18.2 Mechanical Overhead Line Design, Underground Cables & Insulators
PRC Registered Electrical Engineer REE
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Overview, RA 7920 & Electrical Engineering Ethics
1.1 PRC Board of Electrical Engineering & REE Examination Overview 1.2 Republic Act No. 7920 (New Electrical Engineering Law) & License Classes 1.3 Code of Ethics & Professional Practice for Electrical Engineers
2 Chapter 2: Math — Algebra, Trig & Geometry
2.1 Algebraic Equations, Polynomials & Complex Numbers 2.2 Trigonometry — Identities, Triangles & Spherical Trig 2.3 Analytic & Solid Geometry
3 Chapter 3: Engineering Mathematics — Calculus & Differential Equations
3.1 Differential Calculus, Limits, Derivatives & Applications 3.2 Integral Calculus, Integration Techniques & Area/Volume Applications 3.3 Ordinary Differential Equations & Initial-Value Problems
4 Chapter 4: Engineering Mathematics — Advanced Math & Transform Methods
4.1 Laplace Transforms, Inverse Transforms & Circuit Applications 4.2 Fourier Series, Fourier Transforms & Frequency-Domain Analysis 4.3 Vector Analysis, Linear Algebra, Matrices & Complex Analysis
5 Chapter 5: Engineering Mathematics — Probability, Statistics & Engineering Data Analysis
5.1 Probability Theory, Counting Techniques & Bayes' Theorem 5.2 Engineering Data Analysis I — Descriptive Statistics & Probability Distributions 5.3 Engineering Data Analysis II — Confidence Intervals, Hypothesis Testing & Regression
6 Chapter 6: Engineering Mathematics — Numerical Methods & Analysis
6.1 Numerical Root-Finding & Solution of Linear Systems 6.2 Interpolation, Numerical Integration & Numerical Solution of ODEs
7 Chapter 7: ESAS — Physics, Chemistry & Computer Fundamentals
7.1 Physics for Engineers 7.2 General Chemistry & Materials Science 7.3 Computer Fundamentals, Programming & Data Logic 7.4 Logic Circuits, Switching Theory & Microprocessor Systems
8 Chapter 8: ESAS — Mechanics & Thermal-Fluid Engineering
8.1 Engineering Mechanics — Statics & Dynamics 8.2 Strength of Materials & Mechanics of Deformable Bodies 8.3 Thermal-Fluid Engineering — Thermodynamics & Fluid Mechanics
9 Chapter 9: ESAS — Engineering Economics, Management & Contracts
9.1 Engineering Economics & Depreciation 9.2 Engineering Management & Ethics 9.3 Philippine Electrical Engineering Law, Code & Contracts 9.4 Technopreneurship 101 & Management of Engineering Projects
10 Chapter 10: PEC 1 — Safety, Sizing & Protection
10.1 PEC Fundamentals, Safety Standards & Grounding/Bonding 10.2 Conductor Sizing, Ampacity Adjustment & Voltage Drop 10.3 Overcurrent Protection, Branch Circuit & Feeder Sizing 10.4 Basic Occupational Safety & Health (BOSH) and Electrical Safety Standards
11 Chapter 11: PEC 1 & 2 — Equipment & Utility Systems
11.1 PEC Equipment Installation & Wiring Methods 11.2 Utility Systems, Transformers & Switchgear 11.3 Special Occupancies & Hazardous Locations
12 Chapter 12: Electrical Professional — DC & AC Circuit Fundamentals
12.1 DC Circuit Analysis & Network Theorems 12.2 Single-Phase AC Circuits & Phasor Analysis 12.3 Balanced & Unbalanced Three-Phase AC Circuits
13 Chapter 13: Electrical Professional — EM Fields & Transients
13.1 Electrostatics, Magnetostatics & Maxwell's Equations 13.2 Electromagnetic Waves & Transmission Line Fields 13.3 First-Order & Second-Order Circuit Transients
14 Chapter 14: Electrical Professional — Electronics, Industrial Electronics & Communications
14.1 Electronics 1 & 2 — Semiconductor Devices & Analog Circuits 14.2 Electrical Apparatus & Devices — Industrial Electronics & Power Converters 14.3 Fundamentals of Electronic Communications
15 Chapter 15: Electrical Professional — Transformers & DC Machines
15.1 Single-Phase & Three-Phase Transformers 15.2 Transformer Connections & Special Transformers 15.3 DC Generators & DC Motors
16 Chapter 16: Electrical Professional — AC Synchronous & Induction Machinery
16.1 Synchronous Generators (Alternators) 16.2 Synchronous Motors & Special AC Machines 16.3 Three-Phase & Single-Phase Induction Motors
17 Chapter 17: Electrical Professional — Power Plants & Energy Conversion
17.1 Hydroelectric, Thermal & Combined Cycle Power Plants 17.2 Renewable Energy Systems & Geothermal Power Plants 17.3 Power Plant Economics, Load Curves & Energy Conversion
18 Chapter 18: Electrical Professional — Transmission & Distribution
18.1 Transmission Line Parameters & Performance Models 18.2 Mechanical Overhead Line Design, Underground Cables & Insulators 18.3 Distribution Systems, Substation Layouts & Power Flow Control
19 Chapter 19: Electrical Professional — Power System Analysis
19.1 The Per-Unit System, Base Conversion & Impedance Diagrams 19.2 Symmetrical Components & Unbalanced Fault Analysis 19.3 Load Flow, Economic Dispatch & Power System Stability
20 Chapter 20: Electrical Professional — Protection, Control, Instrumentation & Illumination
20.1 Power System Protection & Protective Relaying 20.2 Industrial Motor Control, Logic Circuits & PLC Automation 20.3 Electrical Instrumentation, Transducers & Measurement Systems 20.4 Illumination Engineering, Lighting Design & Photometrics 20.5 Feedback Control Systems & Research Methods
18.2 Mechanical Overhead Line Design, Underground Cables & Insulators
Key Takeaways Explain This Topic AI
Conductor sag on equal-level supports is governed by S = w L 2 8 T S = \frac{w L^2}{8 T} S = 8 T w L 2 , where resultant conductor weight w w w combines vertical gravity, ice coating weight, and horizontal transverse wind pressure ( w = ( w c + w i ) 2 + w w 2 w = \sqrt{(w_c + w_i)^2 + w_w^2} w = ( w c + w i ) 2 + w w 2 ).
Suspension insulator string voltage distribution is non-uniform due to shunt capacitance k C kC k C to the grounded tower structure, with maximum electrical stress concentrated on the disc closest to the line conductor.
Insulator String Efficiency η string = V total n ⋅ V n × 100 % \eta_{\text{string}} = \frac{V_{\text{total}}}{n \cdot V_n} \times 100\% η string = n ⋅ V n V total × 100% measures voltage equality across n n n discs; efficiency is enhanced by installing guard rings, lengthening tower cross-arms, or capacitance grading.
Corona discharge occurs when the conductor surface electric field exceeds the dielectric breakdown strength of air ( g 0 = 30 kV/cm peak = 21.2 kV/cm RMS g_0 = 30\ \text{kV/cm peak} = 21.2\ \text{kV/cm RMS} g 0 = 30 kV/cm peak = 21.2 kV/cm RMS ); increasing conductor diameter or utilizing bundled conductors elevates disruptive critical voltage ( V d = m 0 g 0 δ r ln ( D / r ) V_d = m_0 g_0 \delta r \ln(D/r) V d = m 0 g 0 δr ln ( D / r ) ) and suppresses power loss.
Single-core underground cable insulation resistance R ins = ρ 2 π l ln ( R / r ) R_{\text{ins}} = \frac{\rho}{2\pi l} \ln(R/r) R ins = 2 π l ρ ln ( R / r ) varies inversely with cable length l l l , while electrostatic stress is maximum at the conductor surface ( E max = V r ln ( R / r ) E_{\max} = \frac{V}{r \ln(R/r)} E m a x = r l n ( R / r ) V ) and minimized when R r = e ≈ 2.718 \frac{R}{r} = e \approx 2.718 r R = e ≈ 2.718 .
Last updated: August 2026
18.2 Mechanical Overhead Line Design, Underground Cables & Insulators
Mechanical overhead line design, insulator string voltage distribution, corona phenomenon control, and underground cable engineering represent vital practical competencies tested in the PRC Registered Electrical Engineer (REE) Licensure Examination . Overhead line conductors must withstand severe mechanical tension and environmental loading (wind pressure and ice buildup) while maintaining statutory ground clearances mandated by the Philippine Electrical Code (PEC) and National Electrical Safety Code (NESC).
1. Mechanical Overhead Line Design & Sag Calculations
Sag ( S S S ) is the maximum vertical distance between the line conductor and the imaginary straight line joining its two supporting tower points. Sufficient sag is necessary to prevent conductor mechanical tension ( T T T ) from exceeding safe working stress limits.
Conductor Sag on Equal-Level Supports
For a span length L L L (meters) between two supports at equal height, carrying a conductor of resultant weight w w w (N/m) under tension T T T (N): S = w L 2 8 T ⟹ T = w L 2 8 S S = \frac{w L^2}{8 T} \quad \implies \quad T = \frac{w L^2}{8 S} S = 8 T w L 2 ⟹ T = 8 S w L 2
The total curved length of the conductor along the span is: S length ≈ L + 8 S 2 3 L S_{\text{length}} \approx L + \frac{8 S^2}{3 L} S length ≈ L + 3 L 8 S 2
Conductor Sag on Unequal-Level Supports
When supporting towers have a height difference h = h 2 − h 1 h = h_2 - h_1 h = h 2 − h 1 across span L L L : x 1 = L 2 − T h w L , x 2 = L 2 + T h w L x_1 = \frac{L}{2} - \frac{T h}{w L}, \quad x_2 = \frac{L}{2} + \frac{T h}{w L} x 1 = 2 L − w L T h , x 2 = 2 L + w L T h
where x 1 x_1 x 1 and x 2 x_2 x 2 are the horizontal distances from the lower support 1 and higher support 2 to the lowest point (vertex) of the conductor catenary. The respective sags are: S 1 = w x 1 2 2 T , S 2 = w x 2 2 2 T S_1 = \frac{w x_1^2}{2 T}, \quad S_2 = \frac{w x_2^2}{2 T} S 1 = 2 T w x 1 2 , S 2 = 2 T w x 2 2
Environmental Vector Loading (Wind & Ice Effects)
Under real environmental conditions, conductors experience three concurrent force vectors:
Self-Weight ( w c w_c w c ) : Vertical downward force due to gravity ( w c = m ⋅ g w_c = m \cdot g w c = m ⋅ g ).
Ice Coating Weight ( w i w_i w i ) : Radial ice layer of thickness t t t adds vertical downward weight: w i = ρ ice ⋅ V ice = ρ ice ⋅ π t ( d + t ) ⋅ g w_i = \rho_{\text{ice}} \cdot V_{\text{ice}} = \rho_{\text{ice}} \cdot \pi t (d + t) \cdot g w i = ρ ice ⋅ V ice = ρ ice ⋅ π t ( d + t ) ⋅ g where d d d is conductor outer diameter and ρ ice ≈ 915 kg/m 3 \rho_{\text{ice}} \approx 915\ \text{kg/m}^3 ρ ice ≈ 915 kg/m 3 .
Wind Pressure Force ( w w w_w w w ) : Horizontal wind pressure P wind P_{\text{wind}} P wind acting perpendicular to projected surface area: w w = P wind ⋅ ( d + 2 t ) ⋅ 1.0 w_w = P_{\text{wind}} \cdot (d + 2t) \cdot 1.0 w w = P wind ⋅ ( d + 2 t ) ⋅ 1.0
Total Resultant Weight ( w R w_R w R ): w R = ( w c + w i ) 2 + w w 2 w_R = \sqrt{(w_c + w_i)^2 + w_w^2} w R = ( w c + w i ) 2 + w w 2
Slanted Sag ( S slant S_{\text{slant}} S slant ) along the resultant force plane: S slant = w R L 2 8 T S_{\text{slant}} = \frac{w_R L^2}{8 T} S slant = 8 T w R L 2
Vertical Sag ( S vert S_{\text{vert}} S vert ) for ground clearance evaluation: S vert = S slant cos θ = S slant ( w c + w i w R ) S_{\text{vert}} = S_{\text{slant}} \cos \theta = S_{\text{slant}} \left( \frac{w_c + w_i}{w_R} \right) S vert = S slant cos θ = S slant ( w R w c + w i )
2. Overhead Line Insulators & String Efficiency
Insulators physically support high-voltage conductors while preventing current leakage to grounded steel towers.
Insulator Types & Applications
Pin Insulators : Used for primary distribution lines up to 33 kV 33\ \text{kV} 33 kV . Economical, but physically bulky above 33 kV 33\ \text{kV} 33 kV .
Suspension Insulators : Used for transmission lines above 33 kV 33\ \text{kV} 33 kV ( 69 kV , 138 kV , 230 kV , 500 kV 69\ \text{kV}, 138\ \text{kV}, 230\ \text{kV}, 500\ \text{kV} 69 kV , 138 kV , 230 kV , 500 kV ). Standard porcelain or toughened glass discs linked in series strings. If one disc fails, only that disc is replaced.
Strain Insulators : Heavy-duty suspension discs mounted horizontally at dead-end towers, river crossings, and sharp line angle turns.
Shackle (Spool) Insulators : Used for low-voltage secondary distribution ( 230 V / 400 V 230\ \text{V}/400\ \text{V} 230 V /400 V ).
Potential Distribution & String Efficiency
A suspension string consisting of n n n series disc units has a mutual capacitance C C C across each porcelain unit. Shunt capacitance C g = k C C_g = k C C g = k C ( k ≈ 0.10 to 0.20 k \approx 0.10 \text{ to } 0.20 k ≈ 0.10 to 0.20 ) exists between the metal pin connectors and the grounded steel tower structure.
Due to current escaping through shunt capacitances, charging current is maximum at the disc closest to the line conductor and minimum at the top disc near the cross-arm. Consequently, voltage distribution across discs is non-uniform , with the bottom disc experiencing peak dielectric stress.
Nodal Voltage Formulas for a 3-Disc String:
Let V 1 , V 2 , V 3 V_1, V_2, V_3 V 1 , V 2 , V 3 be disc voltages from top (cross-arm) to bottom (conductor): V 2 = V 1 ( 1 + k ) V_2 = V_1 (1 + k) V 2 = V 1 ( 1 + k ) V 3 = V 1 ( 1 + 3 k + k 2 ) V_3 = V_1 (1 + 3k + k^2) V 3 = V 1 ( 1 + 3 k + k 2 ) Total Line-to-Neutral Voltage: V = V 1 + V 2 + V 3 = V 1 ( 3 + 4 k + k 2 ) \text{Total Line-to-Neutral Voltage: } V = V_1 + V_2 + V_3 = V_1 (3 + 4k + k^2) Total Line-to-Neutral Voltage: V = V 1 + V 2 + V 3 = V 1 ( 3 + 4 k + k 2 )
Insulator String Efficiency ( η string \eta_{\text{string}} η string ): η string = Total Phase Voltage Across String ( V ) n × Voltage Across Disc Nearest Conductor ( V n ) × 100 % \eta_{\text{string}} = \frac{\text{Total Phase Voltage Across String }(V)}{n \times \text{Voltage Across Disc Nearest Conductor }(V_n)} \times 100\% η string = n × Voltage Across Disc Nearest Conductor ( V n ) Total Phase Voltage Across String ( V ) × 100%
Methods to Improve String Efficiency:
Longer Cross-Arms : Reduces shunt capacitance C g C_g C g , lowering ratio k k k .
Capacitance Grading : Using larger capacitance units near the bottom conductor end.
Static Shielding / Guard Ring : A metal ring connected to the line conductor surrounding the bottom disc. The guard ring introduces line-to-pin capacitances that cancel shunt ground currents, equalizing disc voltage distribution towards 100 % 100\% 100% .
3. Corona Effect in Overhead Transmission Lines
Corona is the localized dielectric breakdown and ionization of air surrounding high-voltage conductors, accompanied by a violet glow, hissing noise, ozone ( O 3 O_3 O 3 ) production, and power loss.
Physical Breakdown Mechanism
When the electric field gradient at the conductor surface exceeds the dielectric breakdown strength of air ( g 0 = 30 kV/cm peak = 21.2 kV/cm RMS g_0 = 30\ \text{kV/cm peak} = 21.2\ \text{kV/cm RMS} g 0 = 30 kV/cm peak = 21.2 kV/cm RMS at standard temperature 25 ∘ C 25^\circ\text{C} 2 5 ∘ C and pressure 76 cmHg 76\ \text{cmHg} 76 cmHg ), air molecules ionize into free electrons and positive ions, initiating corona discharge.
Critical Voltage Formulations
Disruptive Critical Voltage ( V d V_d V d ) : Line-to-neutral voltage at which atmospheric air breakdown begins: V d = m 0 ⋅ g 0 ⋅ δ ⋅ r ⋅ ln ( D r ) ( kV/phase RMS ) V_d = m_0 \cdot g_0 \cdot \delta \cdot r \cdot \ln\left( \frac{D}{r} \right) \quad (\text{kV/phase RMS}) V d = m 0 ⋅ g 0 ⋅ δ ⋅ r ⋅ ln ( r D ) ( kV/phase RMS )
where:
m 0 m_0 m 0 = conductor surface irregularity factor ( 1.0 1.0 1.0 for smooth polished wires, 0.80 – 0.92 0.80\text{--}0.92 0.80 – 0.92 for stranded ACSR conductors).
δ \delta δ = air density factor: δ = 3.92 b 273 + T \delta = \frac{3.92 b}{273 + T} δ = 273 + T 3.92 b (where b b b is barometric pressure in cmHg, T T T in ∘ C ^\circ\text{C} ∘ C ; δ = 1.0 \delta = 1.0 δ = 1.0 at STP).
r r r = conductor radius (cm); D D D = inter-conductor spacing (cm).
Visual Critical Voltage ( V v V_v V v ) : Line-to-neutral voltage at which visible violet glow appears along the line: V v = m v ⋅ g 0 ⋅ δ ⋅ r ( 1 + 0.3 δ r ) ln ( D r ) ( kV/phase RMS ) V_v = m_v \cdot g_0 \cdot \delta \cdot r \left( 1 + \frac{0.3}{\sqrt{\delta r}} \right) \ln\left( \frac{D}{r} \right) \quad (\text{kV/phase RMS}) V v = m v ⋅ g 0 ⋅ δ ⋅ r ( 1 + δr 0.3 ) ln ( r D ) ( kV/phase RMS )
Corona Power Loss (Peek's Empirical Formula) : P c = 242.2 δ ( f + 25 ) r D ( V − V d ) 2 × 10 − 5 ( kW/phase/km ) P_c = \frac{242.2}{\delta} (f + 25) \sqrt{\frac{r}{D}} (V - V_d)^2 \times 10^{-5} \quad (\text{kW/phase/km}) P c = δ 242.2 ( f + 25 ) D r ( V − V d ) 2 × 1 0 − 5 ( kW/phase/km )
where V V V is operating line-to-neutral voltage (kV), and f f f is frequency (Hz).
Methods to Reduce Corona:
Increase conductor outer diameter using hollow conductors or ACSR steel-reinforced cores.
Utilize bundled conductors (2, 3, or 4 sub-conductors per phase), which dramatically increases effective self GMR ( D s D_s D s ), lowering surface electric stress below g 0 g_0 g 0 .
Increase inter-conductor spacing D D D .
4. Underground Power Cable Engineering
Underground cables transport electric power in urban environments where overhead lines are physically impractical or unsafe.
Cable Construction Layers
Core / Conductor : Tinned copper or aluminum strands.
Insulation : Cross-linked polyethylene (XLPE) or impregnated paper.
Metallic Sheath : Lead or aluminum extrusion preventing moisture ingress.
Bedding : Jute or hessian tape protecting sheath from mechanical damage.
Armouring : Galvanized steel wire or tape serving as mechanical armor.
Serving : Fibrous outer layer protecting armouring against soil corrosion.
Insulation Resistance of Single-Core Cable ( R ins R_{\text{ins}} R ins )
For a single-core cable of conductor radius r r r , internal sheath radius R R R , length l l l , and insulation resistivity ρ \rho ρ : R ins = ρ 2 π l ln ( R r ) ( Ω ) R_{\text{ins}} = \frac{\rho}{2 \pi l} \ln\left( \frac{R}{r} \right) \quad (\Omega) R ins = 2 π l ρ ln ( r R ) ( Ω )
CRITICAL REE EXAM FACT: Cable insulation resistance varies inversely with length ( R ins ∝ 1 / l R_{\text{ins}} \propto 1/l R ins ∝ 1/ l ). Doubling cable length halves its insulation resistance!
Cable Capacitance & Dielectric Stress
Single-Core Capacitance : C = 2 π ϵ 0 ϵ r ln ( R r ) F/m = ϵ r 18 ln ( R r ) μ F/km C = \frac{2 \pi \epsilon_0 \epsilon_r}{\ln\left( \frac{R}{r} \right)}\ \text{F/m} = \frac{\epsilon_r}{18 \ln\left( \frac{R}{r} \right)}\ \mu\text{F/km} C = ln ( r R ) 2 π ϵ 0 ϵ r F/m = 18 ln ( r R ) ϵ r μ F/km
Electrostatic Dielectric Stress ( E E E ) at distance x x x from core center ( r ≤ x ≤ R r \le x \le R r ≤ x ≤ R ): E ( x ) = V x ln ( R r ) E(x) = \frac{V}{x \ln\left( \frac{R}{r} \right)} E ( x ) = x ln ( r R ) V
Maximum Stress occurs at conductor surface ( x = r x = r x = r ): E max = V r ln ( R r ) E_{\max} = \frac{V}{r \ln\left( \frac{R}{r} \right)} E m a x = r ln ( r R ) V
Minimum Stress occurs at inner sheath boundary ( x = R x = R x = R ): E min = V R ln ( R r ) ⟹ E max E min = R r E_{\min} = \frac{V}{R \ln\left( \frac{R}{r} \right)} \implies \frac{E_{\max}}{E_{\min}} = \frac{R}{r} E m i n = R ln ( r R ) V ⟹ E m i n E m a x = r R
Optimum Cable Dimensioning:
To minimize E max E_{\max} E m a x for a given sheath radius R R R and operating voltage V V V , differentiate E max E_{\max} E m a x with respect to r r r . Setting d E max d r = 0 \frac{d E_{\max}}{dr} = 0 d r d E m a x = 0 yields: ln ( R r ) = 1 ⟹ R r = e ≈ 2.718 \ln\left( \frac{R}{r} \right) = 1 \implies \frac{R}{r} = e \approx 2.718 ln ( r R ) = 1 ⟹ r R = e ≈ 2.718
Under optimum geometry, E max , opt = V r E_{\max,\text{opt}} = \frac{V}{r} E m a x , opt = r V .
- Solved Board Exam Examples
- Example 1: Conductor Sag under Combined Wind and Ice Loading
Problem: A transmission line conductor has a span length L = 250 m L = 250\ \text{m} L = 250 m between equal-level supports. Conductor weight w c = 1.1 kg/m w_c = 1.1\ \text{kg/m} w c = 1.1 kg/m ( 10.791 N/m 10.791\ \text{N/m} 10.791 N/m ), outer diameter d = 20 mm d = 20\ \text{mm} d = 20 mm , allowable working tension T = 20 , 000 N T = 20,000\ \text{N} T = 20 , 000 N . The conductor is coated with a radial ice layer t = 10 mm t = 10\ \text{mm} t = 10 mm thick (ice density ρ ice = 915 kg/m 3 \rho_{\text{ice}} = 915\ \text{kg/m}^3 ρ ice = 915 kg/m 3 ) and subjected to a horizontal wind pressure P wind = 390 N/m 2 P_{\text{wind}} = 390\ \text{N/m}^2 P wind = 390 N/m 2 of projected area. Determine: (a) Total resultant weight per meter w R w_R w R , (b) Slanted sag S slant S_{\text{slant}} S slant , and (c) Vertical sag S vert S_{\text{vert}} S vert .
Solution:
Calculate weight of ice per meter ( w i w_i w i ): A ice = π t ( d + t ) = π ( 0.01 ) ( 0.02 + 0.01 ) = 0.00094248 m 2 A_{\text{ice}} = \pi t (d + t) = \pi (0.01)(0.02 + 0.01) = 0.00094248\ \text{m}^2 A ice = π t ( d + t ) = π ( 0.01 ) ( 0.02 + 0.01 ) = 0.00094248 m 2 w i = 0.00094248 × 915 × 9.81 = 8.46 N/m w_i = 0.00094248 \times 915 \times 9.81 = 8.46\ \text{N/m} w i = 0.00094248 × 915 × 9.81 = 8.46 N/m
Calculate horizontal wind force per meter ( w w w_w w w ): Projected Diameter = d + 2 t = 0.02 + 0.02 = 0.04 m \text{Projected Diameter} = d + 2t = 0.02 + 0.02 = 0.04\ \text{m} Projected Diameter = d + 2 t = 0.02 + 0.02 = 0.04 m w w = 390 × 0.04 = 15.60 N/m w_w = 390 \times 0.04 = 15.60\ \text{N/m} w w = 390 × 0.04 = 15.60 N/m
Calculate total vertical force ( w V w_V w V ) and resultant force ( w R w_R w R ): w V = w c + w i = 10.791 + 8.46 = 19.251 N/m w_V = w_c + w_i = 10.791 + 8.46 = 19.251\ \text{N/m} w V = w c + w i = 10.791 + 8.46 = 19.251 N/m w R = w V 2 + w w 2 = 19.251 2 + 15.60 2 = 370.60 + 243.36 = 613.96 = 24.778 N/m w_R = \sqrt{w_V^2 + w_w^2} = \sqrt{19.251^2 + 15.60^2} = \sqrt{370.60 + 243.36} = \sqrt{613.96} = 24.778\ \text{N/m} w R = w V 2 + w w 2 = 19.25 1 2 + 15.6 0 2 = 370.60 + 243.36 = 613.96 = 24.778 N/m
Calculate slanted sag ( S slant S_{\text{slant}} S slant ) and vertical sag ( S vert S_{\text{vert}} S vert ): S slant = w R L 2 8 T = 24.778 × 250 2 8 × 20 , 000 = 1 , 548 , 625 160 , 000 = 9.679 m S_{\text{slant}} = \frac{w_R L^2}{8 T} = \frac{24.778 \times 250^2}{8 \times 20,000} = \frac{1,548,625}{160,000} = 9.679\ \text{m} S slant = 8 T w R L 2 = 8 × 20 , 000 24.778 × 25 0 2 = 160 , 000 1 , 548 , 625 = 9.679 m S vert = S slant × ( w V w R ) = 9.679 × 19.251 24.778 = 7.520 m S_{\text{vert}} = S_{\text{slant}} \times \left( \frac{w_V}{w_R} \right) = 9.679 \times \frac{19.251}{24.778} = 7.520\ \text{m} S vert = S slant × ( w R w V ) = 9.679 × 24.778 19.251 = 7.520 m
Example 2: Suspension Insulator String Voltage Distribution
Problem: A 3-phase, 138 kV 138\ \text{kV} 138 kV transmission line uses a string of 4 suspension insulator discs. The ratio of shunt capacitance to ground to mutual disc capacitance is k = 0.15 k = 0.15 k = 0.15 . Determine: (a) Voltage distribution across each disc ( V 1 , V 2 , V 3 , V 4 V_1, V_2, V_3, V_4 V 1 , V 2 , V 3 , V 4 ), and (b) String Efficiency η string \eta_{\text{string}} η string .
Solution:
Express disc voltages in terms of top disc voltage V 1 V_1 V 1 ( k = 0.15 k = 0.15 k = 0.15 ): V 2 = V 1 ( 1 + k ) = 1.15 V 1 V_2 = V_1 (1 + k) = 1.15 V_1 V 2 = V 1 ( 1 + k ) = 1.15 V 1 V 3 = V 1 ( 1 + 3 k + k 2 ) = V 1 ( 1 + 0.45 + 0.0225 ) = 1.4725 V 1 V_3 = V_1 (1 + 3k + k^2) = V_1 (1 + 0.45 + 0.0225) = 1.4725 V_1 V 3 = V 1 ( 1 + 3 k + k 2 ) = V 1 ( 1 + 0.45 + 0.0225 ) = 1.4725 V 1 V 4 = V 3 ( 1 + k ) + ( V 1 + V 2 + V 3 ) k = 1.4725 V 1 ( 1.15 ) + ( 1 + 1.15 + 1.4725 ) V 1 ( 0.15 ) = 1.693375 V 1 + 0.543375 V 1 = 2.23675 V 1 V_4 = V_3(1+k) + (V_1+V_2+V_3)k = 1.4725 V_1 (1.15) + (1 + 1.15 + 1.4725) V_1 (0.15) = 1.693375 V_1 + 0.543375 V_1 = 2.23675 V_1 V 4 = V 3 ( 1 + k ) + ( V 1 + V 2 + V 3 ) k = 1.4725 V 1 ( 1.15 ) + ( 1 + 1.15 + 1.4725 ) V 1 ( 0.15 ) = 1.693375 V 1 + 0.543375 V 1 = 2.23675 V 1
Calculate total string line-to-neutral voltage ( V L N V_{LN} V L N ): V L N = 138 , 000 3 = 79 , 674.3 V V_{LN} = \frac{138,000}{\sqrt{3}} = 79,674.3\ \text{V} V L N = 3 138 , 000 = 79 , 674.3 V V total = V 1 + V 2 + V 3 + V 4 = ( 1 + 1.15 + 1.4725 + 2.23675 ) V 1 = 5.85925 V 1 V_{\text{total}} = V_1 + V_2 + V_3 + V_4 = (1 + 1.15 + 1.4725 + 2.23675) V_1 = 5.85925 V_1 V total = V 1 + V 2 + V 3 + V 4 = ( 1 + 1.15 + 1.4725 + 2.23675 ) V 1 = 5.85925 V 1
Solve individual disc voltages: V 1 = 79 , 674.3 5.85925 = 13 , 598.1 V = 13.60 kV V_1 = \frac{79,674.3}{5.85925} = 13,598.1\ \text{V} = 13.60\ \text{kV} V 1 = 5.85925 79 , 674.3 = 13 , 598.1 V = 13.60 kV V 2 = 1.15 × 13 , 598.1 = 15 , 637.8 V = 15.64 kV V_2 = 1.15 \times 13,598.1 = 15,637.8\ \text{V} = 15.64\ \text{kV} V 2 = 1.15 × 13 , 598.1 = 15 , 637.8 V = 15.64 kV V 3 = 1.4725 × 13 , 598.1 = 20 , 023.2 V = 20.02 kV V_3 = 1.4725 \times 13,598.1 = 20,023.2\ \text{V} = 20.02\ \text{kV} V 3 = 1.4725 × 13 , 598.1 = 20 , 023.2 V = 20.02 kV V 4 = 2.23675 × 13 , 598.1 = 30 , 415.2 V = 30.42 kV ( Bottom Disc Nearest Conductor ) V_4 = 2.23675 \times 13,598.1 = 30,415.2\ \text{V} = 30.42\ \text{kV} \quad (\text{Bottom Disc Nearest Conductor}) V 4 = 2.23675 × 13 , 598.1 = 30 , 415.2 V = 30.42 kV ( Bottom Disc Nearest Conductor )
Calculate Insulator String Efficiency ( η string \eta_{\text{string}} η string ): η string = V L N 4 × V 4 × 100 % = 79 , 674.3 4 × 30 , 415.2 × 100 % = 79 , 674.3 121 , 660.8 × 100 % = 65.49 % \eta_{\text{string}} = \frac{V_{LN}}{4 \times V_4} \times 100\% = \frac{79,674.3}{4 \times 30,415.2} \times 100\% = \frac{79,674.3}{121,660.8} \times 100\% = 65.49\% η string = 4 × V 4 V L N × 100% = 4 × 30 , 415.2 79 , 674.3 × 100% = 121 , 660.8 79 , 674.3 × 100% = 65.49%