Study guide

3.2 Process Safety Information

RETA CIRO Certified Industrial Refrigeration Operator Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts 1.2 Test-Day Tools, On-Screen References, and Calculators 1.3 CIRO vs CARO and the RETA Credential Path

2 IIAR and ASHRAE Standards

2.1 IIAR 2 and ASHRAE 15 Machinery-Room Design 2.2 IIAR 6 Inspection, Testing, and Maintenance 2.3 IIAR 7 Operating Procedures and IIAR 9 Existing Systems

3 OSHA Process Safety Management

3.1 PSM Applicability and the 14 Elements 3.2 Process Safety Information 3.3 Process Hazard Analysis 3.4 Operating Procedures, Training, Contractors, and PSSR

4 Integrity, Change, and Emergency Programs

4.1 Mechanical Integrity and Pressure-Relief Valves 4.2 Hot Work and Management of Change 4.3 Incident Investigation and Compliance Audits 4.4 Emergency Planning, EPA RMP, and the General Duty Clause

5 Ammonia Hazards and Machinery-Room Safety

5.1 Ammonia Properties, SDS, and Exposure Limits 5.2 Detection, Ventilation, and Emergency Shutdown 5.3 Eyewash, PPE, Materials Compatibility, and ASME B31.5 Piping

6 Three-Phase Motors and Starting

6.1 Three-Phase Motors, Nameplates, and FLA 6.2 Wye-Delta and Reduced-Voltage Starting 6.3 Voltage Unbalance 6.4 Single-Phasing, Rotation Checks, and Screw Compressors

7 Ladder Diagrams, VFDs, and Power

7.1 Ladder Diagrams, Seal-In Circuits, and Safety Interlocks 7.2 Variable-Frequency Drives in Refrigeration Plants 7.3 Power Factor, kW/HP, Overloads, and Machinery-Room Electrical Classification

8 Pressure-Enthalpy Diagrams and Properties

8.1 Reading the Ammonia P-h Diagram 8.2 Saturated Properties, psia vs psig, and Saturation Temperature 8.3 Superheat, Subcooling, and Flash Gas

9 Capacity, COP, and Efficiency

9.1 Enthalpy, Latent Heat, and Net Refrigerating Effect 9.2 COP, Tons of Refrigeration, and Heat Rejection Ratio 9.3 BHP/ton, Isentropic Efficiency, and Theoretical Discharge Temperature

10 Heat Transfer and Rejection

10.1 Q = UAΔT, LMTD, and Heat Exchangers 10.2 Condensers, Approach, and Wet-Bulb Limits 10.3 Specific Volume, Mass Flow, and Compression Ratio

11 System Screens and Performance KPIs

11.1 Using CIRO Operating Screens (normal vs abnormal) 11.2 kW/ton, BHP/ton, and KPI Dashboards 11.3 Power Cost, Demand Charges, and the Cost of Poor Operation

12 Approach, TD, and Oil-Cooling Diagnostics

12.1 Condenser Approach and Non-Condensables 12.2 Evaporator TD and Superheat Diagnostics 12.3 Thermosiphon Oil Coolers and Oil-Temperature Trends

13 Floating Head, Sequencing, and Slide Valves

13.1 Floating Head Pressure 13.2 Compressor Sequencing 13.3 Screw Slide-Valve Unloading and Feedback

14 Expansion Devices and DX Feed

14.1 Solenoid and TXV Pairs, Equalizers, and Hunting 14.2 Electronic Expansion Valves 14.3 Hand Expansion Valves and DX Coil Distribution

15 Pressure-Regulating and Pilot-Operated Valves

15.1 Back-Pressure Regulators 15.2 Crankcase Pressure Regulators and Gas-Pumped CPR Systems 15.3 Pilot-Operated Valves and High-to-Low Relief Regulators

16 Floats, Checks, Solenoid Failures, and Piping

16.1 High-Side Floats and High-Pressure Receivers 16.2 Check Valves, Discharge Checks, and Defrost Check Valves 16.3 Solenoid Failure Modes, Strainers, King Valves, and Ammonia Piping

17 Flooded and Liquid-Overfeed Basics

17.1 Flooded vs DX Advantages and Charge 17.2 Overfeed Ratios and Recirculation Rate 17.3 Surge Drums, Separators, and Wet Suction Returns

18 Pumps, Oil Management, and Level Control

18.1 Mechanical Liquid Pumps and NPSH 18.2 Oil Drain Pots, Rectifiers, and Thermosiphon Oil Management 18.3 Level Glasses, Float Switches, and High/Low Cutouts 18.4 Liquid-Line Sizing and High-/Low-Pressure Receivers

19 Two-Stage Compression and Intercoolers

19.1 Why Two-Stage: Compression Ratio and Discharge Temperature 19.2 Interstage Pressure Selection (Geometric Mean) 19.3 Open Flash Intercoolers 19.4 Closed Intercoolers and Two-Stage Troubleshooting

20 Cascade and Secondary Coolant Systems

20.1 NH3/CO2 Cascade Designs 20.2 Glycol and Brine Secondary Coolants (pH, freeze point, inhibitors) 20.3 Why Secondary Coolants and Glycol Testing/Maintenance

21 Evaporator Defrost

21.1 Hot-Gas Defrost Sequence 21.2 Defrost Drain Pressure-Relief Regulators and Soft Equalization 21.3 Time/Temperature Termination, Drain Pans, Water and Electric Defrost

3.2 Process Safety Information

Key Takeaways Explain This Topic AI

Process safety information (PSI) under 1910.119(d) is compiled in three buckets: hazards of the highly hazardous chemicals, technology of the process, and equipment in the process

Chemical information must include toxicity, PELs, physical data, corrosivity, reactivity, thermal and chemical stability, and hazardous effects of mixing materials that could foreseeably occur

Technology information must include a block-flow or simplified process-flow diagram, process chemistry, maximum intended inventory, safe upper and lower limits, and an evaluation of the consequences of deviation

Equipment information must include materials of construction, P&IDs, electrical classification, relief-system design and design basis, ventilation design, design codes, material and energy balances for processes built after May 26, 1992, and safety systems

The employer must document that equipment complies with RAGAGEP — recognized and generally accepted good engineering practices — and must still demonstrate that older equipment remains designed, maintained, inspected, tested, and operating in a safe manner

Last updated: September 2026

Process safety information (PSI) is 1910.119(d) . OSHA wants a compiled, written body of facts before you rely on procedures and PHAs. If the P&ID is wrong, the HAZOP of “what happens if this valve is closed” is theater. If nobody recorded maximum intended inventory , you cannot even prove whether the process is over the 10,000 lb anhydrous threshold. Treat PSI as the source documents a CIRO uses when training a new operator, briefing a contractor, or arguing that a vessel is still inside its design.

OSHA groups PSI into three required sets. Memorize the three headings; then memorize the bullet lists under each. On the exam, distractors mix a chemical fact into the equipment list or bury consequences of deviation in the contractor element. Keep the buckets clean.

Bucket 1 — Hazards of the highly hazardous chemicals

For each highly hazardous chemical in the process, PSI must include:

Required chemical fact Ammonia-plant content

Toxicity information Corrosive to eyes, skin, respiratory tract; severe inhalation injury as concentration rises toward IDLH

Permissible exposure limits OSHA Table Z-1 PEL 50 ppm (8-hour TWA). Label NIOSH REL or ACGIH TLV (commonly 25 ppm TWA / 35 ppm STEL) as those authorities , not as the OSHA PEL

Physical data Vapor pressure vs. temperature, boiling point at atmospheric pressure, density/specific gravity of liquid and vapor, flammable range ~15–28% by volume

Corrosivity data Attacks copper, zinc, and galvanized steel; compatible families are typically steel, iron, aluminum, and stainless — piping detail belongs with ASME B31.5 in a later chapter

Reactivity data Reacts with acids, halogens, and some metals; oil and water contamination issues in the circuit

Thermal and chemical stability data Stable as a refrigerant in normal industrial service; still document stability so the PHA is not guessing

Hazardous effects of inadvertent mixing What happens if water, oil types, brine, CO2 (in cascade plants), or cleaning chemicals mix in a vessel or drain header

An SDS is a start , not a complete PSI chemical file by itself. SDS pages often omit plant-specific mixing (for example, overfeeding oil into a recirculator, or pulling a dirty water-wash into an evaporator drain). OSHA’s list is process-specific . If a foreseeable mix can happen in your engine room, the hazardous effect belongs in PSI.

IDLH 300 ppm and the OSHA-cited 20 ppm odor threshold belong in the toxicity/physical picture operators carry. Odor at 20 ppm is below the 50 ppm PEL and far below 300 ppm IDLH — which is why “I would smell it” is not an engineering control. Detectors, ventilation, and PPE are designed against numbers in this file, not against someone’s nose.

Bucket 2 — Technology of the process

Technology information answers: what is this plant doing with ammonia, how much is in it, and what happens when it leaves the safe envelope? Required items:

A block flow diagram or simplified process flow diagram. This is not the full P&ID. It is the one-page story: compressors, condensers, high-pressure receiver, recirculators or DX coils, suction accumulators, intercoolers on two-stage plants, and the major liquid and vapor paths. CIRO exam screens make more sense when you can sketch this from memory.

Process chemistry. For a single-refrigerant ammonia plant this is the refrigeration cycle — evaporation, compression, condensation, expansion — not an organic-synthesis recipe. For NH3/CO2 cascade or glycol secondary loops, chemistry includes why those fluids are there and how they interface with ammonia.

Maximum intended inventory. The largest ammonia mass the process is intended to hold, including vessels, packages, and piping that are part of the process. This number is compared to the 10,000 lb TQ. It is also the number emergency planners use when they describe a worst-case or alternative release in RMP (later chapter). Do not substitute “what we think is in it today after a leak last winter.”

Safe upper and lower limits for temperatures, pressures, flows, or compositions. Examples: high-side pressure relative to relief settings and condenser capability; vessel level bands on a surge drum; oil-temperature limits on a screw package; minimum suction pressure that still keeps motor amps and discharge temperature inside design. Limits must be written , not tribal knowledge.

An evaluation of the consequences of deviations , including those affecting employee safety and health . If level goes high in a recirculator, liquid carries over and wrecks a compressor — and can throw liquid into relief paths. If discharge pressure exceeds design, relief valves lift and a release can fill the machinery room. If someone bypasses a high-level cutout, the PHA will later ask why the administrative control was the only layer. Consequences of deviation are how PSI talks to the PHA.

Bucket 3 — Equipment in the process

Equipment information is the iron and the safeties:

Required equipment item What a CIRO should be able to find

Materials of construction Vessel and piping specs consistent with ammonia (no copper/brass/galvanized in the ammonia stream)

Piping and instrument diagrams (P&IDs) Valves, controls, vents, drains, reliefs, instrumentation — kept as-built

Electrical classification Machinery-room and process-area classification that matches the flammable-range hazard

  • Relief system design and design basis Why each PRV is sized and set as it is; where it discharges
  • Ventilation system design Emergency and normal machinery-room ventilation capacity and actuation

Design codes and standards employed The codes the plant claims — IIAR 2 and ASHRAE 15 for rooms, ASME for vessels, B31.5 for piping

Material and energy balances Required for processes built after May 26, 1992

Safety systems Interlocks, ammonia detection, emergency shutdown, high-level cutouts, oil-pressure safeties, suppression if used

Material and energy balances for processes built after May 26, 1992 is a favorite exam detail because the date is the original PSM effective-design line. Older plants still need the rest of the equipment list. They do not get a free pass on P&IDs or relief design basis just because the engine room predates 1992.

Safety systems in PSI are the list and function of interlocks and detection — “what is installed and what it is supposed to do.” Operating procedures later tell the operator how to run when those systems trip. Mechanical integrity later proves they still work. Do not dump the full IIAR 2 detector-setpoint lesson into PSI; do record that detectors and emergency ventilation exist and what design they follow.

RAGAGEP

The employer must document that equipment complies with recognized and generally accepted good engineering practices (RAGAGEP) . For industrial ammonia, RAGAGEP typically includes ANSI/IIAR 2 (ammonia machinery-room and system design), ASHRAE 15 (general refrigeration safety), ASME boiler and pressure-vessel rules for vessels, ASME B31.5 for refrigeration piping, and ANSI/IIAR 6 for inspection, testing, and maintenance of existing equipment. You already have an IIAR/ASHRAE chapter; here the point is the PSM hook : those standards are how you demonstrate RAGAGEP, not optional reading.

For existing equipment designed to codes, standards, or practices no longer in general use , OSHA does not require a time machine. The employer must determine and document that the equipment is designed, maintained, inspected, tested, and operating in a safe manner . That sentence is why a 1980s vessel without a modern IIAR 2 nameplate is not automatically illegal — and why “grandfathered, so we never inspect it” is not RAGAGEP. Mechanical integrity (later) is how you keep that documentation alive.

PSI must stay true

PSI is not a binder that is right on commissioning day and decorative thereafter. When piping, setpoints, inventory, or safety systems change enough to alter the facts in the three buckets, management of change (later chapter) and PSSR (this chapter’s last section) exist to force an update before ammonia is introduced or reintroduced. A CIRO who finds a field-installed bypass that is not on the P&ID has found a PSI failure, not a clever workaround.

Walk a real package with the three-bucket test: Can you point to toxicity and PEL? Can you point to a flow diagram, max inventory, and safe limits with written consequences? Can you point to materials, P&IDs, electrical class, relief basis, ventilation, codes, balances if post-1992, and the safety-system list? If any answer is “in someone’s head,” PSI is incomplete, and every element downstream is standing on sand.