Study guide
2.1 Macroscopic Traffic Stream Models & Fundamental Diagram (q = k × u)
Professional Traffic Operations Engineer PTOE
Track your progress as you read
Finished sections get a check mark.
1 Introduction & PTOE Exam Overview
1.1 The PTOE Credential: Certification Overview & Industry Value 1.2 Core Industry Reference Standards in Traffic Operations 1.3 Study Guide Architecture, Blueprint Alignment & Exam-Day Strategy
2 Domain 1: Traffic Flow Theory & Fundamental Concepts
2.1 Macroscopic Traffic Stream Models & Fundamental Diagram (q = k × u) 2.2 Microscopic Traffic Characteristics & Car-Following Models 2.3 Hydrodynamic Shockwave Analysis & Traffic Queuing Models
3 Domain 1: Highway & Interrupted Flow Capacity Analysis (HCM)
3.1 Basic Freeway Segments & Multilane Highways (HCM 7th Edition) 3.2 Freeway Weaving, Merging, and Diverging Segments 3.3 Signalized Intersection Capacity & Delay Modeling (HCM)
4 Domain 1: Managed Lanes, Transit Priority, TSMO & Travel Demand Management
4.1 Unsignalized Intersections (TWSC, AWSC) & Modern Roundabouts Capacity 4.2 Managed Lanes, HOV/HOT Operations, & Ramp Metering 4.3 Transit Priority & Multimodal Signal Operations (TSP) 4.4 Transportation Systems Management and Operations (TSMO) & Regional ITS 4.5 Travel Demand Management (TDM) & Trip Reduction Strategies
5 Domain 2: Geometric Design Controls, Criteria, & Sight Distance
5.1 Functional Classification, Design Controls, & Context-Sensitive Design 5.2 Sight Distance Principles: Stopping, Decision, & Passing (AASHTO) 5.3 Horizontal Alignment, Curve Radius, & Superelevation Design
6 Domain 2: Roadway Cross-Sections & Access Management
6.1 Vertical Alignment: Tangent Grades, Crest & Sag Vertical Curves 6.2 Roadway Cross-Section Elements & AASHTO Clear Zone Concepts 6.3 Access Management Principles & Driveway Spacing Criteria
7 Domain 2: Intersection & Interchange Geometric Design
7.1 Intersection Channelization, Turn Lane Design, & Storage Length 7.2 Interchange Configurations & Operational Comparisons (Diamond, Cloverleaf, SPUI) 7.3 Diverging Diamond Interchanges (DDI / DCMI) Operational Principles 7.4 Modern Roundabout Geometric Design Elements & Fastest Paths 7.5 Multimodal Geometric Design: Pedestrian Facilities, Bikeways, & ADA
8 Domain 3: Traffic Safety Concepts, Human Factors, & Safe System
8.1 The Safe System Approach & Vision Zero Principles 8.2 Human Factors, Driver Expectancy, & Perception-Reaction Time (PRT) 8.3 Crash Collision Typologies & Statistical Rate Formulations (MEV, MVMT)
9 Domain 3: Highway Safety Manual (HSM) Predictive Methods & EB
9.1 Highway Safety Manual (HSM) Predictive Methodology & Part C Models 9.2 Safety Performance Functions (SPFs) & Crash Modification Factors (CMFs) 9.3 Empirical Bayes (EB) Method & Regression-to-the-Mean (RTM) Correction 9.4 Economic Appraisal of Safety Projects (Benefit-Cost Analysis, NPV)
10 Domain 3: Safety Countermeasures & Road Safety Audits (RSA)
10.1 Roadway Departure Countermeasures (Rumble Strips, Safety Edge, Barriers) 10.2 Intersection Safety Countermeasures (Sight Triangles, Left-Turn Calming, Roundabouts) 10.3 Vulnerable Road User (VRU) Safety Countermeasures (PHB/HAWK, RRFB, Curb Extensions) 10.4 Road Safety Audits (RSAs) & Systemic Safety Analysis
11 Domain 4: Traffic Signal Warrants & Isolated Timing (MUTCD/ITE)
11.1 MUTCD Traffic Signal Warrants (Warrants 1 through 9) 11.2 Signal Phasing Principles & NEMA Dual-Ring Operations 11.3 Clearance Intervals (ITE Kinematic Equations) & Pedestrian Timing Parameters
12 Domain 4: Signal Coordination, Networks, & ATSPMs
12.1 Actuated Signal Controller Parameters (Passage Time, Gap Reduction, Max Recall) 12.2 Traffic Signal Coordination: Bandwidth, Offsets, & Progression Models 12.3 Traffic Responsive & Adaptive Traffic Signal Control Systems (ASCS) 12.4 Automated Traffic Signal Performance Measures (ATSPMs) & High-Resolution Data
13 Domain 4: Signing, Markings, Work Zones, Grade Crossings & School Zones (MUTCD)
13.1 MUTCD Regulatory, Warning, & Guide Signs Principles and Placement 13.2 Sign Retroreflectivity Standards & Nighttime Visual Maintenance 13.3 Longitudinal Pavement Markings, Delineators, & Object Markers 13.4 Temporary Traffic Control (TTC) & Work Zone Safety (MUTCD Part 6) 13.5 Highway-Rail Grade Crossings: Warning Devices, Preemption & Storage 13.6 School Zone Traffic Control & Student Walk Route Planning
14 Domain 5: Traffic Studies & Applied Statistical Methods
14.1 Applied Statistical Distributions & Sample Size Determination 14.2 Spot Speed Studies, 85th Percentile Speed, & 10-mph Pace 14.3 Volume Count Methodologies & Expansion Factoring (ADT, AADT, PHF)
15 Domain 5: Traffic Impact Studies & Trip Generation (ITE)
15.1 Travel Time, Delay, & Intersection Queue Studies 15.2 Parking Supply, Duration, & Turnover Analysis 15.3 Traffic Impact Study (TIS) Scoping, Horizon Years, & Mitigation 15.4 ITE Trip Generation Handbook: Average Rates vs. Regression Equations
16 Domain 6: Environmental, Institutional, Ethics & Equity Issues
16.1 Vehicle Emissions, Air Quality Conformity, & Decarbonization 16.2 Traffic Noise Modeling (TNM) & Noise Abatement Criteria (NAC) 16.3 Long-Range Transportation Planning & the NEPA Environmental Review 16.4 Professional Engineering Ethics, Tort Liability, & Risk Management 16.5 Transportation Equity, Access & Multimodal Community Considerations
2.1 Macroscopic Traffic Stream Models & Fundamental Diagram (q = k × u)
Key Takeaways Explain This Topic AI
The fundamental macroscopic traffic flow equation q = k × u_s strictly requires Space Mean Speed (harmonic mean), not Time Mean Speed (arithmetic mean); Wardrop's identity proves u_t = u_s + (σ_s² / u_s), meaning TMS always overestimates SMS whenever speed variance exists.
Greenshields' linear speed-density formulation u(k) = u_f(1 - k/k_j) yields a symmetric parabolic flow-density curve with maximum flow (capacity) q_max = (u_f × k_j)/4 occurring at critical density k_c = k_j/2 and critical speed u_c = u_f/2.
Greenberg's logarithmic model u(k) = u_c ln(k_j/k) excels in high-density congested regimes with critical density k_c = k_j/e, whereas Underwood's exponential model u(k) = u_f exp(-k/k_c) fits low-density free-flow regimes with critical speed u_c = u_f/e.
The Fundamental Diagram divides traffic operations into two distinct operational regimes: uncongested (stable flow, k < k_c, positive slope dq/dk > 0) and congested (forced flow / oversaturated, k > k_c, negative slope dq/dk < 0).
Last updated: August 2026
2.1 Macroscopic Traffic Stream Models & Fundamental Diagram (q = k × u)
PTOE Exam Focus: The macroscopic fundamental relationship q = k × u ˉ s q = k \times \bar{u}_s q = k × u ˉ s forms the bedrock of traffic operations engineering. Expect quantitative exam problems testing the mathematical derivation of Space Mean Speed from spot speed datasets, the application of Wardrop's speed variance identity, and the calculation of critical capacity parameters ( u f , k j , k c , u c , q max u_f, k_j, k_c, u_c, q_{\max} u f , k j , k c , u c , q m a x ) across Greenshields, Greenberg, and Underwood speed-density formulations.
1. Fundamental Traffic Stream Parameters
Macroscopic traffic flow theory treats vehicular traffic as a continuous compressible fluid, aggregating individual vehicle trajectories into three primary stream parameters:
Flow Rate ( q q q or V V V ): The equivalent hourly rate at which vehicles pass a fixed point on a lane or roadway during a specified time interval less than one hour (typically 15 minutes): q = N T q = \frac{N}{T} q = T N
Where N N N is the observed vehicle count over observation period T T T (hours). On the PTOE exam, hourly volume ( V V V ) is expanded to peak 15-minute flow rate ( v v v ) using the Peak Hour Factor ( P H F PHF P H F ): v = V P H F = V 4 × V 15 v = \frac{V}{PHF} = \frac{V}{4 \times V_{15}} v = P H F V = 4 × V 15 V
Density ( k k k or K K K ): The number of vehicles occupying a given length of lane or roadway at a single instant in time (spatial snapshot), expressed in vehicles per mile per lane (veh/mi/ln) or vehicles per kilometer per lane (veh/km/ln): k = N L k = \frac{N}{L} k = L N
Where N N N is the number of vehicles concurrently present along roadway segment length L L L . Density can also be estimated from electronic presence loop detector occupancy ( O c c Occ O cc , the percentage of time the detection zone is occupied): k = 5280 × O c c 100 × ( L v + L d ) k = \frac{5280 \times Occ}{100 \times (L_v + L_d)} k = 100 × ( L v + L d ) 5280 × O cc
Where L v L_v L v is average vehicle length (typically 18–20 ft) and L d L_d L d is the detector loop length (typically 6 ft).
Speed ( u u u or v v v ): The rate of vehicle motion, expressed in miles per hour (mph) or kilometers per hour (km/h). Because speed varies among individual drivers, macroscopic stream analysis requires precise statistical averaging.
2. Space Mean Speed vs. Time Mean Speed (Wardrop's Variance Identity)
A frequent trap on the PTOE exam is confusing Time Mean Speed (TMS) with Space Mean Speed (SMS) . The fundamental equation of traffic flow ( q = k × u q = k \times u q = k × u ) holds strictly and exclusively for Space Mean Speed.
Mathematical Definitions
Time Mean Speed ( u ˉ t \bar{u}_t u ˉ t ): The arithmetic mean of spot speeds of all vehicles passing a specific roadway cross-section during a given time interval: u ˉ t = 1 N ∑ i = 1 N u i \bar{u}_t = \frac{1}{N} \sum_{i=1}^{N} u_i u ˉ t = N 1 i = 1 ∑ N u i
TMS reflects what a roadside radar gun, lidar, or single inductive loop detector records over time.
Space Mean Speed ( u ˉ s \bar{u}_s u ˉ s ): The harmonic mean of spot speeds, representing the average speed of all vehicles occupying a given roadway segment over a spatial length L L L : u ˉ s = L t ˉ = L 1 N ∑ i = 1 N t i = N ∑ i = 1 N 1 u i \bar{u}_s = \frac{L}{\bar{t}} = \frac{L}{\frac{1}{N}\sum_{i=1}^N t_i} = \frac{N}{\sum_{i=1}^N \frac{1}{u_i}} u ˉ s = t ˉ L = N 1 ∑ i = 1 N t i L = ∑ i = 1 N u i 1 N
Where t i = L / u i t_i = L / u_i t i = L / u i is the individual travel time of vehicle i i i across segment length L L L .
Wardrop's Variance Identity
In 1952, John Glen Wardrop formulated the mathematical proof establishing the exact structural relationship between TMS and SMS: u ˉ t = u ˉ s + σ s 2 u ˉ s \bar{u}_t = \bar{u}_s + \frac{\sigma_s^2}{\bar{u}_s} u ˉ t = u ˉ s + u ˉ s σ s 2
Where σ s 2 \sigma_s^2 σ s 2 is the sample variance of vehicle speeds about the Space Mean Speed: σ s 2 = 1 N ∑ i = 1 N ( u i − u ˉ s ) 2 \sigma_s^2 = \frac{1}{N} \sum_{i=1}^N (u_i - \bar{u}_s)^2 σ s 2 = N 1 i = 1 ∑ N ( u i − u ˉ s ) 2
Engineering Implications:
Because σ s 2 ≥ 0 \sigma_s^2 \ge 0 σ s 2 ≥ 0 , Time Mean Speed is always greater than or equal to Space Mean Speed ( u ˉ t ≥ u ˉ s \bar{u}_t \ge \bar{u}_s u ˉ t ≥ u ˉ s ).
u ˉ t = u ˉ s \bar{u}_t = \bar{u}_s u ˉ t = u ˉ s if and only if all vehicles travel at identical speeds (zero speed variance, σ s 2 = 0 \sigma_s^2 = 0 σ s 2 = 0 ).
Faster vehicles cross a point detector more frequently than slower vehicles relative to their spatial presence, causing TMS to place disproportionate weight on high-speed vehicles. SMS weights vehicles inversely by travel time, correctly capturing spatial density.
Substituting TMS into q = k × u q = k \times u q = k × u will systematically overestimate actual roadway flow and capacity.
3. The Fundamental Diagram of Traffic Flow
The macroscopic behavior of a traffic stream is governed by the continuous interrelationship between q q q , k k k , and u u u . Plotting these pairwise produces the three curves of the Fundamental Diagram : Flow (q) Speed (u) Flow (q)
- ^ ^ ^
- q_max| * (Capacity) u_f|* q_max| * (Capacity)
- | * * | * | * *
- | * * | * | * *
- | * * | * | * *
- 0+-------------*->k 0+-------*---->k 0+-------------*->u
- 0 k_c k_j 0 k_c k_j 0 u_c u_f
- (Flow-Density) (Speed-Density) (Flow-Speed)
Key Boundary Parameters:
Free-Flow Speed ( u f u_f u f ): The theoretical speed of vehicles as density approaches zero ( k → 0 k \to 0 k → 0 ). Drivers travel unhindered by other traffic.
Jam Density ( k j k_j k j ): The maximum physical density of a roadway segment where vehicles are bumper-to-bumper in complete gridlock ( u = 0 u = 0 u = 0 , q = 0 q = 0 q = 0 ). Typical passenger car jam density is 180 – 240 veh/mi/ln 180\text{--}240\text{ veh/mi/ln} 180 – 240 veh/mi/ln ( 40 – 50 ft/veh 40\text{--}50\text{ ft/veh} 40 – 50 ft/veh ).
Critical Density ( k c k_c k c or k m k_m k m ): The density at which the roadway delivers its absolute maximum flow rate (capacity, q max q_{\max} q m a x ).
Critical Speed ( u c u_c u c or u m u_m u m ): The Space Mean Speed corresponding to maximum capacity flow.
Capacity ( q max q_{\max} q m a x or C C C ): Maximum sustainable stream throughput: q max = k c × u c q_{\max} = k_c \times u_c q m a x = k c × u c .
Operational Regimes:
Uncongested / Stable / Undersaturated Regime ( k < k c k < k_c k < k c , u > u c u > u_c u > u c ):
Flow increases as density increases (positive slope: d q d k > 0 \frac{dq}{dk} > 0 d k d q > 0 ).
Individual drivers maintain speed autonomy; perturbations dampen out.
Congested / Forced Flow / Oversaturated Regime ( k > k c k > k_c k > k c , u < u c u < u_c u < u c ):
Flow decreases as density increases (negative slope: d q d k < 0 \frac{dq}{dk} < 0 d k d q < 0 ).
Operating under stop-and-go queue conditions; disturbances propagate upstream as shockwaves.
4. Single-Regime Macroscopic Stream Formulations
Traffic engineers utilize mathematical models relating speed and density to predict flow performance. The three foundational single-regime models are Greenshields, Greenberg, and Underwood.
A. Greenshields Model (Linear Speed-Density)
Bruce Greenshields (1935) proposed a direct linear decline in speed with increasing density: ν ( k ) = u f ( 1 − k k j ) \nu(k) = u_f \left(1 - \frac{k}{k_j}\right) ν ( k ) = u f ( 1 − k j k )
Multiplying by density k k k yields the parabolic flow-density relationship: q ( k ) = k ⋅ u ( k ) = u f ( k − k 2 k j ) q(k) = k \cdot u(k) = u_f \left(k - \frac{k^2}{k_j}\right) q ( k ) = k ⋅ u ( k ) = u f ( k − k j k 2 )
Differentiating with respect to k k k and setting d q d k = 0 \frac{dq}{dk} = 0 d k d q = 0 identifies the critical capacity parameters: d q d k = u f ( 1 − 2 k k j ) = 0 ⟹ k c = k j 2 \frac{dq}{dk} = u_f \left(1 - \frac{2k}{k_j}\right) = 0 \implies k_c = \frac{k_j}{2} d k d q = u f ( 1 − k j 2 k ) = 0 ⟹ k c = 2 k j ν c = u ( k c ) = u f ( 1 − k j / 2 k j ) = u f 2 \nu_c = u(k_c) = u_f \left(1 - \frac{k_j/2}{k_j}\right) = \frac{u_f}{2} ν c = u ( k c ) = u f ( 1 − k j k j /2 ) = 2 u f q max = k c ⋅ u c = ( k j 2 ) ( u f 2 ) = u f k j 4 q_{\max} = k_c \cdot u_c = \left(\frac{k_j}{2}\right)\left(\frac{u_f}{2}\right) = \frac{u_f k_j}{4} q m a x = k c ⋅ u c = ( 2 k j ) ( 2 u f ) = 4 u f k j
Properties: Perfectly symmetric parabola centered at k c = k j / 2 k_c = k_j/2 k c = k j /2 . Parabolic flow-speed relationship: q ( u ) = k j ( u − u 2 / u f ) q(u) = k_j(u - u^2/u_f) q ( u ) = k j ( u − u 2 / u f ) . Simple and widely used for planning, but underestimates speeds at low densities and overestimates speeds near jam density.
B. Greenberg Model (Logarithmic Speed-Density)
Harold Greenberg (1959) derived a logarithmic model based on 1D fluid hydrodynamic continuity: ν ( k ) = u c ln ( k j k ) \nu(k) = u_c \ln\left(\frac{k_j}{k}\right) ν ( k ) = u c ln ( k k j )
Corresponding flow-density equation: q ( k ) = u c ⋅ k ln ( k j k ) q(k) = u_c \cdot k \ln\left(\frac{k_j}{k}\right) q ( k ) = u c ⋅ k ln ( k k j )
Setting d q d k = 0 \frac{dq}{dk} = 0 d k d q = 0 : d q d k = u c ln ( k j k ) − u c = 0 ⟹ ln ( k j k c ) = 1 ⟹ k c = k j e ≈ 0.368 k j \frac{dq}{dk} = u_c \ln\left(\frac{k_j}{k}\right) - u_c = 0 \implies \ln\left(\frac{k_j}{k_c}\right) = 1 \implies k_c = \frac{k_j}{e} \approx 0.368 k_j d k d q = u c ln ( k k j ) − u c = 0 ⟹ ln ( k c k j ) = 1 ⟹ k c = e k j ≈ 0.368 k j q max = u c k c = u c k j e q_{\max} = u_c k_c = \frac{u_c k_j}{e} q m a x = u c k c = e u c k j
Properties: Excellent fit for dense, congested urban freeway and tunnel traffic (such as the Lincoln Tunnel data from which it was calibrated). However, as density approaches zero ( k → 0 k \to 0 k → 0 ), speed mathematically approaches infinity ( u → ∞ u \to \infty u → ∞ ), meaning it cannot model free-flow speed.
C. Underwood Model (Exponential Speed-Density)
Robin Underwood (1961) addressed Greenberg's low-density limitation with an exponential formulation: ν ( k ) = u f exp ( − k k c ) \nu(k) = u_f \exp\left(-\frac{k}{k_c}\right) ν ( k ) = u f exp ( − k c k )
Corresponding flow-density equation: q ( k ) = u f ⋅ k exp ( − k k c ) q(k) = u_f \cdot k \exp\left(-\frac{k}{k_c}\right) q ( k ) = u f ⋅ k exp ( − k c k )
Setting d q d k = 0 \frac{dq}{dk} = 0 d k d q = 0 : d q d k = u f exp ( − k k c ) ( 1 − k k c ) = 0 ⟹ k = k c \frac{dq}{dk} = u_f \exp\left(-\frac{k}{k_c}\right) \left(1 - \frac{k}{k_c}\right) = 0 \implies k = k_c d k d q = u f exp ( − k c k ) ( 1 − k c k ) = 0 ⟹ k = k c ν c = u ( k c ) = u f e − 1 = u f e ≈ 0.368 u f \nu_c = u(k_c) = u_f e^{-1} = \frac{u_f}{e} \approx 0.368 u_f ν c = u ( k c ) = u f e − 1 = e u f ≈ 0.368 u f q max = k c u c = u f k c e q_{\max} = k_c u_c = \frac{u_f k_c}{e} q m a x = k c u c = e u f k c
Properties: Models free-flow conditions with high accuracy ( u = u f u = u_f u = u f at k = 0 k = 0 k = 0 ). However, speed approaches zero only asymptotically as k → ∞ k \to \infty k → ∞ , meaning the model lacks a finite jam density ( k j = ∞ k_j = \infty k j = ∞ ).
5. Macroscopic Model Comparison Matrix
Model Name Speed-Density u ( k ) u(k) u ( k ) Flow-Density q ( k ) q(k) q ( k ) Critical Density k c k_c k c Critical Speed u c u_c u c Capacity q max q_{\max} q m a x Ideal Application Regime Major Limitation
Greenshields u f ( 1 − k / k j ) u_f(1 - k/k_j) u f ( 1 − k / k j ) u f ( k − k 2 / k j ) u_f(k - k^2/k_j) u f ( k − k 2 / k j ) k j / 2 k_j / 2 k j /2 u f / 2 u_f / 2 u f /2 u f k j 4 \frac{u_f k_j}{4} 4 u f k j General arterials, macro planning Oversimplified linear assumption
Greenberg u c ln ( k j / k ) u_c \ln(k_j / k) u c ln ( k j / k ) u c k ln ( k j / k ) u_c k \ln(k_j / k) u c k ln ( k j / k ) k j / e ≈ 0.368 k j k_j / e \approx 0.368 k_j k j / e ≈ 0.368 k j u c u_c u c u c k j e \frac{u_c k_j}{e} e u c k j Congested freeways, tunnels u → ∞ u \to \infty u → ∞ as k → 0 k \to 0 k → 0 (no finite u f u_f u f )
Underwood u f exp ( − k / k c ) u_f \exp(-k / k_c) u f exp ( − k / k c ) u f k exp ( − k / k c ) u_f k \exp(-k / k_c) u f k exp ( − k / k c ) k c k_c k c u f / e ≈ 0.368 u f u_f / e \approx 0.368 u_f u f / e ≈ 0.368 u f u f k c e \frac{u_f k_c}{e} e u f k c Sparse rural freeways k j → ∞ k_j \to \infty k j → ∞ (no finite jam density)
Northwestern (Drake) u f exp [ − 1 2 ( k / k c ) 2 ] u_f \exp\left[-\frac{1}{2}(k/k_c)^2\right] u f exp [ − 2 1 ( k / k c ) 2 ] u f k exp [ − 1 2 ( k / k c ) 2 ] u_f k \exp\left[-\frac{1}{2}(k/k_c)^2\right] u f k exp [ − 2 1 ( k / k c ) 2 ] k c k_c k c u f / e ≈ 0.607 u f u_f / \sqrt{e} \approx 0.607 u_f u f / e ≈ 0.607 u f u f k c e \frac{u_f k_c}{\sqrt{e}} e u f k c Multilane highways Bell curve inflection at k = k c k = k_c k = k c
6. Worked PTOE Calculation Example
Problem Statement:
A macroscopic traffic study on a 3-lane suburban freeway segment calibrates a linear Greenshields speed-density model defined as: ν = 64 − 0.40 k \nu = 64 - 0.40 k ν = 64 − 0.40 k
Where speed u u u is in mph and density k k k is in veh/mi/ln.
Determine the free-flow speed ( u f u_f u f ) and jam density ( k j k_j k j ).
Calculate the critical density ( k c k_c k c ), critical speed ( u c u_c u c ), and per-lane capacity ( q max q_{\max} q m a x ).
If a loop detector currently records a lane flow of 1800 veh/hr/ln 1800\text{ veh/hr/ln} 1800 veh/hr/ln at a speed of 30 mph 30\text{ mph} 30 mph , determine the operating regime (congested vs. uncongested).
Solution:
Boundary Parameters:
At k = 0 k = 0 k = 0 , u f = 64 mph u_f = 64\text{ mph} u f = 64 mph .
At u = 0 u = 0 u = 0 , 0 = 64 − 0.40 k j ⟹ k j = 64 0.40 = 160 veh/mi/ln 0 = 64 - 0.40 k_j \implies k_j = \frac{64}{0.40} = 160\text{ veh/mi/ln} 0 = 64 − 0.40 k j ⟹ k j = 0.40 64 = 160 veh/mi/ln .
Critical Values:
Critical density: k c = k j 2 = 160 2 = 80 veh/mi/ln k_c = \frac{k_j}{2} = \frac{160}{2} = 80\text{ veh/mi/ln} k c = 2 k j = 2 160 = 80 veh/mi/ln .
Critical speed: u c = u f 2 = 64 2 = 32 mph u_c = \frac{u_f}{2} = \frac{64}{2} = 32\text{ mph} u c = 2 u f = 2 64 = 32 mph .
Maximum lane capacity: q max = k c × u c = 80 × 32 = 2560 veh/hr/ln q_{\max} = k_c \times u_c = 80 \times 32 = 2560\text{ veh/hr/ln} q m a x = k c × u c = 80 × 32 = 2560 veh/hr/ln .
Operating Regime Analysis:
At operating speed u = 30 mph u = 30\text{ mph} u = 30 mph , operating density is: k = q u = 1800 veh/hr/ln 30 mph = 60 veh/mi/ln k = \frac{q}{u} = \frac{1800\text{ veh/hr/ln}}{30\text{ mph}} = 60\text{ veh/mi/ln} k = u q = 30 mph 1800 veh/hr/ln = 60 veh/mi/ln
Comparing to critical values:
k = 60 veh/mi/ln < k c = 80 veh/mi/ln k = 60\text{ veh/mi/ln} < k_c = 80\text{ veh/mi/ln} k = 60 veh/mi/ln < k c = 80 veh/mi/ln
Operating speed u = 30 mph u = 30\text{ mph} u = 30 mph is less than u c = 32 mph u_c = 32\text{ mph} u c = 32 mph , but checking consistency with the model: u ( 60 ) = 64 − 0.40 ( 60 ) = 40 mph u(60) = 64 - 0.40(60) = 40\text{ mph} u ( 60 ) = 64 − 0.40 ( 60 ) = 40 mph .
Since the observed speed ( 30 mph 30\text{ mph} 30 mph ) is below the critical speed ( 32 mph 32\text{ mph} 32 mph ) for the measured flow, the traffic stream is operating in the congested (forced flow / oversaturated) regime.