4.3 Power Factor Correction, Harmonics, and Power Quality

EMA Electrician Licence Written Assessment Study Guide Singapore

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Assessment Overview, Electricity Act and Regulations

1.1 Assessment Structure, Eligibility, Fees, and Application Process 1.2 Legislative Framework and Electricity Act Overview (Part 9) 1.3 Electrical Workers Regulations and LEW Classes 1.4 Scope of Work and Responsibilities of a Licensed Electrician 1.5 Electrical Installations Regulations and Compliance Requirements 1.6 Notification, Connection, Modification, and Inspection Duties 1.7 Offences, Penalties, Disciplinary Actions, and Licence Renewal

2 Chapter 2: Domestic Electrical Installations (SS 638)

2.1 Domestic Wiring Systems, Cables, and Conduits 2.2 Consumer Units and Distribution Board (DB) Layouts 2.3 Final Circuits: Lighting, Radial, and Ring Final Socket Circuits 2.4 Mandatory 30 mA RCD/RCCB Protection and Isolation 2.5 Cable Colour Coding, Identification, and Accessories

3 Chapter 3: Industrial Electrical Installations (SS 638)

3.1 Industrial Low-Voltage (LV) Distribution and Sub-Switchboards 3.2 Motor Control Circuits, Starters, and Overload Protection 3.3 Industrial Wiring Systems: Trunking, Tray, Ladder, and Armoured Cables 3.4 Industrial Load Segregation, Phase Balancing, and Emergency Stopping 3.5 Industrial Switchgear, Circuit Breakers (MCB, MCCB), and Fuses 3.6 Motor Troubleshooting, Sequential Starting, and Programmable Logic Controllers (PLC)

4 Chapter 4: Electrical Principles — AC/DC Supplies, Three-Phase Power, and Power Quality

4.1 AC and DC Supply Fundamentals: Circuit Laws, RMS Values, and Singapore Voltage Levels 4.2 Three-Phase Relationships and Real, Apparent, and Reactive Power 4.3 Power Factor Correction, Harmonics, and Power Quality

5 Chapter 5: Protection Against Electric Shock and Earthing

5.1 Fundamentals of Electric Shock: Basic Protection and Fault Protection 5.2 Earthing Systems in Singapore: TN-S and TT Arrangements 5.3 Touch Voltage, Protective Conductor Sizing, and Main Earthing Terminals 5.4 Residual Current Devices (RCD/RCCB), Earth Fault Protection, and Equipotential Bonding

6 Chapter 6: Installation Design, Single-Line Diagrams (SLD), and Cable Sizing

6.1 Single-Line Diagram (SLD) Preparation, Symbols, and Standard Layouts 6.2 Maximum Demand Calculation and Diversity Factors for ≤45 kVA 6.3 Cable Selection, Current-Carrying Capacity, and Correction Factors 6.4 Voltage Drop Calculations and Circuit Segregation Rules

7 Chapter 7: Testing and Commissioning

7.1 Inspection and Testing Sequence Overview and Visual Inspection 7.2 Continuity Testing of Protective and Equipotential Conductors 7.3 Insulation Resistance Testing and Polarity Verification 7.4 Earth Fault Loop Impedance (Zs), RCD Testing, and Post-Turn-On Checks

8 Chapter 8: Temporary Electrical Installations (SS 650)

8.1 SS 650 Part 1: Construction Site Temporary Electrical Supply 8.2 SS 650 Part 2: Festive Lighting, Trade Fairs, and Exhibition Supplies 8.3 Temporary Generators, Statement of Approval (SOA), and Safety Inspections

4.3 Power Factor Correction, Harmonics, and Power Quality

Key Takeaways Explain This Topic AI

Low power factor forces the supply to deliver more current for the same real power, increasing I²R cable losses, voltage drop, and intake capacity requirements — and attracting utility reactive-power charges for larger consumers.

Shunt capacitor banks correct power factor by supplying leading reactive power locally: Qc = P × (tan φ1 − tan φ2).

Correcting a 30 kW load from 0.75 to 0.95 power factor requires Qc = 30 × (0.882 − 0.329) ≈ 16.6 kVAr of capacitance.

Non-linear loads generate harmonics; triplen (3rd, 9th, 15th) harmonics are zero-sequence and add arithmetically in the neutral, which can force an oversized or double neutral conductor.

Capacitors interact dangerously with harmonics (resonance and amplification), so detuning reactors, harmonic filters, or oversized neutrals are the standard mitigation measures.

Last updated: August 2026

4.3 Power Factor Correction, Harmonics, and Power Quality

Quick Summary: Induction motors, transformers, and discharge lighting draw lagging reactive power , depressing the power factor and inflating current throughout an installation. Shunt capacitor banks restore power factor towards unity, while harmonics from modern non-linear loads (VFDs, UPS units, switch-mode power supplies, LED drivers) distort waveforms, overheat neutral conductors, and resonate with capacitors. Both topics are written-test favourites because they connect theory directly to cable sizing and protective-device behaviour.

1. Why Power Factor Matters

For the same real power P P P , line current is inversely proportional to power factor: I L = P 3 V L cos ⁡ ϕ I_L = \frac{P}{\sqrt{3} \, V_L \cos\phi} I L ​ = 3 ​ V L ​ cos ϕ P ​

Example: a 30 kW 400 V 3-phase load draws 30,000 / ( 3 × 400 × 0.95 ) = 45.6 A 30{,}000/(\sqrt{3} \times 400 \times 0.95) = 45.6\text{ A} 30 , 000/ ( 3 ​ × 400 × 0.95 ) = 45.6 A at 0.95 PF, but 30,000 / ( 3 × 400 × 0.70 ) = 61.9 A 30{,}000/(\sqrt{3} \times 400 \times 0.70) = 61.9\text{ A} 30 , 000/ ( 3 ​ × 400 × 0.70 ) = 61.9 A at 0.70 PF — a 36% current increase with zero extra useful output.

Consequences of Low Power Factor

Higher I²R losses in cables and transformer windings (losses grow with the square of current).

Larger voltage drop ( V = I × Z V = I \times Z V = I × Z ), pushing utilization voltage towards the 4% limit.

Reduced usable capacity of the intake, transformer, and switchgear (a 45 kVA ceiling is reached with less real kW delivered).

Utility reactive-energy charges for larger consumers whose meters register kVArh; within the Electrician's ≤45 kVA scope the dominant penalties are thermal and voltage-drop effects.

Diagnostic value: chronic low PF usually means under-loaded or oversized motors.

2. Shunt Capacitor Bank Correction

Capacitors draw leading reactive current that cancels the motor's lagging reactive current. The required correction is: Q c = P × ( tan ⁡ ϕ 1 − tan ⁡ ϕ 2 ) Q_c = P \times (\tan\phi_1 - \tan\phi_2) Q c ​ = P × ( tan ϕ 1 ​ − tan ϕ 2 ​ )

Worked Example

Correct a P = 30 kW P = 30\text{ kW} P = 30 kW load from cos ⁡ ϕ 1 = 0.75 \cos\phi_1 = 0.75 cos ϕ 1 ​ = 0.75 to cos ⁡ ϕ 2 = 0.95 \cos\phi_2 = 0.95 cos ϕ 2 ​ = 0.95 :

tan ⁡ ϕ 1 = tan ⁡ ( arccos ⁡ 0.75 ) = 0.882 \tan\phi_1 = \tan(\arccos 0.75) = 0.882 tan ϕ 1 ​ = tan ( arccos 0.75 ) = 0.882 ; tan ⁡ ϕ 2 = tan ⁡ ( arccos ⁡ 0.95 ) = 0.329 \tan\phi_2 = \tan(\arccos 0.95) = 0.329 tan ϕ 2 ​ = tan ( arccos 0.95 ) = 0.329 .

Q c = 30 × ( 0.882 − 0.329 ) = 30 × 0.553 = 16.6 kVAr Q_c = 30 \times (0.882 - 0.329) = 30 \times 0.553 = 16.6\text{ kVAr} Q c ​ = 30 × ( 0.882 − 0.329 ) = 30 × 0.553 = 16.6 kVAr → select a standard 17–20 kVAr 3-phase capacitor bank.

Line current falls from 30,000 / ( 3 × 400 × 0.75 ) = 57.7 A 30{,}000/(\sqrt{3} \times 400 \times 0.75) = 57.7\text{ A} 30 , 000/ ( 3 ​ × 400 × 0.75 ) = 57.7 A to 45.6 A 45.6\text{ A} 45.6 A .

Practical Installation Rules

Connect capacitor banks at the main switchboard (bulk correction) or at large motor terminals (individual correction); never over-correct an individual motor beyond its no-load magnetising kVAr (self-excitation risk when the supply is removed).

Capacitors must discharge to a safe voltage within the manufacturer-stated time before re-energisation or maintenance.

Provide short-circuit protection (HRC fuses or an MCCB) and an inrush-limiting contactor or series reactor.

3. Harmonics from Non-Linear Loads

Linear loads draw sinusoidal current; non-linear loads draw pulsed current and inject harmonics — integer multiples of the 50 Hz fundamental: VFDs, UPS rectifiers, computers and SMPS, LED drivers, battery chargers, and arc welders.

Triplen harmonics (3rd = 150 Hz, 9th, 15th): zero-sequence — they are in phase across L1/L2/L3 and add arithmetically in the neutral (Chapter 3.4), producing neutral currents that can exceed phase current. Design response: full-size or double neutral, and the 0.86 cable derating when triplen content is 15–33%.

Other effects: transformer and capacitor overheating, nuisance MCB tripping, RCD blinding (choose Type F or B where appropriate, Chapter 5.4), and distorted voltage (THD) that mal-times sensitive controls.

Mitigation: segregate dirty loads on dedicated DBs (Chapter 3.4), detuned (series-reactor) capacitor banks, passive or active harmonic filters, and K-rated transformers for heavy non-linear concentrations.

4. Power Quality at Commissioning

Voltage sag from motor starting: DOL starting of large motors (6–8 × FLC) depresses voltage for adjacent consumers — the reason reduced-voltage starters (star-delta, soft starter) are required for larger motors (Chapter 3.2).

Verification: post-turn-on checks include voltage measurement at the intake and at circuit extremities (400 V / 230 V within the declared variations), phase rotation, and observation of flicker under load cycling (Chapters 7 and 8).

5. Harmonic Orders, Sequence, and Neutral Behaviour

Examiners expect candidates to classify harmonics by their phase sequence, because sequence decides where the current goes:

  • Harmonic Order (at 50 Hz) Sequence Behaviour in 3-Phase 4-Wire Systems
  • Fundamental 1st (50 Hz) Positive Balanced currents cancel in the neutral

3rd 150 Hz Zero Adds arithmetically in the neutral ( I N ≈ 3 × I h 3 I_N \approx 3 \times I_{h3} I N ​ ≈ 3 × I h 3 ​ )

  • 5th 250 Hz Negative Cancels in neutral; causes motor reverse-torque and heating
  • 7th 350 Hz Positive Cancels in neutral; transformer and cable heating
  • 9th 450 Hz Zero Adds in the neutral like the 3rd

Only the triplen (zero-sequence) orders accumulate in the neutral conductor — which is why a modern office full of computers and LED drivers can overheat a neutral that is perfectly balanced at 50 Hz.

6. Power Factor Correction in the ≤45 kVA Context

Within the Electrician licence scope (small factories, workshops, eating houses), correction is usually applied as a fixed or automatically switched capacitor bank at the main intake , sized from the maximum-demand calculation rather than per-motor. The design sequence is: (1) compute installation kW and existing PF from meter readings or nameplates; (2) choose a target PF (typically 0.95); (3) size Q c = P ( tan ⁡ ϕ 1 − tan ⁡ ϕ 2 ) Q_c = P(\tan\phi_1 - \tan\phi_2) Q c ​ = P ( tan ϕ 1 ​ − tan ϕ 2 ​ ) ; (4) verify the capacitor's cable, breaker, and discharge device; and (5) record the bank on the SLD with its kVAr rating and protection. Becausecapacitors raise the fault level slightly and can resonate with supply inductance when harmonics are present, detuning reactors are added whenever non-linear load exceeds roughly 15–20% of the installation.