1 Introduction & Exam Overview
1.1 About the Texas Journeyman Electrician Exam 1.2 The Two-Part Exam Format (Knowledge + Calculations) 1.3 Eligibility, Application & Scheduling
2 NEC Structure & Navigation
2.1 Key NEC Definitions (Article 100) 2.2 How the NEC is Organized 2.3 NEC Index and Quick Lookup Strategies 2.4 Reading Electrical Plans, Symbols, and Schedules
3 Electrical Theory & Fundamentals
3.1 Ohm's Law, Power, and Series/Parallel Circuits 3.2 Conductors, Resistance, and Voltage Drop 3.3 Three-Phase Systems and Power Factor
4 Services & Service Equipment
4.1 Service Entrance Conductors and Service Point 4.2 Service Disconnecting Means 4.3 Grounding Electrode Systems for Services 4.4 Service Load Calculations
5 Separately Derived Systems & Feeders
5.1 Separately Derived Systems 5.2 Feeder Sizing, Ampacity, and Tap Rules 5.3 Feeder Load Calculations
6 Branch Circuits & Receptacles
6.1 Branch Circuit Sizing and Conductor Selection 6.2 Receptacle Spacing and Required Outlets 6.3 GFCI and AFCI Requirements 6.4 Lighting Outlets and Switch-Controlled Circuits
7 Overcurrent Protection
7.1 Overcurrent Principles and OCPD Types 7.2 Small-Conductor and Continuous-Load Rules 7.3 Motor Overcurrent and Short-Circuit Protection
8 Wiring Methods, Conductors & Boxes
8.1 Wiring Methods and Raceways 8.2 Conductor Insulations and Ampacity 8.3 Conduit and Raceway Fill 8.4 Boxes and Box Fill 8.5 Cable Trays and Underground Wiring 8.6 Cabinets, Cutout Boxes, and Panelboards
9 Equipment Grounding & Bonding
9.1 Equipment Grounding Conductors 9.2 Bonding & the Effective Ground-Fault Current Path 9.3 Equipment and Box Grounding Connections
10 Equipment, Devices & Transformers
10.1 Luminaires and Lighting (NEC Article 410) 10.2 Switches and Device Wiring (NEC Articles 404 & 400) 10.3 Appliances and Utilization Equipment (NEC Articles 422 & 424) 10.4 Transformers (NEC Article 450) 10.5 Working Space and Equipment Access (NEC 110.26)
11 Motors & Generators
11.1 Motor Branch Circuits & Conductors 11.2 Motor Disconnects, Controllers & Starters 11.3 Generators & Emergency Systems
12 Control Devices & Disconnecting Means
12.1 General Disconnecting Means Principles 12.2 HVAC and Refrigeration Disconnects 12.3 Motor Control Circuits and VFDs
13 Dwelling Load Calculations
13.1 General Lighting and Receptacle Load 13.2 Appliance, Range, and Dryer Load 13.3 Neutral Load and Service Sizing
14 Commercial & Advanced Calculations
14.1 Commercial Lighting and Receptacle Load 14.2 Continuous Loads and Equipment Demand 14.3 Voltage Drop and Conductor Sizing 14.4 Commercial Building Load Capstone
15 Special Occupancies & Conditions
15.1 Hazardous (Classified) Locations — NEC Articles 500–506 15.2 Health Care Facilities — NEC Article 517 15.3 Pools, Spas, and Fountains — NEC Article 680 (Beyond GFCI) 15.4 Other Specific Occupancies — A Survey 15.5 Data Processing Rooms and Communications Systems
16 Renewable Energy Technologies
16.1 Solar PV Systems (Article 690) 16.2 Energy Storage and EV Charging (Articles 706, 625)
17 Exam Strategy & Final Review
17.1 Time Management and NEC Lookup Speed 17.2 Test Day and Final Practice
14.1 Commercial Lighting and Receptacle Load
Key Takeaways Explain This Topic AI
NEC 2026 Table 120.42(A) sets office buildings at 1.3 VA/ft² and retail stores at 1.9 VA/ft² — these values already include the 125% continuous load factor, so do not apply it again.
Per 120.14(I), each receptacle yoke or strap in a non-dwelling occupancy is calculated at not less than 180 VA; a piece of equipment with four or more receptacles uses 90 VA per receptacle.
Table 120.45 gives lighting demand factors only for hospitals (40%/20%), hotels and motels (50%/40%/30%), and warehouses (100%/50%); offices, retail, restaurants, and schools fall under All Others at 100%.
Table 120.47 reduces non-dwelling receptacle loads: the first 10 kVA at 100% and the remainder at 50%.
In banks and office buildings, NEC 120.14(K) takes the LARGER of the 120.14(I) receptacle load after Table 120.47 or 1 VA per square foot — the two are never added.
Last updated: October 2026
Why Non-Dwelling Load Calculations Matter
The TX Journeyman exam's Calculations part (26 questions, 110 minutes) tests your ability to compute feeder and service loads for commercial and industrial buildings. Non-dwelling load calculations follow a different path from the single-family dwelling calculations covered in Chapter 13: the occupancy types, unit loads, demand factors, and receptacle rules are all distinct. A single wrong table value can cascade through every step of a multi-part calculation question.
Current Load-Calculation Lookups
Use the 2026 Article 120 references in this section. Older study materials may use Article 220:
- 2023 reference 2026 reference Purpose
- Table 220.42(A) Table 120.42(A) Non-dwelling general lighting unit loads
- Table 220.45 Table 120.45 General lighting demand factors
- Table 220.47 Table 120.47 Receptacle demand factors
120.5(E) addresses the Article 120 load calculation. The conductor and overcurrent-device checks under Articles 210 and 215 are separate steps; avoid counting the same continuous-load allowance twice.
Table 120.42(A) — General Lighting Loads by Occupancy
For non-dwelling occupancies, the minimum general lighting load equals the floor area (in square feet, measured from outside dimensions per 120.5(C)) multiplied by the unit load from Table 120.42(A).
- Occupancy Type VA/ft²
- Bank / Office 1.3
- Church / Religious Facility 1.4
- Club / Restaurant 1.5
- Court Room 1.4
- Gymnasium / Armory 1.7
- Hospital / Healthcare 1.6
- Hotel / Motel (Guest Rooms) 1.7
- Industrial / Manufacturing 1.5
- Lodge / Dormitory 1.7
- Retail Store / Barber / Beauty 1.9
- School 1.5
- Warehouse (Storage) 0.3
- Garage (Commercial / Parking) 0.3
Critical note: The table note states that the 125% continuous load factor is already included in these unit values. Do not apply an additional 125% multiplier to the general lighting load when using Table 120.42(A). This is a frequent exam trap for students who learned the pre-2020 table values (which did not include the 125% factor).
Footnotes classify unlisted occupancies: banks are office-type; barber shops and beauty parlors are retail; clubs are restaurant occupancies; commercial garages are parking garage occupancies; armories and auditoriums are gymnasium-type.
- Receptacle and Outlet Loads — 120.14(A), (G), (H), and (I)
- 120.14(A) — Specific Loads
Lighting and receptacle outlets for specific loads (other than show windows) are calculated at not less than the computed load for those outlets. If a receptacle supplies a specific appliance, use the nameplate rating.
120.14(G) — Show Windows
Show window lighting is calculated at 200 VA per linear foot of show window, measured along its base. This is a separate calculation from the Table 120.42(A) general lighting unit load — do not combine them.
120.14(I) — Receptacle Outlets (Non-Dwelling)
For other than dwelling units, each receptacle outlet is calculated at not less than 180 VA per yoke (strap) . A standard duplex receptacle on one strap counts as 180 VA total — not 360 VA. A piece of equipment with four or more receptacles on a single strap is calculated at 90 VA per receptacle (e.g., a quad = 4 × 90 = 360 VA).
120.14(H) — Fixed Multioutlet Assemblies
In other than dwelling units and hotel/motel guest rooms, fixed multioutlet assemblies are calculated by length , not by receptacle count:
- Condition Rule Unit Load
- Appliances unlikely to be used simultaneously Each 5 ft (1.5 m) or fraction = 1 outlet 180 VA
- Appliances likely to be used simultaneously Each 1 ft (300 mm) or fraction = 1 outlet 180 VA
The key exam distinction: a workshop with hand tools plugging in intermittently uses the 5 ft rule; an assembly line where stations run continuously uses the 1 ft rule.
Table 120.45 — Lighting Load Demand Factors (Non-Dwelling Rows)
After computing the general lighting load from Table 120.42(A), demand factors from Table 120.45 may reduce it for feeder and service sizing only (not for branch-circuit count):
- Occupancy Portion of Lighting Load (VA) Demand Factor
- Hospitals First 50,000 or less 40%
- Remainder over 50,000 20%
- Hotels/Motels (incl. apartment houses without cooking) First 20,000 or less 50%
- 20,001 – 100,000 40%
- Remainder over 100,000 30%
- Warehouses (storage) First 12,500 or less 100%
- Remainder over 12,500 50%
- All others Total VA 100%
Key exam point: Offices, retail stores, restaurants, schools, churches, and garages all fall under All others at 100% — no demand factor reduction applies. A common error is mistakenly applying the hotel or warehouse brackets to an office or retail building.
Footnote: These demand factors do not apply to areas in hospitals, hotels, or motels where all lighting is likely to be energized simultaneously (operating rooms, ballrooms, dining rooms) — those areas are calculated at 100%.
120.14(K) — Banks and Office Buildings
Banks and office buildings get a rule of their own, and it is the single most-missed step in a commercial calculation. In those two occupancies the receptacle load is the larger of :
The load from 120.14(I) (180 VA per strap) after applying the Table 120.47 demand factors, or
1 VA per square foot of floor area.
You compute both and carry the bigger number forward — you never add them. In a sparsely populated office the 1 VA/ft² floor wins; in a densely populated call center the strap count wins. Nothing equivalent exists for retail, restaurants, or schools, where 120.14(I) alone governs.
Table 120.47 — Receptacle Load Demand Factors
Receptacle loads calculated under 120.14(H) and (I) may be reduced for feeder and service sizing:
- Portion of Receptacle Load Demand Factor
- First 10 kVA (10,000 VA) or less 100%
- Remainder over 10 kVA 50%
If the total receptacle load is 10,000 VA or less, no reduction applies. This demand factor is separate from the lighting demand factors in Table 120.45 — apply them independently to their respective load components.
Worked Example: 5,000 sq ft Office Building
Given: A 5,000 sq ft office building with 60 receptacle outlets, each on one strap/yoke.
- Step 1 — General Lighting Load (Table 120.42(A))
- Unit load for office = 1.3 VA/ft²
- 5,000 ft² × 1.3 VA/ft² = 6,500 VA
The 125% continuous factor is already included — do not apply again.
- Step 2 — Receptacle Load (120.14(I))
- 60 straps × 180 VA/strap = 10,800 VA
- Step 3 — Apply Table 120.45 Demand Factor to Lighting
- Office = "All others" → 100%
- 6,500 VA × 100% = 6,500 VA
- Step 4 — Apply Table 120.47 Demand Factor to Receptacles
- First 10,000 VA × 100% = 10,000 VA
- Remaining 800 VA × 50% = 400 VA
- Receptacle demand = 10,400 VA
- Step 5 — Apply the 120.14(K) Comparison
Because this is an office building, 120.14(K) requires a comparison before the receptacle number is final:
- 120.14(K) option Calculation Result
- (K)(1) 120.14(I) after Table 120.47 10,000 VA at 100% + 800 VA at 50% 10,400 VA
- (K)(2) 1 VA per square foot 5,000 ft² × 1 VA/ft² 5,000 VA
The larger of the two governs, so the receptacle load stays at 10,400 VA . Had this office contained only 20 receptacles, (K)(1) would have produced 3,600 VA and the 5,000 VA floor from (K)(2) would have taken over — which is exactly the case the capstone in Section 14.4 walks through.
- Step 6 — Total Computed Load
- 6,500 + 10,400 = 16,900 VA
If this building were served by a 240 V single-phase feeder:
I = 16,900 VA ÷ 240 V = 70.4 A
This example demonstrates the two independent demand factor tables plus the office-building floor: Table 120.45 applies to general lighting, Table 120.47 applies to receptacles, and 120.14(K) then checks the receptacle result against 1 VA per square foot. For an office building, the lighting demand factor is 100% (All others), while the receptacle demand factor reduces the load only above 10 kVA.