Study guide
3.2 Time & Work; Pipes & Cisterns
RRB Group D Level 1
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the RRB Group D (Level 1) Exam 1.2 CBT Pattern, Negative Marking & Score Normalization 1.3 How to Use This Study Guide
2 Mathematics — Number Foundations & Arithmetic
2.1 Number System, BODMAS, Decimals & Fractions 2.2 LCM, HCF & Square Roots 2.3 Ratio & Proportion 2.4 Percentages 2.5 Profit, Loss & Discount
3 Mathematics — Interest, Time & Mensuration
3.1 Simple & Compound Interest 3.2 Time & Work; Pipes & Cisterns 3.3 Time, Speed & Distance 3.4 Mensuration (2D & 3D)
4 Mathematics — Algebra, Geometry & Data
4.1 Algebra & Linear Equations 4.2 Geometry & Trigonometry Basics 4.3 Elementary Statistics & Data Interpretation 4.4 Age, Calendar & Clock Problems
5 Reasoning — Analogies, Series & Coding
5.1 Analogies 5.2 Alphabetical & Number Series 5.3 Coding & Decoding 5.4 Mathematical Operations
6 Reasoning — Logic & Relationships
6.1 Blood Relations 6.2 Syllogism 6.3 Classification (Similarities & Differences) 6.4 Venn Diagram
7 Reasoning — Arrangements & Analytical Reasoning
7.1 Jumbling 7.2 Directions 7.3 Analytical Reasoning & Puzzles 7.4 Statements: Arguments, Assumptions & Conclusions 7.5 Data Sufficiency & Data Interpretation
8 General Science — Physics
8.1 Units, Measurement & Motion 8.2 Force, Gravitation, Work & Energy 8.3 Sound & Light 8.4 Electricity & Magnetism 8.5 Sources of Energy
9 General Science — Chemistry
9.1 Matter, Atoms & Molecules 9.2 Chemical Reactions & Equations 9.3 Acids, Bases & Salts 9.4 Metals, Non-metals & Carbon Compounds
10 General Science — Biology
10.1 Life Processes: Nutrition & Respiration 10.2 Life Processes: Transportation & Excretion 10.3 Control & Coordination 10.4 Reproduction 10.5 Heredity & Evolution 10.6 Human Health & Diseases
11 General Awareness — History & Geography
11.1 Ancient & Medieval Indian History 11.2 Modern Indian History & Freedom Struggle 11.3 Indian Geography 11.4 World Geography
12 General Awareness — Polity, Economy & Current Affairs
12.1 Indian Polity & Constitution 12.2 Indian Economy 12.3 Science & Technology, Sports & Culture 12.4 Books, Authors, Awards, Days & Organizations 12.5 Current Affairs: Sources, Scope & Strategy
13 After the CBT & Final Strategy
13.1 Physical Efficiency Test (PET) 13.2 Document Verification & Medical Examination 13.3 Final Revision & Exam-Day Strategy
3.2 Time & Work; Pipes & Cisterns
Key Takeaways Explain This Topic AI
If a worker can finish a job in n days, that worker's 1-day work is 1/n of the job.
Combined 1-day work of A and B is 1/a + 1/b; the time to finish together is the reciprocal of that sum, ab/(a+b).
The MDH relation M1·D1·H1/W1 = M2·D2·H2/W2 links men, days, hours and work across two teams doing the same kind of job.
In pipes-and-cisterns problems an emptying pipe does negative work; subtract its rate from the fill rate.
An emptying pipe with a larger rate than the fill pipe means the tank never fills — check the sign of the net rate before taking the reciprocal.
Last updated: August 2026
Why Time & Work Matters
These problems test rate thinking — converting "X can do a job in N days" into "X does 1/N of the job per day". Once you express every worker as work-per-unit-time, addition solves most questions. RRB Group D typically asks 2-3 questions from this cluster, often mixed with pipes-and-cisterns.
Work-Rate Basics
If A can finish a job in n days, A's 1-day work = 1/n.
If A takes a days and B takes b days for the same job:
- Combined 1-day work = 1/a + 1/b = (a + b) / ab
- Time to finish together = ab / (a + b) days
- Worked example 1 (working together)
A can do a job in 12 days, B in 18 days. Working together, how long will they take?
- 1-day work = 1/12 + 1/18 = 3/36 + 2/36 = 5/36
- Time = 1 / (5/36) = 36/5 = 7.2 days (7 1/5 days, or 7 days 4 hr 48 min)
- The MDH Formula
When work is measured in man-days and the same kind of work is done by different teams, the relation is:
M1 · D1 · H1 / W1 = M2 · D2 · H2 / W2
where M = number of men, D = number of days, H = hours per day, W = work units.
Worked example 2 (man-days)
8 men can build a wall in 12 days of 8 hours each. How many days of 6 hours each will 16 men take for the same wall?
- (8 × 12 × 8) / 1 = (16 × D × 6) / 1
- 768 = 96D → D = 8 days
- Efficiency and "k Times as Fast"
If A is twice as efficient as B, then in the same time A does 2 units of work for every 1 unit B does. If A finishes a job in n days, B finishes it in 2n days.
Worked example 3 (efficiency ratio)
A is thrice as efficient as B and together they finish a job in 12 days. How long will A alone take?
- Let B's 1-day work = 1/x; A's = 3/x
- Together: 1/x + 3/x = 4/x = 1/12 → x = 48
- A alone: 3/x = 3/48 = 1/16 → 16 days
- Pipes & Cisterns
The logic is identical to time-and-work, but an emptying pipe does NEGATIVE work (it removes water).
- Fill pipe (fills in n hours): +1/n per hour
- Emptying pipe (empties in m hours): −1/m per hour
- Net per hour = 1/n − 1/m
- Time to fill = 1 / (net rate), provided net rate is positive
- Worked example 4 (fill + leak)
A tap fills a tank in 6 hours; a leak empties it in 12 hours. With both open, how long to fill the tank?
- Net rate = 1/6 − 1/12 = 2/12 − 1/12 = 1/12 per hour
- Time = 1 / (1/12) = 12 hours
- Diagram — Net Rate in a Tank with Fill + Leak
Loading diagram...
- Worked Examples — Extended Scenarios
- Worked example 5 (alternate days)
A can do a job in 10 days and B in 15 days. They work on alternate days, starting with A. In how many days is the job finished?
A's 1-day work = 1/10; B's 1-day work = 1/15
Work done in a 2-day cycle = 1/10 + 1/15 = 3/30 + 2/30 = 5/30 = 1/6
Work in thirtieths so every step is a whole number: A does 3/30 per day, B does 2/30 per day, and one 2-day cycle completes 5/30.
After 4 full cycles (8 days): 4 × 5/30 = 20/30 done; remaining 10/30.
Day 9 (A): +3/30 → 23/30 done; remaining 7/30.
Day 10 (B): +2/30 → 25/30 done; remaining 5/30.
Day 11 (A): +3/30 → 28/30 done; remaining 2/30.
Day 12 (B): +2/30 → 30/30. The job finishes exactly at the end of day 12 , on B's turn.
The faster route confirms it: each 2-day cycle does 5/30 = 1/6 of the job, so 6 cycles = 12 days complete exactly 1 whole job. Two bookkeeping rules keep this from going wrong: track work done and work remaining as separate running totals, and stop the moment the cumulative work reaches 1 — do not finish the cycle out of habit.
Worked example 6 (worker leaves mid-job)
A and B together can finish a job in 12 days, B and C in 15 days, C and A in 20 days. How long will A alone take?
- (A + B) 1-day = 1/12; (B + C) 1-day = 1/15; (C + A) 1-day = 1/20
- Add all three: 2(A + B + C) = 1/12 + 1/15 + 1/20 = 5/60 + 4/60 + 3/60 = 12/60 = 1/5
- A + B + C 1-day work = 1/10
- A's 1-day work = (A + B + C) − (B + C) = 1/10 − 1/15 = 3/30 − 2/30 = 1/30
- A alone = 30 days
- Pipes — Multiple Fills
When two or more pipes fill together and a third empties, add the fill rates and subtract the empty rate, all in "tanks per hour".
Worked example 7 (two fill + one empty)
Pipe A fills a tank in 6 hours, B in 3 hours, and a drain C empties it in 4 hours. With all three open, how long to fill?
- Net rate = 1/6 + 1/3 − 1/4 = 2/12 + 4/12 − 3/12 = 3/12 = 1/4 per hour
- Time = 1 / (1/4) = 4 hours
- Quick Reference — Rate Conversion
- Given Reciprocal gives
- "A in n days" A's 1-day work = 1/n
- "A's 1-day work = 1/n" A finishes in n days
- "Empty pipe in m hours" −1/m per hour
- "Net rate r per hour" Time = 1/r hours
- Common Exam Traps
"A and B work on alternate days" — add one day of A, then one day of B; each 2-day cycle completes (1/a + 1/b) of the job. Always check whether the final day finishes the job exactly or leaves a remainder to be completed by the next worker.
An emptying pipe is always subtracted; if its rate exceeds the fill rate, the tank never fills.
"A leaves after x days" — compute the work done in x days, then the remaining work is finished by the others; divide remaining work by their combined rate.
Keep all rates in the same time unit (hours vs days) before adding or subtracting.
"A is k times as efficient as B" means A's rate is k × B's rate, not that A's time is k × B's time — the times go the opposite way.
When three pairs of workers are given, never solve for each worker individually first — add the three pair-equations and halve to get the combined 1-day work of all three, then subtract the pair that excludes the worker you need.
A pipe that fills in "n minutes" has rate 1/n per minute — do not mix minutes and hours in the same equation.
If the question says "the tank is already half full", only half the tank's capacity needs to be filled — multiply the fill time by 1/2.