Study guide
2.3 Plotting an Estimated Position (EP) with Tidal Stream
RYA Coastal Skipper / Yachtmaster Offshore Shorebased Theory Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Magnetic Compass, Variation & Deviation
1.1 The Magnetic Compass, Earth's Magnetic Field & Variation 1.2 Compass Deviation, Deviation Cards & Swinging the Compass 1.3 The Mercator Projection, Chart Symbols & Latitude Distance Scales
2 Chapter 2: Dead Reckoning, Estimated Position & Leeway
2.1 Dead Reckoning (DR) & Water Track Principles 2.2 Wind Leeway & Calculating Water Track 2.3 Plotting an Estimated Position (EP) with Tidal Stream
3 Chapter 3: Course to Steer, Vector Triangles & Position Lines
3.1 Course to Steer (CTS) Single-Hour Vector Triangles 3.2 Multi-Hour Courses to Steer & Changing Tidal Streams 3.3 Visual Position Lines, Three-Bearing Fixes & Cocked Hats 3.4 Running Fixes, Transferred Position Lines & Electronic Aids
4 Chapter 4: Tidal Heights, Datums & Standard Port Calculations
4.1 Tidal Theory, Astronomical Causes, Springs & Neaps 4.2 Chart Datums, Lowest Astronomical Tide (LAT) & Soundings 4.3 Standard Port Tidal Calculations & The Rule of Twelfths
5 Chapter 5: Secondary Ports, Tidal Streams & Dynamic Waters
5.1 Secondary Port Calculations: Time & Height Differences 5.2 Using Admiralty Tidal Curves for Height at Any Time 5.3 Tidal Diamonds, Stream Atlases & Tidal Gates 5.4 Tidal Overfalls, Races, Wind-Over-Tide & Shallow Water Effects
6 Chapter 6: IRPCS Steering & Sailing Rules
6.1 General Rules, Look-out, Safe Speed & Risk of Collision (Rules 1-8) 6.2 Narrow Channels & Traffic Separation Schemes (Rules 9 & 10) 6.3 Steering Rules: Sailing Vessels, Overtaking, Head-on & Crossing (Rules 12-17) 6.4 Responsibilities Between Vessels & Restricted Visibility (Rules 18 & 19)
7 Chapter 7: IRPCS Navigation Lights, Day Shapes & Sound Signals
7.1 Fundamentals of Navigation Lights & Day Shapes (Rules 20-22) 7.2 Specific Vessel Lights & Shapes: Power, Sail, Towing & Fishing (Rules 23-26) 7.3 Special Category Vessels: NUC, RAM, CBD, Pilot & Anchored (Rules 27-31) 7.4 Sound and Light Signals: Manoeuvring, Warning & Fog (Rules 32-37)
8 Chapter 8: The IALA Maritime Buoyage System
8.1 Lateral Marks: System A and System B Comparison 8.2 Cardinal Marks: Quadrants, Topmarks, Colours & Light Sequences 8.3 Isolated Danger, Safe Water, Special & Emergency Wreck Marks
9 Chapter 9: Meteorology, Synoptic Systems & Depressions
9.1 Atmospheric Pressure, Isobars & Buys Ballot's Law 9.2 Air Masses & The Anatomy of a Frontal Depression 9.3 Passage of a Frontal Depression: Pressure, Wind & Cloud Changes 9.4 Anticyclones, Ridges, Cols & Troughs
10 Chapter 10: Local Coastal Weather, Fog & Forecasts
10.1 Coastal Effects: Sea & Land Breezes, Katabatic Winds & Funnelling 10.2 Fog Formation: Advection Fog, Radiation Fog & Sea Smoke 10.3 Beaufort Wind Scale & Maritime Forecast Interpretation
11 Chapter 11: Passage Planning & Pilotage Under SOLAS Chapter V
11.1 SOLAS Chapter V Regulations & The 4 Stages of Passage Planning 11.2 Routing Strategy, Tidal Windows, Fuel Planning & Contingencies 11.3 Pilotage Plans, Clearing Bearings, Leading Lines & Soundings 11.4 Night Pilotage, Light Characteristics & Dipping Distances
12 Chapter 12: Marine Safety, Emergencies & GMDSS Communications
12.1 GMDSS Architecture, VHF DSC & Marine Radio Distress Procedures 12.2 Emergency Distress Equipment: EPIRB, SART, Navtex & Pyrotechnics 12.3 Heavy Weather Seamanship, Stability & Man Overboard Recovery
2.3 Plotting an Estimated Position (EP) with Tidal Stream
Key Takeaways Explain This Topic AI
An Estimated Position (EP) is derived by vector addition of the vessel's Water Track (heading, leeway, and log distance) and the Tidal Stream vector (set and drift) for the elapsed time.
Tidal 'Set' is the direction in degrees True towards which current flows, while 'Drift' is the distance run by the stream ( Drift = Rate × Elapsed Hours \text{Drift} = \text{Rate} \times \text{Elapsed Hours} Drift = Rate × Elapsed Hours ); unlike wind, tides are named for where they flow towards.
Standard RYA chartwork symbols dictate: 1 arrow for Water Track, 3 arrows for Tidal Stream vector, 2 arrows for Ground Track, and a triangle with a central dot ( △ \triangle △ ) annotated with the time for the EP.
The Ground Track line connecting the initial fix directly to the EP represents the Course Over Ground (COG) and Speed Over Ground (SOG).
For passages spanning multiple hours with changing tidal rates and sets, consecutive hourly tidal vectors can be linked sequentially or consolidated into a single net tidal vector.
Last updated: November 2026
2.3 Plotting an Estimated Position (EP) with Tidal Stream
Note
In tidal waters, the water body is in continuous motion across the seabed. An Estimated Position (EP) combines the vessel's movement through the water with the bodily displacement of that water mass across the seabed, representing the definitive standard of coastal dead reckoning.
1. Concept of an Estimated Position (EP)
An Estimated Position (EP) is the most accurate position calculable without external observations (such as visual bearings, radar ranges, or GNSS). It is constructed by solving the triangle of velocities : Ground Track ⃗ = Water Track ⃗ + Tidal Stream ⃗ \vec{\text{Ground Track}} = \vec{\text{Water Track}} + \vec{\text{Tidal Stream}} Ground Track = Water Track + Tidal Stream
Water Track : The path and distance run through the water, combining course steered, magnetic corrections, leeway, and log speed.
Tidal Stream Vector : The displacement of water over the seabed for the passage duration.
Ground Track : The resultant vector over the seabed terminating at the Estimated Position .
While a Dead Reckoning (DR) position ignores wind and current, an EP incorporates both. It remains an estimate because leeway estimates, log calibration factors, and published tidal rates carry minor margins of uncertainty.
2. Anatomy of Tidal Streams: Set, Rate, and Drift
Parameter Definition Unit Chart Reference
Set Direction towards which the stream flows Degrees True ( ∘ T ^\circ\text{T} ∘ T ) Tidal Diamond or Stream Atlas
Rate Speed of the stream over the seabed Knots (nautical miles per hour) Spring / Neap rates in tables
Drift Distance water moves during the elapsed time Nautical Miles (NM) Calculated: Rate × Elapsed Hours \text{Rate} \times \text{Elapsed Hours} Rate × Elapsed Hours
Warning
Wind vs. Tide Direction : Wind is named by the direction it comes FROM (a "Westerly wind" blows from 270 ∘ 270^\circ 27 0 ∘ ). A tidal stream is named by the direction it flows TOWARDS (a stream with a set of 090 ∘ T 090^\circ\text{T} 09 0 ∘ T flows toward the East). Confusing these conventions causes severe navigational errors!
Scaling Drift for Fractional Hours
Tidal tables publish hourly rates in knots. When a run lasts for fractional hours, drift must be scaled proportionally:
Drift (NM) = Tidal Rate (knots) × Elapsed Time (minutes) 60 \text{Drift (NM)} = \text{Tidal Rate (knots)} \times \frac{\text{Elapsed Time (minutes)}}{60} Drift (NM) = Tidal Rate (knots) × 60 Elapsed Time (minutes)
If the tidal rate is 2.4 kt 2.4\text{ kt} 2.4 kt and run time is 45 minutes 45\text{ minutes} 45 minutes ( 0.75 hr 0.75\text{ hr} 0.75 hr ): Drift = 2.4 kt × 0.75 hr = 1.8 NM \text{Drift} = 2.4\text{ kt} \times 0.75\text{ hr} = 1.8\text{ NM} Drift = 2.4 kt × 0.75 hr = 1.8 NM
3. Standard RYA Plotting Standards and Arrow Conventions
To maintain universal clarity, standard RYA symbology dictates:
1 Arrow ( > > > ) : Water Track (course steered through the water with leeway applied).
3 Arrows ( > > > >>> >>> ) : Tidal Stream Vector (direction of set and distance of drift).
2 Arrows ( > > >> >> ) : Ground Track (resultant track over the seabed connecting starting fix to EP).
EP Position Symbol : An equilateral triangle with a central dot ( △ \triangle △ ), annotated with the four-digit time (e.g., 1530 EP ).
4. Step-by-Step Construction of an EP on the Chart
Plot Departure Fix : Prick off the starting fix, circle it ( ⊙ \odot ⊙ ), and label with time (e.g., 1400 Fix ).
Lay Off True Water Track : Correct compass heading for deviation, variation, and leeway. Lay off this line from the fix.
Measure Water Distance : Prick off the log distance along the water track and mark with 1 arrow ( > > > ).
Lay Off Tidal Vector : From the terminus of the water track , lay off a line in the direction of the tidal Set ( ∘ T ^\circ\text{T} ∘ T ).
Prick Off Drift : Scale drift ( Rate × Hours \text{Rate} \times \text{Hours} Rate × Hours ) along the tidal vector and mark with 3 arrows ( > > > >>> >>> ).
Mark EP & Ground Track : Draw an EP triangle ( △ \triangle △ ) at the tidal vector terminus with time. Draw a line from the departure fix to the EP with 2 arrows ( > > >> >> ) for Ground Track , measuring COG and SOG.
5. Multi-Hour and Multi-Leg Calculations
When passages span multiple hours, tidal streams alter direction and rate:
Stepped Method : Plot each hour's water track and tide sequentially, deriving intermediate hourly EPs.
Consolidated Method (Preferred) : Plot all consecutive water tracks end-to-end, then apply consecutive tidal vectors joined head-to-tail at the final water track terminus. This yields the identical final EP with a cleaner chart.
6. Comprehensive Worked Navigational Scenario
Scenario : At 1400, a yacht departs a fix off Dartmouth fairway buoy ( 50 ∘ 19.5 ′ N , 003 ∘ 32.5 ′ W 50^\circ 19.5'\text{N}, 003^\circ 32.5'\text{W} 5 0 ∘ 19. 5 ′ N , 00 3 ∘ 32. 5 ′ W ).
Compass Course: 125 ∘ C 125^\circ\text{C} 12 5 ∘ C , Deviation 2 ∘ W 2^\circ\text{W} 2 ∘ W , Variation 3 ∘ W 3^\circ\text{W} 3 ∘ W .
Wind: North-northeast ( 020 ∘ 020^\circ 02 0 ∘ ), Force 5. Leeway estimated at 6 ∘ 6^\circ 6 ∘ .
STW: 6.0 kt 6.0\text{ kt} 6.0 kt constant.
Tidal stream: Sets 230 ∘ T 230^\circ\text{T} 23 0 ∘ T at 1.8 kt 1.8\text{ kt} 1.8 kt .
Target: Construct the Estimated Position for 1530 ( 1.5 hours 1.5\text{ hours} 1.5 hours run).
Solution :
True Water Track :
MC = 125 ∘ C − 2 ∘ W = 123 ∘ M \text{MC} = 125^\circ\text{C} - 2^\circ\text{W} = 123^\circ\text{M} MC = 12 5 ∘ C − 2 ∘ W = 12 3 ∘ M .
TH = 123 ∘ M − 3 ∘ W = 120 ∘ T \text{TH} = 123^\circ\text{M} - 3^\circ\text{W} = 120^\circ\text{T} TH = 12 3 ∘ M − 3 ∘ W = 12 0 ∘ T .
Wind from 020 ∘ 020^\circ 02 0 ∘ strikes port side (pushes to starboard / add): Water Track = 120 ∘ T + 6 ∘ = 126 ∘ T \text{Water Track} = 120^\circ\text{T} + 6^\circ = 126^\circ\text{T} Water Track = 12 0 ∘ T + 6 ∘ = 12 6 ∘ T
Distances :
Run: 1.5 hours 1.5\text{ hours} 1.5 hours at 6.0 kt = 9.0 NM 6.0\text{ kt} = 9.0\text{ NM} 6.0 kt = 9.0 NM through water.
Tidal Drift: 1.8 kt × 1.5 hr = 2.7 NM 1.8\text{ kt} \times 1.5\text{ hr} = 2.7\text{ NM} 1.8 kt × 1.5 hr = 2.7 NM along 230 ∘ T 230^\circ\text{T} 23 0 ∘ T .
Plotting :
Lay off 126 ∘ T 126^\circ\text{T} 12 6 ∘ T for 9.0 NM 9.0\text{ NM} 9.0 NM from 1400 Fix (mark 1 arrow).
From that terminus, lay off 230 ∘ T 230^\circ\text{T} 23 0 ∘ T for 2.7 NM 2.7\text{ NM} 2.7 NM (mark 3 arrows).
Mark the terminus with an EP triangle ( △ \triangle △ ), labeled 1530 EP .
Ground Track Results :
Connect 1400 Fix to 1530 EP (mark 2 arrows).
Measuring yields COG ≈ 143 ∘ T \approx 143^\circ\text{T} ≈ 14 3 ∘ T , Distance Over Ground ≈ 8.75 NM \approx 8.75\text{ NM} ≈ 8.75 NM , and SOG = 8.75 / 1.5 ≈ 5.8 kt \text{SOG} = 8.75 / 1.5 \approx 5.8\text{ kt} SOG = 8.75/1.5 ≈ 5.8 kt .
(Vector Verification) :
Water Track: X 1 = 9.0 × sin ( 126 ∘ ) = + 7.28 NM X_1 = 9.0 \times \sin(126^\circ) = +7.28\text{ NM} X 1 = 9.0 × sin ( 12 6 ∘ ) = + 7.28 NM , Y 1 = 9.0 × cos ( 126 ∘ ) = − 5.29 NM Y_1 = 9.0 \times \cos(126^\circ) = -5.29\text{ NM} Y 1 = 9.0 × cos ( 12 6 ∘ ) = − 5.29 NM
Tidal Vector: X 2 = 2.7 × sin ( 230 ∘ ) = − 2.07 NM X_2 = 2.7 \times \sin(230^\circ) = -2.07\text{ NM} X 2 = 2.7 × sin ( 23 0 ∘ ) = − 2.07 NM , Y 2 = 2.7 × cos ( 230 ∘ ) = − 1.74 NM Y_2 = 2.7 \times \cos(230^\circ) = -1.74\text{ NM} Y 2 = 2.7 × cos ( 23 0 ∘ ) = − 1.74 NM
Net Vector: X = + 5.21 NM X = +5.21\text{ NM} X = + 5.21 NM (East), Y = − 7.03 NM Y = -7.03\text{ NM} Y = − 7.03 NM (South)
Distance Over Ground = 5.21 2 + ( − 7.03 ) 2 = 8.75 NM \text{Distance Over Ground} = \sqrt{5.21^2 + (-7.03)^2} = 8.75\text{ NM} Distance Over Ground = 5.2 1 2 + ( − 7.03 ) 2 = 8.75 NM
COG = 180 ∘ − arctan ( 5.21 / 7.03 ) = 143.4 ∘ T ≈ 143 ∘ T \text{COG} = 180^\circ - \arctan(5.21 / 7.03) = 143.4^\circ\text{T} \approx 143^\circ\text{T} COG = 18 0 ∘ − arctan ( 5.21/7.03 ) = 143. 4 ∘ T ≈ 14 3 ∘ T
SOG = 8.75 / 1.5 = 5.83 kt ≈ 5.8 kt \text{SOG} = 8.75 / 1.5 = 5.83\text{ kt} \approx 5.8\text{ kt} SOG = 8.75/1.5 = 5.83 kt ≈ 5.8 kt
The cross-tide setting 230 ∘ T 230^\circ\text{T} 23 0 ∘ T deflected the vessel's track from 126 ∘ T 126^\circ\text{T} 12 6 ∘ T to 143 ∘ T 143^\circ\text{T} 14 3 ∘ T and slightly reduced progress over ground from 9.0 NM 9.0\text{ NM} 9.0 NM to 8.75 NM 8.75\text{ NM} 8.75 NM ( 5.8 kt 5.8\text{ kt} 5.8 kt SOG).
7. Summary of RYA Plotting Symbols
- Vector Component Arrows Origin Destination Chart Notation
- Water Track 1 ( > > > ) Starting Fix Water Track Terminus 126°T , 9.0M , 6.0kn
- Tidal Vector 3 ( > > > >>> >>> ) Water Track Terminus Estimated Position (EP) Set 230°T , Drift 2.7M
- Ground Track 2 ( > > >> >> ) Starting Fix Estimated Position (EP) COG 143°T , SOG 5.8kn
- Estimated Position Triangle ( △ \triangle △ ) Terminus of Tide Vector (N/A) 1530 EP
- Visual Fix Circle ( ⊙ \odot ⊙ ) Intersection of Bearings (N/A) 1400 Fix
- 8. Common Exam Traps in EP Plotting
Confusing EP with CTS : For an EP, both displacement vectors are known. Drawing water track then tide is the convention used here; reversing their end-to-end order gives the same endpoint. A CTS problem instead solves an unknown water-track direction.
Unscaled Tidal Rates : Always multiply tidal rate by elapsed hours to get drift in nautical miles.
Omitting Leeway : The water track must include leeway before applying the tidal vector.