Study guide

19.1 The Per-Unit System, Base Conversion & Impedance Diagrams

PRC Registered Electrical Engineer REE

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Overview, RA 7920 & Electrical Engineering Ethics

1.1 PRC Board of Electrical Engineering & REE Examination Overview 1.2 Republic Act No. 7920 (New Electrical Engineering Law) & License Classes 1.3 Code of Ethics & Professional Practice for Electrical Engineers

2 Chapter 2: Math — Algebra, Trig & Geometry

2.1 Algebraic Equations, Polynomials & Complex Numbers 2.2 Trigonometry — Identities, Triangles & Spherical Trig 2.3 Analytic & Solid Geometry

3 Chapter 3: Engineering Mathematics — Calculus & Differential Equations

3.1 Differential Calculus, Limits, Derivatives & Applications 3.2 Integral Calculus, Integration Techniques & Area/Volume Applications 3.3 Ordinary Differential Equations & Initial-Value Problems

4 Chapter 4: Engineering Mathematics — Advanced Math & Transform Methods

4.1 Laplace Transforms, Inverse Transforms & Circuit Applications 4.2 Fourier Series, Fourier Transforms & Frequency-Domain Analysis 4.3 Vector Analysis, Linear Algebra, Matrices & Complex Analysis

5 Chapter 5: Engineering Mathematics — Probability, Statistics & Engineering Data Analysis

5.1 Probability Theory, Counting Techniques & Bayes' Theorem 5.2 Engineering Data Analysis I — Descriptive Statistics & Probability Distributions 5.3 Engineering Data Analysis II — Confidence Intervals, Hypothesis Testing & Regression

6 Chapter 6: Engineering Mathematics — Numerical Methods & Analysis

6.1 Numerical Root-Finding & Solution of Linear Systems 6.2 Interpolation, Numerical Integration & Numerical Solution of ODEs

7 Chapter 7: ESAS — Physics, Chemistry & Computer Fundamentals

7.1 Physics for Engineers 7.2 General Chemistry & Materials Science 7.3 Computer Fundamentals, Programming & Data Logic 7.4 Logic Circuits, Switching Theory & Microprocessor Systems

8 Chapter 8: ESAS — Mechanics & Thermal-Fluid Engineering

8.1 Engineering Mechanics — Statics & Dynamics 8.2 Strength of Materials & Mechanics of Deformable Bodies 8.3 Thermal-Fluid Engineering — Thermodynamics & Fluid Mechanics

9 Chapter 9: ESAS — Engineering Economics, Management & Contracts

9.1 Engineering Economics & Depreciation 9.2 Engineering Management & Ethics 9.3 Philippine Electrical Engineering Law, Code & Contracts 9.4 Technopreneurship 101 & Management of Engineering Projects

10 Chapter 10: PEC 1 — Safety, Sizing & Protection

10.1 PEC Fundamentals, Safety Standards & Grounding/Bonding 10.2 Conductor Sizing, Ampacity Adjustment & Voltage Drop 10.3 Overcurrent Protection, Branch Circuit & Feeder Sizing 10.4 Basic Occupational Safety & Health (BOSH) and Electrical Safety Standards

11 Chapter 11: PEC 1 & 2 — Equipment & Utility Systems

11.1 PEC Equipment Installation & Wiring Methods 11.2 Utility Systems, Transformers & Switchgear 11.3 Special Occupancies & Hazardous Locations

12 Chapter 12: Electrical Professional — DC & AC Circuit Fundamentals

12.1 DC Circuit Analysis & Network Theorems 12.2 Single-Phase AC Circuits & Phasor Analysis 12.3 Balanced & Unbalanced Three-Phase AC Circuits

13 Chapter 13: Electrical Professional — EM Fields & Transients

13.1 Electrostatics, Magnetostatics & Maxwell's Equations 13.2 Electromagnetic Waves & Transmission Line Fields 13.3 First-Order & Second-Order Circuit Transients

14 Chapter 14: Electrical Professional — Electronics, Industrial Electronics & Communications

14.1 Electronics 1 & 2 — Semiconductor Devices & Analog Circuits 14.2 Electrical Apparatus & Devices — Industrial Electronics & Power Converters 14.3 Fundamentals of Electronic Communications

15 Chapter 15: Electrical Professional — Transformers & DC Machines

15.1 Single-Phase & Three-Phase Transformers 15.2 Transformer Connections & Special Transformers 15.3 DC Generators & DC Motors

16 Chapter 16: Electrical Professional — AC Synchronous & Induction Machinery

16.1 Synchronous Generators (Alternators) 16.2 Synchronous Motors & Special AC Machines 16.3 Three-Phase & Single-Phase Induction Motors

17 Chapter 17: Electrical Professional — Power Plants & Energy Conversion

17.1 Hydroelectric, Thermal & Combined Cycle Power Plants 17.2 Renewable Energy Systems & Geothermal Power Plants 17.3 Power Plant Economics, Load Curves & Energy Conversion

18 Chapter 18: Electrical Professional — Transmission & Distribution

18.1 Transmission Line Parameters & Performance Models 18.2 Mechanical Overhead Line Design, Underground Cables & Insulators 18.3 Distribution Systems, Substation Layouts & Power Flow Control

19 Chapter 19: Electrical Professional — Power System Analysis

19.1 The Per-Unit System, Base Conversion & Impedance Diagrams 19.2 Symmetrical Components & Unbalanced Fault Analysis 19.3 Load Flow, Economic Dispatch & Power System Stability

20 Chapter 20: Electrical Professional — Protection, Control, Instrumentation & Illumination

20.1 Power System Protection & Protective Relaying 20.2 Industrial Motor Control, Logic Circuits & PLC Automation 20.3 Electrical Instrumentation, Transducers & Measurement Systems 20.4 Illumination Engineering, Lighting Design & Photometrics 20.5 Feedback Control Systems & Research Methods

19.1 The Per-Unit System, Base Conversion & Impedance Diagrams

Key Takeaways Explain This Topic AI

Power System Analysis is the largest single topic in the whole PRC Enhanced TOS at 9.00% of the exam and 20 of the 100 Electrical Engineering items.

Base current is Sbase/(√3·VLL,base) and base impedance is (VLL,base)²/Sbase, using three-phase MVA with line-to-line kV throughout.

Change of base follows Zpu,new = Zpu,old·(Sbase,new/Sbase,old)·(Vbase,old/Vbase,new)², squaring the voltage ratio but not the power ratio.

Per-unit impedance of a transformer is identical viewed from either winding, which is exactly why per-unit analysis eliminates ideal transformers from the impedance diagram.

Short-circuit MVA equals Sbase divided by the per-unit Thevenin impedance at the fault point, so a 0.05 pu source impedance on a 100 MVA base yields 2000 MVA.

Last updated: August 2026

19.1 The Per-Unit System, Base Conversion & Impedance Diagrams

Power System Analysis is topic K of the Electrical Engineering subject in the PRC Enhanced Table of Specifications (PRBEE Resolution No. 40, s. 2024 ), weighted 9.00% of the whole examination and 20 of the 100 Electrical Engineering items . That makes it the largest single topic in the entire REE examination — larger than any Mathematics or ESAS topic. It entered the syllabus explicitly through CHED Memorandum Order No. 88, s. 2017, which lists Power Systems Analysis among the required BSEE professional courses.

Everything in this topic begins with the per-unit system, because no serious fault or load-flow calculation is done in volts and amperes.

1. Why Per-Unit

Expressing every quantity as a fraction of a chosen base: Per-unit value = Actual value Base value \text{Per-unit value} = \frac{\text{Actual value}}{\text{Base value}} Per-unit value = Base value Actual value ​

buys four things an electrical engineer actually needs:

Transformer turns ratios vanish — an ideal transformer becomes a plain connection, so a multi-voltage network collapses into one impedance diagram;

Manufacturer impedance data already arrives in per-unit or percent on the equipment rating;

Per-unit impedances of like equipment fall in narrow, memorable bands, so a wrong answer is obvious by inspection;

Three-phase and single-phase calculations use the same numbers when bases are chosen consistently.

2. Base Quantities

Two bases are chosen — normally three-phase MVA and line-to-line kV — and the rest follow: I b a s e = S b a s e ( 3 ϕ ) 3 V b a s e ( L L ) Z b a s e = V b a s e ( L L ) 2 S b a s e ( 3 ϕ ) I_{base} = \frac{S_{base(3\phi)}}{\sqrt{3}\,V_{base(LL)}} \qquad\qquad Z_{base} = \frac{V_{base(LL)}^{2}}{S_{base(3\phi)}} I ba se ​ = 3 ​ V ba se ( LL ) ​ S ba se ( 3 ϕ ) ​ ​ Z ba se ​ = S ba se ( 3 ϕ ) ​ V ba se ( LL ) 2 ​ ​

With S S S in MVA and V V V in kV, Z b a s e Z_{base} Z ba se ​ comes out directly in ohms and I b a s e I_{base} I ba se ​ in kA: Z b a s e ( Ω ) = [ k V L L ] 2 M V A 3 ϕ I b a s e ( k A ) = M V A 3 ϕ 3 k V L L Z_{base}(\Omega) = \frac{\left[kV_{LL}\right]^{2}}{MVA_{3\phi}} \qquad\qquad I_{base}(kA) = \frac{MVA_{3\phi}}{\sqrt{3}\;kV_{LL}} Z ba se ​ ( Ω ) = M V A 3 ϕ ​ [ k V LL ​ ] 2 ​ I ba se ​ ( k A ) = 3 ​ k V LL ​ M V A 3 ϕ ​ ​

The base voltage changes at every transformer in proportion to the turns ratio; the base MVA is chosen once and stays constant across the whole system. Getting this backwards is the most common structural error in per-unit problems. S p u = S a c t u a l S b a s e , V p u = V a c t u a l V b a s e , I p u = I a c t u a l I b a s e , Z p u = Z a c t u a l Z b a s e S_{pu} = \frac{S_{actual}}{S_{base}}, \qquad V_{pu} = \frac{V_{actual}}{V_{base}}, \qquad I_{pu} = \frac{I_{actual}}{I_{base}}, \qquad Z_{pu} = \frac{Z_{actual}}{Z_{base}} S p u ​ = S ba se ​ S a c t u a l ​ ​ , V p u ​ = V ba se ​ V a c t u a l ​ ​ , I p u ​ = I ba se ​ I a c t u a l ​ ​ , Z p u ​ = Z ba se ​ Z a c t u a l ​ ​

3. Change of Base

Equipment impedance is published on the equipment's own rating, so it must be converted to the common system base: Z p u , new = Z p u , old × S b a s e , new S b a s e , old × ( V b a s e , old V b a s e , new ) 2 Z_{pu,\text{new}} = Z_{pu,\text{old}} \times \frac{S_{base,\text{new}}}{S_{base,\text{old}}} \times \left(\frac{V_{base,\text{old}}}{V_{base,\text{new}}}\right)^{2} Z p u , new ​ = Z p u , old ​ × S ba se , old ​ S ba se , new ​ ​ × ( V ba se , new ​ V ba se , old ​ ​ ) 2

Note the asymmetry: the MVA ratio is direct , the voltage ratio is inverted and squared . When the base voltage matches the equipment's rated voltage — the usual case — only the MVA ratio survives: Z p u , new = Z p u , old × S b a s e , new S b a s e , old Z_{pu,\text{new}} = Z_{pu,\text{old}} \times \frac{S_{base,\text{new}}}{S_{base,\text{old}}} Z p u , new ​ = Z p u , old ​ × S ba se , old ​ S ba se , new ​ ​

Typical Per-Unit Impedances

  • Equipment Typical Z Z Z (percent on own rating)
  • Distribution transformer, 100–2500 kVA 4–6%
  • Power transformer, 10–100 MVA 7–10%
  • Large generator, subtransient X d ′ ′ X_d'' X d ′′ ​ 15–25%
  • Large generator, transient X d ′ X_d' X d ′ ​ 20–35%
  • Large generator, synchronous X d X_d X d ​ 100–200%
  • Induction motor, locked rotor 15–25%

These bands are worth memorising: a computed generator subtransient reactance of 0.02 pu or 2.0 pu is a signal that a base conversion went wrong.

  • 4. Constructing the Impedance Diagram
  • Draw the single-line diagram and mark every rating;
  • Choose one system base MVA (100 MVA is conventional) and one base kV in a chosen zone;

Propagate base kV through each transformer by its turns ratio, defining a voltage zone per transformer section;

Convert every impedance to the common base;

Replace generators by an EMF behind the appropriate reactance ( X d ′ ′ X_d'' X d ′′ ​ for momentary duty, X d ′ X_d' X d ′ ​ for interrupting duty);

Omit ideal transformers entirely — per-unit has already accounted for them;

For balanced three-phase fault studies, draw only the positive-sequence network, with loads usually neglected as they are large impedances beside fault paths.

5. Short-Circuit MVA and Interrupting Duty

Once the network is reduced to a single Thevenin impedance Z t h , p u Z_{th,pu} Z t h , p u ​ at the fault point: I f , p u = V p u Z t h , p u , I f , actual = I f , p u × I b a s e I_{f,pu} = \frac{V_{pu}}{Z_{th,pu}}, \qquad I_{f,\text{actual}} = I_{f,pu} \times I_{base} I f , p u ​ = Z t h , p u ​ V p u ​ ​ , I f , actual ​ = I f , p u ​ × I ba se ​ Short-circuit MVA = S b a s e Z t h , p u (at 1.0 pu prefault voltage) \text{Short-circuit MVA} = \frac{S_{base}}{Z_{th,pu}} \qquad \text{(at 1.0 pu prefault voltage)} Short-circuit MVA = Z t h , p u ​ S ba se ​ ​ (at 1.0 pu prefault voltage)

Equivalently, a utility that quotes an available fault level of M V A s c MVA_{sc} M V A sc ​ at a point of common coupling is telling you its source impedance: Z s o u r c e , p u = S b a s e M V A s c Z_{source,pu} = \frac{S_{base}}{MVA_{sc}} Z so u rce , p u ​ = M V A sc ​ S ba se ​ ​

Circuit-breaker interrupting duty uses X d ′ X_d' X d ′ ​ (or 1.5 X d ′ ′ 1.5X_d'' 1.5 X d ′′ ​ by older practice) because the subtransient component has decayed by the time the contacts part, while momentary or close-and-latch duty uses X d ′ ′ X_d'' X d ′′ ​ . Choosing the wrong reactance under-rates the breaker, which is a safety defect rather than an arithmetic one.

  • Solved Board Exam Examples
  • Example 1: Base Conversion of a Transformer Impedance

A 20 MVA, 69/13.8 kV transformer has an impedance of 8% on its own rating. Express it on a 100 MVA base.

Solution. Base voltages match the transformer ratings, so only the MVA ratio applies: Z p u , new = 0.08 × 100 20 = 0.40 pu Z_{pu,\text{new}} = 0.08 \times \frac{100}{20} = \boxed{0.40 \text{ pu}} Z p u , new ​ = 0.08 × 20 100 ​ = 0.40 pu ​

The same impedance expressed on a five-times-larger base is five times larger in per-unit — the number changed, the physical ohms did not.

Example 2: Fault Current and Short-Circuit MVA

A 13.8 kV bus is supplied through a total Thevenin impedance of j 0.25 j0.25 j 0.25 pu on a 100 MVA base. Find the three-phase fault current and short-circuit MVA.

Solution. I b a s e = 100 3 ( 13.8 ) = 100 23.902 = 4.184 kA I_{base} = \frac{100}{\sqrt{3}(13.8)} = \frac{100}{23.902} = 4.184 \text{ kA} I ba se ​ = 3 ​ ( 13.8 ) 100 ​ = 23.902 100 ​ = 4.184 kA I f , p u = 1.0 0.25 = 4.0 pu ⟹ I f = 4.0 × 4.184 = 16.74 kA I_{f,pu} = \frac{1.0}{0.25} = 4.0 \text{ pu} \implies I_f = 4.0 \times 4.184 = \boxed{16.74 \text{ kA}} I f , p u ​ = 0.25 1.0 ​ = 4.0 pu ⟹ I f ​ = 4.0 × 4.184 = 16.74 kA ​ M V A s c = 100 0.25 = 400 MVA MVA_{sc} = \frac{100}{0.25} = \boxed{400 \text{ MVA}} M V A sc ​ = 0.25 100 ​ = 400 MVA ​

A 25 kA-rated switchgear lineup is therefore adequate; a 16 kA lineup is not.

Example 3: Multi-Zone Per-Unit Network

A 30 MVA, 13.8 kV generator with X d ′ ′ = 0.20 X_d'' = 0.20 X d ′′ ​ = 0.20 pu feeds a 30 MVA, 13.8/69 kV transformer of 10% impedance, then a line of 12 Ω. Using a 30 MVA, 13.8 kV base on the generator side, find the total per-unit impedance to a fault at the far end of the line.

Solution. Base voltage on the line side is 13.8 × ( 69 / 13.8 ) = 69 13.8 \times (69/13.8) = 69 13.8 × ( 69/13.8 ) = 69 kV, so Z b a s e , line = 69 2 30 = 4761 30 = 158.7 Ω Z_{base,\text{line}} = \frac{69^{2}}{30} = \frac{4761}{30} = 158.7\ \Omega Z ba se , line ​ = 30 6 9 2 ​ = 30 4761 ​ = 158.7 Ω Z l i n e , p u = 12 158.7 = 0.0756 pu Z_{line,pu} = \frac{12}{158.7} = 0.0756 \text{ pu} Z l in e , p u ​ = 158.7 12 ​ = 0.0756 pu

Generator and transformer are already on a 30 MVA base at their rated voltages, so: Z t o t a l = j 0.20 + j 0.10 + j 0.0756 = j 0.3756 pu Z_{total} = j0.20 + j0.10 + j0.0756 = \boxed{j0.3756 \text{ pu}} Z t o t a l ​ = j 0.20 + j 0.10 + j 0.0756 = j 0.3756 pu ​ M V A s c = 30 0.3756 = 79.9 MVA MVA_{sc} = \frac{30}{0.3756} = 79.9 \text{ MVA} M V A sc ​ = 0.3756 30 ​ = 79.9 MVA

Observe that the ideal transformer never appeared in the arithmetic — that is the whole point of the per-unit method.

Loading diagram... Per-Unit Workflow from Single-Line Diagram to Fault Duty