Rule (Bowditch Method)
Formulated by Nathaniel Bowditch, the Compass Rule assumes that angle and distance measurements share equal relative precision. Corrections to a line's latitude and departure are directly proportional to the line's length relative to the total perimeter: c L , i = − E L ( D i ∑ D ) c_{L, i} = - E_L \left( \frac{D_i}{\sum D} \right) c L , i = − E L ( ∑ D D i ) c D , i = − E D ( D i ∑ D ) c_{D, i} = - E_D \left( \frac{D_i}{\sum D} \right) c D , i = − E D ( ∑ D D i ) Where:
- c L , i c_{L, i} c L , i , c D , i c_{D, i} c D , i = corrections applied to course i i i
- D i D_i D i = horizontal length of course i i i
- ∑ D = P \sum D = P ∑ D = P = total traverse perimeter
- Adjusted latitude: L corr = L + c L , i L_{\text{corr}} = L + c_{L, i} L corr = L + c L , i
Adjusted departure: D e p corr = D e p + c D , i Dep_{\text{corr}} = Dep + c_{D, i} De p corr = De p + c D , i
2. Transit Rule
The Transit Rule assumes angular measurements are made with significantly higher precision than taped or EDM distances. Corrections depend on the absolute magnitudes of the course's individual latitude and departure: c L , i = − E L ( ∣ L i ∣ ∑ ∣ L ∣ ) c_{L, i} = - E_L \left( \frac{|L_i|}{\sum |L|} \right) c L , i = − E L ( ∑ ∣ L ∣ ∣ L i ∣ ) c D , i = − E D ( ∣ D e p i ∣ ∑ ∣ D e p ∣ ) c_{D, i} = - E_D \left( \frac{|Dep_i|}{\sum |Dep|} \right) c D , i = − E D ( ∑ ∣ De p ∣ ∣ De p i ∣ ) Where ∑ ∣ L ∣ \sum |L| ∑ ∣ L ∣ and ∑ ∣ D e p ∣ \sum |Dep| ∑ ∣ De p ∣ represent the arithmetic sum of latitudes and departures neglecting signs.
4. Traverse Area Determinations
Once balanced, the enclosed boundary area is evaluated through three standard methods.
1. Coordinate Method (Gauss's Area / Shoelace Formula)
If points have known plane coordinates ( x i , y i ) (x_i, y_i) ( x i , y i ) where x x x = Departure/Easting and y y y = Latitude/Northing, listed in clockwise or counterclockwise order: 2 A = ∣ ∑ i = 1 n ( x i y i + 1 − x i + 1 y i ) ∣ = ∣ ( x 1 y 2 + x 2 y 3 + ⋯ + x n y 1 ) − ( y 1 x 2 + y 2 x 3 + ⋯ + y n x 1 ) ∣ 2A = \left| \sum_{i=1}^n (x_i y_{i+1} - x_{i+1} y_i) \right| = \left| (x_1 y_2 + x_2 y_3 + \dots + x_n y_1) - (y_1 x_2 + y_2 x_3 + \dots + y_n x_1) \right| 2 A = ∣ ∑ i = 1 n ( x i y i + 1 − x i + 1 y i ) ∣ = ∣ ( x 1 y 2 + x 2 y 3 + ⋯ + x n y 1 ) − ( y 1 x 2 + y 2 x 3 + ⋯ + y n x 1 ) ∣ A = 1 2 ∣ Cross-Products Difference ∣ A = \frac{1}{2} |\text{Cross-Products Difference}| A = 2 1 ∣ Cross-Products Difference ∣
2. Double Meridian Distance (DMD) Method
The Meridian Distance (MD) of a line is the shortest perpendicular distance from the midpoint of the line to the reference meridian. The Double Meridian Distance (DMD) is twice that value.
The Three DMD Rules
Rule 1 (First Course): The DMD of the first course departing from the reference meridian equals the departure of that course: DMD 1 = D e p 1 \text{DMD}_1 = Dep_1 DMD 1 = De p 1
Rule 2 (Succeeding Courses): The DMD of any succeeding course equals the DMD of the preceding course, plus the departure of the preceding course, plus the departure of the course itself: DMD k = DMD k − 1 + D e p k − 1 + D e p k \text{DMD}_k = \text{DMD}_{k-1} + Dep_{k-1} + Dep_k DMD k = DMD k − 1 + De p k − 1 + De p k
Rule 3 (Verification Check on Last Course): The DMD of the final course must equal the departure of that course with opposite sign: DMD n = − D e p n \text{DMD}_n = - Dep_n DMD n = − De p n
Area by DMD
The double area ( 2 A 2A 2 A ) is the algebraic sum of the products of each course's DMD and its balanced latitude: 2 A = ∣ ∑ i = 1 n ( DMD i × L i ) ∣ ⟹ A = 1 2 ∣ ∑ ( DMD i × L i ) ∣ 2A = \left| \sum_{i=1}^n (\text{DMD}_i \times L_i) \right| \implies A = \frac{1}{2} |\sum (\text{DMD}_i \times L_i)| 2 A = ∣ ∑ i = 1 n ( DMD i × L i ) ∣ ⟹ A = 2 1 ∣ ∑ ( DMD i × L i ) ∣
3. Double Parallel Distance (DPD) Method
Analogous to DMD, but referenced to an east-west parallel axis using latitudes:
DPD 1 = L 1 \text{DPD}_1 = L_1 DPD 1 = L 1
DPD k = DPD k − 1 + L k − 1 + L k \text{DPD}_k = \text{DPD}_{k-1} + L_{k-1} + L_k DPD k = DPD k − 1 + L k − 1 + L k
Check: DPD n = − L n \text{DPD}_n = - L_n DPD n = − L n
Double area: 2 A = ∣ ∑ ( DPD i × D e p i ) ∣ 2A = \left| \sum (\text{DPD}_i \times Dep_i) \right| 2 A = ∣ ∑ ( DPD i × De p i ) ∣
5. Missing Data in Traverses
When field obstructions, rivers, or structures prevent direct observation of boundary elements, missing quantities are determined analytically by enforcing equilibrium: ∑ L = 0 ⟹ L m = − ∑ L known \sum L = 0 \implies L_m = - \sum L_{\text{known}} ∑ L = 0 ⟹ L m = − ∑ L known ∑ D e p = 0 ⟹ D e p m = − ∑ D e p known \sum Dep = 0 \implies Dep_m = - \sum Dep_{\text{known}} ∑ De p = 0 ⟹ De p m = − ∑ De p known
Case Classification
One Side Unknown (Both Length and Bearing Missing): Compute the closing line of the known courses: L m = − ∑ L known L_m = -\sum L_{\text{known}} L m = − ∑ L known , D e p m = − ∑ D e p known Dep_m = -\sum Dep_{\text{known}} De p m = − ∑ De p known . Then: D m = L m 2 + D e p m 2 , tan θ m = ∣ D e p m L m ∣ D_m = \sqrt{L_m^2 + Dep_m^2}, \quad \tan \theta_m = \left| \frac{Dep_m}{L_m} \right| D m = L m 2 + De p m 2 , tan θ m = L m De p m
Two Adjacent Sides with Missing Dimensions:
Sub-case A: Length of one side and bearing of another missing.
Sub-case B: Lengths of two sides missing.
Sub-case C: Bearings of two sides missing. Solution Protocol: Close the traverse across all fully known courses to establish an imaginary "closing baseline." This creates a closed triangle composed of the baseline and the two lines with missing data. Apply the Law of Sines or Law of Cosines to solve for the missing elements.
- 6. Comprehensive Worked Example: Balancing & DMD Area
- Problem
A 4-sided closed property traverse has the following raw latitudes and departures:
Course AB: L = + 124.60 m , D e p = + 165.40 m , D = 207.08 m L = +124.60\text{ m}, \quad Dep = +165.40\text{ m}, \quad D = 207.08\text{ m} L = + 124.60 m , De p = + 165.40 m , D = 207.08 m
Course BC: L = − 82.40 m , D e p = + 210.80 m , D = 226.33 m L = -82.40\text{ m}, \quad Dep = +210.80\text{ m}, \quad D = 226.33\text{ m} L = − 82.40 m , De p = + 210.80 m , D = 226.33 m
Course CD: L = − 185.10 m , D e p = − 120.30 m , D = 220.76 m L = -185.10\text{ m}, \quad Dep = -120.30\text{ m}, \quad D = 220.76\text{ m} L = − 185.10 m , De p = − 120.30 m , D = 220.76 m
Course DA: L = + 142.50 m , D e p = − 256.30 m , D = 293.25 m L = +142.50\text{ m}, \quad Dep = -256.30\text{ m}, \quad D = 293.25\text{ m} L = + 142.50 m , De p = − 256.30 m , D = 293.25 m
Perform:
Determine closure errors, Linear Error of Closure (LEC), and Relative Precision.
Balance the traverse using the Compass Rule.
Compute the area using the Double Meridian Distance (DMD) method.
Solution:
Closure and Precision Analysis: Perimeter P = 207.08 + 226.33 + 220.76 + 293.25 = 947.42 m \text{Perimeter } P = 207.08 + 226.33 + 220.76 + 293.25 = 947.42\text{ m} Perimeter P = 207.08 + 226.33 + 220.76 + 293.25 = 947.42 m E L = ∑ L = + 124.60 − 82.40 − 185.10 + 142.50 = − 0.40 m E_L = \sum L = +124.60 - 82.40 - 185.10 + 142.50 = -0.40\text{ m} E L = ∑ L = + 124.60 − 82.40 − 185.10 + 142.50 = − 0.40 m E D = ∑ D e p = + 165.40 + 210.80 − 120.30 − 256.30 = − 0.40 m E_D = \sum Dep = +165.40 + 210.80 - 120.30 - 256.30 = -0.40\text{ m} E D = ∑ De p = + 165.40 + 210.80 − 120.30 − 256.30 = − 0.40 m LEC = ( − 0.40 ) 2 + ( − 0.40 ) 2 = 0.32 = 0.5657 m \text{LEC} = \sqrt{(-0.40)^2 + (-0.40)^2} = \sqrt{0.32} = 0.5657\text{ m} LEC = ( − 0.40 ) 2 + ( − 0.40 ) 2 = 0.32 = 0.5657 m Relative Precision = 0.5657 947.42 = 1 1 , 675 \text{Relative Precision} = \frac{0.5657}{947.42} = \frac{1}{1,675} Relative Precision = 947.42 0.5657 = 1 , 675 1
Compass Rule Corrections: c L = − ( − 0.40 ) ( D 947.42 ) = + 0.40 ( D 947.42 ) c_L = -(-0.40) \left( \frac{D}{947.42} \right) = +0.40 \left( \frac{D}{947.42} \right) c L = − ( − 0.40 ) ( 947.42 D ) = + 0.40 ( 947.42 D ) c D = − ( − 0.40 ) ( D 947.42 ) = + 0.40 ( D 947.42 ) c_D = -(-0.40) \left( \frac{D}{947.42} \right) = +0.40 \left( \frac{D}{947.42} \right) c D = − ( − 0.40 ) ( 947.42 D ) = + 0.40 ( 947.42 D )
Course AB: c L = + 0.09 m , c D = + 0.09 m ⟹ L = + 124.69 m , D e p = + 165.49 m c_L = +0.09\text{ m}, \quad c_D = +0.09\text{ m} \implies L = +124.69\text{ m}, \quad Dep = +165.49\text{ m} c L = + 0.09 m , c D = + 0.09 m ⟹ L = + 124.69 m , De p = + 165.49 m
Course BC: c L = + 0.10 m , c D = + 0.10 m ⟹ L = − 82.30 m , D e p = + 210.90 m c_L = +0.10\text{ m}, \quad c_D = +0.10\text{ m} \implies L = -82.30\text{ m}, \quad Dep = +210.90\text{ m} c L = + 0.10 m , c D = + 0.10 m ⟹ L = − 82.30 m , De p = + 210.90 m
Course CD: c L = + 0.09 m , c D = + 0.09 m ⟹ L = − 185.01 m , D e p = − 120.21 m c_L = +0.09\text{ m}, \quad c_D = +0.09\text{ m} \implies L = -185.01\text{ m}, \quad Dep = -120.21\text{ m} c L = + 0.09 m , c D = + 0.09 m ⟹ L = − 185.01 m , De p = − 120.21 m
Course DA: c L = + 0.12 m , c D = + 0.12 m ⟹ L = + 142.62 m , D e p = − 256.18 m c_L = +0.12\text{ m}, \quad c_D = +0.12\text{ m} \implies L = +142.62\text{ m}, \quad Dep = -256.18\text{ m} c L = + 0.12 m , c D = + 0.12 m ⟹ L = + 142.62 m , De p = − 256.18 m Check: ∑ L = 0.00 m , ∑ D e p = 0.00 m \sum L = 0.00\text{ m}, \quad \sum Dep = 0.00\text{ m} ∑ L = 0.00 m , ∑ De p = 0.00 m .
DMD and Area Computation:
DMD A B = D e p A B = + 165.49 m \text{DMD}_{AB} = Dep_{AB} = +165.49\text{ m} DMD A B = De p A B = + 165.49 m
DMD B C = 165.49 + 165.49 + 210.90 = + 541.88 m \text{DMD}_{BC} = 165.49 + 165.49 + 210.90 = +541.88\text{ m} DMD BC = 165.49 + 165.49 + 210.90 = + 541.88 m
DMD C D = 541.88 + 210.90 + ( − 120.21 ) = + 632.57 m \text{DMD}_{CD} = 541.88 + 210.90 + (-120.21) = +632.57\text{ m} DMD C D = 541.88 + 210.90 + ( − 120.21 ) = + 632.57 m
DMD D A = 632.57 + ( − 120.21 ) + ( − 256.18 ) = + 256.18 m \text{DMD}_{DA} = 632.57 + (-120.21) + (-256.18) = +256.18\text{ m} DMD D A = 632.57 + ( − 120.21 ) + ( − 256.18 ) = + 256.18 m DMD Check: DMD D A = − D e p D A = − ( − 256.18 ) = + 256.18 m \text{DMD}_{DA} = - Dep_{DA} = -(-256.18) = +256.18\text{ m} DMD D A = − De p D A = − ( − 256.18 ) = + 256.18 m (Verified!).
Course Balanced L (m) Balanced Dep (m) DMD (m) Double Area ( 2 A = DMD × L 2A = \text{DMD} \times L 2 A = DMD × L )
- AB +124.69 +165.49 +165.49 + 20 , 634.95 +20,634.95 + 20 , 634.95
- BC -82.30 +210.90 +541.88 − 44 , 596.72 -44,596.72 − 44 , 596.72
- CD -185.01 -120.21 +632.57 − 117 , 031.78 -117,031.78 − 117 , 031.78
- DA +142.62 -256.18 +256.18 + 36 , 536.39 +36,536.39 + 36 , 536.39
- SUM 0.00 0.00 — 2 A = − 104 , 457.16 m 2 2A = -104,457.16\text{ m}^2 2 A = − 104 , 457.16 m 2
Area = ∣ − 104 , 457.16 ∣ 2 = 52 , 228.58 m 2 ( 5.223 hectares ) \text{Area} = \frac{|-104,457.16|}{2} = 52,228.58\text{ m}^2 \quad (5.223\text{ hectares}) Area = 2 ∣ − 104 , 457.16∣ = 52 , 228.58 m 2 ( 5.223 hectares )