Study guide

19.3 Load Flow, Economic Dispatch & Power System Stability

PRC Registered Electrical Engineer REE

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Overview, RA 7920 & Electrical Engineering Ethics

1.1 PRC Board of Electrical Engineering & REE Examination Overview 1.2 Republic Act No. 7920 (New Electrical Engineering Law) & License Classes 1.3 Code of Ethics & Professional Practice for Electrical Engineers

2 Chapter 2: Math — Algebra, Trig & Geometry

2.1 Algebraic Equations, Polynomials & Complex Numbers 2.2 Trigonometry — Identities, Triangles & Spherical Trig 2.3 Analytic & Solid Geometry

3 Chapter 3: Engineering Mathematics — Calculus & Differential Equations

3.1 Differential Calculus, Limits, Derivatives & Applications 3.2 Integral Calculus, Integration Techniques & Area/Volume Applications 3.3 Ordinary Differential Equations & Initial-Value Problems

4 Chapter 4: Engineering Mathematics — Advanced Math & Transform Methods

4.1 Laplace Transforms, Inverse Transforms & Circuit Applications 4.2 Fourier Series, Fourier Transforms & Frequency-Domain Analysis 4.3 Vector Analysis, Linear Algebra, Matrices & Complex Analysis

5 Chapter 5: Engineering Mathematics — Probability, Statistics & Engineering Data Analysis

5.1 Probability Theory, Counting Techniques & Bayes' Theorem 5.2 Engineering Data Analysis I — Descriptive Statistics & Probability Distributions 5.3 Engineering Data Analysis II — Confidence Intervals, Hypothesis Testing & Regression

6 Chapter 6: Engineering Mathematics — Numerical Methods & Analysis

6.1 Numerical Root-Finding & Solution of Linear Systems 6.2 Interpolation, Numerical Integration & Numerical Solution of ODEs

7 Chapter 7: ESAS — Physics, Chemistry & Computer Fundamentals

7.1 Physics for Engineers 7.2 General Chemistry & Materials Science 7.3 Computer Fundamentals, Programming & Data Logic 7.4 Logic Circuits, Switching Theory & Microprocessor Systems

8 Chapter 8: ESAS — Mechanics & Thermal-Fluid Engineering

8.1 Engineering Mechanics — Statics & Dynamics 8.2 Strength of Materials & Mechanics of Deformable Bodies 8.3 Thermal-Fluid Engineering — Thermodynamics & Fluid Mechanics

9 Chapter 9: ESAS — Engineering Economics, Management & Contracts

9.1 Engineering Economics & Depreciation 9.2 Engineering Management & Ethics 9.3 Philippine Electrical Engineering Law, Code & Contracts 9.4 Technopreneurship 101 & Management of Engineering Projects

10 Chapter 10: PEC 1 — Safety, Sizing & Protection

10.1 PEC Fundamentals, Safety Standards & Grounding/Bonding 10.2 Conductor Sizing, Ampacity Adjustment & Voltage Drop 10.3 Overcurrent Protection, Branch Circuit & Feeder Sizing 10.4 Basic Occupational Safety & Health (BOSH) and Electrical Safety Standards

11 Chapter 11: PEC 1 & 2 — Equipment & Utility Systems

11.1 PEC Equipment Installation & Wiring Methods 11.2 Utility Systems, Transformers & Switchgear 11.3 Special Occupancies & Hazardous Locations

12 Chapter 12: Electrical Professional — DC & AC Circuit Fundamentals

12.1 DC Circuit Analysis & Network Theorems 12.2 Single-Phase AC Circuits & Phasor Analysis 12.3 Balanced & Unbalanced Three-Phase AC Circuits

13 Chapter 13: Electrical Professional — EM Fields & Transients

13.1 Electrostatics, Magnetostatics & Maxwell's Equations 13.2 Electromagnetic Waves & Transmission Line Fields 13.3 First-Order & Second-Order Circuit Transients

14 Chapter 14: Electrical Professional — Electronics, Industrial Electronics & Communications

14.1 Electronics 1 & 2 — Semiconductor Devices & Analog Circuits 14.2 Electrical Apparatus & Devices — Industrial Electronics & Power Converters 14.3 Fundamentals of Electronic Communications

15 Chapter 15: Electrical Professional — Transformers & DC Machines

15.1 Single-Phase & Three-Phase Transformers 15.2 Transformer Connections & Special Transformers 15.3 DC Generators & DC Motors

16 Chapter 16: Electrical Professional — AC Synchronous & Induction Machinery

16.1 Synchronous Generators (Alternators) 16.2 Synchronous Motors & Special AC Machines 16.3 Three-Phase & Single-Phase Induction Motors

17 Chapter 17: Electrical Professional — Power Plants & Energy Conversion

17.1 Hydroelectric, Thermal & Combined Cycle Power Plants 17.2 Renewable Energy Systems & Geothermal Power Plants 17.3 Power Plant Economics, Load Curves & Energy Conversion

18 Chapter 18: Electrical Professional — Transmission & Distribution

18.1 Transmission Line Parameters & Performance Models 18.2 Mechanical Overhead Line Design, Underground Cables & Insulators 18.3 Distribution Systems, Substation Layouts & Power Flow Control

19 Chapter 19: Electrical Professional — Power System Analysis

19.1 The Per-Unit System, Base Conversion & Impedance Diagrams 19.2 Symmetrical Components & Unbalanced Fault Analysis 19.3 Load Flow, Economic Dispatch & Power System Stability

20 Chapter 20: Electrical Professional — Protection, Control, Instrumentation & Illumination

20.1 Power System Protection & Protective Relaying 20.2 Industrial Motor Control, Logic Circuits & PLC Automation 20.3 Electrical Instrumentation, Transducers & Measurement Systems 20.4 Illumination Engineering, Lighting Design & Photometrics 20.5 Feedback Control Systems & Research Methods

19.3 Load Flow, Economic Dispatch & Power System Stability

Key Takeaways Explain This Topic AI

Load flow classifies every bus as slack (V and δ specified), PV or generator (P and |V| specified), or PQ or load (P and Q specified).

Gauss-Seidel load flow converges linearly with iteration count rising with system size, while Newton-Raphson converges quadratically in three to five iterations almost independently of size.

Real power transferred over a line is approximately P = (V1·V2/X)·sin δ, so maximum steady-state transfer occurs at a power angle of 90°.

Economic dispatch neglecting losses equalises the incremental cost of every generator, dC/dP = λ, subject to each unit's output limits.

The swing equation is (2H/ωs)·d²δ/dt² = Pm − Pe, and the equal-area criterion judges first-swing transient stability without integrating it.

Last updated: August 2026

19.3 Load Flow, Economic Dispatch & Power System Stability

The third pillar of Enhanced TOS topic K, Power System Analysis (PRBEE Resolution No. 40, s. 2024) is the steady-state and dynamic behaviour of an interconnected network: where power flows, what it costs, and whether the machines stay in step after a disturbance.

1. The Load-Flow Problem

Each bus has four quantities — ∣ V ∣ |V| ∣ V ∣ , δ \delta δ , P P P and Q Q Q — of which two are specified and two are computed.

Bus type Specified Computed Count

Slack / swing ∣ V ∣ \lvert V \rvert ∣ V ∣ , δ \delta δ (reference, δ = 0 \delta = 0 δ = 0 ) P P P , Q Q Q Exactly one per island

  • PV / generator / voltage-controlled P P P , ∣ V ∣ \lvert V \rvert ∣ V ∣ Q Q Q , δ \delta δ Each generator bus
  • PQ / load P P P , Q Q Q ∣ V ∣ \lvert V \rvert ∣ V ∣ , δ \delta δ All remaining buses

The slack bus exists because total system losses are unknown until the solution converges; the slack generator absorbs the mismatch. There is exactly one per electrical island, and it also sets the angle reference.

A PV bus reverts to a PQ bus whenever its reactive output hits the machine's Q Q Q limit — the voltage schedule can no longer be held and ∣ V ∣ |V| ∣ V ∣ becomes a computed quantity. This limit switching is why real load-flow programs iterate on bus type as well as on voltage.

Bus Admittance Matrix Y i i = ∑ admittances connected to bus i , Y i j = − y i j ( i ≠ j ) Y_{ii} = \sum \text{admittances connected to bus } i, \qquad Y_{ij} = -\,y_{ij} \ (i \ne j) Y ii ​ = ∑ admittances connected to bus i , Y ij ​ = − y ij ​ ( i  = j )

Y b u s Y_{bus} Y b u s ​ is symmetric for a network without phase shifters, highly sparse (a bus connects to only a few others), and diagonally dominant — the property that guarantees Gauss-Seidel convergence, as established in the numerical methods chapter.

Power-Flow Equations P i = ∑ k = 1 n ∣ V i ∣ ∣ V k ∣ ∣ Y i k ∣ cos ⁡ ( θ i k + δ k − δ i ) P_i = \sum_{k=1}^{n} |V_i||V_k||Y_{ik}|\cos(\theta_{ik} + \delta_k - \delta_i) P i ​ = k = 1 ∑ n ​ ∣ V i ​ ∣∣ V k ​ ∣∣ Y ik ​ ∣ cos ( θ ik ​ + δ k ​ − δ i ​ ) Q i = − ∑ k = 1 n ∣ V i ∣ ∣ V k ∣ ∣ Y i k ∣ sin ⁡ ( θ i k + δ k − δ i ) Q_i = -\sum_{k=1}^{n} |V_i||V_k||Y_{ik}|\sin(\theta_{ik} + \delta_k - \delta_i) Q i ​ = − k = 1 ∑ n ​ ∣ V i ​ ∣∣ V k ​ ∣∣ Y ik ​ ∣ sin ( θ ik ​ + δ k ​ − δ i ​ )

Solution Methods

  • Method Convergence Iterations Memory Notes
  • Gauss-Seidel Linear 50–150, grows with system size Low Simple, robust from a poor start, slow
  • Newton-Raphson Quadratic 3–5, nearly independent of size High (Jacobian) Industry standard

Fast decoupled Linear but fast 5–15 Low Exploits P P P – δ \delta δ and Q Q Q – ∣ V ∣ \vert V\vert ∣ V ∣ decoupling in high- X / R X/R X / R networks

Acceleration factors of roughly 1.4 to 1.6 are applied to Gauss-Seidel to reduce the iteration count.

2. Power Transfer and Voltage Stability

For a short line of reactance X X X between buses of voltage V 1 V_1 V 1 ​ and V 2 V_2 V 2 ​ separated by power angle δ \delta δ , with resistance neglected: P = V 1 V 2 X sin ⁡ δ Q = V 1 ( V 1 − V 2 cos ⁡ δ ) X P = \frac{V_1 V_2}{X}\sin\delta \qquad\qquad Q = \frac{V_1\left(V_1 - V_2\cos\delta\right)}{X} P = X V 1 ​ V 2 ​ ​ sin δ Q = X V 1 ​ ( V 1 ​ − V 2 ​ cos δ ) ​

Two engineering rules fall straight out and are examined constantly:

Real power flows from the leading to the lagging bus and is controlled by the angle ; maximum steady-state transfer occurs at δ = 90 ° \delta = 90° δ = 90° ;

Reactive power flows from the higher-magnitude to the lower-magnitude bus and is controlled by the voltage magnitude .

This decoupling is the basis of the fast-decoupled load flow and of every voltage-control scheme: to raise a bus voltage, inject VARs locally rather than trying to import them across a reactive network.

Voltage collapse appears on the P–V (nose) curve : as load increases, voltage falls slowly, then plunges at the nose point where the Jacobian becomes singular and no solution exists. Operating margins are stated as a distance from that nose.

3. Economic Dispatch

Each thermal unit has a cost curve, conventionally quadratic: C i = a i + b i P i + c i P i 2 ( PHP/h ) ⟹ d C i d P i = b i + 2 c i P i ( PHP/MWh ) C_i = a_i + b_iP_i + c_iP_i^{2} \quad (\text{PHP/h}) \qquad \Longrightarrow \qquad \frac{dC_i}{dP_i} = b_i + 2c_iP_i \quad (\text{PHP/MWh}) C i ​ = a i ​ + b i ​ P i ​ + c i ​ P i 2 ​ ( PHP/h ) ⟹ d P i ​ d C i ​ ​ = b i ​ + 2 c i ​ P i ​ ( PHP/MWh )

Neglecting losses, minimum total cost occurs when every unit runs at the same incremental cost : d C 1 d P 1 = d C 2 d P 2 = ⋯ = λ , subject to ∑ P i = P D , P i , min ⁡ ≤ P i ≤ P i , max ⁡ \frac{dC_1}{dP_1} = \frac{dC_2}{dP_2} = \cdots = \lambda, \qquad \text{subject to} \quad \sum P_i = P_D, \quad P_{i,\min} \le P_i \le P_{i,\max} d P 1 ​ d C 1 ​ ​ = d P 2 ​ d C 2 ​ ​ = ⋯ = λ , subject to ∑ P i ​ = P D ​ , P i , m i n ​ ≤ P i ​ ≤ P i , m a x ​

A unit driven outside its limits is fixed at the violated limit and removed from the equal- λ \lambda λ set, and λ \lambda λ is re-solved for the remaining units.

Including transmission losses, the coordination equations introduce penalty factors : d C i d P i × L i = λ , L i = 1 1 − ∂ P L ∂ P i \frac{dC_i}{dP_i} \times L_i = \lambda, \qquad L_i = \frac{1}{1 - \dfrac{\partial P_L}{\partial P_i}} d P i ​ d C i ​ ​ × L i ​ = λ , L i ​ = 1 − ∂ P i ​ ∂ P L ​ ​ 1 ​

A generator electrically remote from load has a penalty factor above unity, so it must be cheaper at the busbar to be worth dispatching — the reason a distant coal plant may be backed down in favour of nearer gas.

Note the distinction from unit commitment , which decides which units run over a horizon accounting for start-up cost and minimum up/down times. Economic dispatch allocates load among units already running.

4. Power System Stability

Type Disturbance Question answered

Steady-state stability Small, gradual load change Can the machine follow slow changes?

Transient stability Large — fault, line trip, sudden load rejection Does the machine survive the first swing ?

Dynamic stability Small, with controls modelled Do governor and exciter dynamics damp or amplify oscillation?

The Swing Equation 2 H ω s d 2 δ d t 2 = P m − P e (per unit) \frac{2H}{\omega_s}\frac{d^{2}\delta}{dt^{2}} = P_m - P_e \quad \text{(per unit)} ω s ​ 2 H ​ d t 2 d 2 δ ​ = P m ​ − P e ​ (per unit)

where H H H is the inertia constant in MJ/MVA (typically 3–10 s for thermal units), P m P_m P m ​ the mechanical input and P e P_e P e ​ the electrical output. A large H H H means large stored kinetic energy and a slow, stable response — which is precisely why grids with high inverter-based renewable penetration are concerned about declining system inertia.

Equal-Area Criterion

For a single machine against an infinite bus, the system remains stable through the first swing if the decelerating area available after fault clearing is at least equal to the accelerating area accumulated during the fault: A accelerating ≤ A decelerating A_{\text{accelerating}} \le A_{\text{decelerating}} A accelerating ​ ≤ A decelerating ​

The critical clearing angle δ c r \delta_{cr} δ cr ​ is where the two areas are exactly equal, and the critical clearing time is how long the protection has to clear the fault before that angle is exceeded. This is the direct engineering link between stability studies and relay/breaker speed specifications: faster clearing buys stability margin, which is why high-speed relaying and single-pole tripping exist on critical transmission lines. Steady-state stability limit: P max ⁡ = ∣ E ∣ ∣ V ∣ X s at δ = 90 ° \text{Steady-state stability limit: } P_{\max} = \frac{|E||V|}{X_s} \text{ at } \delta = 90° Steady-state stability limit: P m a x ​ = X s ​ ∣ E ∣∣ V ∣ ​ at δ = 90°

  • Solved Board Exam Examples
  • Example 1: Power Angle and Transfer Limit

A generator with E = 1.20 E = 1.20 E = 1.20 pu behind a synchronous reactance of j 0.80 j0.80 j 0.80 pu feeds an infinite bus at 1.00 1.00 1.00 pu. Find the maximum steady-state power transfer and the power angle at 1.0 pu output.

Solution. P max ⁡ = ( 1.20 ) ( 1.00 ) 0.80 = 1.50 pu at δ = 90 ° P_{\max} = \frac{(1.20)(1.00)}{0.80} = \boxed{1.50 \text{ pu}} \quad \text{at } \delta = 90° P m a x ​ = 0.80 ( 1.20 ) ( 1.00 ) ​ = 1.50 pu ​ at δ = 90°

For P = 1.0 P = 1.0 P = 1.0 pu: 1.0 = 1.5 sin ⁡ δ ⟹ sin ⁡ δ = 0.6667 ⟹ δ = 41.8 ° 1.0 = 1.5\sin\delta \implies \sin\delta = 0.6667 \implies \delta = \boxed{41.8°} 1.0 = 1.5 sin δ ⟹ sin δ = 0.6667 ⟹ δ = 41.8° ​

The machine operates well inside the 90° limit, leaving a healthy stability margin.

Example 2: Economic Dispatch of Two Units

Two units have incremental costs d C 1 / d P 1 = 8.0 + 0.024 P 1 dC_1/dP_1 = 8.0 + 0.024P_1 d C 1 ​ / d P 1 ​ = 8.0 + 0.024 P 1 ​ and d C 2 / d P 2 = 6.4 + 0.040 P 2 dC_2/dP_2 = 6.4 + 0.040P_2 d C 2 ​ / d P 2 ​ = 6.4 + 0.040 P 2 ​ (₱/MWh, P P P in MW). Dispatch a total load of 300 MW economically, ignoring losses and limits.

Solution. Set the incremental costs equal: 8.0 + 0.024 P 1 = 6.4 + 0.040 P 2 , P 1 + P 2 = 300 8.0 + 0.024P_1 = 6.4 + 0.040P_2, \qquad P_1 + P_2 = 300 8.0 + 0.024 P 1 ​ = 6.4 + 0.040 P 2 ​ , P 1 ​ + P 2 ​ = 300

Substituting P 2 = 300 − P 1 P_2 = 300 - P_1 P 2 ​ = 300 − P 1 ​ : 8.0 + 0.024 P 1 = 6.4 + 0.040 ( 300 − P 1 ) = 6.4 + 12 − 0.040 P 1 8.0 + 0.024P_1 = 6.4 + 0.040(300 - P_1) = 6.4 + 12 - 0.040P_1 8.0 + 0.024 P 1 ​ = 6.4 + 0.040 ( 300 − P 1 ​ ) = 6.4 + 12 − 0.040 P 1 ​ 0.064 P 1 = 10.4 ⟹ P 1 = 162.5 MW , P 2 = 137.5 MW 0.064P_1 = 10.4 \implies P_1 = \boxed{162.5 \text{ MW}}, \qquad P_2 = \boxed{137.5 \text{ MW}} 0.064 P 1 ​ = 10.4 ⟹ P 1 ​ = 162.5 MW ​ , P 2 ​ = 137.5 MW ​

Check: λ 1 = 8.0 + 0.024 ( 162.5 ) = 11.90 \lambda_1 = 8.0 + 0.024(162.5) = 11.90 λ 1 ​ = 8.0 + 0.024 ( 162.5 ) = 11.90 ₱/MWh and λ 2 = 6.4 + 0.040 ( 137.5 ) = 11.90 \lambda_2 = 6.4 + 0.040(137.5) = 11.90 λ 2 ​ = 6.4 + 0.040 ( 137.5 ) = 11.90 ₱/MWh — equal, as required. Note that the unit with the lower intercept does not simply take all the load; the slopes decide the split.

Example 3: Rotor Acceleration from the Swing Equation

A 60 Hz turbine-generator of H = 5.0 H = 5.0 H = 5.0 MJ/MVA suffers a fault that drops its electrical output from 1.0 pu to 0.30 pu while mechanical input stays at 1.0 pu. Find the initial rotor acceleration in electrical degrees per second squared.

Solution. The accelerating power is P a = 1.0 − 0.30 = 0.70 P_a = 1.0 - 0.30 = 0.70 P a ​ = 1.0 − 0.30 = 0.70 pu, and ω s = 360 f = 21 600 \omega_s = 360f = 21\,600 ω s ​ = 360 f = 21 600 electrical degrees per second. d 2 δ d t 2 = ω s 2 H P a = 21 600 2 ( 5.0 ) ( 0.70 ) = 2160 ( 0.70 ) = 1512 elec. deg/s 2 \frac{d^{2}\delta}{dt^{2}} = \frac{\omega_s}{2H}P_a = \frac{21\,600}{2(5.0)}(0.70) = 2160(0.70) = \boxed{1512 \text{ elec. deg/s}^{2}} d t 2 d 2 δ ​ = 2 H ω s ​ ​ P a ​ = 2 ( 5.0 ) 21 600 ​ ( 0.70 ) = 2160 ( 0.70 ) = 1512 elec. deg/s 2 ​

At this rate the rotor advances roughly 7.6 electrical degrees in the first 0.1 s, so a five-cycle (83 ms) breaker keeps the swing small — the quantitative justification for high-speed clearing.