Study guide

8.4 Boxes and Box Fill

Texas Journeyman Electrician License Exam Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 About the Texas Journeyman Electrician Exam 1.2 The Two-Part Exam Format (Knowledge + Calculations) 1.3 Eligibility, Application & Scheduling

2 NEC Structure & Navigation

2.1 Key NEC Definitions (Article 100) 2.2 How the NEC is Organized 2.3 NEC Index and Quick Lookup Strategies 2.4 Reading Electrical Plans, Symbols, and Schedules

3 Electrical Theory & Fundamentals

3.1 Ohm's Law, Power, and Series/Parallel Circuits 3.2 Conductors, Resistance, and Voltage Drop 3.3 Three-Phase Systems and Power Factor

4 Services & Service Equipment

4.1 Service Entrance Conductors and Service Point 4.2 Service Disconnecting Means 4.3 Grounding Electrode Systems for Services 4.4 Service Load Calculations

5 Separately Derived Systems & Feeders

5.1 Separately Derived Systems 5.2 Feeder Sizing, Ampacity, and Tap Rules 5.3 Feeder Load Calculations

6 Branch Circuits & Receptacles

6.1 Branch Circuit Sizing and Conductor Selection 6.2 Receptacle Spacing and Required Outlets 6.3 GFCI and AFCI Requirements 6.4 Lighting Outlets and Switch-Controlled Circuits

7 Overcurrent Protection

7.1 Overcurrent Principles and OCPD Types 7.2 Small-Conductor and Continuous-Load Rules 7.3 Motor Overcurrent and Short-Circuit Protection

8 Wiring Methods, Conductors & Boxes

8.1 Wiring Methods and Raceways 8.2 Conductor Insulations and Ampacity 8.3 Conduit and Raceway Fill 8.4 Boxes and Box Fill 8.5 Cable Trays and Underground Wiring 8.6 Cabinets, Cutout Boxes, and Panelboards

9 Equipment Grounding & Bonding

9.1 Equipment Grounding Conductors 9.2 Bonding & the Effective Ground-Fault Current Path 9.3 Equipment and Box Grounding Connections

10 Equipment, Devices & Transformers

10.1 Luminaires and Lighting (NEC Article 410) 10.2 Switches and Device Wiring (NEC Articles 404 & 400) 10.3 Appliances and Utilization Equipment (NEC Articles 422 & 424) 10.4 Transformers (NEC Article 450) 10.5 Working Space and Equipment Access (NEC 110.26)

11 Motors & Generators

11.1 Motor Branch Circuits & Conductors 11.2 Motor Disconnects, Controllers & Starters 11.3 Generators & Emergency Systems

12 Control Devices & Disconnecting Means

12.1 General Disconnecting Means Principles 12.2 HVAC and Refrigeration Disconnects 12.3 Motor Control Circuits and VFDs

13 Dwelling Load Calculations

13.1 General Lighting and Receptacle Load 13.2 Appliance, Range, and Dryer Load 13.3 Neutral Load and Service Sizing

14 Commercial & Advanced Calculations

14.1 Commercial Lighting and Receptacle Load 14.2 Continuous Loads and Equipment Demand 14.3 Voltage Drop and Conductor Sizing 14.4 Commercial Building Load Capstone

15 Special Occupancies & Conditions

15.1 Hazardous (Classified) Locations — NEC Articles 500–506 15.2 Health Care Facilities — NEC Article 517 15.3 Pools, Spas, and Fountains — NEC Article 680 (Beyond GFCI) 15.4 Other Specific Occupancies — A Survey 15.5 Data Processing Rooms and Communications Systems

16 Renewable Energy Technologies

16.1 Solar PV Systems (Article 690) 16.2 Energy Storage and EV Charging (Articles 706, 625)

17 Exam Strategy & Final Review

17.1 Time Management and NEC Lookup Speed 17.2 Test Day and Final Practice

8.4 Boxes and Box Fill

Key Takeaways Explain This Topic AI

Table 314.16(B) volume allowances per conductor: #14 = 2.0 in³, #12 = 2.0 in³, #10 = 2.5 in³, #8 = 3.0 in³, #6 = 5.0 in³

A device yoke (switch or receptacle) counts as 2 times the largest conductor connected to it under 314.16(B)(3) — the most commonly missed allowance

Internal cable clamps are counted once total, based on the largest conductor in the box (314.16(B)(4))

Equipment grounding conductors: the first and largest EGC gets a full Table 314.16(B) allowance; each additional EGC (14–6 AWG) adds 0.25 in³

NEC 300.14 requires at least 6 in. of free conductor at each box, with at least 3 in. extending outside the box opening

Last updated: August 2026

Why Box Fill Matters on the TX Journeyman Exam

Box-fill calculations are a core Calculations-part topic. The exam presents a box with a list of conductors, devices, and fittings, then asks for the minimum box volume required — or whether a given box is compliant. You must know the volume allowances in Table 314.16(B) and how each item in a box is counted. There are at least six distinct categories, and miscounting one is the most common reason candidates miss the question.

  • Article 314 — Outlet, Device, Pull, and Junction Boxes
  • 314.16 — Number of Conductors in Boxes

Boxes must be sized to provide adequate free space for all contained conductors and devices. There are two methods:

314.16(A) — Boxes 6 in.³ or smaller: Use Table 314.16(A), which lists the maximum number of conductors by box size (based on #14 and #12 conductor equivalents).

314.16(B) — Box Volume Calculations: Compute the required volume from the allowances in Table 314.16(B) . This method is used whenever the box contains conductors of mixed sizes, devices, clamps, or EGCs — which describes most real-world boxes and virtually all exam questions.

Table 314.16(B) — Volume Allowances

Each item in a box gets a volume allowance based on the largest conductor in its category:

  • Item Volume Allowance
  • 314.16(B)(1) — Each conductor entering the box Per Table 314.16(B) by conductor size
  • 314.16(B)(2) — Fixture stud or hickey 1 × largest conductor connected to the stud
  • 314.16(B)(3) — Device or equipment yoke (switch, receptacle) 2 × largest conductor connected to the device
  • 314.16(B)(4) — Internal cable clamps (all clamps counted once) 1 × largest conductor in the box

314.16(B)(5) — Equipment grounding conductors 1 × largest EGC, plus 0.25 in.³ for each additional EGC (14–6 AWG)

Conductor volume allowances by size (Table 314.16(B)):

  • Conductor Size Volume Allowage
  • 14 AWG 2.0 in.³
  • 12 AWG 2.0 in.³
  • 10 AWG 2.5 in.³
  • 8 AWG 3.0 in.³
  • 6 AWG 5.0 in.³
  • How Each Item Is Counted

Conductors entering the box: Each conductor that enters from outside counts once, based on its size. A conductor running through the box without a splice counts once. A conductor that originates entirely inside the box (a pigtail, for example) does not count.

Device yoke (switch or receptacle): Each yoke counts as 2 × the largest conductor connected to that device. A single-gang box with one receptacle and #12 conductors on it = 2 × 2.0 = 4.0 in.³ for the device alone.

Internal cable clamps: If the box has internal cable clamps (a metal box with built-in clamps), count one allowance for all the clamps, based on the largest conductor in the box. External cable connectors (NM connectors screwed to the outside) are not counted.

Equipment grounding conductors: Count the largest EGC once as a full allowance (for example, #12 EGC = 2.0 in.³). Each additional EGC (14–6 AWG) adds 0.25 in.³ based on the largest of the additional EGCs.

Fixture studs and hickeys: Each counts as 1 × the largest conductor on the stud.

Worked Example — Box-Fill Calculation

Problem: A box contains the following:

  • 3 #12 THHN conductors entering from the top
  • 2 #14 THHN conductors entering from the side
  • 1 duplex receptacle (device yoke) with #12 conductors connected
  • 2 internal cable clamps
  • 2 #12 equipment grounding conductors

Calculate the minimum box volume required.

Step 1 — Conductors entering the box:

  • 3 #12 = 3 × 2.0 = 6.0 in.³
  • 2 #14 = 2 × 2.0 = 4.0 in.³
  • Subtotal = 10.0 in.³

Step 2 — Device yoke (receptacle):

Largest conductor on device = #12 → 2 × 2.0 = 4.0 in.³

Step 3 — Internal cable clamps:

All clamps counted once; largest conductor in box = #12 → 1 × 2.0 = 2.0 in.³

Step 4 — Equipment grounding conductors:

  • First (largest) #12 EGC = 2.0 in.³
  • One additional #12 EGC = 0.25 in.³
  • Subtotal = 2.25 in.³

Step 5 — Total required volume:

10.0 + 4.0 + 2.0 + 2.25 = 18.25 in.³

Select a box: A 4 in. square box with 1-1/4 in. depth has 18.0 in.³ — not enough (18.0 < 18.25). A 4 in. square box with 1-1/2 in. depth has 21.0 in.³ — sufficient. The minimum compliant box is 4 in. square, 1-1/2 in. deep .

  • Related Article 314 and 300 Rules
  • 314.24 — Depth of Boxes

Boxes must be deep enough to prevent damage to conductors when devices or fittings are installed. A box that is too shallow can pinch conductors against the device strap.

300.14 — Minimum Free Conductor Length at Boxes

At least 6 in. of free conductor must be provided at each outlet box, junction box, or switch point, measured from the point where the conductor emerges from the raceway or cable sheath. At least 3 in. of that conductor must extend outside the box opening . This ensures conductors can be terminated without strain and devices can be replaced safely.

314.17 — Conductors Entering Boxes

Conductors entering a box must be secured. Where raceways or cables enter the box, they must be clamped or secured to the box. Nonmetallic cable (NM) must be secured within 12 in. of the box. Metal raceways are secured at the box by their listed fittings or connectors. Knockout closures or listed fittings are required to protect conductors from sharp edges.

314.29 — Access to Boxes

Boxes must be accessible without removing any part of the building finish or structure. A junction box buried above a finished ceiling with no access panel is a code violation. Exception: boxes covered by removable panels (suspended ceiling tiles, access doors) are considered accessible.

Key Takeaways for the Exam

Table 314.16(B) allowances: #14 = 2.0 in.³, #12 = 2.0 in.³, #10 = 2.5 in.³, #8 = 3.0 in.³, #6 = 5.0 in.³.

Device yoke = 2 × largest conductor on that device — the most commonly missed allowance.

Internal cable clamps = 1 × largest conductor (all clamps counted as one unit).

EGCs: first and largest gets a full allowance; each additional (14–6 AWG) adds 0.25 in.³.

300.14 requires 6 in. of free conductor at each box, with 3 in. outside the box opening.