Study guide
18.3 Distribution Systems, Substation Layouts & Power Flow Control
PRC Registered Electrical Engineer REE
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Overview, RA 7920 & Electrical Engineering Ethics
1.1 PRC Board of Electrical Engineering & REE Examination Overview 1.2 Republic Act No. 7920 (New Electrical Engineering Law) & License Classes 1.3 Code of Ethics & Professional Practice for Electrical Engineers
2 Chapter 2: Math — Algebra, Trig & Geometry
2.1 Algebraic Equations, Polynomials & Complex Numbers 2.2 Trigonometry — Identities, Triangles & Spherical Trig 2.3 Analytic & Solid Geometry
3 Chapter 3: Engineering Mathematics — Calculus & Differential Equations
3.1 Differential Calculus, Limits, Derivatives & Applications 3.2 Integral Calculus, Integration Techniques & Area/Volume Applications 3.3 Ordinary Differential Equations & Initial-Value Problems
4 Chapter 4: Engineering Mathematics — Advanced Math & Transform Methods
4.1 Laplace Transforms, Inverse Transforms & Circuit Applications 4.2 Fourier Series, Fourier Transforms & Frequency-Domain Analysis 4.3 Vector Analysis, Linear Algebra, Matrices & Complex Analysis
5 Chapter 5: Engineering Mathematics — Probability, Statistics & Engineering Data Analysis
5.1 Probability Theory, Counting Techniques & Bayes' Theorem 5.2 Engineering Data Analysis I — Descriptive Statistics & Probability Distributions 5.3 Engineering Data Analysis II — Confidence Intervals, Hypothesis Testing & Regression
6 Chapter 6: Engineering Mathematics — Numerical Methods & Analysis
6.1 Numerical Root-Finding & Solution of Linear Systems 6.2 Interpolation, Numerical Integration & Numerical Solution of ODEs
7 Chapter 7: ESAS — Physics, Chemistry & Computer Fundamentals
7.1 Physics for Engineers 7.2 General Chemistry & Materials Science 7.3 Computer Fundamentals, Programming & Data Logic 7.4 Logic Circuits, Switching Theory & Microprocessor Systems
8 Chapter 8: ESAS — Mechanics & Thermal-Fluid Engineering
8.1 Engineering Mechanics — Statics & Dynamics 8.2 Strength of Materials & Mechanics of Deformable Bodies 8.3 Thermal-Fluid Engineering — Thermodynamics & Fluid Mechanics
9 Chapter 9: ESAS — Engineering Economics, Management & Contracts
9.1 Engineering Economics & Depreciation 9.2 Engineering Management & Ethics 9.3 Philippine Electrical Engineering Law, Code & Contracts 9.4 Technopreneurship 101 & Management of Engineering Projects
10 Chapter 10: PEC 1 — Safety, Sizing & Protection
10.1 PEC Fundamentals, Safety Standards & Grounding/Bonding 10.2 Conductor Sizing, Ampacity Adjustment & Voltage Drop 10.3 Overcurrent Protection, Branch Circuit & Feeder Sizing 10.4 Basic Occupational Safety & Health (BOSH) and Electrical Safety Standards
11 Chapter 11: PEC 1 & 2 — Equipment & Utility Systems
11.1 PEC Equipment Installation & Wiring Methods 11.2 Utility Systems, Transformers & Switchgear 11.3 Special Occupancies & Hazardous Locations
12 Chapter 12: Electrical Professional — DC & AC Circuit Fundamentals
12.1 DC Circuit Analysis & Network Theorems 12.2 Single-Phase AC Circuits & Phasor Analysis 12.3 Balanced & Unbalanced Three-Phase AC Circuits
13 Chapter 13: Electrical Professional — EM Fields & Transients
13.1 Electrostatics, Magnetostatics & Maxwell's Equations 13.2 Electromagnetic Waves & Transmission Line Fields 13.3 First-Order & Second-Order Circuit Transients
14 Chapter 14: Electrical Professional — Electronics, Industrial Electronics & Communications
14.1 Electronics 1 & 2 — Semiconductor Devices & Analog Circuits 14.2 Electrical Apparatus & Devices — Industrial Electronics & Power Converters 14.3 Fundamentals of Electronic Communications
15 Chapter 15: Electrical Professional — Transformers & DC Machines
15.1 Single-Phase & Three-Phase Transformers 15.2 Transformer Connections & Special Transformers 15.3 DC Generators & DC Motors
16 Chapter 16: Electrical Professional — AC Synchronous & Induction Machinery
16.1 Synchronous Generators (Alternators) 16.2 Synchronous Motors & Special AC Machines 16.3 Three-Phase & Single-Phase Induction Motors
17 Chapter 17: Electrical Professional — Power Plants & Energy Conversion
17.1 Hydroelectric, Thermal & Combined Cycle Power Plants 17.2 Renewable Energy Systems & Geothermal Power Plants 17.3 Power Plant Economics, Load Curves & Energy Conversion
18 Chapter 18: Electrical Professional — Transmission & Distribution
18.1 Transmission Line Parameters & Performance Models 18.2 Mechanical Overhead Line Design, Underground Cables & Insulators 18.3 Distribution Systems, Substation Layouts & Power Flow Control
19 Chapter 19: Electrical Professional — Power System Analysis
19.1 The Per-Unit System, Base Conversion & Impedance Diagrams 19.2 Symmetrical Components & Unbalanced Fault Analysis 19.3 Load Flow, Economic Dispatch & Power System Stability
20 Chapter 20: Electrical Professional — Protection, Control, Instrumentation & Illumination
20.1 Power System Protection & Protective Relaying 20.2 Industrial Motor Control, Logic Circuits & PLC Automation 20.3 Electrical Instrumentation, Transducers & Measurement Systems 20.4 Illumination Engineering, Lighting Design & Photometrics 20.5 Feedback Control Systems & Research Methods
18.3 Distribution Systems, Substation Layouts & Power Flow Control
Key Takeaways Explain This Topic AI
Distribution network topologies balance reliability and cost: Radial systems are low-cost but vulnerable to single point failures, Ring Main (loop) networks provide dual-feed continuity during faults, and Interconnected mesh grids offer maximum reliability for high-density urban loads.
System load diversity dictates peak transformer sizing through Diversity Factor ( DivF = ∑ P max , i P max , coincident ≥ 1.0 \text{DivF} = \frac{\sum P_{\max,i}}{P_{\max, \text{coincident}}} \ge 1.0 DivF = P m a x , coincident ∑ P m a x , i ≥ 1.0 ) and Demand Factor ( DF = P max P connected ≤ 1.0 \text{DF} = \frac{P_{\max}}{P_{\text{connected}}} \le 1.0 DF = P connected P m a x ≤ 1.0 ), reducing required distribution capacity below total connected load.
Voltage drop along a uniformly loaded distributor with length L L L and total current I total I_{\text{total}} I total equals half the voltage drop of a concentrated load I total I_{\text{total}} I total at the far end ( V drop, uniform = 1 2 I total Z L V_{\text{drop, uniform}} = \frac{1}{2} I_{\text{total}} Z L V drop, uniform = 2 1 I total Z L ).
Substation busbar configurations determine operational flexibility and maintenance availability: Breaker-and-a-half schemes permit circuit breaker maintenance without interrupting line feeders while retaining high security.
Reactive power (VAR) compensation via shunt capacitors ( Q c = P ( tan θ 1 − tan θ 2 ) Q_c = P(\tan \theta_1 - \tan \theta_2) Q c = P ( tan θ 1 − tan θ 2 ) ) elevates system power factor, reduces I 2 R I^2 R I 2 R transmission losses, and improves feeder voltage profiles, while series capacitors lower line net reactance ( X L − X C X_L - X_C X L − X C ), increasing transient power transfer capability ( P = V 1 V 2 X L − X C sin δ P = \frac{V_1 V_2}{X_L - X_C} \sin \delta P = X L − X C V 1 V 2 sin δ ).
Last updated: August 2026
18.3 Distribution Systems, Substation Layouts & Power Flow Control
Power distribution engineering, substation busbar schemes, load flow formulation, and reactive power compensation are primary operational subjects evaluated on the PRC Registered Electrical Engineer (REE) Licensure Examination . Distribution networks transport electric energy from primary bulk substations to commercial, industrial, and residential end consumers. System engineers must maintain voltage regulation within statutory boundaries (typically ± 5 % \pm 5\% ± 5% mandated by the Philippine Distribution Code) while optimizing feeder efficiency and operational continuity.
1. Distribution System Topologies & Feeder Voltage Drop Calculations
Electric distribution networks are divided into Primary Distribution ( 13.8 kV , 34.5 kV 13.8\ \text{kV}, 34.5\ \text{kV} 13.8 kV , 34.5 kV in Meralco/electric cooperative grids) and Secondary Distribution ( 230 V 230\ \text{V} 230 V single-phase 2-wire/3-wire, 230 / 400 V 230/400\ \text{V} 230/400 V or 480 / 277 V 480/277\ \text{V} 480/277 V 3-phase 4-wire).
Distribution Network Topologies
Radial System : Feeders branch outward from a single substation source without downstream loop ties. Low initial capital cost, simple protective relaying. Disadvantage : Any fault on the main feeder de-energizes all downstream customers (zero redundancy).
Ring Main (Loop) System : Feeders originate from a substation, loop through load centers, and return to the same or adjacent substation. Closed ring operation with isolator switches permits isolating fault sections while maintaining continuous dual-feed supply to all healthy loads.
Interconnected (Mesh) System : Multiple substations feed a interconnected grid network. Offers maximum service reliability and minimal voltage drop; utilized in high-density commercial business districts.
Feeder Voltage Drop Calculations
Uniformly Loaded Distributor Fed at One End:
Consider a distributor of length L L L carrying uniform current loading i i i (A/m) with line impedance z z z ( Ω \Omega Ω /m). Total current I total = i ⋅ L I_{\text{total}} = i \cdot L I total = i ⋅ L and total impedance Z total = z ⋅ L Z_{\text{total}} = z \cdot L Z total = z ⋅ L .
The voltage drop at distance x x x from the feeding end is: V drop ( x ) = ∫ 0 x i ( L − y ) z d y = i z ( L x − x 2 2 ) V_{\text{drop}}(x) = \int_0^x i (L - y) z\ dy = i z \left( L x - \frac{x^2}{2} \right) V drop ( x ) = ∫ 0 x i ( L − y ) z d y = i z ( Lx − 2 x 2 )
Maximum voltage drop at the far end ( x = L x = L x = L ): V drop, max = 1 2 i z L 2 = 1 2 ( i L ) ( z L ) = 1 2 I total Z total V_{\text{drop, max}} = \frac{1}{2} i z L^2 = \frac{1}{2} (i L) (z L) = \frac{1}{2} I_{\text{total}} Z_{\text{total}} V drop, max = 2 1 i z L 2 = 2 1 ( i L ) ( z L ) = 2 1 I total Z total
REE Board Exam Principle: A uniformly loaded distributor fed at one end has a total voltage drop equal to an equivalent single concentrated load I total I_{\text{total}} I total connected at its midpoint ( L / 2 L/2 L /2 ) .
Uniformly Loaded Distributor Fed at Both Ends (Equal Voltage V 0 V_0 V 0 ):
Minimum voltage occurs at the exact midpoint ( x = L / 2 x = L/2 x = L /2 ). Maximum voltage drop is: V drop, max = 1 8 i z L 2 = 1 8 I total Z total V_{\text{drop, max}} = \frac{1}{8} i z L^2 = \frac{1}{8} I_{\text{total}} Z_{\text{total}} V drop, max = 8 1 i z L 2 = 8 1 I total Z total
2. Power System Load Characteristics & Demand Metrics
Distribution transformers and feeder conductors are sized using statistical load indices.
Load Metric Mathematical Definition Typical Range Operational Significance
Demand Factor (DF) DF = Maximum Demand Total Connected Load \text{DF} = \frac{\text{Maximum Demand}}{\text{Total Connected Load}} DF = Total Connected Load Maximum Demand 0.40 to 0.80 ≤ 1.0 0.40 \text{ to } 0.80 \le 1.0 0.40 to 0.80 ≤ 1.0 Sizes customer service entrance equipment.
Diversity Factor (DivF) DivF = ∑ Individual Max Demands Coincident Peak System Demand \text{DivF} = \frac{\sum \text{Individual Max Demands}}{\text{Coincident Peak System Demand}} DivF = Coincident Peak System Demand ∑ Individual Max Demands ≥ 1.0 \ge 1.0 ≥ 1.0 ( 1.20 to 1.75 1.20 \text{ to } 1.75 1.20 to 1.75 ) Accounts for non-coincident customer peaks; reduces substation transformer kVA capacity.
Load Factor (LF) LF = Average Power Demand Maximum Peak Demand = Energy (kWh) P max × T \text{LF} = \frac{\text{Average Power Demand}}{\text{Maximum Peak Demand}} = \frac{\text{Energy (kWh)}}{P_{\max} \times T} LF = Maximum Peak Demand Average Power Demand = P m a x × T Energy (kWh) 0.30 to 0.85 ≤ 1.0 0.30 \text{ to } 0.85 \le 1.0 0.30 to 0.85 ≤ 1.0 Measures overall system equipment utilization efficiency over period T T T .
Plant Capacity Factor (CF) CF = Average Demand Total Installed Plant Capacity \text{CF} = \frac{\text{Average Demand}}{\text{Total Installed Plant Capacity}} CF = Total Installed Plant Capacity Average Demand ≤ LF \le \text{LF} ≤ LF Indicates reserve generation margin.
Utilization Factor (UF) UF = Maximum Demand Total Installed Plant Capacity \text{UF} = \frac{\text{Maximum Demand}}{\text{Total Installed Plant Capacity}} UF = Total Installed Plant Capacity Maximum Demand 0.75 to 0.95 0.75 \text{ to } 0.95 0.75 to 0.95 Measures plant loading severity relative to rated nameplate capacity.
3. Substation Layouts, Switchgear & Grounding Design
Substations transform voltage levels, route power, and protect grid apparatus.
Primary Substation Busbar Schemes
Single Busbar Scheme : Lowest cost, single bus. Breaker maintenance requires completely de-energizing all connected feeders.
Double Busbar with Single Breaker : Main and Transfer buses connected via bus-coupler breaker. Permits transferring feeders between buses without power interruption, but breaker maintenance requires feeder outage.
Double Busbar with Double Breaker : Each feeder has two circuit breakers connected to independent buses. Highest reliability, allows servicing any breaker without feeder interruption. High capital cost.
Breaker-and-a-Half Scheme : Three circuit breakers shared between two feeders (1.5 breakers per feeder). Offers supreme security and flexibility; any breaker can be isolated for maintenance without disconnecting any feeder line.
Ring Bus Scheme : Breakers arranged in a closed ring. Each feeder connected between two breakers. Compact footprint, no main busbar required; opening any single breaker maintains all feeders in service.
Substation Grounding Grid (IEEE Std 80 Safety Limits)
A metallic grounding grid (copper mesh buried 0.5 m 0.5\ \text{m} 0.5 m deep) maintains low earth resistance ( R g < 1.0 Ω R_g < 1.0\ \Omega R g < 1.0 Ω ). Ground grid design prevents fatal electric shocks during single-line-to-ground fault conditions by enforcing safety thresholds:
Touch Voltage ( V touch V_{\text{touch}} V touch ) : Potential difference between grounded metal equipment structure and human feet standing 1 m 1\ \text{m} 1 m away.
Step Voltage ( V step V_{\text{step}} V step ) : Potential difference between human feet separated by 1 m 1\ \text{m} 1 m distance on the ground surface without touching any structure.
4. Power Flow Analysis & Voltage / VAR Control Methods
Power flow (load flow) calculations determine steady-state voltage magnitudes ( ∣ V i ∣ |V_i| ∣ V i ∣ ), phase angles ( θ i \theta_i θ i ), active power ( P i P_i P i ), and reactive power ( Q i Q_i Q i ) across all system buses.
Bus Classification in Load Flow Analysis
Bus Type Specified Known Variables Calculated Unknown Variables Physical Power System Equivalent
Slack / Swing Bus (Bus 1) ∣ V 1 ∣ = 1.0 pu , θ 1 = 0 ∘ \vert V_1\vert= 1.0\ \text{pu}, \theta_1 = 0^\circ ∣ V 1 ∣ = 1.0 pu , θ 1 = 0 ∘ P 1 , Q 1 P_1, Q_1 P 1 , Q 1 Major reference power plant balancing total system losses.
Voltage-Controlled (PV Bus) P i , ∣ V i ∣ P_i, \vert V_i\vert P i , ∣ V i ∣ Q i , θ i Q_i, \theta_i Q i , θ i Generator stations, synchronous condensers, STATCOM units.
Load Bus (PQ Bus) P i , Q i P_i, Q_i P i , Q i ∣ V i ∣ , θ i \vert V_i\vert, \theta_i ∣ V i ∣ , θ i Step-down distribution substations, consumer load centers.
Nodal Admittance Matrix ( Y bus Y_{\text{bus}} Y bus ) & Power Flow Equations
The N N N -bus system nodal admittance matrix equation is I bus = Y bus V bus \mathbf{I}_{\text{bus}} = \mathbf{Y}_{\text{bus}} \mathbf{V}_{\text{bus}} I bus = Y bus V bus . The non-linear complex power equation at bus i i i is: S i ∗ = P i − j Q i = V i ∗ ∑ j = 1 N Y i j V j S_i^* = P_i - j Q_i = V_i^* \sum_{j=1}^N Y_{ij} V_j S i ∗ = P i − j Q i = V i ∗ j = 1 ∑ N Y ij V j
Gauss-Seidel Method : Iterative nodal formulation. Low memory requirements, but slow linear convergence rate (increases with large bus counts).
Newton-Raphson Method : Iterative method based on Taylor series expansion utilizing the Jacobian Matrix ( [ J ] [J] [ J ] ) of partial derivatives. Exhibits fast quadratic convergence , making it the industry standard for large multi-bus grids.
Reactive Power (VAR) & Voltage Control
Under-Load Tap-Changing (ULTC) Transformers : Mechanically adjusts primary-to-secondary turns ratio a a a under energized load to raise distribution secondary voltage.
Shunt Capacitor Compensation : Connects parallel capacitor banks at load substations to supply leading reactive power ( Q c Q_c Q c ), offsetting lagging inductive load current. Required capacitor bank rating for power factor correction from pf 1 = cos θ 1 \text{pf}_1 = \cos \theta_1 pf 1 = cos θ 1 to pf 2 = cos θ 2 \text{pf}_2 = \cos \theta_2 pf 2 = cos θ 2 : Q c = P ( tan θ 1 − tan θ 2 ) ( kVAR ) Q_c = P \left( \tan \theta_1 - \tan \theta_2 \right) \quad (\text{kVAR}) Q c = P ( tan θ 1 − tan θ 2 ) ( kVAR )
Benefits : Elevates feeder voltage magnitude ( V R V_R V R ), reduces total feeder current ( I = P 3 V cos ϕ I = \frac{P}{\sqrt{3} V \cos \phi} I = 3 V c o s ϕ P ), and dramatically cuts line copper losses ( P loss ∝ I 2 R P_{\text{loss}} \propto I^2 R P loss ∝ I 2 R ).
Series Capacitors : Connected in series with transmission line conductors to cancel line inductive reactance ( X net = X L − X C X_{\text{net}} = X_L - X_C X net = X L − X C ). This increases maximum steady-state power transfer capability: P max = ∣ V 1 ∣ ∣ V 2 ∣ X L − X C sin δ P_{\max} = \frac{|V_1| |V_2|}{X_L - X_C} \sin \delta P m a x = X L − X C ∣ V 1 ∣∣ V 2 ∣ sin δ
Static VAR Compensators (SVC / STATCOM) : Power electronics-based dynamic reactive power compensators providing rapid sub-cycle VAR absorption or injection.
- Solved Board Exam Examples
- Example 1: Feeder Voltage Drop Calculation
Problem: A 3 3 3 -phase, 13.8 kV 13.8\ \text{kV} 13.8 kV primary distribution feeder carries three concentrated loads along a 6 km 6\ \text{km} 6 km route from the main substation:
Load 1 at 2 km 2\ \text{km} 2 km : 100 A 100\ \text{A} 100 A at 0.80 0.80 0.80 pf lagging.
Load 2 at 4 km 4\ \text{km} 4 km : 150 A 150\ \text{A} 150 A at 0.85 0.85 0.85 pf lagging.
Load 3 at 6 km 6\ \text{km} 6 km : 80 A 80\ \text{A} 80 A at 0.90 0.90 0.90 pf lagging.
Feeder line impedance is z = 0.25 + j 0.35 Ω / km/phase z = 0.25 + j 0.35\ \Omega/\text{km/phase} z = 0.25 + j 0.35 Ω/ km/phase . Calculate total line-to-line voltage drop across the entire 6 km 6\ \text{km} 6 km feeder.
Solution:
Calculate branch currents (working backwards from far end 6 km 6\ \text{km} 6 km to source):
Branch 3 ( 4 to 6 km 4 \text{ to } 6\ \text{km} 4 to 6 km , length 2 km 2\ \text{km} 2 km ): Carries Load 3 current: I 3 = 80 ( 0.90 − j 0.4359 ) = 72.0 − j 34.87 A I_3 = 80 (0.90 - j 0.4359) = 72.0 - j 34.87\ \text{A} I 3 = 80 ( 0.90 − j 0.4359 ) = 72.0 − j 34.87 A
Branch 2 ( 2 to 4 km 2 \text{ to } 4\ \text{km} 2 to 4 km , length 2 km 2\ \text{km} 2 km ): Carries Load 3 + Load 2 current: I 2 = ( 72.0 − j 34.87 ) + 150 ( 0.85 − j 0.5268 ) = ( 72.0 − j 34.87 ) + ( 127.5 − j 79.02 ) = 199.5 − j 113.89 A I_2 = (72.0 - j 34.87) + 150(0.85 - j 0.5268) = (72.0 - j 34.87) + (127.5 - j 79.02) = 199.5 - j 113.89\ \text{A} I 2 = ( 72.0 − j 34.87 ) + 150 ( 0.85 − j 0.5268 ) = ( 72.0 − j 34.87 ) + ( 127.5 − j 79.02 ) = 199.5 − j 113.89 A
Branch 1 ( 0 to 2 km 0 \text{ to } 2\ \text{km} 0 to 2 km , length 2 km 2\ \text{km} 2 km ): Carries total current (Load 3 + Load 2 + Load 1): I 1 = ( 199.5 − j 113.89 ) + 100 ( 0.80 − j 0.60 ) = ( 199.5 − j 113.89 ) + ( 80.0 − j 60.0 ) = 279.5 − j 173.89 A I_1 = (199.5 - j 113.89) + 100(0.80 - j 0.60) = (199.5 - j 113.89) + (80.0 - j 60.0) = 279.5 - j 173.89\ \text{A} I 1 = ( 199.5 − j 113.89 ) + 100 ( 0.80 − j 0.60 ) = ( 199.5 − j 113.89 ) + ( 80.0 − j 60.0 ) = 279.5 − j 173.89 A
Branch impedance for each 2 km 2\ \text{km} 2 km section ( Z sec Z_{\text{sec}} Z sec ): Z sec = 2 × ( 0.25 + j 0.35 ) = 0.50 + j 0.70 Ω Z_{\text{sec}} = 2 \times (0.25 + j 0.35) = 0.50 + j 0.70\ \Omega Z sec = 2 × ( 0.25 + j 0.35 ) = 0.50 + j 0.70 Ω
Calculate line-to-neutral voltage drop for each section: Δ V 1 = ( 279.5 − j 173.89 ) ( 0.50 + j 0.70 ) = ( 139.75 + 121.72 ) + j ( 195.65 − 86.95 ) = 261.47 + j 108.70 V \Delta V_1 = (279.5 - j 173.89)(0.50 + j 0.70) = (139.75 + 121.72) + j(195.65 - 86.95) = 261.47 + j 108.70\ \text{V} Δ V 1 = ( 279.5 − j 173.89 ) ( 0.50 + j 0.70 ) = ( 139.75 + 121.72 ) + j ( 195.65 − 86.95 ) = 261.47 + j 108.70 V Δ V 2 = ( 199.5 − j 113.89 ) ( 0.50 + j 0.70 ) = ( 99.75 + 79.72 ) + j ( 139.65 − 56.95 ) = 179.47 + j 82.70 V \Delta V_2 = (199.5 - j 113.89)(0.50 + j 0.70) = (99.75 + 79.72) + j(139.65 - 56.95) = 179.47 + j 82.70\ \text{V} Δ V 2 = ( 199.5 − j 113.89 ) ( 0.50 + j 0.70 ) = ( 99.75 + 79.72 ) + j ( 139.65 − 56.95 ) = 179.47 + j 82.70 V Δ V 3 = ( 72.0 − j 34.87 ) ( 0.50 + j 0.70 ) = ( 36.00 + 24.41 ) + j ( 50.40 − 17.44 ) = 60.41 + j 32.96 V \Delta V_3 = (72.0 - j 34.87)(0.50 + j 0.70) = (36.00 + 24.41) + j(50.40 - 17.44) = 60.41 + j 32.96\ \text{V} Δ V 3 = ( 72.0 − j 34.87 ) ( 0.50 + j 0.70 ) = ( 36.00 + 24.41 ) + j ( 50.40 − 17.44 ) = 60.41 + j 32.96 V
Calculate total line-to-neutral voltage drop ( Δ V LN \Delta V_{\text{LN}} Δ V LN ): Δ V LN = Δ V 1 + Δ V 2 + Δ V 3 = ( 261.47 + 179.47 + 60.41 ) + j ( 108.70 + 82.70 + 32.96 ) = 501.35 + j 224.36 V \Delta V_{\text{LN}} = \Delta V_1 + \Delta V_2 + \Delta V_3 = (261.47 + 179.47 + 60.41) + j(108.70 + 82.70 + 32.96) = 501.35 + j 224.36\ \text{V} Δ V LN = Δ V 1 + Δ V 2 + Δ V 3 = ( 261.47 + 179.47 + 60.41 ) + j ( 108.70 + 82.70 + 32.96 ) = 501.35 + j 224.36 V ∣ Δ V LN ∣ = 501.35 2 + 224.36 2 = 251 , 351.8 + 50 , 337.4 = 301 , 689.2 = 549.26 V \left| \Delta V_{\text{LN}} \right| = \sqrt{501.35^2 + 224.36^2} = \sqrt{251,351.8 + 50,337.4} = \sqrt{301,689.2} = 549.26\ \text{V} ∣ Δ V LN ∣ = 501.3 5 2 + 224.3 6 2 = 251 , 351.8 + 50 , 337.4 = 301 , 689.2 = 549.26 V
Calculate total line-to-line voltage drop: Δ V L − L = 549.26 × 3 = 951.34 V \Delta V_{L-L} = 549.26 \times \sqrt{3} = 951.34\ \text{V} Δ V L − L = 549.26 × 3 = 951.34 V
Example 2: Shunt Capacitor Compensation & Loss Reduction
Problem: An industrial facility connected to a 3 3 3 -phase, 13.8 kV 13.8\ \text{kV} 13.8 kV distribution system draws an active load P = 1 , 200 kW P = 1,200\ \text{kW} P = 1 , 200 kW at a power factor of 0.72 0.72 0.72 lagging. Calculate: (a) Required capacitor bank kVAR rating to elevate power factor to 0.95 0.95 0.95 lagging, (b) Percentage reduction in line current, and (c) Percentage reduction in feeder I 2 R I^2 R I 2 R copper losses.
Solution:
Calculate power factor angles and initial/target reactive power: θ 1 = arccos ( 0.72 ) = 43.945 ∘ ⟹ tan θ 1 = 0.9640 \theta_1 = \arccos(0.72) = 43.945^\circ \implies \tan \theta_1 = 0.9640 θ 1 = arccos ( 0.72 ) = 43.94 5 ∘ ⟹ tan θ 1 = 0.9640 θ 2 = arccos ( 0.95 ) = 18.195 ∘ ⟹ tan θ 2 = 0.3287 \theta_2 = \arccos(0.95) = 18.195^\circ \implies \tan \theta_2 = 0.3287 θ 2 = arccos ( 0.95 ) = 18.19 5 ∘ ⟹ tan θ 2 = 0.3287 Q 1 = P tan θ 1 = 1200 × 0.9640 = 1 , 156.8 kVAR Q_1 = P \tan \theta_1 = 1200 \times 0.9640 = 1,156.8\ \text{kVAR} Q 1 = P tan θ 1 = 1200 × 0.9640 = 1 , 156.8 kVAR Q 2 = P tan θ 2 = 1200 × 0.3287 = 394.4 kVAR Q_2 = P \tan \theta_2 = 1200 \times 0.3287 = 394.4\ \text{kVAR} Q 2 = P tan θ 2 = 1200 × 0.3287 = 394.4 kVAR
Calculate required shunt capacitor rating ( Q c Q_c Q c ): Q c = Q 1 − Q 2 = 1 , 156.8 − 394.4 = 762.4 kVAR Q_c = Q_1 - Q_2 = 1,156.8 - 394.4 = 762.4\ \text{kVAR} Q c = Q 1 − Q 2 = 1 , 156.8 − 394.4 = 762.4 kVAR
Calculate initial current ( I 1 I_1 I 1 ) and improved current ( I 2 I_2 I 2 ): I 1 = 1 , 200 , 000 3 × 13 , 800 × 0.72 = 69.74 A I_1 = \frac{1,200,000}{\sqrt{3} \times 13,800 \times 0.72} = 69.74\ \text{A} I 1 = 3 × 13 , 800 × 0.72 1 , 200 , 000 = 69.74 A I 2 = 1 , 200 , 000 3 × 13 , 800 × 0.95 = 52.86 A I_2 = \frac{1,200,000}{\sqrt{3} \times 13,800 \times 0.95} = 52.86\ \text{A} I 2 = 3 × 13 , 800 × 0.95 1 , 200 , 000 = 52.86 A
Calculate percentage current reduction: % Current Reduction = 69.74 − 52.86 69.74 × 100 % = 16.88 69.74 × 100 % = 24.21 % \% \text{Current Reduction} = \frac{69.74 - 52.86}{69.74} \times 100\% = \frac{16.88}{69.74} \times 100\% = 24.21\% % Current Reduction = 69.74 69.74 − 52.86 × 100% = 69.74 16.88 × 100% = 24.21%
Calculate percentage reduction in I 2 R I^2 R I 2 R line losses: % Loss Reduction = [ 1 − ( I 2 I 1 ) 2 ] × 100 % = [ 1 − ( 52.86 69.74 ) 2 ] × 100 % = [ 1 − 0.5744 ] × 100 % = 42.56 % \% \text{Loss Reduction} = \left[ 1 - \left( \frac{I_2}{I_1} \right)^2 \right] \times 100\% = \left[ 1 - \left( \frac{52.86}{69.74} \right)^2 \right] \times 100\% = \left[ 1 - 0.5744 \right] \times 100\% = 42.56\% % Loss Reduction = [ 1 − ( I 1 I 2 ) 2 ] × 100% = [ 1 − ( 69.74 52.86 ) 2 ] × 100% = [ 1 − 0.5744 ] × 100% = 42.56%