Study guide

4.2 Engineering Economics, Time Value of Money, Cash Flows, Depreciation, and Capital Costing

PRC Geodetic Engineering Licensure Examination Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Laws, Professional Practice, and Code of Ethics

1.1 Republic Act 8560 & RA 9200 (Philippine Geodetic Engineering Act) and PRC Board Rules 1.2 Code of Ethics for Geodetic Engineers, Professional Responsibilities & Practice Limits 1.3 PRC Licensure Examination Rules, Continuing Professional Development (CPD), and Legal Penalties

2 Chapter 2: Property, Land Registration, and Natural Resources Laws

2.1 Presidential Decree 1529 (Property Registration Decree) & The Torrens System 2.2 Commonwealth Act 141 (Public Land Act), Land Classification, and Public Land Patents 2.3 Comprehensive Agrarian Reform Law (RA 6657) & Environmental/Forestry/Mining Laws (RA 7942, PD 705) 2.4 Civil Code Provisions on Ownership, Property Boundaries, Easements, Obligations, and Contracts 2.5 DENR Administrative Order DAO 2007-29 (Revised Regulations for Land Surveys) & Technical Standards

3 Chapter 3: Mathematics, Geometry, and Trigonometry

3.1 Advanced Algebra, Analytic Geometry, and Solid Geometry in Geodetic Calculations 3.2 Plane and Spherical Trigonometry for Surveying and Astronomical Applications 3.3 Differential and Integral Calculus Applied to Curves, Surfaces, and Surveying Computations

4 Chapter 4: Engineering Sciences, Mechanics, and Economics

4.1 Engineering Mechanics (Statics, Kinematics, Dynamics) for Engineering Applications 4.2 Engineering Economics, Time Value of Money, Cash Flows, Depreciation, and Capital Costing

5 Chapter 5: Theory of Errors and Adjustment of Observations

5.1 Theory of Errors, Precision vs. Accuracy, Random/Systematic Errors, and Error Propagation 5.2 Principles of Least Squares, Most Probable Value, and Weighted Observations 5.3 Least-Squares Adjustment of Level Nets, Triangulation, and Plane Traverses

6 Chapter 6: Plane & Distance/Angle Surveying Fundamentals

6.1 Distance Measurement Methods, Taping Corrections (Temperature, Tension, Sag), and EDM Operations 6.2 Angular Measurements, Transit/Theodolite/Total Station Operations, Bearings, Azimuths, and Magnetic Declination 6.3 Differential, Trigonometric, Barometric, and Profile Leveling Methods

7 Chapter 7: Cadastral, Property, and Special Surveys

7.1 Traverse Computations, Latitudes, Departures, Error of Closure, and Transit/Compass Rule Adjustments 7.2 Area Computations (DMD, DPD, Coordinates) and Subdivision/Consolidation Survey Standards 7.3 Mineral and Mining Surveys, Hydrographic Surveying, Route Alignment, and Construction Layout

8 Chapter 8: Geodetic Surveying and Reference Datums

8.1 Ellipsoids, Geoid Undulation, Geodetic Datums, and the Philippine Reference System of 1992 (PRS92) 8.2 Geodetic Position Computations: Direct and Inverse Problems on the Reference Ellipsoid 8.3 Triangulation, Trilateration, Baseline Measurements, and National Geodetic Control Networks

9 Chapter 9: Geodetic Astronomy and Satellite Positioning (GNSS)

9.1 Celestial Sphere, Equatorial/Horizon Coordinate Systems, and Astronomical Time Systems (UT, ST, LMT) 9.2 Determination of Latitude, Longitude, and Solar/Polaris Azimuth by Astronomical Observations 9.3 Global Navigation Satellite Systems (GNSS/GPS), Carrier-Phase Positioning, RTK, and Static Baselines

10 Chapter 10: Cartography, Map Projections, and Coordinate Systems

10.1 Cartographic Principles, Map Scales, Map Symbolization, and Cartographic Generalization 10.2 Map Projections: Universal Transverse Mercator (UTM) and Philippine Transverse Mercator (PTM) Grid Systems 10.3 Survey Plan Preparation, Technical Description Formatting, and DENR Approval Workflows

11 Chapter 11: Photogrammetry, Remote Sensing, and Geographic Information Systems (GIS)

11.1 Aerial Photogrammetry, Photographic Scale, Relief Displacement, Flight Planning, and Stereoscopy 11.2 Digital Photogrammetry, UAV/Drone Surveying, Orthophoto Generation, and LiDAR Data Processing 11.3 Remote Sensing Spectral Signatures, Multispectral Image Classification, and GIS Spatial Analysis

4.2 Engineering Economics, Time Value of Money, Cash Flows, Depreciation, and Capital Costing

Key Takeaways Explain This Topic AI

The time value of money converts cash inflows and outflows across time using interest factors (P/F, F/P, P/A, A/P).

The Capital Recovery Factor (CRF, A/P) determines the annual equivalent cost required to amortize capital surveying equipment purchases over their service life.

Asset depreciation methods (Straight-Line, Double Declining Balance, Sum-of-the-Years'-Digits) dictate tax deductions and asset book value progression.

Project selection criteria (NPV > 0, IRR > MARR, B/C ratio ≥ 1.0) provide objective financial metrics for municipal GIS and cadastral survey investments.

Geodetic project fee calculations require compounding direct labor, field expenses, overhead allocation, equipment depreciation, and professional margins.

Last updated: July 2026

4.2 Engineering Economics, Time Value of Money, Cash Flows, Depreciation, and Capital Costing

Engineering economics equips Geodetic Engineers with quantitative tools to evaluate capital investments in surveying technology, bid competitively on cadastral and infrastructure mapping contracts, and manage professional firm finances. Every capital decision—whether purchasing an RTK-GNSS receiver, investing in a drone LiDAR system, or bidding on a multi-year LGU cadastral project—depends on understanding cash flow dynamics and financial equivalency.

1. Time Value of Money and Cash Flow Dynamics

Money possesses time value because capital can earn interest over time. A peso received today is worth more than a peso received a year from today.

Cash Flow Diagrams (CFD)

Cash flow diagrams visually summarize receipts and disbursements along a horizontal time axis:

Vertical Upward Arrow (+) : Cash Inflow (Revenue, savings, salvage value).

Vertical Downward Arrow (-) : Cash Outflow (Initial purchase cost, maintenance, operating expense).

End-of-Period Convention : Transactions occurring during a interest period are assumed to occur at the end of that period.

Interest Formulas and Compound Interest Factors

Let P P P = Present sum of money, F F F = Future sum of money after n n n periods, A A A = End-of-period uniform annual payment, i i i = interest rate per period, n n n = number of compounding periods.

Conversion Purpose Notation / Factor Name Mathematical Formula

Find F F F given P P P ( F / P , i , n ) (F/P, i, n) ( F / P , i , n ) Single Payment Compound Amount F = P ( 1 + i ) n F = P(1 + i)^n F = P ( 1 + i ) n

Find P P P given F F F ( P / F , i , n ) (P/F, i, n) ( P / F , i , n ) Single Payment Present Worth P = F ( 1 + i ) − n = F ( 1 + i ) n P = F(1 + i)^{-n} = \frac{F}{(1 + i)^n} P = F ( 1 + i ) − n = ( 1 + i ) n F ​

Find F F F given A A A ( F / A , i , n ) (F/A, i, n) ( F / A , i , n ) Uniform Series Compound Amount F = A [ ( 1 + i ) n − 1 i ] F = A \left[ \frac{(1 + i)^n - 1}{i} \right] F = A [ i ( 1 + i ) n − 1 ​ ]

Find A A A given F F F ( A / F , i , n ) (A/F, i, n) ( A / F , i , n ) Sinking Fund Factor A = F [ i ( 1 + i ) n − 1 ] A = F \left[ \frac{i}{(1 + i)^n - 1} \right] A = F [ ( 1 + i ) n − 1 i ​ ]

Find P P P given A A A ( P / A , i , n ) (P/A, i, n) ( P / A , i , n ) Uniform Series Present Worth P = A [ ( 1 + i ) n − 1 i ( 1 + i ) n ] P = A \left[ \frac{(1 + i)^n - 1}{i(1 + i)^n} \right] P = A [ i ( 1 + i ) n ( 1 + i ) n − 1 ​ ]

Find A A A given P P P ( A / P , i , n ) (A/P, i, n) ( A / P , i , n ) Capital Recovery Factor (CRF) A = P [ i ( 1 + i ) n ( 1 + i ) n − 1 ] A = P \left[ \frac{i(1 + i)^n}{(1 + i)^n - 1} \right] A = P [ ( 1 + i ) n − 1 i ( 1 + i ) n ​ ]

Nominal vs. Effective Interest Rates

When interest is compounded m m m times per year at nominal annual rate r r r : ∋ e f f = ( 1 + r m ) m − 1 \ni_{eff} = \left(1 + \frac{r}{m}\right)^m - 1 ∋ e ff ​ = ( 1 + m r ​ ) m − 1

2. Depreciation Methods for Surveying Equipment

Depreciation is the non-cash allocation of an asset's historical acquisition cost over its estimated economic service life.

Let B B B = Initial cost (basis), S S S = Estimated salvage value, n n n = Useful life in years, t t t = Specific year ( 1 ≤ t ≤ n 1 \le t \le n 1 ≤ t ≤ n ), D t D_t D t ​ = Depreciation charge in year t t t , B V t BV_t B V t ​ = Book Value at end of year t t t .

1. Straight-Line Depreciation (SLD)

Depreciation is constant each year: D t = B − S n , B V t = B − t ⋅ D t D_t = \frac{B - S}{n}, \quad BV_t = B - t \cdot D_t D t ​ = n B − S ​ , B V t ​ = B − t ⋅ D t ​

2. Double Declining Balance (DDB)

Accelerated method using rate d = 2 n d = \frac{2}{n} d = n 2 ​ . Salvage value S S S is ignored in initial annual calculations, but B V t BV_t B V t ​ cannot drop below S S S : D t = d ⋅ B V t − 1 = 2 n ⋅ B V t − 1 , B V t = B ( 1 − d ) t D_t = d \cdot BV_{t-1} = \frac{2}{n} \cdot BV_{t-1}, \quad BV_t = B(1 - d)^t D t ​ = d ⋅ B V t − 1 ​ = n 2 ​ ⋅ B V t − 1 ​ , B V t ​ = B ( 1 − d ) t

3. Sum-of-the-Years'-Digits (SYD)

Accelerated method based on digit sum S O Y D = n ( n + 1 ) 2 SOYD = \frac{n(n+1)}{2} SO Y D = 2 n ( n + 1 ) ​ : D t = ( B − S ) [ n − t + 1 S O Y D ] , B V t = B − ∑ k = 1 t D k D_t = (B - S) \left[ \frac{n - t + 1}{SOYD} \right], \quad BV_t = B - \sum_{k=1}^t D_k D t ​ = ( B − S ) [ SO Y D n − t + 1 ​ ] , B V t ​ = B − k = 1 ∑ t ​ D k ​

  • Method Annual Depreciation Pattern Tax Impact early in asset life
  • Straight-Line (SLD) Uniform / Constant Low tax shield
  • Double Declining Balance (DDB) Rapidly Decreasing Maximum early tax shield
  • Sum-of-the-Years'-Digits (SYD) Linearly Decreasing High early tax shield
  • 3. Project Evaluation & Capital Costing Metrics
  • Net Present Value (NPV / PW)

Converts all cash inflows and outflows to time t = 0 t=0 t = 0 using the Minimum Attractive Rate of Return (MARR): N P V = P W ( B e n e f i t s ) − P W ( C o s t s ) = ∑ t = 0 n C F t ( 1 + M A R R ) t NPV = PW(Benefits) - PW(Costs) = \sum_{t=0}^n \frac{CF_t}{(1 + MARR)^t} NP V = P W ( B e n e f i t s ) − P W ( C os t s ) = t = 0 ∑ n ​ ( 1 + M A RR ) t C F t ​ ​

Accept project if N P V ≥ 0 NPV \ge 0 NP V ≥ 0 .

Benefit-Cost Ratio (B/C Ratio)

Used primarily for public infrastructure and government cadastral projects: B / C = P W ( Benefits ) P W ( Costs ) = A W ( Benefits ) A W ( Costs ) B/C = \frac{PW(\text{Benefits})}{PW(\text{Costs})} = \frac{AW(\text{Benefits})}{AW(\text{Costs})} B / C = P W ( Costs ) P W ( Benefits ) ​ = A W ( Costs ) A W ( Benefits ) ​

Accept project if B / C ≥ 1.0 B/C \ge 1.0 B / C ≥ 1.0 .

Internal Rate of Return (IRR)

The break-even interest rate i ∗ i^* i ∗ at which N P V = 0 NPV = 0 NP V = 0 or P W ( B e n e f i t s ) = P W ( C o s t s ) PW(Benefits) = PW(Costs) P W ( B e n e f i t s ) = P W ( C os t s ) : ∑ t = 0 n C F t ( 1 + i ∗ ) t = 0 \sum_{t=0}^n \frac{CF_t}{(1 + i^*)^t} = 0 t = 0 ∑ n ​ ( 1 + i ∗ ) t C F t ​ ​ = 0

Accept project if I R R ≥ M A R R IRR \ge MARR I RR ≥ M A RR .

4. Cost Estimation & Fee Structure for Geodetic Engineering Contracts

Professional surveying fees under standard Board of Geodetic Engineering pricing frameworks compound several cost centers:

Direct Labor Costs ( D L C DLC D L C ) : Salaries and per diems for Geodetic Engineer (Team Leader), Instrumentman, Rodmen, Chainmen, and GIS Encoders.

Direct Non-Labor Expenses ( D N E DNE D NE ) : Boundary monuments, wooden stakes, fuel, vehicle maintenance, travel allowances, permits, and agency data fees (e.g., NAMRIA/LMB record copies).

Equipment Depreciation / Rental Costs ( E Q EQ EQ ) : Hourly or daily cost allocation for Total Stations, GNSS receivers, and UAVs.

Overhead / Indirect Costs ( O / H O/H O / H ) : Office rent, utilities, insurance, administrative staff, accounting (typically 30% to 50% of Direct Labor).

Contingencies & Professional Profit Margin ( P P P ) : Margin applied to total base cost (typically 15% to 25%). Total Fee = ( D L C + D N E + E Q + O / H ) × ( 1 + Profit & Contingency % ) \text{Total Fee} = (DLC + DNE + EQ + O/H) \times (1 + \text{Profit \& Contingency \%}) Total Fee = ( D L C + D NE + EQ + O / H ) × ( 1 + Profit & Contingency % )

  • Worked Calculation Examples
  • Worked Example 4.2.1: Capital Recovery Factor & EUAC of GNSS Equipment

Problem: A geodetic surveying firm buys an RTK GNSS Receiver unit for P = PHP 450 , 000 P = \text{PHP }450,000 P = PHP 450 , 000 . It has an estimated service life n = 6 years n = 6 \text{ years} n = 6 years and a residual salvage value S = PHP 50 , 000 S = \text{PHP }50,000 S = PHP 50 , 000 . Annual calibration and maintenance expenses are A m a i n t = PHP 25 , 000 / year A_{maint} = \text{PHP }25,000/\text{year} A main t ​ = PHP 25 , 000/ year . If the firm's MARR is i = 12 % i = 12\% i = 12% , calculate the Equivalent Uniform Annual Cost (EUAC).

Solution:

Capital Recovery Factor ( A / P , 12 % , 6 ) (A/P, 12\%, 6) ( A / P , 12% , 6 ) : ( A / P , 12 % , 6 ) = 0.12 ( 1 + 0.12 ) 6 ( 1 + 0.12 ) 6 − 1 = 0.12 ( 1.97382 ) 0.97382 = 0.23686 0.97382 = 0.24323 (A/P, 12\%, 6) = \frac{0.12(1 + 0.12)^6}{(1 + 0.12)^6 - 1} = \frac{0.12(1.97382)}{0.97382} = \frac{0.23686}{0.97382} = 0.24323 ( A / P , 12% , 6 ) = ( 1 + 0.12 ) 6 − 1 0.12 ( 1 + 0.12 ) 6 ​ = 0.97382 0.12 ( 1.97382 ) ​ = 0.97382 0.23686 ​ = 0.24323

Sinking Fund Factor ( A / F , 12 % , 6 ) (A/F, 12\%, 6) ( A / F , 12% , 6 ) : ( A / F , 12 % , 6 ) = 0.12 ( 1.12 ) 6 − 1 = 0.12 0.97382 = 0.12323 (A/F, 12\%, 6) = \frac{0.12}{(1.12)^6 - 1} = \frac{0.12}{0.97382} = 0.12323 ( A / F , 12% , 6 ) = ( 1.12 ) 6 − 1 0.12 ​ = 0.97382 0.12 ​ = 0.12323

EUAC Calculation: E U A C = P ( A / P , 12 % , 6 ) − S ( A / F , 12 % , 6 ) + A m a i n t EUAC = P(A/P, 12\%, 6) - S(A/F, 12\%, 6) + A_{maint} E U A C = P ( A / P , 12% , 6 ) − S ( A / F , 12% , 6 ) + A main t ​ E U A C = 450 , 000 ( 0.24323 ) − 50 , 000 ( 0.12323 ) + 25 , 000 EUAC = 450,000(0.24323) - 50,000(0.12323) + 25,000 E U A C = 450 , 000 ( 0.24323 ) − 50 , 000 ( 0.12323 ) + 25 , 000 E U A C = 109 , 453.50 − 6 , 161.50 + 25 , 000 = PHP 128 , 292.00 / year EUAC = 109,453.50 - 6,161.50 + 25,000 = \text{PHP }128,292.00 / \text{year} E U A C = 109 , 453.50 − 6 , 161.50 + 25 , 000 = PHP 128 , 292.00/ year

Worked Example 4.2.2: Depreciation Method Comparison

Problem: An aerial photogrammetry drone is purchased for B = PHP 800 , 000 B = \text{PHP }800,000 B = PHP 800 , 000 with S = PHP 80 , 000 S = \text{PHP }80,000 S = PHP 80 , 000 after n = 5 years n = 5 \text{ years} n = 5 years . Compute the Year 2 depreciation D 2 D_2 D 2 ​ and Book Value B V 2 BV_2 B V 2 ​ using (a) Straight-Line (SLD), (b) Double Declining Balance (DDB), and (c) Sum-of-the-Years'-Digits (SYD).

Solution:

(a) Straight-Line Depreciation (SLD): D = 800 , 000 − 80 , 000 5 = PHP 144 , 000 / year D = \frac{800,000 - 80,000}{5} = \text{PHP }144,000 / \text{year} D = 5 800 , 000 − 80 , 000 ​ = PHP 144 , 000/ year D 2 = PHP 144 , 000 D_2 = \text{PHP }144,000 D 2 ​ = PHP 144 , 000 B V 2 = 800 , 000 − ( 2 × 144 , 000 ) = PHP 512 , 000 BV_2 = 800,000 - (2 \times 144,000) = \text{PHP }512,000 B V 2 ​ = 800 , 000 − ( 2 × 144 , 000 ) = PHP 512 , 000

(b) Double Declining Balance (DDB): Rate d = 2 5 = 0.40 d = \frac{2}{5} = 0.40 d = 5 2 ​ = 0.40 (40%). Y e a r 1 : D 1 = 0.40 × 800 , 000 = PHP 320 , 000 , B V 1 = 800 , 000 − 320 , 000 = PHP 480 , 000 Year 1: \quad D_1 = 0.40 \times 800,000 = \text{PHP }320,000, \quad BV_1 = 800,000 - 320,000 = \text{PHP }480,000 Y e a r 1 : D 1 ​ = 0.40 × 800 , 000 = PHP 320 , 000 , B V 1 ​ = 800 , 000 − 320 , 000 = PHP 480 , 000 Y e a r 2 : D 2 = 0.40 × 480 , 000 = PHP 192 , 000 , B V 2 = 480 , 000 − 192 , 000 = PHP 288 , 000 Year 2: \quad D_2 = 0.40 \times 480,000 = \text{PHP }192,000, \quad BV_2 = 480,000 - 192,000 = \text{PHP }288,000 Y e a r 2 : D 2 ​ = 0.40 × 480 , 000 = PHP 192 , 000 , B V 2 ​ = 480 , 000 − 192 , 000 = PHP 288 , 000

(c) Sum-of-the-Years'-Digits (SYD): S O Y D = 5 ( 6 ) 2 = 15 , Depreciable Basis = 800 , 000 − 80 , 000 = PHP 720 , 000 SOYD = \frac{5(6)}{2} = 15, \quad \text{Depreciable Basis} = 800,000 - 80,000 = \text{PHP }720,000 SO Y D = 2 5 ( 6 ) ​ = 15 , Depreciable Basis = 800 , 000 − 80 , 000 = PHP 720 , 000 Y e a r 1 : D 1 = 720 , 000 × 5 15 = PHP 240 , 000 Year 1: \quad D_1 = 720,000 \times \frac{5}{15} = \text{PHP }240,000 Y e a r 1 : D 1 ​ = 720 , 000 × 15 5 ​ = PHP 240 , 000 Y e a r 2 : D 2 = 720 , 000 × 4 15 = PHP 192 , 000 Year 2: \quad D_2 = 720,000 \times \frac{4}{15} = \text{PHP }192,000 Y e a r 2 : D 2 ​ = 720 , 000 × 15 4 ​ = PHP 192 , 000 B V 2 = 800 , 000 − ( 240 , 000 + 192 , 000 ) = PHP 368 , 000 BV_2 = 800,000 - (240,000 + 192,000) = \text{PHP }368,000 B V 2 ​ = 800 , 000 − ( 240 , 000 + 192 , 000 ) = PHP 368 , 000

Worked Example 4.2.3: Benefit-Cost Ratio for Municipal CORS Station

Problem: A local government unit (LGU) evaluates installing an automated Continuously Operating Reference Station (CORS) for municipal land titling. Initial capital expenditure is C 0 = PHP 2 , 500 , 000 C_0 = \text{PHP }2,500,000 C 0 ​ = PHP 2 , 500 , 000 . Annual operational cost is PHP 150 , 000 / year \text{PHP }150,000/\text{year} PHP 150 , 000/ year for 10 years. Annual quantifiable public benefits (reduced survey dispute litigation and faster property titling turnarounds) are estimated at PHP 650 , 000 / year \text{PHP }650,000/\text{year} PHP 650 , 000/ year . Using i = 10 % i = 10\% i = 10% discount rate and n = 10 years n = 10 \text{ years} n = 10 years , calculate the Benefit-Cost ( B / C B/C B / C ) Ratio and verify project feasibility.

Solution:

Uniform Series Present Worth Factor ( P / A , 10 % , 10 ) (P/A, 10\%, 10) ( P / A , 10% , 10 ) : ( P / A , 10 % , 10 ) = ( 1.10 ) 10 − 1 0.10 ( 1.10 ) 10 = 2.59374 − 1 0.259374 = 6.14457 (P/A, 10\%, 10) = \frac{(1.10)^{10} - 1}{0.10(1.10)^{10}} = \frac{2.59374 - 1}{0.259374} = 6.14457 ( P / A , 10% , 10 ) = 0.10 ( 1.10 ) 10 ( 1.10 ) 10 − 1 ​ = 0.259374 2.59374 − 1 ​ = 6.14457

Present Worth of Costs ( P W C PW_C P W C ​ ): P W C = 2 , 500 , 000 + 150 , 000 ( 6.14457 ) = 2 , 500 , 000 + 921 , 685.50 = PHP 3 , 421 , 685.50 PW_C = 2,500,000 + 150,000(6.14457) = 2,500,000 + 921,685.50 = \text{PHP }3,421,685.50 P W C ​ = 2 , 500 , 000 + 150 , 000 ( 6.14457 ) = 2 , 500 , 000 + 921 , 685.50 = PHP 3 , 421 , 685.50

Present Worth of Benefits ( P W B PW_B P W B ​ ): P W B = 650 , 000 ( 6.14457 ) = PHP 3 , 993 , 970.50 PW_B = 650,000(6.14457) = \text{PHP }3,993,970.50 P W B ​ = 650 , 000 ( 6.14457 ) = PHP 3 , 993 , 970.50

Benefit-Cost Ratio ( B / C B/C B / C ): B / C = P W B P W C = 3 , 993 , 970.50 3 , 421 , 685.50 = 1.167 B/C = \frac{PW_B}{PW_C} = \frac{3,993,970.50}{3,421,685.50} = 1.167 B / C = P W C ​ P W B ​ ​ = 3 , 421 , 685.50 3 , 993 , 970.50 ​ = 1.167

Since B / C = 1.17 > 1.0 B/C = 1.17 > 1.0 B / C = 1.17 > 1.0 , the project is economically justified.