Study guide

4.3 The Installation Certificate (SF035) and Its Distribution

Texas Fire Alarm Installer License Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Texas Insurance Code Chapter 6002 Foundations

1.1 Chapter 6002 Purpose, Scope & Statutory Definitions 1.2 State Preemption and the Limits of Local Regulation 1.3 Commissioner and SFMO Authority; Adopted Standards and Editions 1.4 Activities Not Regulated: The § 6002.155 Exemptions 1.5 Required Device Labels, Listings and Consumer Information

2 Chapter 2: Certificates of Registration and Company Operating Rules

2.1 Registration Certificates: Main Office, Branch Office and Single Station 2.2 Insurance Requirements for Registered Firms 2.3 Business Location, Designated Employee and Vehicle Identification (§ 34.610) 2.4 Ownership Changes, Officer Changes and Revised Certificates

3 Chapter 3: Individual Licenses, Qualifying Tests and Renewal

3.1 The Six Texas Fire Alarm Licenses and What Each May Do 3.2 License Applications, Fingerprinting and Criminal History 3.3 The Qualifying Tests: TFM11, TFM12, TFM13, TFM14 and Their References 3.4 NICET, ESA and Professional Engineer Substitutions 3.5 Fees, the Two-Year Renewal Cycle and Late Renewal 3.6 Training Schools, Instructors and the Residential Technician Course

4 Chapter 4: Texas Field Practice — Installation, Service, Monitoring and Certification

4.1 Sales, Installation and Service Rules (§ 34.616) 4.2 Monitoring Requirements for Registered Firms (§ 34.616(c)) 4.3 The Installation Certificate (SF035) and Its Distribution 4.4 The Three-Stage Installation Inspection (§ 34.618) 4.5 Fire Alarm Plans and Record Drawings (§ 34.619)

5 Chapter 5: Texas Labels, Records and Enforcement

5.1 Installation and Service Labels (§§ 34.620–34.621) 5.2 Inspection/Test, Yellow and Red Labels and Impairment Notice 5.3 The Texas Recordkeeping and Retention Map 5.4 Prohibited Practices, Discipline, Enforcement and Penalties

6 Chapter 6: NFPA 72 Fundamentals, Power, Signals and Pathways

6.1 Identifying the Applicable NFPA Standards for TFM12 6.2 NFPA 72 Scope, Organization & Core Life Safety Definitions 6.3 NFPA 72 Documentation and Personnel Qualifications 6.4 Types of Equipment and Circuits: IDC, NAC, SLC and System Architectures 6.5 Signal Priority, Annunciation and Monitoring Integrity 6.6 Primary & Secondary Power Supply Calculations 6.7 Principles of Electricity and Notification Circuit Voltage Drop 6.8 Initiating & Notification Circuit Pathways (Class A, B, N, X) 6.9 Pathway Survivability, Shared Pathways and Circuit Separation

7 Chapter 7: Initiating Devices and Detection

7.1 Smoke, Heat & Flame Detection Principles & Spacing Rules 7.2 Gas Detection, Carbon Monoxide Detection and Special-Application Devices 7.3 Detector Selection and Environmental Limits 7.4 Duct Smoke Detectors, HVAC Controls & Specialized Sensors 7.5 Manual Fire Alarm Boxes, Waterflow Switches & Supervisory Initiating Devices 7.6 Sprinkler, Suppression and Releasing Service Interface

8 Chapter 8: Notification Appliances, Emergency Communications and Control Functions

8.1 Audible Notification Requirements & Sound Level Standards 8.2 Visible Notification Spacing, Synchronization & Candela Ratings 8.3 Emergency Communications Systems & Mass Notification Integration 8.4 Emergency Control Functions: Elevators, HVAC, Doors and Egress 8.5 Protected Premises Systems and the Sequence of Operation

9 Chapter 9: Wiring Methods, Supervising Stations and Inspection, Testing and Maintenance

9.1 NEC Article 760 Wiring Methods, Cable Classes & Circuit Protection 9.2 NEC Article 300 Wiring Methods and Installation Workmanship 9.3 Supervising Station Monitoring Systems & Signal Transmission Methods 9.4 Public Emergency Alarm Reporting Systems and Auxiliary Systems 9.5 Periodic Inspection, Testing & Impairment Procedures 9.6 System Acceptance Testing, Commissioning & Maintenance Records

4.3 The Installation Certificate (SF035) and Its Distribution

Key Takeaways Explain This Topic AI

After completion of the installation, modification, or addition of a system or single station detector unit — except for a one- or two-family residence — the licensee must complete an installation certificate in the format provided by the state fire marshal (§ 34.617).

The Texas installation certificate is completed in lieu of the installation form required by the adopted standard, unless the local authority having jurisdiction requires otherwise (§ 34.617).

The certificate must be presented to the owner or the owner's representative or posted near the main control panel (§ 34.617).

The certificate must identify the standards applicable to the installation and certify compliance, and where a § 34.616(b)(4) variance applies, must identify the specific variance and the authority for it (§ 34.617).

Distribution: original at the site of installation; one copy retained by the certifying company for the life of the system or ten years, whichever occurs first; one copy sent to the local AHJ within 10 days after completion of installation (§ 34.617(1)–(3)).

Last updated: August 2026

Why This Section Matters

The installation certificate is the document that converts finished work into legal certification. It is also the rule most often mis-cited in third-party study material — the correct citation is § 34.617 , not the label rules at §§ 34.620–34.624. TDI publishes the form as SF035, Fire Alarm Installation Certificate .

1. When a Certificate Is Required

"After completion of the installation, modification, or addition of a system or single station detector unit , except for a one-or-two-family residence , the licensee shall complete an installation certificate…"

Trigger Certificate required?

  • New commercial system Yes
  • Modification or addition to an existing commercial system Yes
  • Single station detector unit installed in a commercial occupancy Yes
  • Any work in a one- or two-family residence No — expressly excepted

Service or repair that is not an installation, modification, or addition No — a service label under § 34.621 applies

Remember that § 6002.002 defines "installation" to include extension, modification, or alteration — so the certificate obligation attaches to far more work than just new construction.

2. In Lieu of the Adopted Standard's Form

"…the licensee shall complete an installation certificate in the format provided by the state fire marshal in lieu of the installation form required by the adopted standard unless required otherwise by the local authority having jurisdiction ."

This is § 34.607(a)'s variance clause in action: the Texas form displaces NFPA 72's record of completion. The one exception is a local AHJ that requires the NFPA form as well. The format itself is determined by the state fire marshal and is provided by the SFMO on request .

3. Content of the Certificate

The certificate shall identify the standards applicable to the installation and certify compliance with such standards . If a variance is permitted under § 34.616(b)(4) — that is, the work complies with an edition previously adopted by the political subdivision rather than the § 34.607 edition — then the specific variance and the authority for that variance shall be identified on the certificate.

That single sentence is why the certificate always names an edition. A certificate that simply says "installed per NFPA 72" without an edition is incomplete.

4. Who Gets It and How Long It Is Kept

"The certificate shall be presented to the owner or the owner's representative or posted near the main control panel ."

Note the or — presentation to the owner and posting at the panel are alternatives, not both.

When the certificate has been completed, legible copies shall be distributed as follows :

  • # Copy Destination Timing / retention
  • (1) Original At the site of installation After completion of the installation

(2) One copy Retained by the certifying company for access by the SFMO The life of the system or ten years, whichever occurs first

(3) One copy The local authority having jurisdiction Sent within 10 days after completion of installation

Two numbers to memorize: 10 days to the AHJ, and life of the system or 10 years, whichever occurs first in the company file. The "whichever occurs first" phrasing means a 25-year-old system's certificate may lawfully have been purged at year 10.

5. Who Signs, and Who Must Be Present

Section 34.617 says "the licensee shall complete" the certificate. Read that with § 34.616(b)(1):

The certifying licensee must be licensed under the ACR number of the registered firm responsible for the installation ; and

That licensee must be present for the final acceptance test prior to certification .

Read it also with § 34.619(a): the planner is an APS, an RAS (as applicable), or a Texas registered PE, and § 34.620(d)(5) requires the installation label to carry the name and license number of the planner. So a complete commercial job normally involves a planner and a certifying licensee, who may be the same person when an APS acts as an FAL under § 6002.154(d).

6. Worked Fact Patterns

Pattern A. A firm adds a smoke detector and two horn/strobes to an existing office system on May 1 and completes acceptance testing the same day.

→ This is a modification/addition : an installation certificate is required. The AHJ copy must be sent by May 11 . The company's copy is kept for the life of the system or 10 years, whichever comes first. An installation label under § 34.620 also goes inside the panel cover.

Pattern B. A firm installs a monitored system in a two-family duplex.

→ No installation certificate — § 34.617 excepts one- and two-family residences. But § 34.619(f) requires drawings showing device and panel locations, retained by the installing firm for not less than one year , and § 34.620 still requires an installation label.

Pattern C. A city has adopted an older NFPA 72 edition and the system was planned and installed to that edition.

→ Permitted by § 34.616(b)(4), and the certificate must identify the specific variance and the authority for it .

Pattern D. The AHJ requires the NFPA 72 record of completion in addition to the Texas form.

→ Permitted. Section 34.617's "in lieu of" applies "unless required otherwise by the local authority having jurisdiction."