Study guide

6.3 Voltage Unbalance

RETA CIRO Certified Industrial Refrigeration Operator Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts 1.2 Test-Day Tools, On-Screen References, and Calculators 1.3 CIRO vs CARO and the RETA Credential Path

2 IIAR and ASHRAE Standards

2.1 IIAR 2 and ASHRAE 15 Machinery-Room Design 2.2 IIAR 6 Inspection, Testing, and Maintenance 2.3 IIAR 7 Operating Procedures and IIAR 9 Existing Systems

3 OSHA Process Safety Management

3.1 PSM Applicability and the 14 Elements 3.2 Process Safety Information 3.3 Process Hazard Analysis 3.4 Operating Procedures, Training, Contractors, and PSSR

4 Integrity, Change, and Emergency Programs

4.1 Mechanical Integrity and Pressure-Relief Valves 4.2 Hot Work and Management of Change 4.3 Incident Investigation and Compliance Audits 4.4 Emergency Planning, EPA RMP, and the General Duty Clause

5 Ammonia Hazards and Machinery-Room Safety

5.1 Ammonia Properties, SDS, and Exposure Limits 5.2 Detection, Ventilation, and Emergency Shutdown 5.3 Eyewash, PPE, Materials Compatibility, and ASME B31.5 Piping

6 Three-Phase Motors and Starting

6.1 Three-Phase Motors, Nameplates, and FLA 6.2 Wye-Delta and Reduced-Voltage Starting 6.3 Voltage Unbalance 6.4 Single-Phasing, Rotation Checks, and Screw Compressors

7 Ladder Diagrams, VFDs, and Power

7.1 Ladder Diagrams, Seal-In Circuits, and Safety Interlocks 7.2 Variable-Frequency Drives in Refrigeration Plants 7.3 Power Factor, kW/HP, Overloads, and Machinery-Room Electrical Classification

8 Pressure-Enthalpy Diagrams and Properties

8.1 Reading the Ammonia P-h Diagram 8.2 Saturated Properties, psia vs psig, and Saturation Temperature 8.3 Superheat, Subcooling, and Flash Gas

9 Capacity, COP, and Efficiency

9.1 Enthalpy, Latent Heat, and Net Refrigerating Effect 9.2 COP, Tons of Refrigeration, and Heat Rejection Ratio 9.3 BHP/ton, Isentropic Efficiency, and Theoretical Discharge Temperature

10 Heat Transfer and Rejection

10.1 Q = UAΔT, LMTD, and Heat Exchangers 10.2 Condensers, Approach, and Wet-Bulb Limits 10.3 Specific Volume, Mass Flow, and Compression Ratio

11 System Screens and Performance KPIs

11.1 Using CIRO Operating Screens (normal vs abnormal) 11.2 kW/ton, BHP/ton, and KPI Dashboards 11.3 Power Cost, Demand Charges, and the Cost of Poor Operation

12 Approach, TD, and Oil-Cooling Diagnostics

12.1 Condenser Approach and Non-Condensables 12.2 Evaporator TD and Superheat Diagnostics 12.3 Thermosiphon Oil Coolers and Oil-Temperature Trends

13 Floating Head, Sequencing, and Slide Valves

13.1 Floating Head Pressure 13.2 Compressor Sequencing 13.3 Screw Slide-Valve Unloading and Feedback

14 Expansion Devices and DX Feed

14.1 Solenoid and TXV Pairs, Equalizers, and Hunting 14.2 Electronic Expansion Valves 14.3 Hand Expansion Valves and DX Coil Distribution

15 Pressure-Regulating and Pilot-Operated Valves

15.1 Back-Pressure Regulators 15.2 Crankcase Pressure Regulators and Gas-Pumped CPR Systems 15.3 Pilot-Operated Valves and High-to-Low Relief Regulators

16 Floats, Checks, Solenoid Failures, and Piping

16.1 High-Side Floats and High-Pressure Receivers 16.2 Check Valves, Discharge Checks, and Defrost Check Valves 16.3 Solenoid Failure Modes, Strainers, King Valves, and Ammonia Piping

17 Flooded and Liquid-Overfeed Basics

17.1 Flooded vs DX Advantages and Charge 17.2 Overfeed Ratios and Recirculation Rate 17.3 Surge Drums, Separators, and Wet Suction Returns

18 Pumps, Oil Management, and Level Control

18.1 Mechanical Liquid Pumps and NPSH 18.2 Oil Drain Pots, Rectifiers, and Thermosiphon Oil Management 18.3 Level Glasses, Float Switches, and High/Low Cutouts 18.4 Liquid-Line Sizing and High-/Low-Pressure Receivers

19 Two-Stage Compression and Intercoolers

19.1 Why Two-Stage: Compression Ratio and Discharge Temperature 19.2 Interstage Pressure Selection (Geometric Mean) 19.3 Open Flash Intercoolers 19.4 Closed Intercoolers and Two-Stage Troubleshooting

20 Cascade and Secondary Coolant Systems

20.1 NH3/CO2 Cascade Designs 20.2 Glycol and Brine Secondary Coolants (pH, freeze point, inhibitors) 20.3 Why Secondary Coolants and Glycol Testing/Maintenance

21 Evaporator Defrost

21.1 Hot-Gas Defrost Sequence 21.2 Defrost Drain Pressure-Relief Regulators and Soft Equalization 21.3 Time/Temperature Termination, Drain Pans, Water and Electric Defrost

6.3 Voltage Unbalance

Key Takeaways Explain This Topic AI

NEMA MG-1 percent voltage unbalance equals the maximum deviation of any line-to-line voltage from the three-voltage average, divided by that average, times 100.

Worked 480 / 472 / 488 V example: average 480 V, maximum deviation 8 V, unbalance 8/480 × 100 = 1.67%.

Approximate extra temperature rise is 2 × (unbalance percent) squared — about 5.6% extra rise at 1.67% unbalance, 18% at 3%, 50% at 5%.

NEMA expects voltage unbalance at the motor near 1% or less; derate or stop rather than run a motor on a large unbalance.

Current unbalance is several times the voltage unbalance, so windings overheat even when the average of the three voltages still looks like 480 V.

Last updated: September 2026

A three-phase motor is designed for three equal voltages 120° apart . When the three line-to-line voltages are not equal, the rotating field is distorted. Some windings carry more than their share of current, copper losses rise with the square of that current, and the stator and rotor run hotter than the nameplate temperature rise. The motor may still turn, the compressor may still make tons, and a single-amp clamp on one phase may even look “near FLA.” The damage is the hot phase you did not watch.

CIRO electricity items expect the NEMA MG-1 style definition, a calculator, and the judgment to derate or stop — not a vague sense that “unbalance is bad.”

The NEMA percent-unbalance formula

Measure the three line-to-line voltages at the motor terminals under load : V_AB, V_BC, V_CA.

Compute the average : V_avg = (V_AB + V_BC + V_CA) / 3.

Find the maximum deviation from that average (the largest of |V_AB − V_avg|, |V_BC − V_avg|, |V_CA − V_avg|).

Percent voltage unbalance = (maximum deviation / V_avg) × 100.

Use line-to-line voltages, not line-to-neutral, unless you are diagnosing a grounded-wye distribution problem. A motor does not run on phase-to-ground numbers. Measure under load; a loose lug often looks fine at no load and unbalances only when current produces a voltage drop.

NEMA MG-1 guidance is that voltage unbalance at the motor should not exceed about 1% . That is a tight number. Utility supplies, long feeders, and single-phase lighting on a shared transformer make 1% a maintenance target, not a decoration on a poster.

Worked example 1 — 480 V, 472 V, 488 V

A screw-compressor motor is running. Terminal voltages are 480 V, 472 V, and 488 V .

V_avg = (480 + 472 + 488) / 3 = 1440 / 3 = 480 V

Deviations from 480 V:

  • |480 − 480| = 0 V
  • |472 − 480| = 8 V
  • |488 − 480| = 8 V
  • Maximum deviation = 8 V
  • Percent unbalance = (8 / 480) × 100 = 1.67%

That already exceeds the 1% NEMA preference. It is not a spectacular-looking set of voltages — 472 and 488 still “look like 480” if you only glance at one meter — but the formula does not care about glances.

Heating effect: about 2 × (unbalance %)²

A widely used NEMA-related rule of thumb is that the increase in temperature rise is approximately:

extra temperature-rise percent ≈ 2 × (percent voltage unbalance)²

For the 1.67% example:

  • (1.67)² ≈ 2.79
  • 2 × 2.79 ≈ 5.6% extra temperature rise

That does not mean the winding is only 5.6% hotter than ambient. It means the motor’s temperature rise above its cooling baseline grows by about 5.6%. On a motor that was already near class limits because of a dirty TEFC fan, high machinery-room ambient, or operation in the service factor, 5.6% is enough to eat insulation life.

The square law is the operational point. Unbalance does not hurt in a straight line:

1% unbalance → 2 × 1 = 2% extra rise (near the NEMA target).

2% unbalance → 2 × 4 = 8% extra rise.

3% unbalance → 2 × 9 = 18% extra rise.

4% unbalance → 2 × 16 = 32% extra rise.

5% unbalance → 2 × 25 = 50% extra rise.

A motor that looked fine at 1% is not “twice as unhappy” at 2%; it is on a curve that gets steep quickly. Do not run with a large unbalance and hope FLA on the average of the three ammeters will save you.

Approximate extra temperature rise vs voltage unbalance (2 × unbalance% squared)

Worked example 2 — a worse bus, same average

Same motor, voltages 468 V, 480 V, and 492 V .

V_avg = (468 + 480 + 492) / 3 = 480 V (the average still looks perfect).

Maximum deviation = |468 − 480| = 12 V (492 is also 12 V off).

  • Percent unbalance = (12 / 480) × 100 = 2.5%
  • Extra temperature rise ≈ 2 × (2.5)² = 2 × 6.25 = 12.5%

Push it further to 462 V, 480 V, and 498 V :

V_avg is still 480 V . Maximum deviation = 18 V. Percent unbalance = (18 / 480) × 100 = 3.75% . Extra rise ≈ 2 × (3.75)² = 2 × 14.06 = 28% . The average meter on the MCC could still be labeled 480 V. The windings would not agree.

Current unbalance and derating

Voltage unbalance of a few percent typically produces current unbalance several times larger — commonly on the order of 6 to 10 times the voltage-unbalance percentage, depending on motor design and load. A 2.5% voltage unbalance can mean on the order of 15% to 25% current unbalance. The hot winding’s I²R loss is then far above nameplate, while the average of the three clamp readings can still sit near FLA. Always record all three amperes, not one.

Current unbalance uses the same style of formula: (maximum deviation from average current / average current) × 100. If you find large current unbalance with small voltage unbalance, look for a motor-side problem (internal winding issue, high-resistance connection at T-leads). If both voltage and current are unbalanced, start on the supply : tap settings, a failing transformer, a high-resistance lug, a deteriorating fuse or starter pole, or heavy single-phase loads on one leg of the same bank.

NEMA MG-1 publishes a derating curve for unbalanced voltage. The allowed horsepower falls as unbalance rises; by several percent unbalance the motor is no longer a full-HP machine, and operation around 5% is not a normal running condition. A CIRO supervisor does not need to memorize every point on that curve. The field rule is:

Stay near 1% or better at the motor.

If unbalance is a few percent, reduce load (slide valve, number of fans, pump throttle) and fix the supply .

  • If unbalance is large, stop the motor before you cook a 300 HP stator. Do not “watch it through the shift.”
  • Where unbalance comes from in a refrigeration plant

Loose or corroded lugs on one phase at the disconnect, starter, or motor box (voltage drop on that conductor under load).

A fuse or starter pole that is high resistance but not yet open (the next section’s single-phasing is the limit of this).

Unbalanced utility or plant transformer taps; an open-delta bank that was never a good idea for motors.

Large single-phase lighting or receptacles piled on one leg of a shared transformer.

Long feeders of unequal length or a damaged conductor.

Operator sequence: clamp all three voltages at the motor under load, compute percent unbalance, clamp all three currents, then work upstream toward the MCC and the transformer. Tighten and infrared the connections. Do not pad overload settings to hide a hot phase. Unbalance protection on some electronic overloads will trip on current unbalance; older heater overloads may not, which is why the supervisor’s meter still matters.

A 300 HP screw at 93% efficiency is already turning roughly 241 kW of electrical input into heat plus shaft work. Extra I²R from unbalance is heat that the insulation and the oil-cooled package did not budget. Fix the bus; do not ask the windings to derate themselves in silence.