9.1 Engineering Economics & Depreciation
PRC Registered Electrical Engineer REE
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Overview, RA 7920 & Electrical Engineering Ethics
1.1 PRC Board of Electrical Engineering & REE Examination Overview 1.2 Republic Act No. 7920 (New Electrical Engineering Law) & License Classes 1.3 Code of Ethics & Professional Practice for Electrical Engineers
2 Chapter 2: Math — Algebra, Trig & Geometry
2.1 Algebraic Equations, Polynomials & Complex Numbers 2.2 Trigonometry — Identities, Triangles & Spherical Trig 2.3 Analytic & Solid Geometry
3 Chapter 3: Engineering Mathematics — Calculus & Differential Equations
3.1 Differential Calculus, Limits, Derivatives & Applications 3.2 Integral Calculus, Integration Techniques & Area/Volume Applications 3.3 Ordinary Differential Equations & Initial-Value Problems
4 Chapter 4: Engineering Mathematics — Advanced Math & Transform Methods
4.1 Laplace Transforms, Inverse Transforms & Circuit Applications 4.2 Fourier Series, Fourier Transforms & Frequency-Domain Analysis 4.3 Vector Analysis, Linear Algebra, Matrices & Complex Analysis
5 Chapter 5: Engineering Mathematics — Probability, Statistics & Engineering Data Analysis
5.1 Probability Theory, Counting Techniques & Bayes' Theorem 5.2 Engineering Data Analysis I — Descriptive Statistics & Probability Distributions 5.3 Engineering Data Analysis II — Confidence Intervals, Hypothesis Testing & Regression
6 Chapter 6: Engineering Mathematics — Numerical Methods & Analysis
6.1 Numerical Root-Finding & Solution of Linear Systems 6.2 Interpolation, Numerical Integration & Numerical Solution of ODEs
7 Chapter 7: ESAS — Physics, Chemistry & Computer Fundamentals
7.1 Physics for Engineers 7.2 General Chemistry & Materials Science 7.3 Computer Fundamentals, Programming & Data Logic 7.4 Logic Circuits, Switching Theory & Microprocessor Systems
8 Chapter 8: ESAS — Mechanics & Thermal-Fluid Engineering
8.1 Engineering Mechanics — Statics & Dynamics 8.2 Strength of Materials & Mechanics of Deformable Bodies 8.3 Thermal-Fluid Engineering — Thermodynamics & Fluid Mechanics
9 Chapter 9: ESAS — Engineering Economics, Management & Contracts
9.1 Engineering Economics & Depreciation 9.2 Engineering Management & Ethics 9.3 Philippine Electrical Engineering Law, Code & Contracts 9.4 Technopreneurship 101 & Management of Engineering Projects
10 Chapter 10: PEC 1 — Safety, Sizing & Protection
10.1 PEC Fundamentals, Safety Standards & Grounding/Bonding 10.2 Conductor Sizing, Ampacity Adjustment & Voltage Drop 10.3 Overcurrent Protection, Branch Circuit & Feeder Sizing 10.4 Basic Occupational Safety & Health (BOSH) and Electrical Safety Standards
11 Chapter 11: PEC 1 & 2 — Equipment & Utility Systems
11.1 PEC Equipment Installation & Wiring Methods 11.2 Utility Systems, Transformers & Switchgear 11.3 Special Occupancies & Hazardous Locations
12 Chapter 12: Electrical Professional — DC & AC Circuit Fundamentals
12.1 DC Circuit Analysis & Network Theorems 12.2 Single-Phase AC Circuits & Phasor Analysis 12.3 Balanced & Unbalanced Three-Phase AC Circuits
13 Chapter 13: Electrical Professional — EM Fields & Transients
13.1 Electrostatics, Magnetostatics & Maxwell's Equations 13.2 Electromagnetic Waves & Transmission Line Fields 13.3 First-Order & Second-Order Circuit Transients
14 Chapter 14: Electrical Professional — Electronics, Industrial Electronics & Communications
14.1 Electronics 1 & 2 — Semiconductor Devices & Analog Circuits 14.2 Electrical Apparatus & Devices — Industrial Electronics & Power Converters 14.3 Fundamentals of Electronic Communications
15 Chapter 15: Electrical Professional — Transformers & DC Machines
15.1 Single-Phase & Three-Phase Transformers 15.2 Transformer Connections & Special Transformers 15.3 DC Generators & DC Motors
16 Chapter 16: Electrical Professional — AC Synchronous & Induction Machinery
16.1 Synchronous Generators (Alternators) 16.2 Synchronous Motors & Special AC Machines 16.3 Three-Phase & Single-Phase Induction Motors
17 Chapter 17: Electrical Professional — Power Plants & Energy Conversion
17.1 Hydroelectric, Thermal & Combined Cycle Power Plants 17.2 Renewable Energy Systems & Geothermal Power Plants 17.3 Power Plant Economics, Load Curves & Energy Conversion
18 Chapter 18: Electrical Professional — Transmission & Distribution
18.1 Transmission Line Parameters & Performance Models 18.2 Mechanical Overhead Line Design, Underground Cables & Insulators 18.3 Distribution Systems, Substation Layouts & Power Flow Control
19 Chapter 19: Electrical Professional — Power System Analysis
19.1 The Per-Unit System, Base Conversion & Impedance Diagrams 19.2 Symmetrical Components & Unbalanced Fault Analysis 19.3 Load Flow, Economic Dispatch & Power System Stability
20 Chapter 20: Electrical Professional — Protection, Control, Instrumentation & Illumination
20.1 Power System Protection & Protective Relaying 20.2 Industrial Motor Control, Logic Circuits & PLC Automation 20.3 Electrical Instrumentation, Transducers & Measurement Systems 20.4 Illumination Engineering, Lighting Design & Photometrics 20.5 Feedback Control Systems & Research Methods
9.1 Engineering Economics & Depreciation
Key Takeaways Explain This Topic AI
The time value of money governs equivalence between present worth ( P P P ), future worth ( F F F ), and uniform annual series ( A A A ) using discrete compounding formulas at effective interest rate i i i .
Capital growth under compounding uses standard interest factors: single payment compound amount ( F / P , i , n ) = ( 1 + i ) n (F/P, i, n) = (1+i)^n ( F / P , i , n ) = ( 1 + i ) n and capital recovery factor ( A / P , i , n ) = i ( 1 + i ) n ( 1 + i ) n − 1 (A/P, i, n) = \frac{i(1+i)^n}{(1+i)^n - 1} ( A / P , i , n ) = ( 1 + i ) n − 1 i ( 1 + i ) n .
Depreciation allocates asset capital cost over service life using Straight-Line (equal annual drop), Sum-of-the-Years'-Digits (accelerated fraction), or Declining Balance methods.
Capitalized cost ( C C CC CC ) evaluates perpetual-life assets by combining initial investment with the present worth of infinite replacement cycles: C C = C 0 + A i + F − C L ( 1 + i ) k − 1 CC = C_0 + \frac{A}{i} + \frac{F - C_L}{(1+i)^k - 1} CC = C 0 + i A + ( 1 + i ) k − 1 F − C L .
Break-even analysis establishes the production or operational volume ( Q BE = F C P − V C Q_{\text{BE}} = \frac{FC}{P - VC} Q BE = P − V C FC ) where total revenues equal total production costs.
Last updated: August 2026
9.1 Engineering Economics & Depreciation
Engineering Economics provides quantitative mathematical tools to evaluate financial feasibility, asset replacement, and capital expenditure options. For the Registered Electrical Engineer (REE) Licensure Examination under Engineering Sciences and Allied Subjects (ESAS), candidates must master cash flow equivalence, interest formulas, asset depreciation methods, and capital project comparison techniques.
1. Time Value of Money & Cash Flow Equivalence
The fundamental principle of engineering economics is that a unit of money available today is worth more than the same unit received in the future due to its earning capacity (interest).
Interest Definitions
Simple Interest ( I I I ): Interest earned strictly on the principal amount: I = P ⋅ i ⋅ n I = P \cdot i \cdot n I = P ⋅ i ⋅ n F = P ( 1 + i ⋅ n ) F = P(1 + i \cdot n) F = P ( 1 + i ⋅ n ) where P P P is principal, i i i is interest rate per period, n n n is number of periods, and F F F is future amount.
Compound Interest: Interest earned on both principal and accumulated past interest: F = P ( 1 + i ) n F = P(1 + i)^n F = P ( 1 + i ) n
Single Payment & Uniform Series Interest Factors
Equivalence Name Finding Given Formula / Symbol Functional Notation
Single Payment Compound Amount F F F P P P F = P ( 1 + i ) n F = P (1+i)^n F = P ( 1 + i ) n P ( F / P , i % , n ) P(F/P, i\%, n) P ( F / P , i % , n )
Single Payment Present Worth P P P F F F P = F ( 1 + i ) − n P = F (1+i)^{-n} P = F ( 1 + i ) − n F ( P / F , i % , n ) F(P/F, i\%, n) F ( P / F , i % , n )
Uniform Series Compound Amount F F F A A A F = A [ ( 1 + i ) n − 1 i ] F = A \left[ \frac{(1+i)^n - 1}{i} \right] F = A [ i ( 1 + i ) n − 1 ] A ( F / A , i % , n ) A(F/A, i\%, n) A ( F / A , i % , n )
Sinking Fund Factor A A A F F F A = F [ i ( 1 + i ) n − 1 ] A = F \left[ \frac{i}{(1+i)^n - 1} \right] A = F [ ( 1 + i ) n − 1 i ] F ( A / F , i % , n ) F(A/F, i\%, n) F ( A / F , i % , n )
Capital Recovery Factor A A A P P P A = P [ i ( 1 + i ) n ( 1 + i ) n − 1 ] A = P \left[ \frac{i(1+i)^n}{(1+i)^n - 1} \right] A = P [ ( 1 + i ) n − 1 i ( 1 + i ) n ] P ( A / P , i % , n ) P(A/P, i\%, n) P ( A / P , i % , n )
Uniform Series Present Worth P P P A A A P = A [ ( 1 + i ) n − 1 i ( 1 + i ) n ] P = A \left[ \frac{(1+i)^n - 1}{i(1+i)^n} \right] P = A [ i ( 1 + i ) n ( 1 + i ) n − 1 ] A ( P / A , i % , n ) A(P/A, i\%, n) A ( P / A , i % , n )
Nominal vs. Effective Interest Rates
When interest is compounded m m m times per year at nominal annual rate r r r :
Interest rate per compounding period ( i i i ): i = r m i = \frac{r}{m} i = m r
Effective Annual Interest Rate ( i e i_e i e ): The actual annual rate earned under sub-annual compounding: i e = ( 1 + r m ) m − 1 i_e = \left(1 + \frac{r}{m}\right)^m - 1 i e = ( 1 + m r ) m − 1
Continuous Compounding ( m → ∞ m \to \infty m → ∞ ): i e = e r − 1 i_e = e^r - 1 i e = e r − 1 F = P e r t F = P e^{r t} F = P e r t
Cash Flow Gradient Series
Arithmetic Gradient ( G G G ): Cash flow increases by constant magnitude G G G each period ( A k = ( k − 1 ) G A_k = (k-1)G A k = ( k − 1 ) G ): P G = G i [ ( 1 + i ) n − 1 i ( 1 + i ) n − n ( 1 + i ) n ] P_G = \frac{G}{i} \left[ \frac{(1+i)^n - 1}{i(1+i)^n} - \frac{n}{(1+i)^n} \right] P G = i G [ i ( 1 + i ) n ( 1 + i ) n − 1 − ( 1 + i ) n n ]
Geometric Gradient ( g g g ): Cash flow increases by constant percentage rate g g g each period ( A k = A 1 ( 1 + g ) k − 1 A_k = A_1 (1+g)^{k-1} A k = A 1 ( 1 + g ) k − 1 ): P = A 1 [ 1 − ( 1 + g ) n ( 1 + i ) − n ] i − g ( for i ≠ g ) P = \frac{A_1 [1 - (1+g)^n (1+i)^{-n}]}{i - g} \quad (\text{for } i \neq g) P = i − g A 1 [ 1 − ( 1 + g ) n ( 1 + i ) − n ] ( for i = g ) P = n A 1 1 + i ( for i = g ) P = \frac{n A_1}{1 + i} \quad (\text{for } i = g) P = 1 + i n A 1 ( for i = g )
2. Depreciation Methods & Asset Book Value
Depreciation represents the systematic reduction in accounting value of a physical asset over its estimated useful life due to wear, tear, age, or technological obsolescence.
- Common Terminology
- C 0 C_0 C 0 = Initial installed capital cost (first cost)
- C L C_L C L = Salvage value (resale/scrap value at end of useful life)
- n n n = Useful life in years
- k k k = Specific year number ( 1 , 2 , … , n 1, 2, \dots, n 1 , 2 , … , n )
- d k d_k d k = Depreciation charge during year k k k
- D k D_k D k = Cumulative depreciation through year k k k
B V k BV_k B V k = Book value at end of year k k k ( B V k = C 0 − D k BV_k = C_0 - D_k B V k = C 0 − D k )
Summary of Standard Depreciation Methods
Straight-Line Method (SLM): Constant annual depreciation charge. d = C 0 − C L n d = \frac{C_0 - C_L}{n} d = n C 0 − C L D k = k ⋅ d = k ( C 0 − C L n ) D_k = k \cdot d = k \left(\frac{C_0 - C_L}{n}\right) D k = k ⋅ d = k ( n C 0 − C L ) B V k = C 0 − k ⋅ d BV_k = C_0 - k \cdot d B V k = C 0 − k ⋅ d
Sinking Fund Method (SFM): Assumes annual depreciation charges accumulate in an interest-bearing fund at rate i i i . d = ( C 0 − C L ) [ i ( 1 + i ) n − 1 ] = ( C 0 − C L ) ( A / F , i % , n ) d = (C_0 - C_L) \left[ \frac{i}{(1+i)^n - 1} \right] = (C_0 - C_L) (A/F, i\%, n) d = ( C 0 − C L ) [ ( 1 + i ) n − 1 i ] = ( C 0 − C L ) ( A / F , i % , n ) D k = d [ ( 1 + i ) k − 1 i ] = d ( F / A , i % , k ) D_k = d \left[ \frac{(1+i)^k - 1}{i} \right] = d (F/A, i\%, k) D k = d [ i ( 1 + i ) k − 1 ] = d ( F / A , i % , k ) B V k = C 0 − D k BV_k = C_0 - D_k B V k = C 0 − D k
Sum-of-the-Years'-Digits (SYD) Method: Accelerated depreciation allocating larger charges in early years.
Sum of digits: S = n ( n + 1 ) 2 S = \frac{n(n+1)}{2} S = 2 n ( n + 1 )
Depreciation in year k k k : d k = ( n − k + 1 S ) ( C 0 − C L ) d_k = \left( \frac{n - k + 1}{S} \right) (C_0 - C_L) d k = ( S n − k + 1 ) ( C 0 − C L )
Cumulative depreciation at year k k k : D k = [ k ( 2 n − k + 1 ) 2 S ] ( C 0 − C L ) D_k = \left[ \frac{k(2n - k + 1)}{2 S} \right] (C_0 - C_L) D k = [ 2 S k ( 2 n − k + 1 ) ] ( C 0 − C L )
Declining Balance Method (DBM) / Matched Rate: Constant percentage rate K K K applied to decaying book value.
Fixed rate K K K derived from exact salvage value: K = 1 − C L C 0 n K = 1 - \sqrt[n]{\frac{C_L}{C_0}} K = 1 − n C 0 C L
Depreciation in year k k k : d k = K ⋅ B V k − 1 = K ⋅ C 0 ( 1 − K ) k − 1 d_k = K \cdot BV_{k-1} = K \cdot C_0 (1 - K)^{k-1} d k = K ⋅ B V k − 1 = K ⋅ C 0 ( 1 − K ) k − 1
Book value at year k k k : B V k = C 0 ( 1 − K ) k BV_k = C_0 (1 - K)^k B V k = C 0 ( 1 − K ) k
Double Declining Balance Method (DDBM): Accelerated declining balance using twice the straight-line rate ( K = 2 n K = \frac{2}{n} K = n 2 ), ignoring initial salvage value until book value reaches C L C_L C L . d k = ( 2 n ) B V k − 1 d_k = \left(\frac{2}{n}\right) BV_{k-1} d k = ( n 2 ) B V k − 1
Service Output / Unit-of-Production Method: Depreciation based on total operating hours or units produced T T T . Depreciation per unit = C 0 − C L T \text{Depreciation per unit } = \frac{C_0 - C_L}{T} Depreciation per unit = T C 0 − C L d k = ( Units in year k ) × ( C 0 − C L T ) d_k = (\text{Units in year } k) \times \left(\frac{C_0 - C_L}{T}\right) d k = ( Units in year k ) × ( T C 0 − C L )
3. Capital Budgeting & Economic Comparison Criteria
When evaluating competing electrical engineering investments or equipment options, candidates must apply standardized evaluation methods.
Present Worth (PW) / Net Present Value (NPV)
Converts all cash inflows and outflows to present values at minimum attractive rate of return (MARR) i i i :
NPV = ∑ k = 0 n R k ( 1 + i ) − k − ∑ k = 0 n C k ( 1 + i ) − k \text{NPV} = \sum_{k=0}^n R_k (1+i)^{-k} - \sum_{k=0}^n C_k (1+i)^{-k} NPV = ∑ k = 0 n R k ( 1 + i ) − k − ∑ k = 0 n C k ( 1 + i ) − k
Decision Rule: Accept project if NPV ≥ 0 \text{NPV} \ge 0 NPV ≥ 0 .
Equivalent Uniform Annual Cost (EUAC) / Annual Worth (AW)
Converts all capital expenditures, operating costs, and salvage values into an equivalent uniform annual amount over useful life n n n :
EUAC = C 0 ( A / P , i % , n ) + Annual O&M − C L ( A / F , i % , n ) \text{EUAC} = C_0 (A/P, i\%, n) + \text{Annual O\&M} - C_L (A/F, i\%, n) EUAC = C 0 ( A / P , i % , n ) + Annual O&M − C L ( A / F , i % , n )
Decision Rule: Select option with the lowest EUAC.
Capitalized Cost ( C C CC CC )
The present worth of an asset intended to provide continuous service perpetually ( n → ∞ n \to \infty n → ∞ ).
Non-replaceable asset / perpetual stream: C C = C 0 + A i CC = C_0 + \frac{A}{i} CC = C 0 + i A
Asset replaced every k k k years perpetually with salvage value C L C_L C L : C C = C 0 + A i + C 0 − C L ( 1 + i ) k − 1 CC = C_0 + \frac{A}{i} + \frac{C_0 - C_L}{(1+i)^k - 1} CC = C 0 + i A + ( 1 + i ) k − 1 C 0 − C L
Internal Rate of Return (IRR)
The discount rate i ∗ i^* i ∗ at which Net Present Value equals zero:
NPV ( i ∗ ) = 0 \text{NPV}(i^*) = 0 NPV ( i ∗ ) = 0
Decision Rule: Accept project if IRR ≥ MARR \text{IRR} \ge \text{MARR} IRR ≥ MARR .
Benefit-Cost Ratio ( B / C B/C B / C )
Used primarily in public works projects:
B / C = PW of Benefits PW of Costs = Equivalent Annual Benefits Equivalent Annual Costs B/C = \frac{\text{PW of Benefits}}{\text{PW of Costs}} = \frac{\text{Equivalent Annual Benefits}}{\text{Equivalent Annual Costs}} B / C = PW of Costs PW of Benefits = Equivalent Annual Costs Equivalent Annual Benefits
Decision Rule: Accept project if B / C ≥ 1.0 B/C \ge 1.0 B / C ≥ 1.0 .
- 4. Break-Even Analysis & Payback Period
- Break-Even Volume Analysis
Determines operational level where total revenues equal total production costs.
- Total Cost: T C = F C + V C ⋅ Q TC = FC + VC \cdot Q TC = FC + V C ⋅ Q
- Total Revenue: T R = P ⋅ Q TR = P \cdot Q TR = P ⋅ Q
Break-Even Quantity ( Q BE Q_{\text{BE}} Q BE ): Q BE = F C P − V C Q_{\text{BE}} = \frac{FC}{P - VC} Q BE = P − V C FC where F C FC FC is fixed costs, V C VC V C is variable cost per unit, and P P P is selling price per unit.
Payback Period
Simple Payback Period ( n p n_p n p ): Time required for cumulative cash inflows to equal initial investment (ignoring time value of money): n p = C 0 Annual Net Cash Flow n_p = \frac{C_0}{\text{Annual Net Cash Flow}} n p = Annual Net Cash Flow C 0
Discounted Payback Period: Time required for cumulative discounted cash flows to equal initial investment.
- Solved Board Exam Examples
- Example 1: EUAC Comparison of Motor Drive Systems
Problem: An industrial plant requires an electrical motor drive. Two candidate motors are being evaluated at an interest rate of i = 10 % i = 10\% i = 10% per annum over a 6-year period:
Motor A: Initial cost C 0 = PHP 150 , 000 C_0 = \text{PHP }150,000 C 0 = PHP 150 , 000 , annual maintenance A = PHP 20 , 000 A = \text{PHP }20,000 A = PHP 20 , 000 , salvage value C L = PHP 30 , 000 C_L = \text{PHP }30,000 C L = PHP 30 , 000 .
Motor B: Initial cost C 0 = PHP 220 , 000 C_0 = \text{PHP }220,000 C 0 = PHP 220 , 000 , annual maintenance A = PHP 10 , 000 A = \text{PHP }10,000 A = PHP 10 , 000 , salvage value C L = PHP 50 , 000 C_L = \text{PHP }50,000 C L = PHP 50 , 000 .
Which motor should be selected based on Equivalent Uniform Annual Cost (EUAC)?
Solution:
Calculate Capital Recovery Factor ( A / P , 10 % , 6 ) (A/P, 10\%, 6) ( A / P , 10% , 6 ) : ( A / P , 10 % , 6 ) = 0.10 ( 1.10 ) 6 ( 1.10 ) 6 − 1 = 0.10 ( 1.771561 ) 0.771561 = 0.229607 (A/P, 10\%, 6) = \frac{0.10(1.10)^6}{(1.10)^6 - 1} = \frac{0.10(1.771561)}{0.771561} = 0.229607 ( A / P , 10% , 6 ) = ( 1.10 ) 6 − 1 0.10 ( 1.10 ) 6 = 0.771561 0.10 ( 1.771561 ) = 0.229607
Calculate Sinking Fund Factor ( A / F , 10 % , 6 ) (A/F, 10\%, 6) ( A / F , 10% , 6 ) : ( A / F , 10 % , 6 ) = 0.10 ( 1.10 ) 6 − 1 = 0.10 0.771561 = 0.129607 (A/F, 10\%, 6) = \frac{0.10}{(1.10)^6 - 1} = \frac{0.10}{0.771561} = 0.129607 ( A / F , 10% , 6 ) = ( 1.10 ) 6 − 1 0.10 = 0.771561 0.10 = 0.129607
Compute EUAC for Motor A: EUAC A = 150 , 000 ( 0.229607 ) + 20 , 000 − 30 , 000 ( 0.129607 ) \text{EUAC}_A = 150,000(0.229607) + 20,000 - 30,000(0.129607) EUAC A = 150 , 000 ( 0.229607 ) + 20 , 000 − 30 , 000 ( 0.129607 ) EUAC A = 34 , 441.05 + 20 , 000 − 3 , 888.21 = PHP 50 , 552.84 \text{EUAC}_A = 34,441.05 + 20,000 - 3,888.21 = \text{PHP }50,552.84 EUAC A = 34 , 441.05 + 20 , 000 − 3 , 888.21 = PHP 50 , 552.84
Compute EUAC for Motor B: EUAC B = 220 , 000 ( 0.229607 ) + 10 , 000 − 50 , 000 ( 0.129607 ) \text{EUAC}_B = 220,000(0.229607) + 10,000 - 50,000(0.129607) EUAC B = 220 , 000 ( 0.229607 ) + 10 , 000 − 50 , 000 ( 0.129607 ) EUAC B = 50 , 513.54 + 10 , 000 − 6 , 480.35 = PHP 54 , 033.19 \text{EUAC}_B = 50,513.54 + 10,000 - 6,480.35 = \text{PHP }54,033.19 EUAC B = 50 , 513.54 + 10 , 000 − 6 , 480.35 = PHP 54 , 033.19
Conclusion: Select Motor A because it yields a lower EUAC by PHP 3 , 480.35 \text{PHP }3,480.35 PHP 3 , 480.35 per year.
Example 2: SYD vs. DDB Depreciation of a Transformer Asset
Problem: A 500 kVA 500\ \text{kVA} 500 kVA distribution transformer has an installed initial cost C 0 = PHP 400 , 000 C_0 = \text{PHP }400,000 C 0 = PHP 400 , 000 and an estimated salvage value C L = PHP 40 , 000 C_L = \text{PHP }40,000 C L = PHP 40 , 000 after a useful life of n = 5 n = 5 n = 5 years. Calculate:
The depreciation charge for Year 3 using Sum-of-the-Years'-Digits (SYD).
The Book Value at the end of Year 2 using Double Declining Balance (DDB).
Solution:
SYD Method (Year 3):
Depreciable amount: C 0 − C L = 400 , 000 − 40 , 000 = PHP 360 , 000 C_0 - C_L = 400,000 - 40,000 = \text{PHP }360,000 C 0 − C L = 400 , 000 − 40 , 000 = PHP 360 , 000 .
Sum of years' digits: S = 5 ( 5 + 1 ) 2 = 15 S = \frac{5(5+1)}{2} = 15 S = 2 5 ( 5 + 1 ) = 15 .
For Year 3 ( k = 3 k = 3 k = 3 ), remaining life digit is 5 − 3 + 1 = 3 5 - 3 + 1 = 3 5 − 3 + 1 = 3 .
Depreciation charge d 3 d_3 d 3 : d 3 = ( 3 15 ) × 360 , 000 = 0.20 × 360 , 000 = PHP 72 , 000 d_3 = \left(\frac{3}{15}\right) \times 360,000 = 0.20 \times 360,000 = \text{PHP }72,000 d 3 = ( 15 3 ) × 360 , 000 = 0.20 × 360 , 000 = PHP 72 , 000
DDB Method (Book Value end of Year 2):
DDB rate: K = 2 n = 2 5 = 0.40 K = \frac{2}{n} = \frac{2}{5} = 0.40 K = n 2 = 5 2 = 0.40 (or 40 % 40\% 40% ).
Year 1 depreciation: d 1 = 0.40 × 400 , 000 = PHP 160 , 000 d_1 = 0.40 \times 400,000 = \text{PHP }160,000 d 1 = 0.40 × 400 , 000 = PHP 160 , 000 .
Book value end of Year 1: B V 1 = 400 , 000 − 160 , 000 = PHP 240 , 000 BV_1 = 400,000 - 160,000 = \text{PHP }240,000 B V 1 = 400 , 000 − 160 , 000 = PHP 240 , 000 .
Year 2 depreciation: d 2 = 0.40 × 240 , 000 = PHP 96 , 000 d_2 = 0.40 \times 240,000 = \text{PHP }96,000 d 2 = 0.40 × 240 , 000 = PHP 96 , 000 .
Book value end of Year 2 ( B V 2 BV_2 B V 2 ): B V 2 = 240 , 000 − 96 , 000 = PHP 144 , 000 BV_2 = 240,000 - 96,000 = \text{PHP }144,000 B V 2 = 240 , 000 − 96 , 000 = PHP 144 , 000 (Alternatively: B V 2 = C 0 ( 1 − K ) 2 = 400 , 000 ( 1 − 0.40 ) 2 = 400 , 000 ( 0.36 ) = PHP 144 , 000 BV_2 = C_0 (1 - K)^2 = 400,000(1 - 0.40)^2 = 400,000(0.36) = \text{PHP }144,000 B V 2 = C 0 ( 1 − K ) 2 = 400 , 000 ( 1 − 0.40 ) 2 = 400 , 000 ( 0.36 ) = PHP 144 , 000 .)