Study guide

2.1 Assessment Plan, Stakeholders, Budget & Resources

ASIS Physical Security Professional PSP

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current PSP Exam Facts 1.2 Eligibility, Fees, Scheduling & Recertification 1.3 Experience-Based Testing, References & Study Approach

2 Assessment Planning & Methods

2.1 Assessment Plan, Stakeholders, Budget & Resources 2.2 Inside-Out, Outside-In, Site-Specific & Functional Models 2.3 Qualitative vs Quantitative Assessment Methods 2.4 Standards, Regulations, Codes & Where to Find Them

3 Asset Identification & Valuation

3.1 Asset Types, Terminology, Value, Criticality & Loss Impact 3.2 Valuing Tangible and Intangible Assets for Operations 3.3 Criticality, Key Areas & Loss-Impact Prioritization

4 Threats, Hazards & Operating Environment

4.1 Criminal, Terrorist, Insider & Sociopolitical Threats 4.2 Natural Disasters, Accidental & Cyber-Physical Hazards 4.3 Geography, Crime, Socioeconomics & Existing Countermeasures 4.4 Neighbors, Competitors, Legal, Reputation & Supply Chain

5 Vulnerability Assessment & Surveys

5.1 Surveys, Interviews, Incident Data, Crime Stats & Benchmarking 5.2 Evaluating Technology, Personnel & Procedures 5.3 Plans, Schematics & Environmental/Site Factors

6 Risk Analysis & Countermeasure Selection

6.1 Risk Analysis Strategies, Principles & Data Interpretation 6.2 Threat/Hazard–Vulnerability Pairing & Loss Event Profiles 6.3 Matching Countermeasures to Specific Risks 6.4 ROI, Total Cost of Ownership, Privacy, PII & Life Safety

7 Performance Requirements & Security Concepts

7.1 Design Constraints & Incorporating Risk Analysis 7.2 CPTED, Defense-in-Depth, 4 Ds & Security Terminology 7.3 Operational, Functional, Performance Requirements, Codes & Metrics

8 Structural Measures & CPTED Application

8.1 Fences, Gates & Perimeter Barriers 8.2 Blast Mitigation, Ballistic Protection & Hostile Vehicle Mitigation 8.3 Lighting, Locks, Doors, Windows & Glazing 8.4 Applying CPTED to Site Planning & Landscaping

9 Electronic Security Systems

9.1 Electronic Access Control Architecture & Credentials 9.2 Biometrics, Electrified Locks, Anti-Passback & Mantraps 9.3 Video Surveillance Design, Storage & Analytics 9.4 Intrusion Detection Sensors & Alarm Communications

10 Screening, Communications, Power & Networks

10.1 Personnel, Package & Vehicle Screening and Visitor/Vendor Policy 10.2 Mass Notification, Audio Comms, Consoles & Central Stations 10.3 Data Storage, Retention, PII & Physical Network Security 10.4 Primary/Backup Power and Copper, Fiber & Wireless Transmission

11 System Design & Project Documentation

11.1 Pre-Design, Schematic, Construction Docs, Calculations & Drawings 11.2 CSI MasterFormat, Owner Standards & AIA MasterSpec 11.3 Systems Integration, Scheduling, Cost Estimation & Value Engineering

12 Pre-Bid Meetings & Solicitation Packages

12.1 Site Visits, RFIs, Substitution Requests & Pre-Bid Meetings 12.2 RFP, RFQ, IFB & Sole Source 12.3 SOW, Timelines, Costs, Personnel & Documentation 12.4 Evaluation Criteria, Technical Compliance & Contracting Ethics

13 Procurement Planning & Vendor Selection

13.1 Procurement Process for Security Goods & Services 13.2 Interviews, Due Diligence, References & Selection 13.3 Project Management Functions in Procurement

14 Installation, Commissioning & Acceptance

14.1 Installation & Inspection Techniques 14.2 Commissioning & Implementation-Phase Integration 14.3 FAT, SAT & Final Acceptance Testing Criteria 14.4 Punch Lists, As-Builts, Config Management & End-User Training

15 Security Personnel Requirements

15.1 Roles, Limits, Proprietary vs Contract Staffing 15.2 Recruiting, KPIs, Discipline & Professional Development 15.3 Post Orders, Uniforms/Equipment & Non-Security Awareness

16 Lifecycle Maintenance & Program Evaluation

16.1 Preventive/Corrective Maintenance, Calibration, Service Agreements & Warranties 16.2 Upgrade Training, System Evaluation & Replacement

2.1 Assessment Plan, Stakeholders, Budget & Resources

Key Takeaways Explain This Topic AI

Write purpose, scope, and a critical-asset list before any walkthrough; a camera full of doors is not an assessment.

Name real stakeholders—facilities, IT, HR, legal, EHS, operations, and an executive sponsor—plus escort and photography constraints.

Budget the assessment itself: assessor labor, travel, after-hours access, meters, and drawings—not the future fence or camera project.

The plan is a charter. The survey report is the later findings product with observations, ratings, and recommended measures.

Starting fieldwork with no charter or asset list is the professional trap that misses pharmacies, fuel fills, and trailer-seal processes.

Last updated: September 2026

Assessment Plan Before Fieldwork

Physical security assessments do not begin at the first locked door. They begin when someone writes why the work exists, what is in scope, which assets are too important to discover by accident, who must participate, and what the assessor may spend on time and tools. Independent ExamFinch teaching for published PSP Domain 1 tasks treats that document as the assessment plan . The later survey report is a different product: it records observations, risk judgments, and recommended measures. Mixing those two products is how teams produce a photo album with no decision.

Trap: walking with no charter

The professional trap is a walkthrough that starts because a director said to start walking the hospital tomorrow. Without a charter or asset list, the assessor follows whatever is convenient: the pretty lobby, the unlocked conference room, the faded warehouse sign. Meanwhile the pharmacy anteroom, the generator fuel fill, and the unattended trailer-seal process never appear in the notes. A camera full of doors is not an assessment. Write the plan first, get the sponsor to accept it, then walk.

Purpose in one sentence the sponsor can defend

Purpose is the reason an executive will later fund or reject the recommendations. Typical drivers include a board request after a neighboring warehouse burglary, an insurer's condition of coverage, due diligence for a data-center colocation lease, a hospital wing that changes occupancy, or a shrink problem operations can already see in cycle counts. Purpose changes method. An insurer may care about forcible-entry paths and documented patrols. A hospital expansion may care about delayed-egress hardware, infant protection, and pharmacy control. A campus research lab may care about trusted insiders walking out with prototypes. If you cannot state the purpose, you cannot choose a model, a night survey, or even whether a light meter belongs in the kit.

Scope is a boundary, not a slogan

Name parcels, buildings, operating hours, and exclusions. State whether tenant clinics, telecom meet-me rooms, public sidewalks, contractor lots, and off-site third-party warehouses are in or out. State whether the assessor will work daylight, after hours, or both. A data center whose cages are customer-controlled needs an explicit rule: full interior survey with escort, observation from the aisle, or exclusion. A hospital medical office building owned by a separate legal entity needs the same honesty. Ambiguous scope produces busy fieldwork and a report nobody can implement.

Critical assets belong in the plan, not in a day-two surprise

Criticality is a planning input. Sit with operations before the site visit and list assets whose loss, delay, contamination, or disclosure would stop the mission or create intolerable harm. Then schedule the rooms and yards those assets live in. Do not wait until the second day on site to ask what actually matters here.

Facility type Critical assets to list in the plan Key areas the plan should schedule

Hospital Pharmacy vault and anteroom, infant or pediatric units, emergency-department behavioral rooms, generators and fuel, medical-gas manifolds, records rooms Ambulance bay, loading dock, sterile processing, roof mechanical, stairwells used for delayed egress

Data center Raised-floor halls, generator plant, fuel oil, UPS rooms, customer cages, media stores, network operations center Loading dock and mantrap, visitor lobby, CRAH galleries, exterior yard, roof hatches

Warehouse High-value cage, shipping office, trailer keys, yard inventory, hazmat lockup Perimeter gates, driver lounge, empty-trailer lot, emergency exits, roof access

Corporate campus Executive suite, research notebooks and lab servers, data closets, mailroom, any childcare or fitness space on site Vehicle approaches, loading docks, after-hours entries, connecting tunnels or skybridges

The plan should also list existing policies and records the team will pull before walking: access-control exception reports, visitor logs, incident and shrink reports, lock-and-key inventories, contractor badging rules, workplace-violence procedures, and any prior survey. Those documents tell you where to spend hours. A warehouse that already knows a large share of shrink is outbound deserves dock time, not a lobby critique. A hospital with repeated after-hours tailgating at the staff entrance deserves a night survey, not another daylight photo of the main revolving door.

Stakeholders who can enable or stop the work

Physical security assessments are not a solo security-department activity. Name people, not only department titles. An unnamed stakeholder is an unscheduled escort, a confiscated camera, or a report that dies in legal review.

Stakeholder Why they are in the plan Typical contribution What breaks if they are omitted

Executive sponsor Authorizes access, overtime, and later funding decisions Charter signature and conflict resolution Site staff treat the assessor as a tourist

Facilities / plant operations Owns doors, power, roofs, and work orders Floor plans, roof access, mechanical-room escorts Missed generators, hatches, and after-hours paths

IT / OT Owns cameras, badge systems, and often building-management interfaces Badge extracts, camera maps, health reports Dead cameras recorded as coverage

Human resources Owns workplace-violence, terminations, and many contractor relationships Termination checklist and staffing patterns Insider paths and true occupancy ignored

Legal / privacy Bounds photography, patient information, and privileged spaces Rules for photos in clinical or legal areas Unusable evidence or a stopped survey

EHS / life safety Owns egress, hazardous materials, and drills Occupancy, fire-door locations, chemical inventory Security ideas that violate egress

Operations Owns the mission: nursing, fulfillment, trading, compute Asset criticality and peak-hour constraints Assessments of rooms that are empty at 10:00 and packed at 02:00

Tenants or customers May control cages, clinics, or leased floors Escort rules and confidentiality limits Incomplete data-hall or pharmacy observations

The plan should state escort rules , photography limits , union or clinical constraints , and who receives the draft . A hospital that forbids flash photography in a neonatal unit can still allow documented notes. A data center may forbid phones in the white space and require sketches. Those constraints belong in the plan so the method remains defensible when someone later asks how you missed a room you were never allowed to enter.

Budget the assessment itself, not the future fence

Budget the assessment , not the countermeasure program. Line items usually include assessor labor for planning, on-site work, analysis, and reporting; travel and lodging; after-hours differentials; rental or purchase of documentation tools; and optional specialists such as a locksmith, lighting designer, or blast consultant. A two-building corporate campus with after-hours coverage is not a one-day job. A hospital that requires an escort on every unit will burn labor faster than a warehouse with a single operations manager.

Do not hide travel. A regional assessor flying to a remote data center still needs a day to review floor plans and a day to write. Do not treat we already have cameras as zero cost: someone must pull video, maps, and device-health reports. A realistic plan states assumptions: number of buildings, nights on site, and whether a lighting survey is included. Do not put the recommended fence replacement or camera project in this budget. Remedy costs, if requested at all, belong in the later report as a rough order of magnitude after the facts exist.

Equipment and source documents the plan should name

Pack or arrange: a camera or phone used only as the site allows; a measuring wheel or laser distance meter; a light meter for exterior and interior lighting notes; a tape measure for door and hardware observations; a compass or mapping method for orientation; PPE the site requires; and printed or digital floor plans with a markup method. For hospitals, confirm whether devices must be wiped and whether patient information can appear in photo backgrounds. For data centers, confirm whether personal phones are banned in the white space.

The plan should request as-builts , door schedules , sequence-of-operations for delayed egress , camera inventories , and lighting as-builts . If those drawings do not exist, the plan should say the survey will capture field measurements instead of treating missing drawings as a surprise on Tuesday morning.

Plan output versus survey-report output

Assessment plan (before fieldwork) Survey report (after fieldwork)

Purpose, scope, critical assets, stakeholders, schedule Observations, allowed photos or sketches, measured lighting, hardware notes

  • Methods and models to be used Risk ratings, scenarios, and recommended measures
  • Budget for assessor time, tools, and travel Rough-order costs for remedies only if the sponsor asked for them
  • Constraints: photos, escorts, privacy, union rules Residual-risk discussion after proposed measures
  • Success criteria for the engagement Prioritized findings the sponsor can fund

Worked picture: at a suburban hospital, the plan might say the purpose is to support a new behavioral-health annex; the critical assets are the pharmacy, infant unit, emergency department, and generator plant; stakeholders include facilities, nursing, EHS, privacy, and the chief operating officer; the budget covers three days plus one night and a light-meter rental; photography is forbidden in patient-care areas. The survey report, written later, is where you record that the pharmacy anteroom door does not latch, that the fuel fill is unobserved, and that a delayed-egress device has a taped-over request-to-exit. Those findings cannot be invented during planning, and the charter cannot be invented after the walk.

Get the sponsor to accept purpose, scope, assets, stakeholders, schedule, resources, and method. Then walk.

Loading diagram... Assessment plan versus unchartered walkthrough