9.3 Global Navigation Satellite Systems (GNSS/GPS), Carrier-Phase Positioning, RTK, and Static Baselines
PRC Geodetic Engineering Licensure Examination Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Laws, Professional Practice, and Code of Ethics
1.1 Republic Act 8560 & RA 9200 (Philippine Geodetic Engineering Act) and PRC Board Rules 1.2 Code of Ethics for Geodetic Engineers, Professional Responsibilities & Practice Limits 1.3 PRC Licensure Examination Rules, Continuing Professional Development (CPD), and Legal Penalties
2 Chapter 2: Property, Land Registration, and Natural Resources Laws
2.1 Presidential Decree 1529 (Property Registration Decree) & The Torrens System 2.2 Commonwealth Act 141 (Public Land Act), Land Classification, and Public Land Patents 2.3 Comprehensive Agrarian Reform Law (RA 6657) & Environmental/Forestry/Mining Laws (RA 7942, PD 705) 2.4 Civil Code Provisions on Ownership, Property Boundaries, Easements, Obligations, and Contracts 2.5 DENR Administrative Order DAO 2007-29 (Revised Regulations for Land Surveys) & Technical Standards
3 Chapter 3: Mathematics, Geometry, and Trigonometry
3.1 Advanced Algebra, Analytic Geometry, and Solid Geometry in Geodetic Calculations 3.2 Plane and Spherical Trigonometry for Surveying and Astronomical Applications 3.3 Differential and Integral Calculus Applied to Curves, Surfaces, and Surveying Computations
4 Chapter 4: Engineering Sciences, Mechanics, and Economics
4.1 Engineering Mechanics (Statics, Kinematics, Dynamics) for Engineering Applications 4.2 Engineering Economics, Time Value of Money, Cash Flows, Depreciation, and Capital Costing
5 Chapter 5: Theory of Errors and Adjustment of Observations
5.1 Theory of Errors, Precision vs. Accuracy, Random/Systematic Errors, and Error Propagation 5.2 Principles of Least Squares, Most Probable Value, and Weighted Observations 5.3 Least-Squares Adjustment of Level Nets, Triangulation, and Plane Traverses
6 Chapter 6: Plane & Distance/Angle Surveying Fundamentals
6.1 Distance Measurement Methods, Taping Corrections (Temperature, Tension, Sag), and EDM Operations 6.2 Angular Measurements, Transit/Theodolite/Total Station Operations, Bearings, Azimuths, and Magnetic Declination 6.3 Differential, Trigonometric, Barometric, and Profile Leveling Methods
7 Chapter 7: Cadastral, Property, and Special Surveys
7.1 Traverse Computations, Latitudes, Departures, Error of Closure, and Transit/Compass Rule Adjustments 7.2 Area Computations (DMD, DPD, Coordinates) and Subdivision/Consolidation Survey Standards 7.3 Mineral and Mining Surveys, Hydrographic Surveying, Route Alignment, and Construction Layout
8 Chapter 8: Geodetic Surveying and Reference Datums
8.1 Ellipsoids, Geoid Undulation, Geodetic Datums, and the Philippine Reference System of 1992 (PRS92) 8.2 Geodetic Position Computations: Direct and Inverse Problems on the Reference Ellipsoid 8.3 Triangulation, Trilateration, Baseline Measurements, and National Geodetic Control Networks
9 Chapter 9: Geodetic Astronomy and Satellite Positioning (GNSS)
9.1 Celestial Sphere, Equatorial/Horizon Coordinate Systems, and Astronomical Time Systems (UT, ST, LMT) 9.2 Determination of Latitude, Longitude, and Solar/Polaris Azimuth by Astronomical Observations 9.3 Global Navigation Satellite Systems (GNSS/GPS), Carrier-Phase Positioning, RTK, and Static Baselines
10 Chapter 10: Cartography, Map Projections, and Coordinate Systems
10.1 Cartographic Principles, Map Scales, Map Symbolization, and Cartographic Generalization 10.2 Map Projections: Universal Transverse Mercator (UTM) and Philippine Transverse Mercator (PTM) Grid Systems 10.3 Survey Plan Preparation, Technical Description Formatting, and DENR Approval Workflows
11 Chapter 11: Photogrammetry, Remote Sensing, and Geographic Information Systems (GIS)
11.1 Aerial Photogrammetry, Photographic Scale, Relief Displacement, Flight Planning, and Stereoscopy 11.2 Digital Photogrammetry, UAV/Drone Surveying, Orthophoto Generation, and LiDAR Data Processing 11.3 Remote Sensing Spectral Signatures, Multispectral Image Classification, and GIS Spatial Analysis
9.3 Global Navigation Satellite Systems (GNSS/GPS), Carrier-Phase Positioning, RTK, and Static Baselines
Key Takeaways Explain This Topic AI
GNSS constellations (GPS, GLONASS, Galileo, BeiDou) operate across core frequencies (L1, L2, L5) with three functional segments: Space, Control, and User.
Carrier-phase positioning achieves millimeter-to-centimeter accuracy by resolving integer phase ambiguity (N), compared to code-based pseudorange positioning which yields meter-level accuracy.
Ionospheric delay is dispersive and eliminated via dual-frequency combination (L_IF), whereas tropospheric delay is non-dispersive and mitigated through zenith delay modeling.
Dilution of Precision (DOP) quantifies geometric satellite constellation strength, where lower values (PDOP < 3) reflect optimal geometry and higher precision.
High-precision survey modes include Static GNSS (primary control), Real-Time Kinematic (RTK/NTRIP for real-time boundaries), Precise Point Positioning (PPP), and rigorous baseline loop closure analysis.
Last updated: July 2026
9.3 Global Navigation Satellite Systems (GNSS/GPS), Carrier-Phase Positioning, RTK, and Static Baselines
Global Navigation Satellite Systems (GNSS) have revolutionized geodetic surveying, replacing traditional optical triangulation networks with satellite-based baseline vectors referencing global geodetic datums (such as WGS84 and ITRF/PRS92).
1. GNSS Constellations & System Segments
Modern multi-constellation GNSS integrates signals from four major global satellite networks:
System Country / Organization Satellites Orbital Planes Altitude / Inclination Core Frequencies
GPS United States (USSF) ~31 6 MEO planes 20 , 200 km / 55 ∘ 20,200 \text{ km} / 55^\circ 20 , 200 km /5 5 ∘ L1 ( 1575.42 MHz 1575.42 \text{ MHz} 1575.42 MHz ), L2 ( 1227.60 MHz 1227.60 \text{ MHz} 1227.60 MHz ), L5 ( 1176.45 MHz 1176.45 \text{ MHz} 1176.45 MHz )
GLONASS Russia (Roscosmos) ~24 3 MEO planes 19 , 100 km / 64.8 ∘ 19,100 \text{ km} / 64.8^\circ 19 , 100 km /64. 8 ∘ G1 ( 1602 MHz 1602 \text{ MHz} 1602 MHz FDMA/CDMA), G2 ( 1246 MHz 1246 \text{ MHz} 1246 MHz )
Galileo European Union (ESA) ~24-30 3 MEO planes 23 , 222 km / 56 ∘ 23,222 \text{ km} / 56^\circ 23 , 222 km /5 6 ∘ E1 ( 1575.42 MHz 1575.42 \text{ MHz} 1575.42 MHz ), E5a/b, E6
BeiDou (BDS) China (CNSA) ~35 GEO, IGSO, MEO 21 , 150 km (MEO) / 55 ∘ 21,150 \text{ km} \text{ (MEO)} / 55^\circ 21 , 150 km (MEO) /5 5 ∘ B1 ( 1561.098 MHz 1561.098 \text{ MHz} 1561.098 MHz ), B2, B3
Functional Segments
Every GNSS operates via three interconnected segments:
Space Segment : The constellation of orbiting satellites transmitting PRN codes, carrier signals, and navigation messages (ephemerides, clock bias parameters).
Control Segment : Master Control Station (MCS), ground antennas, and tracking stations monitoring orbits, calculating ephemerides, and uploading clock/orbital corrections.
User Segment : GNSS antennas, field survey receivers, and post-processing software used by geodetic engineers.
2. Pseudorange vs. Carrier-Phase Measurements
GNSS receivers determine distance to satellites using two fundamental measurement types:
Pseudorange (Code) Measurement
Pseudorange ( P P P ) measures time of arrival ( Δ t \Delta t Δ t ) of the satellite's Pseudo-Random Noise (PRN) code: P = ρ + c ⋅ ( d t − d T ) + I + T + ϵ P P = \rho + c \cdot (dt - dT) + I + T + \epsilon_P P = ρ + c ⋅ ( d t − d T ) + I + T + ϵ P
where ρ \rho ρ is true geometric range, c c c is speed of light, d t dt d t is receiver clock error, d T dT d T is satellite clock error, I I I is ionospheric delay, T T T is tropospheric delay, and ϵ P \epsilon_P ϵ P is code noise.
Accuracy : Code-based positioning (standalone GNSS) yields accuracies of 0.5 m 0.5 \text{ m} 0.5 m to 3.0 m 3.0 \text{ m} 3.0 m .
Carrier-Phase Measurement
Carrier-phase ( Φ \Phi Φ ) measures the phase of the continuous sinusoidal carrier wave (e.g. L1 wavelength λ 1 ≈ 19.05 cm \lambda_1 \approx 19.05 \text{ cm} λ 1 ≈ 19.05 cm ): Φ = 1 λ ρ + N + c λ ( d t − d T ) − I λ + T λ + ϵ Φ \Phi = \frac{1}{\lambda} \rho + N + \frac{c}{\lambda}(dt - dT) - \frac{I}{\lambda} + \frac{T}{\lambda} + \epsilon_\Phi Φ = λ 1 ρ + N + λ c ( d t − d T ) − λ I + λ T + ϵ Φ
where N N N is the Integer Phase Ambiguity —the unknown whole number of carrier cycles between satellite and receiver at signal lock-on.
Accuracy : Resolving N N N to correct integers (Fixed Solution) yields millimeter-to-centimeter precision ( 1 mm − 10 mm 1 \text{ mm} - 10 \text{ mm} 1 mm − 10 mm ).
3. Atmospheric Delays and Error Sources
Error Source Magnitude Physical Mechanism Mitigation Strategy
Ionospheric Refraction ( I I I ) 1 m − 50 m 1 \text{ m} - 50 \text{ m} 1 m − 50 m Dispersive delay caused by free electrons in ionosphere ( I ∝ 1 / f 2 I \propto 1/f^2 I ∝ 1/ f 2 ). Dual-Frequency Combination ( L IF L_{\text{IF}} L IF ) cancels 99% of 1st-order delay. Differential processing.
Tropospheric Refraction ( T T T ) 2 m − 25 m 2 \text{ m} - 25 \text{ m} 2 m − 25 m Non-dispersive refraction in lower atmosphere (90% hydrostatic/dry, 10% wet). Standard models (Saastamoinen, Hopfield) + zenith troposphere parameter estimation.
Multipath Effect 0.1 m − 5 m 0.1 \text{ m} - 5 \text{ m} 0.1 m − 5 m Signal reflections from buildings, ground, or structures arriving out of phase. Choke ring antennas, elevation masks ( 15 ∘ 15^\circ 1 5 ∘ ), avoiding reflective surroundings.
Satellite Clock & Orbit 1 m − 3 m 1 \text{ m} - 3 \text{ m} 1 m − 3 m Orbit ephemeris drift and satellite clock instability. Differential double differencing, precise IGS orbits.
Receiver Clock Bias Up to 100 km 100 \text{ km} 100 km equivalent Internal quartz crystal clock offset. Eliminated by double-differencing or estimating as receiver parameter.
4. Dilution of Precision (DOP)
Dilution of Precision (DOP) is a dimensionless scalar factor describing the impact of satellite constellation geometry on positioning accuracy: Positioning Error σ pos = DOP × σ range \text{Positioning Error } \sigma_{\text{pos}} = \text{DOP} \times \sigma_{\text{range}} Positioning Error σ pos = DOP × σ range
Types of DOP
GDOP (Geometric DOP) : Overall geometry combining 3D position and time ( GDOP = PDOP 2 + TDOP 2 \text{GDOP} = \sqrt{\text{PDOP}^2 + \text{TDOP}^2} GDOP = PDOP 2 + TDOP 2 ).
PDOP (Position DOP) : 3D spatial geometry ( PDOP = HDOP 2 + VDOP 2 \text{PDOP} = \sqrt{\text{HDOP}^2 + \text{VDOP}^2} PDOP = HDOP 2 + VDOP 2 ).
HDOP (Horizontal DOP) : 2D horizontal positional strength.
VDOP (Vertical DOP) : Vertical height determination strength (typically 1.5 × 1.5\times 1.5 × to 2 × 2\times 2 × higher than HDOP due to satellites only being visible above horizon).
Rule of Thumb : Ideal surveys require PDOP < 3 \text{PDOP} < 3 PDOP < 3 . If PDOP > 6 \text{PDOP} > 6 PDOP > 6 , satellite geometry is weak, and precision survey observations must be suspended.
5. GNSS Survey Positioning Modes
Positioning Mode Occupation Time Baseline Length Accuracy Level Common Geodetic Applications
Static GNSS 30 min − 4 + hours 30 \text{ min} - 4+ \text{ hours} 30 min − 4 + hours Long ( > 20 km > 20 \text{ km} > 20 km ) ± ( 3 mm + 0.5 ppm ) \pm (3 \text{ mm} + 0.5 \text{ ppm}) ± ( 3 mm + 0.5 ppm ) Primary geodetic control networks (PRS92/PGP), tectonic monitoring.
Rapid Static 5 min − 20 min 5 \text{ min} - 20 \text{ min} 5 min − 20 min Short ( < 10 − 15 km < 10-15 \text{ km} < 10 − 15 km ) ± ( 5 mm + 1 ppm ) \pm (5 \text{ mm} + 1 \text{ ppm}) ± ( 5 mm + 1 ppm ) Secondary control, DENR boundary surveys.
Real-Time Kinematic (RTK) Instantaneous ( 1 − 5 sec 1 - 5 \text{ sec} 1 − 5 sec ) Short ( < 10 km < 10 \text{ km} < 10 km ) ± ( 10 mm + 1 ppm ) \pm (10 \text{ mm} + 1 \text{ ppm}) ± ( 10 mm + 1 ppm ) Boundary stakeout, topographic surveys, engineering construction.
Network RTK (VRS/MAC) Instantaneous ( 1 − 5 sec 1 - 5 \text{ sec} 1 − 5 sec ) Extended ( < 50 km < 50 \text{ km} < 50 km ) ± ( 10 mm + 0.5 ppm ) \pm (10 \text{ mm} + 0.5 \text{ ppm}) ± ( 10 mm + 0.5 ppm ) Continuous CORS networks (e.g. NAMRIA Pag-ASA CORS).
Precise Point Positioning (PPP) 15 min − 1 hour 15 \text{ min} - 1 \text{ hour} 15 min − 1 hour (convergence) Unlimited (Global) ± ( 1 cm − 5 cm ) \pm (1 \text{ cm} - 5 \text{ cm}) ± ( 1 cm − 5 cm ) Remote regional mapping, aerial survey ground control.
- 6. Baseline Processing, Differencing, and Loop Closure
- Differencing Techniques
In differential GNSS processing, carrier-phase observations are differenced to cancel systematic errors:
Single Difference : Formed between two receivers tracking the same satellite. Cancels satellite clock error ( d T dT d T ).
Double Difference : Formed by differencing two single-differences between two receivers and two satellites. Cancels both receiver and satellite clock biases, leaving integer phase ambiguities ( N N N ) as solveable integers.
Triple Difference : Formed by differencing double-differences between consecutive time epochs. Cancels integer phase ambiguities; used primarily for cycle slip detection .
Independent vs. Dependent Baselines
For a session with n n n GNSS receivers observing simultaneously:
Total Baselines Formed : N total = n ( n − 1 ) 2 N_{\text{total}} = \frac{n(n - 1)}{2} N total = 2 n ( n − 1 )
Independent (Non-Trivial) Baselines : N ind = n − 1 N_{\text{ind}} = n - 1 N ind = n − 1
Critical Exam Rule : Processing software must only include independent baselines ( n − 1 n-1 n − 1 ) in network adjustments. Including trivial (dependent) baselines artificially inflates statistical degrees of freedom.
Loop Closure Analysis
A closed loop formed by GNSS baseline vectors must sum to zero: ∑ Δ X = 0 , ∑ Δ Y = 0 , ∑ Δ Z = 0 \sum \Delta X = 0, \quad \sum \Delta Y = 0, \quad \sum \Delta Z = 0 ∑ Δ X = 0 , ∑ Δ Y = 0 , ∑ Δ Z = 0
Misclosure vector magnitude W W W : W = ( ∑ Δ X ) 2 + ( ∑ Δ Y ) 2 + ( ∑ Δ Z ) 2 W = \sqrt{(\sum \Delta X)^2 + (\sum \Delta Y)^2 + (\sum \Delta Z)^2} W = ( ∑ Δ X ) 2 + ( ∑ Δ Y ) 2 + ( ∑ Δ Z ) 2
According to DENR standards (DAO 2007-29), primary control GNSS baseline loops must satisfy relative error tolerances ≤ 1 : 100 , 000 \le 1 : 100,000 ≤ 1 : 100 , 000 or maximum misclosure limit W ≤ 10 mm + 2 ppm × L W \le 10 \text{ mm} + 2 \text{ ppm} \times L W ≤ 10 mm + 2 ppm × L (where L L L is total loop length).