1.2 License Groups 1-5, Financial Limits & Bond Requirements
South Carolina General Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: South Carolina Licensing Law & Board Regulations
1.1 Licensing Framework, Classifications & Scope 1.2 License Groups 1-5, Financial Limits & Bond Requirements 1.3 Qualifying Parties, Renewals & Enforcement Penalties
2 Chapter 2: Business Organization & Financial Management
2.1 Business Entities & South Carolina Registration 2.2 Construction Accounting Methods & Financial Statements 2.3 Tax Compliance: Payroll, Sales/Use & State Requirements
3 Chapter 3: Estimating, Bidding & Public Procurement
3.1 Quantity Takeoffs, Cost Classification & Overhead Allocation 3.2 Bid Preparation, Markup Calculation & Margin Analysis 3.3 Public Bidding & South Carolina Procurement Code
4 Chapter 4: Construction Contracts & Risk Allocation
4.1 Contract Types & Project Delivery Systems 4.2 Standard Contract Provisions & Risk Allocation 4.3 Change Orders, Claims, Delays & Dispute Resolution
5 Chapter 5: South Carolina Mechanics' Lien Law & Payment Rights
5.1 Mechanics' Lien Rights, Scope & Priority in South Carolina 5.2 Notice of Project Commencement & Notice of Furnishing 5.3 Lien Perfection, Foreclosure Deadlines & Prompt Pay Act
6 Chapter 6: Insurance & Surety Bonding
6.1 Commercial General Liability, Builders Risk & Property Coverage 6.2 Workers' Compensation & Statutory Employer Rules in South Carolina 6.3 Surety Bonds: Bid, Performance, Payment & The Little Miller Act
7 Chapter 7: Project Management, Scheduling & Quality Control
7.1 Project Administration, Submittals & Communication Protocols 7.2 CPM Scheduling: Critical Path, Float & Schedule Control 7.3 Quality Assurance, Inspection Standards & Project Closeout
8 Chapter 8: Labor Regulations & Environmental Compliance
8.1 Wage and Hour Laws, FLSA & Worker Classification 8.2 South Carolina Employment Laws, I-9 & Workplace Standards 8.3 Environmental Compliance: Stormwater, Lead RRP & Asbestos
9 Chapter 9: OSHA Safety Standards & Recordkeeping
9.1 OSHA Regulatory Framework, Inspections & Form 300 Recordkeeping 9.2 OSHA Focus Four Hazards & Jobsite Protection Standards 9.3 Excavations, Scaffolding & Fall Protection in Construction
10 Chapter 10: Site Work, Foundations, Concrete & Masonry
10.1 Site Preparation, Soil Mechanics & Foundation Systems 10.2 Concrete Construction, Mix Specifications & Quality Control 10.3 Masonry Materials, Mortar Types & Structural Masonry Walls
11 Chapter 11: Structural Framing, Carpentry, Building Envelope, Finishes & South Carolina Building Codes
11.1 Structural Steel, Heavy Timber & Framing Systems 11.2 Commercial Roofing, Thermal Insulation & Moisture Protection 11.3 South Carolina Building Code: Occupancy & Construction Types 11.4 Means of Egress, Fire Protection & Accessibility Standards 11.5 Wood Framing, Trusses & Carpentry 11.6 Doors, Windows, Hardware & Interior Finishes
1.2 License Groups 1-5, Financial Limits & Bond Requirements
Key Takeaways Explain This Topic AI
South Carolina Code Ann. § 40-11-260 establishes five distinct financial license groups that define the maximum allowable dollar value of any single bid or contract.
An applicant qualifies for a group by meeting either the working-capital or the net-worth figure, or by posting a continuous surety bond equal to the group's net-worth amount under § 40-11-262.
Working Capital is defined as Current Assets minus Current Liabilities, whereas Net Worth is defined as Total Assets minus Total Liabilities.
Groups 1–2 may file an owner-prepared statement with an affidavit; Groups 3–4 need a CPA-compiled GAAP statement on initial application; Group 5 needs an audited balance sheet initially and a reviewed statement at renewal.
License group limitations apply strictly to the total contract sum; contractors are prohibited from bidding on or contracting projects beyond their group limit by deducting subcontracts or materials.
Last updated: September 2026
Statutory Financial Groups under S.C. Code Ann. § 40-11-260
South Carolina does not issue "blanket" commercial contractor licenses without financial classification. Under South Carolina Code Ann. § 40-11-260 , every general contracting applicant and renewing licensee is evaluated and assigned to one of five statutory license groups . This group assignment dictates the maximum dollar limit per individual bid or project that the licensee may lawfully undertake.
The legislative purpose of the financial grouping system is to protect project owners, public entities, subcontractors, and commercial vendors by ensuring that a contractor possesses adequate liquidity and capitalization to absorb unexpected project delays, cost overruns, and payroll obligations.
To qualify for a specific license group, the contractor must satisfy at least one of three statutory criteria:
- Maintain the required minimum Working Capital ; OR
- Maintain the required minimum Net Worth ; OR
Post a continuous Surety Bond in the designated statutory amount.
Complete Financial License Groups Breakdown
The following master table outlines the statutory thresholds established under S.C. Code Ann. § 40-11-260 for commercial General Contractors:
License Group Maximum Bid / Job Limit Minimum Working Capital Minimum Net Worth Surety Bond Alternative Financial Statement Requirements
Group 1 Up to $100,000 $10,000 $20,000 $20,000 Initial and renewal: owner-prepared statement on the Board form with an affidavit of accuracy
Group 2 Up to $400,000 $40,000 $60,000 $60,000 Initial and renewal: owner-prepared statement on the Board form with an affidavit of accuracy
Group 3 Up to $1,000,000 $100,000 $150,000 $150,000 Initial: statement compiled by a licensed CPA under GAAP. Renewal: owner-prepared with affidavit, or CPA-compiled
Group 4 Up to $3,000,000 $175,000 $250,000 $250,000 Initial: statement compiled by a licensed CPA under GAAP. Renewal: owner-prepared with affidavit, or CPA-compiled
Group 5 Unlimited $250,000 $350,000 $350,000 Initial: audited balance sheet under GAAP. Renewal: reviewed statement under GAAP
Every financial statement must have a balance sheet date no more than 12 months before the application (§ 40-11-260(A)).
Key Principle — Dual Financial Pathways: Notice that an applicant does not need to satisfy both Working Capital and Net Worth. South Carolina law provides these as statutory alternatives. If a contractor satisfies the Net Worth requirement, they qualify for that group even if their Working Capital is below the threshold, and vice versa.
Working Capital vs. Net Worth: Definitions and Accounting Rules
Understanding the exact balance sheet components of Working Capital and Net Worth is essential for passing the South Carolina examination and maintaining licensing compliance.
1. Working Capital Calculation Working Capital = Current Assets − Current Liabilities \text{Working Capital} = \text{Current Assets} - \text{Current Liabilities} Working Capital = Current Assets − Current Liabilities
Working Capital represents the contractor's short-term operating liquidity—the funds readily available to finance day-to-day jobsite operations, pay labor, and purchase supplies before receiving progress payments from project owners.
Current Assets (assets reasonably expected to be realized in cash, sold, or consumed within one operating cycle, typically 12 months):
- Cash and cash equivalents (unrestricted checking, savings, money market accounts)
- Marketable securities held as short-term investments
- Trade accounts receivable due within 12 months (less allowance for doubtful accounts)
- Retainage receivable due within 12 months on active contracts
- Costs and estimated earnings in excess of billings on uncompleted contracts (underbillings)
- Construction materials and inventory on hand
- Prepaid expenses (insurance premiums, rent, bond deposits)
Excluded from Current Assets: Notes receivable from affiliated officers/shareholders, real estate, vehicles, heavy equipment, and intangible assets. The Board may consider the personal financial statements of principals only for an entity with less than two years of operating experience (§ 40-11-260(C)), and LLR accepts them only on an initial application.
Current Liabilities (obligations expected to be satisfied within 12 months):
- Trade accounts payable to suppliers and sub-tier contractors
- Subcontractor retainage payable due within 12 months
- Accrued payroll, payroll withholding taxes, and employee benefits
- Short-term operating notes and bank lines of credit payable within one year
- Current maturities of long-term equipment financing or commercial mortgages
- Billings in excess of costs and estimated earnings (overbillings)
- Accrued income, sales, and property taxes
2. Net Worth Calculation Net Worth (Owner’s Equity) = Total Assets − Total Liabilities \text{Net Worth (Owner's Equity)} = \text{Total Assets} - \text{Total Liabilities} Net Worth (Owner’s Equity) = Total Assets − Total Liabilities
Net Worth reflects the total cumulative financial stake of the owners or shareholders in the contracting enterprise, representing the firm's long-term solvency cushion.
Total Assets: Includes all Current Assets plus Non-Current / Fixed Assets (such as construction machinery, heavy vehicles, office property, commercial real estate, and shop equipment, net of accumulated depreciation), plus any other verifiable long-term tangible assets.
Total Liabilities: Includes all Current Liabilities plus Long-Term Debt (such as commercial bank mortgages, equipment notes payable beyond 12 months, and long-term debentures).
Why South Carolina Recognizes Both Metrics
The dual-metric framework prevents discrimination against different business models in construction:
General Commercial Builders typically lease heavy machinery and maintain minimal fixed assets; they maintain strong cash and receivables, easily meeting the Working Capital test.
Grading and Highway Contractors invest heavily in excavators, bulldozers, pavers, and utility fleets. While their cash may be tied up in equipment payments, their heavy equity in machinery creates substantial Net Worth , allowing them to qualify for higher license groups even when working capital is tight.
Worked Accounting Calculations: Qualifying for License Groups
To master this concept for examination purposes, study the following real-world balance sheet analyses.
Case Study 1: Heavy Equipment Grading Contractor
Carolina Earthworks LLC submits an application for general contractor licensing. Their certified balance sheet reports the following accounts:
- Balance Sheet Account Amount Account Classification
- Cash in Bank $45,000 Current Asset
- Trade Accounts Receivable (current) $65,000 Current Asset
- Construction Materials Inventory $20,000 Current Asset
- Heavy Excavation Equipment (net book value) $380,000 Fixed / Non-Current Asset
- Shop Facility & Yard Real Estate $250,000 Fixed / Non-Current Asset
- Total Assets $760,000
- Trade Accounts Payable (suppliers) $55,000 Current Liability
- Accrued Payroll & Taxes $15,000 Current Liability
- Line of Credit (due in 6 months) $30,000 Current Liability
- Long-term Equipment Financing Notes $210,000 Long-Term Liability
- Commercial Mortgage on Shop Facility $170,000 Long-Term Liability
- Total Liabilities $480,000
Step 1: Calculate Working Capital Current Assets = $ 45 , 000 + $ 65 , 000 + $ 20 , 000 = $ 130 , 000 \text{Current Assets} = \$45,000 + \$65,000 + \$20,000 = \$130,000 Current Assets = $45 , 000 + $65 , 000 + $20 , 000 = $130 , 000 Current Liabilities = $ 55 , 000 + $ 15 , 000 + $ 30 , 000 = $ 100 , 000 \text{Current Liabilities} = \$55,000 + \$15,000 + \$30,000 = \$100,000 Current Liabilities = $55 , 000 + $15 , 000 + $30 , 000 = $100 , 000 Working Capital = $ 130 , 000 − $ 100 , 000 = $ 30 , 000 \text{Working Capital} = \$130,000 - \$100,000 = \mathbf{\$30,000} Working Capital = $130 , 000 − $100 , 000 = $30 , 000
Evaluating Working Capital against statutory thresholds:
- Group 1 ($10,000 WC): Met
- Group 2 ($40,000 WC): Not Met ($30,000 < $40,000)
Based on Working Capital alone, Carolina Earthworks would be capped at Group 1 ($100,000 limit) .
Step 2: Calculate Net Worth Total Assets = $ 760 , 000 \text{Total Assets} = \$760,000 Total Assets = $760 , 000 Total Liabilities = $ 480 , 000 \text{Total Liabilities} = \$480,000 Total Liabilities = $480 , 000 Net Worth = $ 760 , 000 − $ 480 , 000 = $ 280 , 000 \text{Net Worth} = \$760,000 - \$480,000 = \mathbf{\$280,000} Net Worth = $760 , 000 − $480 , 000 = $280 , 000
Evaluating Net Worth against statutory thresholds:
- Group 1 ($20,000 NW): Met
- Group 2 ($60,000 NW): Met
- Group 3 ($150,000 NW): Met
- Group 4 ($250,000 NW): Met ($280,000 >= $250,000)
- Group 5 ($350,000 NW): Not Met ($280,000 < $350,000)
Conclusion:
Because S.C. Code Ann. § 40-11-260 permits qualifying under either Working Capital OR Net Worth, Carolina Earthworks LLC qualifies for Group 4 (up to $3,000,000 bid/job limit) based on its $280,000 Net Worth, despite having only $30,000 in Working Capital.
Case Study 2: Construction Management General Contractor
Palmetto Commercial Builders Inc. focuses on construction management with high liquidity and zero owned equipment:
- Current Assets: $210,000
- Current Liabilities: $30,000
- Total Assets: $240,000
Total Liabilities: $35,000 Working Capital = $ 210 , 000 − $ 30 , 000 = $ 180 , 000 \text{Working Capital} = \$210,000 - \$30,000 = \mathbf{\$180,000} Working Capital = $210 , 000 − $30 , 000 = $180 , 000 Net Worth = $ 240 , 000 − $ 35 , 000 = $ 205 , 000 \text{Net Worth} = \$240,000 - \$35,000 = \mathbf{\$205,000} Net Worth = $240 , 000 − $35 , 000 = $205 , 000
Group 4 statutory requirements are: Working Capital of $175,000 OR Net Worth of $250,000 .
Here, Palmetto's Net Worth ($205,000) falls short of the $250,000 requirement. However, its Working Capital ($180,000) exceeds the $175,000 Working Capital threshold. Therefore, Palmetto qualifies for Group 4 ($3,000,000 limit) based on Working Capital.
Financial Statement Documentation Rules
Section 40-11-260 sets different documentation levels by group and by application type. Group revisions use the initial-application standard for the higher group (§ 40-11-260(D)).
1. Groups 1 and 2
For both the initial application and renewal, the applicant may submit an owner-prepared financial statement on the Board's form (LLR Doc #172) with an affidavit of accuracy , or it may post the surety bond instead.
2. Groups 3 and 4
On initial application, the statement must be compiled by a licensed CPA under Generally Accepted Accounting Principles (GAAP), including all GAAP disclosures.
On renewal , the licensee may use an owner-prepared statement with an affidavit or a CPA-compiled statement.
3. Group 5 (Unlimited)
On initial application, the applicant must submit an audited balance sheet prepared under GAAP with all disclosures.
On renewal , a reviewed financial statement is required. An owner-prepared statement is never enough for Group 5.
LLR requires every compiled, reviewed, or audited statement to be prepared by a licensed CPA, with a signed CPA cover letter. The statement must clearly show net worth or working capital.
A parent company's statement may be accepted for a wholly owned subsidiary if the notes or a parent-company letter say so. If the Board has reason to believe a licensee no longer meets its group's figures, it may demand more information and move the licensee to a lower group (§ 40-11-260(E)).
4. The Surety Bond Alternative (§ 40-11-262)
In place of a financial statement, an applicant may post a surety bond in the same amount as the net-worth figure for its group. Act No. 69 of 2023 replaced the older two-times-net-worth rule.
- Bond amounts: Group 1 $20,000; Group 2 $60,000; Group 3 $150,000; Group 4 $250,000; Group 5 $350,000
- Surety: a surety authorized to transact surety business in South Carolina
Form: continuous , kept in force as long as the license is held or until the licensee files a qualifying financial statement
Obligee: the State of South Carolina
Beneficiaries: anyone damaged by the licensee's breach of a construction contract or a contract for labor, materials, or professional services, or by an unlawful act or omission in performing construction
Relationship to other bonds: it is in addition to , not in place of, any bond required by law or by contract
Cancellation: only by notice to the Board from the surety and the licensee 30 days before cancellation. The licensee must then prove its net worth or working capital within 10 days of cancellation, or the license is suspended until it does.
The Board may increase the bond after a violation or when financial responsibility is doubtful, and it may reduce it after one year of good standing.
Bonds payable to the Residential Builders Commission are not accepted by the CLB.
Compliance Rules for Bid and Job Limits
The limit applies to bids and jobs. A licensee is confined to its license group and classifications (§ 40-11-270(A)). The group amounts are "bids and jobs not to exceed" limits. Contracting, offering to contract, or bidding beyond the group limit is a ground for discipline (§ 40-11-110(A)(21)), and the Board may penalize a licensee who offers to undertake work over its limit (§ 40-11-280). A Group 3 contractor therefore cannot submit a $1,050,000 bid and hope that negotiation brings it under $1,000,000.
No deducting subcontracts. The total cost of construction determines the group for a project, and work may not be divided to avoid a group limit (§ 40-11-300(A)). A Group 3 contractor cannot bid a $1,400,000 project by pointing out that $500,000 will be subcontracted.
Upgrading a group. A licensee files a revision application and must meet the initial-application financial standard for the higher group. Existing limits stay in effect until LLR approves the revision (§ 40-11-280).
Joint ventures. Two or more licensed contractors may submit a joint-venture bid if the contract does not exceed the highest group limit among the members. An unlicensed contractor may not be a party (§ 40-11-330).