Study guide

6.3 Ratios, Proportions, Mixtures & Work-Time Rates

NTS Graduate Assessment Test GAT General

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: GAT General Overview & Test Administration

1.1 GAT General Test Structure & Logistics 1.2 Time Management & No-Negative-Marking Strategy 1.3 GAT Test Categories & Admissions Alignment

2 Chapter 2: Verbal Reasoning — Vocabulary, Analogies & Word Roots

2.1 Verbal Analogies & Relationship Mapping 2.2 Synonyms, Antonyms & Contextual Meaning 2.3 High-Frequency NTS Vocabulary & Word Roots

3 Chapter 3: Verbal Reasoning — Sentence Completion & Reading Comprehension

3.1 Sentence Completion & Single/Double-Blank Strategies 3.2 Reading Comprehension & Textual Analysis 3.3 Essential English Grammar & Sentence Structure

4 Chapter 4: Verbal Reasoning — Grammar: Tenses, Structure & Conditionals

4.1 Tenses & Aspects I: Simple and Progressive Forms 4.2 Tenses & Aspects II: Perfect Forms, Sequence of Tenses & Voice 4.3 Parts of Speech in Depth: Articles, Prepositions & Determiners 4.4 Conditional Sentences & Hypothetical Structures

5 Chapter 5: Verbal Reasoning — Language Functions & Passage Analysis

5.1 Language Functions & Situational Appropriacy 5.2 Linking Devices, Transitions & Textual Cohesion 5.3 Main Idea, Title Selection & Topic Sentences 5.4 Types of Passage, Author's Purpose & Tone

6 Chapter 6: Quantitative Reasoning — Arithmetic & Number Theory

6.1 Number Properties, Divisibility Rules & Prime Factorization 6.2 Fractions, Decimals, Percentages & Profit-Loss Math 6.3 Ratios, Proportions, Mixtures & Work-Time Rates

7 Chapter 7: Quantitative Reasoning — Business, Consumer & Islamic Financial Mathematics

7.1 Business, Financial & Consumer Mathematics 7.2 Zakat, Ushar & Inheritance Calculations

8 Chapter 8: Quantitative Reasoning — Algebra & Equations

8.1 Algebraic Simplification, Exponent Rules & Radicals 8.2 Linear Equations, Systems & Quadratic Equations 8.3 Inequalities, Absolute Value & Function Basics

9 Chapter 9: Quantitative Reasoning — Matrices, Sequences, Sets & Functions

9.1 Matrices & Determinants 9.2 Arithmetic & Geometric Sequences 9.3 Sets, Venn Relations & Functions

10 Chapter 10: Quantitative Reasoning — Geometry & Measurement

10.1 Lines, Angles, Triangles & Pythagorean Theorem 10.2 Quadrilaterals, Polygons, Circles & Coordinate Geometry 10.3 Perimeter, Area, Surface Area & 3D Volume Calculations

11 Chapter 11: Quantitative Reasoning — Triangle Theorems, Circles & Trigonometry

11.1 Congruent Triangles, Bisectors & the Projection Rule 11.2 Circle Theorems: Chords, Tangents, Arcs & Segments 11.3 Introduction to Trigonometry

12 Chapter 12: Quantitative Reasoning — Data Interpretation & Word Problems

12.1 Data Interpretation: Tables, Bar Charts, Line Graphs & Pie Charts 12.2 Basic Statistics, Permutations, Combinations & Probability 12.3 Quantitative Word Problems & Age/Coin/Venn Diagram Scenarios

13 Chapter 13: Analytical Reasoning — Fundamentals & Ordering Games

13.1 Analytical Reasoning Framework & Diagramming Notation 13.2 Linear Sequencing, Ranking & Slot-Based Puzzles 13.3 Circular Seating Arrangements & Spatial Relative Puzzles

14 Chapter 14: Analytical Reasoning — Grouping, Selection & Matrix Games

14.1 Grouping, Distribution & Bin-Assignment Puzzles 14.2 Selection Games & Team Formation Constraints 14.3 Attribute Matching & Multi-Dimensional Grid Puzzles

15 Chapter 15: Analytical Reasoning — Critical & Deductive Logic

15.1 Logical Arguments, Premise-Conclusion Structure & Unstated Assumptions 15.2 Strengthening, Weakening & Evaluating Logical Arguments 15.3 Formal Deductions, Syllogisms & Scenario-Based Inferences

16 Chapter 16: Analytical Reasoning — Inductive Logic & Causal Inference

16.1 Inductive Logic, Generalisation & Causal Reasoning

6.3 Ratios, Proportions, Mixtures & Work-Time Rates

Key Takeaways Explain This Topic AI

A ratio represents a relative comparison of quantities, and multiple ratios sharing a common term can be combined into a continuous ratio (A:B:C).

In direct proportion, the quotient y/x is constant (y = k x); in inverse proportion, the product x y is constant (x*y = k).

The Rule of Alligation computes the mixing ratio of two ingredients: (Quantity of Cheaper / Quantity of Dearer) = (Price of Dearer - Mean Price) / (Mean Price - Price of Cheaper).

Work done is the product of rate and time (W = R * T); when individuals work together, their individual work rates additively combine.

Average speed for equal distances covered at speeds S1 and S2 is given by the harmonic mean: Average Speed = (2 * S1 * S2) / (S1 + S2).

Last updated: August 2026

Ratios, Proportions, Mixtures & Work-Time Rates

Rate calculations, proportion dynamics, mixture compositions, and work-time scenarios represent some of the most frequent word problem types on the NTS GAT General Quantitative Reasoning section. Although these problems present diverse real-world contexts—such as combining chemical solutions, predicting team construction timelines, or calculating train arrival times—they all rely on unified rate equations ( y = k x y = k x y = k x , W = R ⋅ T W = R \cdot T W = R ⋅ T , D = S ⋅ T D = S \cdot T D = S ⋅ T ). Developing structural mastery over these rate frameworks allows rapid problem translation and error-free execution.

1. Ratio Principles, Proportion Rules & Multi-Ratio Combination

A ratio is a mathematical comparison of two quantities of the same unit, expressed as A : B A : B A : B or A B \frac{A}{B} B A ​ .

Combining Ratios (The LCM Method)

When given separate ratios sharing a common variable (e.g., A : B = a : b A : B = a : b A : B = a : b and B : C = c : d B : C = c : d B : C = c : d ), combine them into a single continuous ratio A : B : C A : B : C A : B : C by finding the LCM of the common term ( B B B ): Multiplier for first ratio = LCM ( b , c ) b \text{Multiplier for first ratio} = \frac{\text{LCM}(b, c)}{b} Multiplier for first ratio = b LCM ( b , c ) ​ Multiplier for second ratio = LCM ( b , c ) c \text{Multiplier for second ratio} = \frac{\text{LCM}(b, c)}{c} Multiplier for second ratio = c LCM ( b , c ) ​

Example: Given A : B = 2 : 3 A : B = 2 : 3 A : B = 2 : 3 and B : C = 4 : 5 B : C = 4 : 5 B : C = 4 : 5 . Common element B B B has values 3 3 3 and 4 4 4 . LCM ( 3 , 4 ) = 12 \text{LCM}(3,4) = 12 LCM ( 3 , 4 ) = 12 .

Scale first ratio by 4 4 4 : A : B = 8 : 12 A : B = 8 : 12 A : B = 8 : 12 .

Scale second ratio by 3 3 3 : B : C = 12 : 15 B : C = 12 : 15 B : C = 12 : 15 .

Combined Ratio: A : B : C = 8 : 12 : 15 A : B : C = 8 : 12 : 15 A : B : C = 8 : 12 : 15 .

Proportion Fundamentals

A proportion asserts that two ratios are equal ( A : B : : C : D ⟺ A B = C D A : B :: C : D \iff \frac{A}{B} = \frac{C}{D} A : B :: C : D ⟺ B A ​ = D C ​ ).

Extremes and Means Rule: The product of extremes equals the product of means: A × D = B × C A \times D = B \times C A × D = B × C

Mean Proportion: The mean proportion between two numbers a a a and b b b is a ⋅ b \sqrt{a \cdot b} a ⋅ b ​ .

Third Proportion: If a : b : : b : c a : b :: b : c a : b :: b : c , then c = b 2 a c = \frac{b^2}{a} c = a b 2 ​ .

Direct vs. Inverse Variation

Variation Type Mathematical Relation Constant Relationship Real-World Example

Direct Proportion y ∝ x ⟹ y = k ⋅ x y \propto x \implies y = k \cdot x y ∝ x ⟹ y = k ⋅ x y 1 x 1 = y 2 x 2 \frac{y_1}{x_1} = \frac{y_2}{x_2} x 1 ​ y 1 ​ ​ = x 2 ​ y 2 ​ ​ Fuel consumed vs distance traveled

Inverse Proportion y ∝ 1 x ⟹ y ⋅ x = k y \propto \frac{1}{x} \implies y \cdot x = k y ∝ x 1 ​ ⟹ y ⋅ x = k x 1 ⋅ y 1 = x 2 ⋅ y 2 x_1 \cdot y_1 = x_2 \cdot y_2 x 1 ​ ⋅ y 1 ​ = x 2 ​ ⋅ y 2 ​ Workers assigned vs days to complete job

2. Weighted Averages, Mixtures & The Rule of Alligation

When combining two solutions or ingredients of different concentrations/prices, compute the final concentration using weighted averages or the Rule of Alligation .

The Rule of Alligation (Cross Matrix)

To find the ratio in which two ingredients of prices/concentrations C C C (cheaper) and D D D (dearer) must be mixed to produce a mixture of mean price/concentration M M M : Quantity of Cheaper ( Q c ) Quantity of Dearer ( Q d ) = D − M M − C \frac{\text{Quantity of Cheaper } (Q_c)}{\text{Quantity of Dearer } (Q_d)} = \frac{D - M}{M - C} Quantity of Dearer ( Q d ​ ) Quantity of Cheaper ( Q c ​ ) ​ = M − C D − M ​ Cheaper Price ( C ) Dearer Price ( D ) ↘ ↙ Mean Price ( M ) ↙ ↘ ( D − M ) ( M − C ) \begin{matrix} \text{Cheaper Price } (C) & & \text{Dearer Price } (D) \\ & \searrow \quad \swarrow & \\ & \text{Mean Price } (M) & \\ & \swarrow \quad \searrow & \\ (D - M) & & (M - C) \end{matrix} Cheaper Price ( C ) ( D − M ) ​ ↘ ↙ Mean Price ( M ) ↙ ↘ ​ Dearer Price ( D ) ( M − C ) ​

Repeated Liquid Replacement Formula

If a vessel initially contains x x x units of pure liquid, and y y y units are repeatedly drawn out and replaced with water n n n times: Final Quantity of Pure Liquid Remaining = x ( 1 − y x ) n \text{Final Quantity of Pure Liquid Remaining} = x \left(1 - \frac{y}{x}\right)^n Final Quantity of Pure Liquid Remaining = x ( 1 − x y ​ ) n

3. Combined Work-Time Rates & Pipe/Cistern Principles

Work problems follow the core rate relationship: Work Done ( W ) = Rate ( R ) × Time ( T ) \text{Work Done } (W) = \text{Rate } (R) \times \text{Time } (T) Work Done ( W ) = Rate ( R ) × Time ( T )

Unit Work Assumption

Set total work to W = 1 W = 1 W = 1 complete job. If a person completes a job in D D D days, their daily work rate is R = 1 D R = \frac{1}{D} R = D 1 ​ .

Combined Work Rates

When two individuals with completion times A A A and B B B work together, their rates add linearly: R together = R A + R B = 1 A + 1 B = A + B A ⋅ B R_{\text{together}} = R_A + R_B = \frac{1}{A} + \frac{1}{B} = \frac{A + B}{A \cdot B} R together ​ = R A ​ + R B ​ = A 1 ​ + B 1 ​ = A ⋅ B A + B ​ T together = A ⋅ B A + B T_{\text{together}} = \frac{A \cdot B}{A + B} T together ​ = A + B A ⋅ B ​

Pipes and Cisterns Variant

Inlet Pipe (Fills): Positive work rate + 1 A + \frac{1}{A} + A 1 ​ .

Outlet Pipe / Leak (Empties): Negative work rate − 1 B - \frac{1}{B} − B 1 ​ .

Net Rate (Both Open): R net = 1 A − 1 B = B − A A ⋅ B R_{\text{net}} = \frac{1}{A} - \frac{1}{B} = \frac{B - A}{A \cdot B} R net ​ = A 1 ​ − B 1 ​ = A ⋅ B B − A ​ .

Loading diagram... Quantitative Rate Problem Taxonomy & Formula Decision Tree

4. Distance, Speed & Time Rates

Motion problems operate on the motion equation: Distance ( D ) = Speed ( S ) × Time ( T ) \text{Distance } (D) = \text{Speed } (S) \times \text{Time } (T) Distance ( D ) = Speed ( S ) × Time ( T )

Unit Conversions

Kilometers per hour (km/h) → Meters per second (m/s) \text{Kilometers per hour (km/h)} \rightarrow \text{Meters per second (m/s)} Kilometers per hour (km/h) → Meters per second (m/s) : Multiply by 5 18 \frac{5}{18} 18 5 ​ .

Meters per second (m/s) → Kilometers per hour (km/h) \text{Meters per second (m/s)} \rightarrow \text{Kilometers per hour (km/h)} Meters per second (m/s) → Kilometers per hour (km/h) : Multiply by 18 5 \frac{18}{5} 5 18 ​ .

Average Speed Principles

General Formula: Average Speed = Total Distance Covered Total Time Taken \text{Average Speed} = \frac{\text{Total Distance Covered}}{\text{Total Time Taken}} Average Speed = Total Time Taken Total Distance Covered ​

Equal Distance Rule: If an object covers distance D D D at speed S 1 S_1 S 1 ​ and returns over the same distance D D D at speed S 2 S_2 S 2 ​ , average speed is the harmonic mean : S avg = 2 ⋅ S 1 ⋅ S 2 S 1 + S 2 S_{\text{avg}} = \frac{2 \cdot S_1 \cdot S_2}{S_1 + S_2} S avg ​ = S 1 ​ + S 2 ​ 2 ⋅ S 1 ​ ⋅ S 2 ​ ​

Relative Speed Mechanics

When two objects move at speeds S 1 S_1 S 1 ​ and S 2 S_2 S 2 ​ :

Moving in Opposite Directions (Towards or Away): Relative Speed = S 1 + S 2 = S_1 + S_2 = S 1 ​ + S 2 ​ .

Moving in Same Direction: Relative Speed = ∣ S 1 − S 2 ∣ = |S_1 - S_2| = ∣ S 1 ​ − S 2 ​ ∣ .

Train Crossing Distances

Train crossing a stationary point object (pole, standing person): Distance = L train = L_{\text{train}} = L train ​ .

Train crossing a platform, bridge, or tunnel of length L platform L_{\text{platform}} L platform ​ : Distance = L train + L platform = L_{\text{train}} + L_{\text{platform}} = L train ​ + L platform ​ .

  • 5. Comprehensive GAT Worked Examples
  • Worked Example 1: Combined Work with Worker Leaving

Question: Worker A can build a wall in 10 10 10 days, while Worker B can build it in 15 15 15 days. Both work together for 4 4 4 days, after which Worker A leaves. How many additional days will Worker B take to complete the remaining wall?

Solution:

Individual daily work rates: R A = 1 10 R_A = \frac{1}{10} R A ​ = 10 1 ​ , R B = 1 15 R_B = \frac{1}{15} R B ​ = 15 1 ​ .

Combined daily rate: R combo = 1 10 + 1 15 = 3 + 2 30 = 5 30 = 1 6 R_{\text{combo}} = \frac{1}{10} + \frac{1}{15} = \frac{3 + 2}{30} = \frac{5}{30} = \frac{1}{6} R combo ​ = 10 1 ​ + 15 1 ​ = 30 3 + 2 ​ = 30 5 ​ = 6 1 ​ .

Work completed in 4 4 4 days together: W done = 4 × 1 6 = 2 3 W_{\text{done}} = 4 \times \frac{1}{6} = \frac{2}{3} W done ​ = 4 × 6 1 ​ = 3 2 ​ .

Remaining work: W rem = 1 − 2 3 = 1 3 W_{\text{rem}} = 1 - \frac{2}{3} = \frac{1}{3} W rem ​ = 1 − 3 2 ​ = 3 1 ​ .

Time needed for B to complete W rem W_{\text{rem}} W rem ​ : T B = W rem R B = 1 / 3 1 / 15 = 15 3 = 5 T_B = \frac{W_{\text{rem}}}{R_B} = \frac{1/3}{1/15} = \frac{15}{3} = 5 T B ​ = R B ​ W rem ​ ​ = 1/15 1/3 ​ = 3 15 ​ = 5 days.

Final Answer: 5 5 5 days.

Worked Example 2: Rule of Alligation Mixture Problem

Question: In what ratio must a rice merchant mix rice costing PKR 80 80 80 /kg with rice costing PKR 110 110 110 /kg to obtain a blend worth PKR 92 92 92 /kg?

Solution:

Cheaper price C = 80 C = 80 C = 80 , Dearer price D = 110 D = 110 D = 110 , Mean price M = 92 M = 92 M = 92 .

Apply Alligation ratio formula: Q c Q d = D − M M − C \frac{Q_c}{Q_d} = \frac{D - M}{M - C} Q d ​ Q c ​ ​ = M − C D − M ​ .

Compute numerator and denominator:

D − M = 110 − 92 = 18 D - M = 110 - 92 = 18 D − M = 110 − 92 = 18 .

M − C = 92 − 80 = 12 M - C = 92 - 80 = 12 M − C = 92 − 80 = 12 .

Ratio = 18 12 = 3 2 → 3 : 2 = \frac{18}{12} = \frac{3}{2} \rightarrow 3 : 2 = 12 18 ​ = 2 3 ​ → 3 : 2 .

Final Answer: 3 : 2 3 : 2 3 : 2 .

Worked Example 3: Train Crossing Platform

Question: A train 200 200 200 meters long traveling at 72 72 72 km/h crosses a railway platform in 25 25 25 seconds. What is the length of the platform?

Solution:

Convert train speed to m/s: 72 × 5 18 = 4 × 5 = 20 72 \times \frac{5}{18} = 4 \times 5 = 20 72 × 18 5 ​ = 4 × 5 = 20 m/s.

Total distance covered in 25 25 25 seconds: D total = Speed × Time = 20 × 25 = 500 D_{\text{total}} = \text{Speed} \times \text{Time} = 20 \times 25 = 500 D total ​ = Speed × Time = 20 × 25 = 500 meters.

Total distance equals train length plus platform length: L train + L platform = 500 L_{\text{train}} + L_{\text{platform}} = 500 L train ​ + L platform ​ = 500 .

200 + L platform = 500 ⟹ L platform = 300 200 + L_{\text{platform}} = 500 \implies L_{\text{platform}} = 300 200 + L platform ​ = 500 ⟹ L platform ​ = 300 meters.

Final Answer: 300 300 300 meters.