Study guide
6.6 Primary & Secondary Power Supply Calculations
Texas Fire Alarm Installer License Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Texas Insurance Code Chapter 6002 Foundations
1.1 Chapter 6002 Purpose, Scope & Statutory Definitions 1.2 State Preemption and the Limits of Local Regulation 1.3 Commissioner and SFMO Authority; Adopted Standards and Editions 1.4 Activities Not Regulated: The § 6002.155 Exemptions 1.5 Required Device Labels, Listings and Consumer Information
2 Chapter 2: Certificates of Registration and Company Operating Rules
2.1 Registration Certificates: Main Office, Branch Office and Single Station 2.2 Insurance Requirements for Registered Firms 2.3 Business Location, Designated Employee and Vehicle Identification (§ 34.610) 2.4 Ownership Changes, Officer Changes and Revised Certificates
3 Chapter 3: Individual Licenses, Qualifying Tests and Renewal
3.1 The Six Texas Fire Alarm Licenses and What Each May Do 3.2 License Applications, Fingerprinting and Criminal History 3.3 The Qualifying Tests: TFM11, TFM12, TFM13, TFM14 and Their References 3.4 NICET, ESA and Professional Engineer Substitutions 3.5 Fees, the Two-Year Renewal Cycle and Late Renewal 3.6 Training Schools, Instructors and the Residential Technician Course
4 Chapter 4: Texas Field Practice — Installation, Service, Monitoring and Certification
4.1 Sales, Installation and Service Rules (§ 34.616) 4.2 Monitoring Requirements for Registered Firms (§ 34.616(c)) 4.3 The Installation Certificate (SF035) and Its Distribution 4.4 The Three-Stage Installation Inspection (§ 34.618) 4.5 Fire Alarm Plans and Record Drawings (§ 34.619)
5 Chapter 5: Texas Labels, Records and Enforcement
5.1 Installation and Service Labels (§§ 34.620–34.621) 5.2 Inspection/Test, Yellow and Red Labels and Impairment Notice 5.3 The Texas Recordkeeping and Retention Map 5.4 Prohibited Practices, Discipline, Enforcement and Penalties
6 Chapter 6: NFPA 72 Fundamentals, Power, Signals and Pathways
6.1 Identifying the Applicable NFPA Standards for TFM12 6.2 NFPA 72 Scope, Organization & Core Life Safety Definitions 6.3 NFPA 72 Documentation and Personnel Qualifications 6.4 Types of Equipment and Circuits: IDC, NAC, SLC and System Architectures 6.5 Signal Priority, Annunciation and Monitoring Integrity 6.6 Primary & Secondary Power Supply Calculations 6.7 Principles of Electricity and Notification Circuit Voltage Drop 6.8 Initiating & Notification Circuit Pathways (Class A, B, N, X) 6.9 Pathway Survivability, Shared Pathways and Circuit Separation
7 Chapter 7: Initiating Devices and Detection
7.1 Smoke, Heat & Flame Detection Principles & Spacing Rules 7.2 Gas Detection, Carbon Monoxide Detection and Special-Application Devices 7.3 Detector Selection and Environmental Limits 7.4 Duct Smoke Detectors, HVAC Controls & Specialized Sensors 7.5 Manual Fire Alarm Boxes, Waterflow Switches & Supervisory Initiating Devices 7.6 Sprinkler, Suppression and Releasing Service Interface
8 Chapter 8: Notification Appliances, Emergency Communications and Control Functions
8.1 Audible Notification Requirements & Sound Level Standards 8.2 Visible Notification Spacing, Synchronization & Candela Ratings 8.3 Emergency Communications Systems & Mass Notification Integration 8.4 Emergency Control Functions: Elevators, HVAC, Doors and Egress 8.5 Protected Premises Systems and the Sequence of Operation
9 Chapter 9: Wiring Methods, Supervising Stations and Inspection, Testing and Maintenance
9.1 NEC Article 760 Wiring Methods, Cable Classes & Circuit Protection 9.2 NEC Article 300 Wiring Methods and Installation Workmanship 9.3 Supervising Station Monitoring Systems & Signal Transmission Methods 9.4 Public Emergency Alarm Reporting Systems and Auxiliary Systems 9.5 Periodic Inspection, Testing & Impairment Procedures 9.6 System Acceptance Testing, Commissioning & Maintenance Records
6.6 Primary & Secondary Power Supply Calculations
Key Takeaways Explain This Topic AI
NFPA 72 mandates that the primary power supply must be an individual dedicated branch circuit supplied from a commercial utility or generator, mechanically locked, with the disconnect breaker painted red and clearly labeled with its source location.
To prevent nuisance disconnection of life safety equipment, the primary power circuit breaker must not be powered from a Ground-Fault Circuit-Interrupter (GFCI) or Arc-Fault Circuit-Interrupter (AFCI) circuit where permitted by code.
Standard protected premises fire alarm systems must maintain a secondary (standby) power supply capable of operating the entire system in quiescent supervisory mode for at least 24 hours, followed by a minimum of 5 minutes of full-load evacuation alarm operation.
Emergency Voice/Alarm Communications Systems (EVACS) and High-Rise voice systems require 24 hours of standby operation followed by at least 15 minutes of continuous full-load audio evacuation alarm.
Secondary battery calculations must include a mandatory 20% safety / aging derating factor (multiplying total calculated amp-hours by 1.20), and the dedicated automatic charging circuit must fully restore discharged batteries to 100% capacity within 48 hours.
Last updated: August 2026
Primary & Secondary Power Supply Calculations
A fire alarm system must remain fully operational even when catastrophic events, severe weather, or structural fires sever utility electrical power to a building. Under NFPA 72 Chapter 10 and NEC Article 760 , every fire alarm system must be equipped with at least two independent, reliable power sources: a Primary Power Supply and a Secondary (Standby) Power Supply .
For Texas fire alarm licensees, understanding the mechanical requirements of dedicated power circuits and mastering the mathematical calculations for secondary battery banks are essential design and testing competencies tested on the SFMO licensing exam.
1. Primary Power Supply Requirements (NFPA 72 § 10.6.5)
The primary power supply provides continuous electrical energy for normal system operation, battery charging, and all supervisory monitoring functions. It must meet rigid installation criteria: +-----------------------------------------------------------------------------+
- | PRIMARY POWER SUPPLY CODE REQUIREMENTS |
- | |
- | [UTILITY / GENERATOR] |
- | | |
- | v |
- | +-----------------------------------------------------------------------+ |
- | | DEDICATED BRANCH CIRCUIT | |
- | | - Supplies ONLY the fire alarm system and dedicated secondary power. | |
- | | - Dedicated neutral conductor (no shared multi-wire branch neutral). | |
- | | - Prohibited from supplying general lighting or wall receptacles. | |
- | +-----------------------------------------------------------------------+ |
- | | |
- | v |
- | +-----------------------------------------------------------------------+ |
- | | CIRCUIT DISCONNECT & BREAKER LOCKING | |
- | | - Circuit breaker painted RED or marked with red identifier. | |
- | | - Mechanical lock-on device permanently attached (breaker lock-out). | |
- | | - Labeled 'FIRE ALARM CIRCUIT' in durable, permanent lettering. | |
- | | - Location of breaker documented inside FACP deadfront door. | |
- | +-----------------------------------------------------------------------+ |
- | | |
- | v |
- | +-----------------------------------------------------------------------+ |
- | | OVERCURRENT PROTECTION & GFCI RESTRICTION | |
- | | - Sized per NEC Article 760 (typically 15A or 20A branch). | |
- | | - Shall NOT be connected through a GFCI or AFCI device unless | |
- | | specifically required by the NEC for hazardous/wet areas. | |
- | +-----------------------------------------------------------------------+ |
- +-----------------------------------------------------------------------------+
Critical Primary Power Checklist:
Dedicated Branch Circuit: The branch circuit cannot feed any other loads (no convenience receptacles, water coolers, or room lights).
Mechanical Lock: A permanent mechanical lock-on clip must prevent accidental manual shutoff by building maintenance staff.
Red Marking & Identification: The breaker handle or face must be identified in red and marked "FIRE ALARM CIRCUIT."
Directory Labeling: The electrical distribution panel directory must clearly state the fire alarm circuit number, and the location of the electrical distribution panel must be posted permanently inside the FACP enclosure.
Dedicated Neutral: The branch circuit neutral cannot be shared across multi-wire branch circuits to avoid induced transient surges or unintended disconnects during neutral servicing.
2. Secondary (Standby) Power Supply Standards
The secondary power supply must automatically, bumplessly transfer to supply operating power within 10 seconds of primary AC power failure, without generating false alarms or dropping supervisory data. +-----------------------------------------------------------------------------+
- | SECONDARY POWER DURATION STANDARDS BY SYSTEM TYPE |
- | |
- | SYSTEM CLASSIFICATION STANDBY TIME ALARM DURATION |
- | ===================================== ============ ============== |
- | 1. Standard Protected Premises 24 Hours + 5 Minutes |
- | (Horns, Strobes, Bells) |
- | |
- | 2. Emergency Voice / Alarm (EVACS) 24 Hours + 15 Minutes |
- | (High-Rise / Mass Notification) |
- | |
- | 3. Supervising Station / Central Sta. 24 Hours + 5 Minutes |
- | (Without standby generator) |
- | |
- | 4. Supervising Station / Central Sta. 4 Hours + 5 Minutes |
- | (With auto-start generator per NFPA 110) |
- | |
- | 5. Household Systems (NFPA 72 Ch 29) 24 Hours + 4 Minutes |
- +-----------------------------------------------------------------------------+
Important
Standard Systems vs. Voice (EVACS) Systems: Note the crucial distinction on licensing exams: Standard commercial systems with horn/strobe evacuation require 24 hours of standby followed by 5 minutes of alarm . Buildings equipped with an Emergency Voice/Alarm Communications System (EVACS) or High-Rise voice systems require 24 hours of standby followed by 15 minutes of full-load voice evacuation alarm .
3. Battery Chemistries & Operational Profile
Secondary power for protected premises systems is almost universally supplied by rechargeable secondary storage batteries housed inside the FACP enclosure or an adjacent battery cabinet: +-----------------------------------------------------------------------------+
- | BATTERY CHEMISTRIES COMPARISON |
- | |
- | 1. VALVE-REGULATED LEAD-ACID (VRLA - AGM / GEL CELL) |
- | - Industry standard for commercial fire alarm systems. |
- | - Maintenance-free, non-spillable, sealed construction. |
- | - Float charge voltage: 2.25 - 2.30 Volts per cell (13.5 - 13.8V per 12V).|
- | - Typical operational service life: 3 to 5 years. |
- | - Must be replaced when capacity drops below 80% of rated nameplate. |
- | |
- | 2. NICKEL-CADMIUM (Ni-Cad) |
- | - Higher initial cost; highly resistant to extreme temperature swings. |
- | - Long service life (10-15 years), but subject to cell voltage memory. |
- | |
- | 3. LITHIUM-ION (Listed Energy Storage Systems) |
- | - High energy density, compact footprint. |
- | - Requires specialized battery management systems (BMS) and listing |
- | under UL 1973 / NFPA 855 for fire alarm control units. |
- +-----------------------------------------------------------------------------+
- Ambient Temperature Derating
Batteries are rated at a nominal laboratory temperature of 77°F (25°C) .
Cold Environments: Operating in unheated spaces (e.g., parking garages or exterior riser rooms at 32°F / 0°C) reduces available discharge capacity by 20% to 30%, requiring a derating factor (larger battery capacity).
Hot Environments: Elevated temperatures above 95°F (35°C) accelerate internal chemical degradation and plate corrosion, reducing battery service life by approximately 50% for every 18°F (10°C) permanent increase above baseline.
4. The NFPA 72 Battery Sizing Formula & Mathematical Method
To size a battery bank accurately, the designer must calculate the total current drawn by all connected components in two distinct operational states:
Non-Alarm Quiescent Standby Current ( I standby I_{\text{standby}} I standby ): Current consumed by main processor, LCD displays, addressable SLC modules, smoke detector idle currents, and supervisory relays.
Full-Load Alarm Current ( I alarm I_{\text{alarm}} I alarm ): Current consumed by the panel during an active alarm, including all activated notification appliances (horns, strobes, chimes, audio amplifiers), auxiliary control relays, and communicator transmitters. +-----------------------------------------------------------------------------+
- | BATTERY LOAD PROFILE OVER TIME |
- | |
- | CURRENT (Amps) |
- | ^ |
- | | +---------------+ |
- | | | ALARM CURRENT | |
- | | | (e.g., 4.5A) | |
- | | | (5 or 15 min) | |
- | | +---------------+ |
- | | | |
- | | +---------------------------------------------------------+ |
- | | | STANDBY CURRENT (e.g., 0.65A) | |
- | | +---------------------------------------------------------+ |
- | +------------------------------------------------------------+-----> |
- | 0 Hours 24 Hours End of Test |
- | TIME DURATION |
- +-----------------------------------------------------------------------------+
Step-by-Step Sizing Formulas Standby Amp-Hours ( A H sb ) = I standby (Amperes) × T standby (Hours) \text{Standby Amp-Hours } (AH_{\text{sb}}) = I_{\text{standby}} \text{ (Amperes)} \times T_{\text{standby}} \text{ (Hours)} Standby Amp-Hours ( A H sb ) = I standby (Amperes) × T standby (Hours) Alarm Amp-Hours ( A H al ) = I alarm (Amperes) × T alarm (Hours) \text{Alarm Amp-Hours } (AH_{\text{al}}) = I_{\text{alarm}} \text{ (Amperes)} \times T_{\text{alarm}} \text{ (Hours)} Alarm Amp-Hours ( A H al ) = I alarm (Amperes) × T alarm (Hours) Subtotal Amp-Hours ( A H sub ) = A H sb + A H al \text{Subtotal Amp-Hours } (AH_{\text{sub}}) = AH_{\text{sb}} + AH_{\text{al}} Subtotal Amp-Hours ( A H sub ) = A H sb + A H al Required Battery Capacity ( A H total ) = A H sub × 1.20 (20% Safety / Aging Factor) \text{Required Battery Capacity } (AH_{\text{total}}) = AH_{\text{sub}} \times 1.20 \text{ (20\% Safety / Aging Factor)} Required Battery Capacity ( A H total ) = A H sub × 1.20 (20% Safety / Aging Factor)
Warning
The 1.20 Safety / Aging Factor: NFPA 72 § 10.6.7.2.1 mandates that calculated battery capacity must include a minimum 20% safety margin (multiplying by 1.20). This accounts for battery aging, cell degradation over time, internal resistance buildup, and manufacturing tolerances. Failing to apply the 1.20 multiplier is an automatic failure on the Texas licensing exam!
5. Comprehensive Worked Engineering Example
Project Specifications:
System Type: Standard commercial office protected premises fire alarm.
Standby Current ( I standby I_{\text{standby}} I standby ): 0.85 Amperes (850 mA).
Alarm Current ( I alarm I_{\text{alarm}} I alarm ): 4.20 Amperes.
Required Standby Time ( T standby T_{\text{standby}} T standby ): 24.0 Hours.
Required Alarm Time ( T alarm T_{\text{alarm}} T alarm ): 5 Minutes ( 5 / 60 = 0.0833 5 / 60 = 0.0833 5/60 = 0.0833 Hours).
Step-by-Step Solution:
Step 1: Calculate Standby Amp-Hours A H sb = 0.85 A × 24.0 hr = 20.40 Amp-Hours AH_{\text{sb}} = 0.85 \text{ A} \times 24.0 \text{ hr} = 20.40 \text{ Amp-Hours} A H sb = 0.85 A × 24.0 hr = 20.40 Amp-Hours
Step 2: Calculate Alarm Amp-Hours A H al = 4.20 A × ( 5 60 ) hr = 4.20 × 0.0833 = 0.35 Amp-Hours AH_{\text{al}} = 4.20 \text{ A} \times \left(\frac{5}{60}\right) \text{ hr} = 4.20 \times 0.0833 = 0.35 \text{ Amp-Hours} A H al = 4.20 A × ( 60 5 ) hr = 4.20 × 0.0833 = 0.35 Amp-Hours
Step 3: Calculate Subtotal Capacity A H sub = 20.40 AH + 0.35 AH = 20.75 Amp-Hours AH_{\text{sub}} = 20.40 \text{ AH} + 0.35 \text{ AH} = 20.75 \text{ Amp-Hours} A H sub = 20.40 AH + 0.35 AH = 20.75 Amp-Hours
Step 4: Apply 20% Aging / Safety Factor (1.20) A H total = 20.75 AH × 1.20 = 24.90 Amp-Hours AH_{\text{total}} = 20.75 \text{ AH} \times 1.20 = 24.90 \text{ Amp-Hours} A H total = 20.75 AH × 1.20 = 24.90 Amp-Hours
Step 5: Select Commercial Battery Bank Standard sealed lead-acid batteries are manufactured in nominal ratings: 7 AH, 12 AH, 18 AH, 26 AH, 33 AH, 55 AH, etc. Since 24.90 AH > 18 AH 24.90 \text{ AH} > 18 \text{ AH} 24.90 AH > 18 AH , the technician must install a minimum of two 12V 26 AH batteries in series (for a 24VDC system).
6. Battery Charger Performance & Trouble Annunciation
NFPA 72 § 10.6.7.3 establishes strict performance rules for the integral or external battery charging equipment:
Recharge Timeline: An automatic battery charger must be capable of fully recharging a completely discharged battery bank back to 100% capacity within 48 hours while the system continues to operate under maximum normal supervisory load.
Supervision of Power Supplies: The FACP must continuously monitor the secondary power source. The panel must transmit a distinct Trouble Signal within 200 seconds for any of the following conditions:
Total loss of primary AC power.
Physical disconnection of the battery bank.
Battery charger failure or blown battery fuse.
Low battery terminal voltage (falling below 85% of rated system operating voltage—i.e., below 20.4VDC on a nominal 24VDC system).