Study guide

14.2 Word Problems

Pakistan Air Force GD Pilot Initial Test Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Introduction & Exam Overview

1.1 Current Exam Facts 1.2 Eligibility & Registration 1.3 Test Format & Selection Pipeline

2 Verbal Intelligence: Word Relationships

2.1 Analogies 2.2 Synonyms & Antonyms 2.3 Vocabulary in Context 2.4 Sentence Completion

3 Verbal Intelligence: Series & Coding

3.1 Number Series 3.2 Letter & Alpha-Numeric Series 3.3 Coding-Decoding

4 Verbal Intelligence: Quantitative Logic

4.1 Direction Sense 4.2 Percentages 4.3 Age & Relationship Problems 4.4 Time, Speed & Distance

5 Non-Verbal Intelligence: Patterns

5.1 Pattern & Figure Series 5.2 Odd-One-Out 5.3 Classification

6 Non-Verbal Intelligence: Spatial Reasoning

6.1 Rotation 6.2 Mirror Images 6.3 Matrix Reasoning 6.4 Spatial Reasoning

7 English: Grammar Foundations

7.1 Grammar Essentials 7.2 Tenses 7.3 Prepositions

8 English: Voice, Reported Speech, Correction & Vocabulary

8.1 Active & Passive Voice 8.2 Sentence Correction 8.3 Spelling 8.4 Vocabulary & Comprehension 8.5 Direct & Indirect Speech

9 Physics: Mechanics & Fluids

9.1 Mechanics 9.2 Fluid Dynamics & Bernoulli

10 Physics: Waves, Optics & Modern

10.1 Waves & Sound 10.2 Optics & Light 10.3 Modern Physics

11 Physics: Electromagnetism & Thermodynamics

11.1 Electromagnetism 11.2 Thermodynamics

12 Mathematics: Algebra, Calculus & Logs

12.1 Algebra 12.2 Calculus Basics 12.3 Logarithms

13 Mathematics: Geometry, Trig, Matrices & Vectors

13.1 Geometry 13.2 Trigonometry 13.3 Matrices & Vectors

14 Mathematics: Applied Reasoning

14.1 Percentages & Ratio 14.2 Word Problems

15 General Knowledge: PAF & Aviation

15.1 PAF Organisation 15.2 PAF History 15.3 Aviation Fundamentals

16 General Knowledge: Pakistan & General Science

16.1 Pakistan Geography 16.2 Armed Forces Selection & Basic Science

17 Test-Day Strategy & Selection Pipeline

17.1 Test-Day Strategy 17.2 Later Selection Stages

14.2 Word Problems

Key Takeaways Explain This Topic AI

Read the problem, name the unknown x, and translate each English phrase into an equation before solving.

Combined work rate: 1/a + 1/b = 1/T, so time together T = ab/(a+b); for a drain, subtract its rate.

Simple interest SI = P x R x T / 100; compound interest CI = P(1 + R/100)^T - P.

Probability of an event = favourable outcomes / total outcomes; rolling a prime on a fair die (2, 3, 5) gives 3/6 = 1/2.

0! = 1 by definition; nPr = n!/(n-r)! when order matters, nCr = n!/(r!(n-r)!) when order does not.

Last updated: August 2026

Word Problems

Quick Answer: Translate English to an equation, assign a variable, set up the relationship, solve. Common templates: age, mixture, work, pipes, profit/loss, interest, probability.

Translating English to Equations

The core skill is reading the problem, naming the unknown x , and writing what the words say as mathematics. Many practice word problems fit one of a small set of templates; recognising the template is half the battle.

Age Problems

Worked example: Ali is 3 times as old as Bilal. In 5 years, Ali will be twice as old as Bilal. Find their ages now.

Let Bilal = x now, so Ali = 3x now.

In 5 years: Ali = 3x + 5, Bilal = x + 5.

  • Equation: 3x + 5 = 2(x + 5)
  • 3x + 5 = 2x + 10
  • x = 5

So Bilal is 5 and Ali is 15.

Mixture Problems

Worked example: How much water must be added to 40 L of a 30% salt solution to dilute it to a 20% solution?

The amount of salt stays constant. Salt = 40 x 0.30 = 12 L.

Let water added = w. New total volume = 40 + w.

  • 0.20 x (40 + w) = 12
  • 40 + w = 60

w = 20 L.

Work Problems (Combined Rate)

If worker A finishes a job in a days and worker B in b days, their combined rate is 1/a + 1/b (the fraction of the job done per day). Time working together is:

T = 1 / (1/a + 1/b) = ab / (a + b)

Worked example: A fills a tank in 6 hours, B in 3 hours. Together: 1/6 + 1/3 = 1/6 + 2/6 = 3/6 = 1/2. So T = 1 / (1/2) = 2 hours.

Pipes and Cisterns

Identical to work problems, but a draining pipe has a negative rate.

Worked example: Pipe A fills a cistern in 4 h; pipe B empties it in 6 h. With both open, the net rate is 1/4 - 1/6 = 3/12 - 2/12 = 1/12 per hour. Time to fill = 12 h.

Profit, Loss, and Discount

Cost price (CP) is what the seller paid; selling price (SP) is what the buyer pays.

Profit = SP - CP (when positive); Loss = CP - SP (when SP < CP).

Profit % = Profit / CP x 100. Loss % = Loss / CP x 100. Both are computed on the cost price.

Marked price (MP) minus discount equals selling price. Discount % is computed on the marked price.

Worked example: A shopkeeper marks an item 40% above cost (Rs 500). MP = 500 x 1.40 = Rs 700. He gives a 10% discount on the marked price. SP = 700 x 0.90 = Rs 630. Profit = 630 - 500 = Rs 130. Profit % = 130/500 x 100 = 26%.

Simple and Compound Interest

Simple Interest (SI) = P x R x T / 100. Total amount = P + SI.

Compound Interest (CI) = P x (1 + R/100)^T - P. Total amount = P x (1 + R/100)^T.

Worked example: Rs 10,000 at 10% per year for 3 years.

SI = 10,000 x 10 x 3 / 100 = Rs 3,000. Total = Rs 13,000.

CI = 10,000 x (1.1)^3 - 10,000 = 10,000 x 1.331 - 10,000 = Rs 3,310. Total = Rs 13,310.

The CI exceeds the SI by Rs 310 because each year's interest earns interest in the next year.

Probability

Probability of an event = favourable outcomes / total outcomes.

Worked example: Probability of rolling a prime number on a fair six-sided die. The primes on a die are 2, 3, and 5 - three favourable outcomes out of six. P = 3/6 = 1/2.

Factorials, Permutations, Combinations

0! = 1 by definition (the empty product). This is a favourite test fact.

nPr = n! / (n - r)! - order matters (arrangements).

nCr = n! / (r! x (n - r)!) - order does not matter (selections).

Worked example: In how many ways can 3 cadets be selected from 5 for a flight? Order does not matter, so use combinations: 5C3 = 5! / (3! x 2!) = (120) / (6 x 2) = 10.

Common Word-Problem Templates

  • Type Key relationship Equation
  • Age Now: A = kB; later: A + t = m(B + t) linear in one variable
  • Mixture Quantity of solute is constant c1 x V1 = c2 x (V1 + x)
  • Work Rate = 1 / time 1/a + 1/b = 1/T
  • Pipes Fill positive, drain negative 1/a - 1/b = 1/T
  • Profit/Loss On cost price (SP - CP) / CP x 100
  • Simple Interest On principal P x R x T / 100
  • Compound Interest On principal, compounded P x (1 + R/100)^T - P
  • Probability Favourable / total n(E) / n(S)
  • Strategy Checklist

Read the whole problem once before writing anything.

Name the unknown with a single variable.

Write the equation that mirrors the English sentence.

Solve and check the answer makes sense in the story (a negative age is a red flag).

Loading diagram... Word-Problem Solving Flow