Study guide
7.2 Area Computations (DMD, DPD, Coordinates) and Subdivision/Consolidation Survey Standards
PRC Geodetic Engineering Licensure Examination Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Laws, Professional Practice, and Code of Ethics
1.1 Republic Act 8560 & RA 9200 (Philippine Geodetic Engineering Act) and PRC Board Rules 1.2 Code of Ethics for Geodetic Engineers, Professional Responsibilities & Practice Limits 1.3 PRC Licensure Examination Rules, Continuing Professional Development (CPD), and Legal Penalties
2 Chapter 2: Property, Land Registration, and Natural Resources Laws
2.1 Presidential Decree 1529 (Property Registration Decree) & The Torrens System 2.2 Commonwealth Act 141 (Public Land Act), Land Classification, and Public Land Patents 2.3 Comprehensive Agrarian Reform Law (RA 6657) & Environmental/Forestry/Mining Laws (RA 7942, PD 705) 2.4 Civil Code Provisions on Ownership, Property Boundaries, Easements, Obligations, and Contracts 2.5 DENR Administrative Order DAO 2007-29 (Revised Regulations for Land Surveys) & Technical Standards
3 Chapter 3: Mathematics, Geometry, and Trigonometry
3.1 Advanced Algebra, Analytic Geometry, and Solid Geometry in Geodetic Calculations 3.2 Plane and Spherical Trigonometry for Surveying and Astronomical Applications 3.3 Differential and Integral Calculus Applied to Curves, Surfaces, and Surveying Computations
4 Chapter 4: Engineering Sciences, Mechanics, and Economics
4.1 Engineering Mechanics (Statics, Kinematics, Dynamics) for Engineering Applications 4.2 Engineering Economics, Time Value of Money, Cash Flows, Depreciation, and Capital Costing
5 Chapter 5: Theory of Errors and Adjustment of Observations
5.1 Theory of Errors, Precision vs. Accuracy, Random/Systematic Errors, and Error Propagation 5.2 Principles of Least Squares, Most Probable Value, and Weighted Observations 5.3 Least-Squares Adjustment of Level Nets, Triangulation, and Plane Traverses
6 Chapter 6: Plane & Distance/Angle Surveying Fundamentals
6.1 Distance Measurement Methods, Taping Corrections (Temperature, Tension, Sag), and EDM Operations 6.2 Angular Measurements, Transit/Theodolite/Total Station Operations, Bearings, Azimuths, and Magnetic Declination 6.3 Differential, Trigonometric, Barometric, and Profile Leveling Methods
7 Chapter 7: Cadastral, Property, and Special Surveys
7.1 Traverse Computations, Latitudes, Departures, Error of Closure, and Transit/Compass Rule Adjustments 7.2 Area Computations (DMD, DPD, Coordinates) and Subdivision/Consolidation Survey Standards 7.3 Mineral and Mining Surveys, Hydrographic Surveying, Route Alignment, and Construction Layout
8 Chapter 8: Geodetic Surveying and Reference Datums
8.1 Ellipsoids, Geoid Undulation, Geodetic Datums, and the Philippine Reference System of 1992 (PRS92) 8.2 Geodetic Position Computations: Direct and Inverse Problems on the Reference Ellipsoid 8.3 Triangulation, Trilateration, Baseline Measurements, and National Geodetic Control Networks
9 Chapter 9: Geodetic Astronomy and Satellite Positioning (GNSS)
9.1 Celestial Sphere, Equatorial/Horizon Coordinate Systems, and Astronomical Time Systems (UT, ST, LMT) 9.2 Determination of Latitude, Longitude, and Solar/Polaris Azimuth by Astronomical Observations 9.3 Global Navigation Satellite Systems (GNSS/GPS), Carrier-Phase Positioning, RTK, and Static Baselines
10 Chapter 10: Cartography, Map Projections, and Coordinate Systems
10.1 Cartographic Principles, Map Scales, Map Symbolization, and Cartographic Generalization 10.2 Map Projections: Universal Transverse Mercator (UTM) and Philippine Transverse Mercator (PTM) Grid Systems 10.3 Survey Plan Preparation, Technical Description Formatting, and DENR Approval Workflows
11 Chapter 11: Photogrammetry, Remote Sensing, and Geographic Information Systems (GIS)
11.1 Aerial Photogrammetry, Photographic Scale, Relief Displacement, Flight Planning, and Stereoscopy 11.2 Digital Photogrammetry, UAV/Drone Surveying, Orthophoto Generation, and LiDAR Data Processing 11.3 Remote Sensing Spectral Signatures, Multispectral Image Classification, and GIS Spatial Analysis
7.2 Area Computations (DMD, DPD, Coordinates) and Subdivision/Consolidation Survey Standards
Key Takeaways Explain This Topic AI
Double Meridian Distance (DMD) of a succeeding course equals preceding DMD + preceding departure + current departure, yielding area via ½ |Σ(DMD × Lat)|.
Gauss's Shoelace formula computes polygon lot areas directly from ordered grid coordinates (E_i, N_i).
Circular segment corrections (A = ½ R² (θ - sin θ)) are added for convex outward lot boundaries and subtracted for concave inward boundaries.
DENR DAO 2007-29 requires Private Survey (P.S.) cylindrical concrete monuments measuring 15 cm diameter by 50 cm length with 45 cm buried below ground.
Last updated: July 2026
7.2 Area Computations (DMD, DPD, Coordinates) and Subdivision/Consolidation Survey Standards
Accurate area calculation of boundary lots is a primary legal responsibility of Geodetic Engineers. Under Philippine property law and land registration statutes (PD 1529), land titles specify lot areas to the nearest square meter. This section covers classical numerical methods (DMD and DPD), modern coordinate geometry methods, treatment of circular curved boundaries, and DENR administrative regulations for lot subdivision and consolidation surveys.
Double Meridian Distance (DMD) Method
The Double Meridian Distance (DMD) of a course is defined as the sum of the meridian distances of its two endpoints. The meridian distance of a point is the perpendicular distance from that point to the reference north-south meridian passing through the most westerly station of the traverse.
Rules for Computing DMDs:
Rule 1 (First Course) : The DMD of the first course equals the departure of the first course itself. DMD 1 = D e p 1 \text{DMD}_1 = Dep_1 DMD 1 = De p 1
Rule 2 (Succeeding Courses) : The DMD of any succeeding course equals the DMD of the preceding course, plus the departure of the preceding course, plus the departure of the course itself. DMD i = DMD i − 1 + D e p i − 1 + D e p i \text{DMD}_i = \text{DMD}_{i-1} + Dep_{i-1} + Dep_i DMD i = DMD i − 1 + De p i − 1 + De p i
Rule 3 (Check / Last Course) : The DMD of the final course must be equal in magnitude to the departure of the final course, but opposite in sign. DMD n = − D e p n \text{DMD}_n = - Dep_n DMD n = − De p n
Area Formula using DMD: Double Area ( 2 A ) = ∑ i = 1 n ( DMD i ⋅ L a d j , i ) \text{Double Area } (2A) = \sum_{i=1}^{n} (\text{DMD}_i \cdot L_{adj,i}) Double Area ( 2 A ) = i = 1 ∑ n ( DMD i ⋅ L a d j , i ) Area A = 1 2 ∣ ∑ i = 1 n ( DMD i ⋅ L a d j , i ) ∣ \text{Area } A = \frac{1}{2} \left| \sum_{i=1}^{n} (\text{DMD}_i \cdot L_{adj,i}) \right| Area A = 2 1 i = 1 ∑ n ( DMD i ⋅ L a d j , i )
Double Parallel Distance (DPD) Method
The Double Parallel Distance (DPD) method is the orthogonal counterpart to DMD, using an East-West reference parallel (passing through the most southerly station) and working with latitudes instead of departures.
Rules for Computing DPDs:
First Course : DPD 1 = L 1 \text{DPD}_1 = L_1 DPD 1 = L 1
Succeeding Courses : DPD i = DPD i − 1 + L i − 1 + L i \text{DPD}_i = \text{DPD}_{i-1} + L_{i-1} + L_i DPD i = DPD i − 1 + L i − 1 + L i
Check (Last Course) : DPD n = − L n \text{DPD}_n = - L_n DPD n = − L n
Area Formula using DPD: Double Area ( 2 A ) = ∑ i = 1 n ( DPD i ⋅ D e p a d j , i ) \text{Double Area } (2A) = \sum_{i=1}^{n} (\text{DPD}_i \cdot Dep_{adj,i}) Double Area ( 2 A ) = i = 1 ∑ n ( DPD i ⋅ De p a d j , i ) Area A = 1 2 ∣ ∑ i = 1 n ( DPD i ⋅ D e p a d j , i ) ∣ \text{Area } A = \frac{1}{2} \left| \sum_{i=1}^{n} (\text{DPD}_i \cdot Dep_{adj,i}) \right| Area A = 2 1 i = 1 ∑ n ( DPD i ⋅ De p a d j , i )
Coordinate Method (Gauss's Shoelace Formula)
With computer automation and total station/GNSS field data, the Coordinate Method is the standard approach for area determination. Given a closed polygon with n n n vertices having ordered grid coordinates ( E 1 , N 1 ) , ( E 2 , N 2 ) , … , ( E n , N n ) (E_1, N_1), (E_2, N_2), \dots, (E_n, N_n) ( E 1 , N 1 ) , ( E 2 , N 2 ) , … , ( E n , N n ) listed sequentially in either clockwise or counter-clockwise order around the perimeter: 2 A = ∣ ( E 1 N 2 + E 2 N 3 + ⋯ + E n N 1 ) − ( N 1 E 2 + N 2 E 3 + ⋯ + N n E 1 ) ∣ 2A = |(E_1 N_2 + E_2 N_3 + \dots + E_n N_1) - (N_1 E_2 + N_2 E_3 + \dots + N_n E_1)| 2 A = ∣ ( E 1 N 2 + E 2 N 3 + ⋯ + E n N 1 ) − ( N 1 E 2 + N 2 E 3 + ⋯ + N n E 1 ) ∣
In matrix / shoelace expansion form: 2 A = ∣ ∑ i = 1 n ( E i N i + 1 − E i + 1 N i ) ∣ where ( E n + 1 , N n + 1 ) = ( E 1 , N 1 ) 2A = \left| \sum_{i=1}^{n} (E_i N_{i+1} - E_{i+1} N_i) \right| \quad \text{where } (E_{n+1}, N_{n+1}) = (E_1, N_1) 2 A = i = 1 ∑ n ( E i N i + 1 − E i + 1 N i ) where ( E n + 1 , N n + 1 ) = ( E 1 , N 1 )
Alternatively, using coordinate differences: 2 A = ∑ i = 1 n E i ( N i + 1 − N i − 1 ) or 2 A = ∑ i = 1 n N i ( E i + 1 − E i − 1 ) 2A = \sum_{i=1}^{n} E_i (N_{i+1} - N_{i-1}) \quad \text{or} \quad 2A = \sum_{i=1}^{n} N_i (E_{i+1} - E_{i-1}) 2 A = i = 1 ∑ n E i ( N i + 1 − N i − 1 ) or 2 A = i = 1 ∑ n N i ( E i + 1 − E i − 1 )
Area of Irregular and Curved Boundaries
Lots bounded by circular curves (such as road right-of-ways, cul-de-sacs, or river arcs) require combining polygon traverse area with circular segment corrections.
1. Circular Segment Correction
For a lot boundary following a circular curve with radius R R R and central angle I I I (or Δ \Delta Δ ):
Central Angle in Radians : I r a d = I ∘ × π 180 ∘ I_{rad} = I^\circ \times \frac{\pi}{180^\circ} I r a d = I ∘ × 18 0 ∘ π
Area of Circular Sector : A sector = 1 2 R 2 I r a d = π R 2 I ∘ 360 ∘ A_{\text{sector}} = \frac{1}{2} R^2 I_{rad} = \frac{\pi R^2 I^\circ}{360^\circ} A sector = 2 1 R 2 I r a d = 36 0 ∘ π R 2 I ∘
Area of Sector Triangle : A triangle = 1 2 R 2 sin ( I ) A_{\text{triangle}} = \frac{1}{2} R^2 \sin(I) A triangle = 2 1 R 2 sin ( I )
Area of Circular Segment : A segment = A sector − A triangle = 1 2 R 2 ( I r a d − sin ( I ) ) A_{\text{segment}} = A_{\text{sector}} - A_{\text{triangle}} = \frac{1}{2} R^2 \left( I_{rad} - \sin(I) \right) A segment = A sector − A triangle = 2 1 R 2 ( I r a d − sin ( I ) )
Rule of Application :
If the circular arc lies outside the straight chord joining the two lot corners (convex lot curve), ADD the segment area A segment A_{\text{segment}} A segment to the polygon area calculated via DMD or Coordinates.
If the circular arc curves inward toward the lot interior (concave lot curve, like a setback curve), SUBTRACT the segment area A segment A_{\text{segment}} A segment from the polygon area.
2. Irregular Water Boundaries (Trapezoidal & Simpson's 1/3 Rules)
When a boundary follows a natural shoreline or river bank, perpendicular offsets h 0 , h 1 , h 2 , … , h n h_0, h_1, h_2, \dots, h_n h 0 , h 1 , h 2 , … , h n are measured at uniform intervals d d d along a base line:
Trapezoidal Rule : A = d ( h 0 + h n 2 + h 1 + h 2 + ⋯ + h n − 1 ) A = d \left( \frac{h_0 + h_n}{2} + h_1 + h_2 + \dots + h_{n-1} \right) A = d ( 2 h 0 + h n + h 1 + h 2 + ⋯ + h n − 1 )
Simpson's 1/3 Rule (requires an even number of intervals n n n , i.e., odd number of offsets): A = d 3 [ ( h 0 + h n ) + 4 ( h 1 + h 3 + ⋯ + h n − 1 ) + 2 ( h 2 + h 4 + ⋯ + h n − 2 ) ] A = \frac{d}{3} \left[ (h_0 + h_n) + 4(h_1 + h_3 + \dots + h_{n-1}) + 2(h_2 + h_4 + \dots + h_{n-2}) \right] A = 3 d [ ( h 0 + h n ) + 4 ( h 1 + h 3 + ⋯ + h n − 1 ) + 2 ( h 2 + h 4 + ⋯ + h n − 2 ) ]
DENR Standards for Subdivision and Consolidation Surveys (DAO 2007-29)
Under the Philippine Department of Environment and Natural Resources (DENR) Memorandum Circulars and DAO 2007-29 (Revised Regulations on Land Surveys):
1. Classification of Land Surveys
- Survey Type Code Prefix Description
- Private Subdivision Survey Psd Subdivision of titled land surveyed by a private Geodetic Engineer
- Private Consolidation Survey Pcn Amalgamation of two or more titled parcels into one lot
- Consolidation-Subdivision Pcs Combining multiple titled parcels and re-subdividing into smaller lots
- Cadastral Subdivision Csd Subdivision of untitled public agricultural land within a cadastre
- 2. Corner Markers & Monumentation Rules
All lot boundary corners established or re-established during cadastral or property surveys must be marked on the ground with standard monuments:
Standard Corner Monument : Private Survey ( P.S. ) cylindrical concrete monument.
Dimensions : 15 cm in diameter by 50 cm in length .
Installation : Set vertically in the ground with 45 cm buried below ground surface and 5 cm projecting above ground level .
Material Composition : Cast concrete with a volumetric mix ratio of 1 part Portland cement, 2 parts clean sand, and 4 parts gravel (1:2:4 mix) .
Center Mark : The exact corner point is marked on top of the monument by a galvanized iron (G.I.) nail/spike centered in a shallow cross mark.
Bureau of Lands Monuments (B.L.) : Primary control corners use 15 × 15 × 60 cm 15 \times 15 \times 60\text{ cm} 15 × 15 × 60 cm square or 20 cm 20\text{ cm} 20 cm diameter cylindrical monuments.
3. Tie-Line Requirements
Every isolated lot or subdivision survey plan submitted to the Land Management Bureau (LMB) or Land Registration Authority (LRA) must be mathematically connected by a Tie-Line (bearing and distance) from Corner 1 of the lot to an official reference monument, such as a Bureau of Lands Location Monument (BLLM) , City Boundary Monument (CBM) , or established triangulation station.
Worked Example: DMD Area Computation
Using the adjusted traverse data from Section 7.1:
- Course Adjusted Latitude ( L L L , m) Adjusted Departure ( D e p Dep De p , m)
- 1-2 + 86.585 +86.585 + 86.585 + 50.024 +50.024 + 50.024
- 2-3 − 75.027 -75.027 − 75.027 + 129.940 +129.940 + 129.940
- 3-4 − 84.875 -84.875 − 84.875 − 84.824 -84.824 − 84.824
- 4-1 + 73.317 +73.317 + 73.317 − 95.140 -95.140 − 95.140
- Step 1: Compute DMD for each Course
DMD 1 − 2 = D e p 1 − 2 = + 50.024 m \text{DMD}_{1-2} = Dep_{1-2} = \mathbf{+50.024\text{ m}} DMD 1 − 2 = De p 1 − 2 = + 50.024 m
DMD 2 − 3 = DMD 1 − 2 + D e p 1 − 2 + D e p 2 − 3 = 50.024 + 50.024 + 129.940 = + 229.988 m \text{DMD}_{2-3} = \text{DMD}_{1-2} + Dep_{1-2} + Dep_{2-3} = 50.024 + 50.024 + 129.940 = \mathbf{+229.988\text{ m}} DMD 2 − 3 = DMD 1 − 2 + De p 1 − 2 + De p 2 − 3 = 50.024 + 50.024 + 129.940 = + 229.988 m
DMD 3 − 4 = DMD 2 − 3 + D e p 2 − 3 + D e p 3 − 4 = 229.988 + 129.940 + ( − 84.824 ) = + 275.104 m \text{DMD}_{3-4} = \text{DMD}_{2-3} + Dep_{2-3} + Dep_{3-4} = 229.988 + 129.940 + (-84.824) = \mathbf{+275.104\text{ m}} DMD 3 − 4 = DMD 2 − 3 + De p 2 − 3 + De p 3 − 4 = 229.988 + 129.940 + ( − 84.824 ) = + 275.104 m
DMD 4 − 1 = DMD 3 − 4 + D e p 3 − 4 + D e p 4 − 1 = 275.104 + ( − 84.824 ) + ( − 95.140 ) = + 95.140 m \text{DMD}_{4-1} = \text{DMD}_{3-4} + Dep_{3-4} + Dep_{4-1} = 275.104 + (-84.824) + (-95.140) = \mathbf{+95.140\text{ m}} DMD 4 − 1 = DMD 3 − 4 + De p 3 − 4 + De p 4 − 1 = 275.104 + ( − 84.824 ) + ( − 95.140 ) = + 95.140 m (Check: DMD 4 − 1 = + 95.140 \text{DMD}_{4-1} = +95.140 DMD 4 − 1 = + 95.140 , which equals − D e p 4 − 1 = − ( − 95.140 ) = + 95.140 m -Dep_{4-1} = -(-95.140) = +95.140\text{ m} − De p 4 − 1 = − ( − 95.140 ) = + 95.140 m . Check passes!)
Step 2: Compute Double Areas ( 2 A = DMD × L a d j 2A = \text{DMD} \times L_{adj} 2 A = DMD × L a d j )
Course DMD (m) Adjusted Latitude ( L L L , m) Double Area ( 2 A = DMD × L 2A = \text{DMD} \times L 2 A = DMD × L , m 2 \text{m}^2 m 2 )
- 1-2 + 50.024 +50.024 + 50.024 + 86.585 +86.585 + 86.585 + 4 , 331.328 +4,331.328 + 4 , 331.328
- 2-3 + 229.988 +229.988 + 229.988 − 75.027 -75.027 − 75.027 − 17 , 255.310 -17,255.310 − 17 , 255.310
- 3-4 + 275.104 +275.104 + 275.104 − 84.875 -84.875 − 84.875 − 23 , 349.452 -23,349.452 − 23 , 349.452
- 4-1 + 95.140 +95.140 + 95.140 + 73.317 +73.317 + 73.317 + 6 , 975.379 +6,975.379 + 6 , 975.379
- SUM ∑ 2 A = − 29 , 298.055 m 2 \sum 2A = -29,298.055\text{ m}^2 ∑ 2 A = − 29 , 298.055 m 2
Step 3: Compute Final Lot Area Double Area 2 A = ∣ − 29 , 298.055 m 2 ∣ = 29 , 298.055 m 2 \text{Double Area } 2A = |-29,298.055\text{ m}^2| = 29,298.055\text{ m}^2 Double Area 2 A = ∣ − 29 , 298.055 m 2 ∣ = 29 , 298.055 m 2 Area A = 29 , 298.055 2 = 14 , 649.03 m 2 or 1.4649 hectares \text{Area } A = \frac{29,298.055}{2} = \mathbf{14,649.03\text{ m}^2} \quad \text{or} \quad \mathbf{1.4649\text{ hectares}} Area A = 2 29 , 298.055 = 14 , 649.03 m 2 or 1.4649 hectares