Study guide
9.6 System Acceptance Testing, Commissioning & Maintenance Records
Texas Fire Alarm Installer License Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Texas Insurance Code Chapter 6002 Foundations
1.1 Chapter 6002 Purpose, Scope & Statutory Definitions 1.2 State Preemption and the Limits of Local Regulation 1.3 Commissioner and SFMO Authority; Adopted Standards and Editions 1.4 Activities Not Regulated: The § 6002.155 Exemptions 1.5 Required Device Labels, Listings and Consumer Information
2 Chapter 2: Certificates of Registration and Company Operating Rules
2.1 Registration Certificates: Main Office, Branch Office and Single Station 2.2 Insurance Requirements for Registered Firms 2.3 Business Location, Designated Employee and Vehicle Identification (§ 34.610) 2.4 Ownership Changes, Officer Changes and Revised Certificates
3 Chapter 3: Individual Licenses, Qualifying Tests and Renewal
3.1 The Six Texas Fire Alarm Licenses and What Each May Do 3.2 License Applications, Fingerprinting and Criminal History 3.3 The Qualifying Tests: TFM11, TFM12, TFM13, TFM14 and Their References 3.4 NICET, ESA and Professional Engineer Substitutions 3.5 Fees, the Two-Year Renewal Cycle and Late Renewal 3.6 Training Schools, Instructors and the Residential Technician Course
4 Chapter 4: Texas Field Practice — Installation, Service, Monitoring and Certification
4.1 Sales, Installation and Service Rules (§ 34.616) 4.2 Monitoring Requirements for Registered Firms (§ 34.616(c)) 4.3 The Installation Certificate (SF035) and Its Distribution 4.4 The Three-Stage Installation Inspection (§ 34.618) 4.5 Fire Alarm Plans and Record Drawings (§ 34.619)
5 Chapter 5: Texas Labels, Records and Enforcement
5.1 Installation and Service Labels (§§ 34.620–34.621) 5.2 Inspection/Test, Yellow and Red Labels and Impairment Notice 5.3 The Texas Recordkeeping and Retention Map 5.4 Prohibited Practices, Discipline, Enforcement and Penalties
6 Chapter 6: NFPA 72 Fundamentals, Power, Signals and Pathways
6.1 Identifying the Applicable NFPA Standards for TFM12 6.2 NFPA 72 Scope, Organization & Core Life Safety Definitions 6.3 NFPA 72 Documentation and Personnel Qualifications 6.4 Types of Equipment and Circuits: IDC, NAC, SLC and System Architectures 6.5 Signal Priority, Annunciation and Monitoring Integrity 6.6 Primary & Secondary Power Supply Calculations 6.7 Principles of Electricity and Notification Circuit Voltage Drop 6.8 Initiating & Notification Circuit Pathways (Class A, B, N, X) 6.9 Pathway Survivability, Shared Pathways and Circuit Separation
7 Chapter 7: Initiating Devices and Detection
7.1 Smoke, Heat & Flame Detection Principles & Spacing Rules 7.2 Gas Detection, Carbon Monoxide Detection and Special-Application Devices 7.3 Detector Selection and Environmental Limits 7.4 Duct Smoke Detectors, HVAC Controls & Specialized Sensors 7.5 Manual Fire Alarm Boxes, Waterflow Switches & Supervisory Initiating Devices 7.6 Sprinkler, Suppression and Releasing Service Interface
8 Chapter 8: Notification Appliances, Emergency Communications and Control Functions
8.1 Audible Notification Requirements & Sound Level Standards 8.2 Visible Notification Spacing, Synchronization & Candela Ratings 8.3 Emergency Communications Systems & Mass Notification Integration 8.4 Emergency Control Functions: Elevators, HVAC, Doors and Egress 8.5 Protected Premises Systems and the Sequence of Operation
9 Chapter 9: Wiring Methods, Supervising Stations and Inspection, Testing and Maintenance
9.1 NEC Article 760 Wiring Methods, Cable Classes & Circuit Protection 9.2 NEC Article 300 Wiring Methods and Installation Workmanship 9.3 Supervising Station Monitoring Systems & Signal Transmission Methods 9.4 Public Emergency Alarm Reporting Systems and Auxiliary Systems 9.5 Periodic Inspection, Testing & Impairment Procedures 9.6 System Acceptance Testing, Commissioning & Maintenance Records
9.6 System Acceptance Testing, Commissioning & Maintenance Records
Key Takeaways Explain This Topic AI
System acceptance testing requires 100% functional verification of every initiating device, notification appliance, auxiliary control interface, secondary power supply and communication pathway prior to final sign-off.
Auxiliary emergency control functions — elevator Phase I recall, elevator power shutdown by shunt trip, HVAC shutdown, magnetic door release and electrically locked egress door release — must be functionally tested by operating the initiating device and observing the controlled equipment.
In Texas the closeout document is the installation certificate required by 28 TAC § 34.617, completed in lieu of the record-of-completion form required by the adopted standard unless the local AHJ requires otherwise.
Retention differs by document: service, maintenance and testing records 2 years (§ 34.616(d)); the certifying company’s installation certificate copy for the life of the system or 10 years, whichever occurs first (§ 34.617(2)); the installation inspection form 5 years from system certification (§ 34.618); one- and two-family drawings not less than 1 year (§ 34.619(f)).
Texas uses adhesive labels, not punched tags: white installation (inside the panel cover, § 34.620), white service (§ 34.621), blue inspection/test (§ 34.622), yellow non-compliance (§ 34.623) and red inoperable/impaired (§ 34.624).
Last updated: August 2026
System Acceptance Testing, Commissioning & Maintenance Records
The final phase of a fire alarm project is System Acceptance Testing and Commissioning . Prior to turning a newly installed or modified system over to the building owner and securing a Certificate of Occupancy (CO) from the local building official, the installation contractor must verify that 100% of the system components, circuits, and integrated auxiliary controls operate in strict accordance with the approved construction documents, NFPA 72 , NEC Article 760 , and local municipal codes.
In Texas, the commissioning process culminates in the installation certificate required by 28 TAC § 34.617 — the form TDI publishes as SF035 — and the white installation label affixed inside the control panel cover under § 34.620 . Understanding the technical testing protocols, the auxiliary control interfaces, and the recordkeeping rules in 28 TAC §§ 34.616(d), 34.617, 34.618 and 34.619 is vital for passing the PSI TFM11 and TFM12 examinations .
1. 100% System Acceptance Testing Protocols
Acceptance testing is not a random sampling; NFPA 72 Chapter 14 mandates 100% comprehensive functional verification of every single device, appliance, circuit, and interface before the system can be certified: +---------------------------------------------------------------------------------------------------+
- | 100% ACCEPTANCE TESTING VERIFICATION SCOPE |
- | |
- | [INITIATING DEVICES] ===> 100% of Pull Stations, Smoke, Heat, Duct, Waterflow, Tampers |
- | [NOTIFICATION APPLIANCES] ===> 100% of Horns, Strobes (sync check), Speakers (intelligibility)|
- | [EMERGENCY CONTROL RELAYS] ===> 100% of Fan Shutdowns, Damper Closures, Door Holders, Recalls |
- | [POWER SUPPLIES & BACKUP] ===> 100% Verification of AC Power Loss & Battery Standby Duration |
- | [SIGNAL TRANSMISSION] ===> 100% Verification of Supervising Station Receipt <= 90 Seconds |
- | [CIRCUIT INTEGRITY] ===> Open, Short, Ground Fault Verification on all Class A/B/X loops|
- +---------------------------------------------------------------------------------------------------+
Key Acceptance Testing Steps:
Circuit Fault Simulation: Technicians must simulate opens, grounds, and short-circuit fault conditions on every Initiating Device Circuit (IDC), Signaling Line Circuit (SLC), and Notification Appliance Circuit (NAC) to verify that the FACP annunciates the correct trouble condition within 200 seconds (NFPA 72 10.19.1) without dropping active alarms.
Primary & Secondary Power Switching: Primary 120VAC power must be disconnected at the dedicated branch circuit breaker to verify seamless automatic transfer to battery power without generating false alarms or dropping system programming.
Sound Pressure & Strobe Synchronization: Sound levels must be measured with an ANSI Type 2 Sound Level Meter (A-weighted, slow response) to confirm compliance with audible audibility thresholds ( + 15 dBA +15\text{ dBA} + 15 dBA above average ambient or + 5 dBA +5\text{ dBA} + 5 dBA above maximum ambient lasting 60 seconds). Strobe flash synchronization across entire viewing fields must be visually confirmed.
2. Integrated Auxiliary Life Safety Controls & Interfaces
Modern fire alarm systems interface with critical building mechanical, vertical transportation, and security subsystems. During acceptance testing, every auxiliary control function must be operated and verified: +---------------------------------------------------------------------------------------------------+
- | AUXILIARY LIFE SAFETY CONTROL INTERFACE MATRIX |
- | |
- | +-------------------------------------------------------------------------------------------+ |
- | | [1. ELEVATOR EMERGENCY OPERATIONS (ASME A17.1 / NFPA 72 21.3)] | |
- | | • Phase I Designated Level Recall: Smoke detector in elevator lobby (floors 2+) | |
- | | • Phase I Alternate Level Recall: Smoke detector in designated/primary floor lobby | |
- | | • Elevator Machine Room / Hoistway Smoke: Recalls car to primary floor + Fire Hat Flashes| |
- | | • Hoistway / Machine Room Heat Detector: Shunt trip power BEFORE sprinkler activates | |
- | +-------------------------------------------------------------------------------------------+ |
- | | |
- | v |
- | +-------------------------------------------------------------------------------------------+ |
- | | [2. HVAC SMOKE CONTROL & DAMPER CLOSURE (NFPA 90A / NFPA 72 21.7)] | |
- | | • Duct smoke detectors (supply > 2,000 CFM, return > 15,000 CFM) shut down supply fans | |
- | | • Smoke dampers close automatically upon duct detector or general alarm activation | |
- | +-------------------------------------------------------------------------------------------+ |
- | | |
- | v |
- | +-------------------------------------------------------------------------------------------+ |
- | | [3. EGRESS & DOOR HOLDER RELEASE (NFPA 101 / NFPA 72 21.8)] |
- | | • Magnetic door holders de-energize (fail-safe) upon general alarm or local smoke | |
- | | • Access-controlled egress doors unlock immediately upon alarm, power loss, or manual push| |
- +---------------------------------------------------------------------------------------------------+
Elevator Recall & Shunt Trip Specifics:
Designated Floor Recall: When a smoke detector activates in any elevator lobby other than the designated primary egress floor (typically Level 1), the elevator must recall non-stop to the designated primary floor and park with doors open.
Alternate Floor Recall: When a smoke detector in the designated primary floor lobby activates, the elevator must recall to the approved alternate level (e.g., Level 2 or basement) so firefighters do not discharge passengers into smoke.
Elevator Shunt Trip (ASME A17.1): Where elevator machine rooms or hoistways are equipped with automatic fire sprinklers, a fixed-temperature heat detector with a lower temperature rating and higher sensitivity (or listed shunt trip module) must disconnect the main electrical power to the elevator prior to sprinkler discharge, preventing car free-fall or erratic electrical brake behavior.
3. Closeout Documentation and the Texas Installation Certificate
Upon successful completion of acceptance testing, a complete closeout package is assembled and turned over. +-------------------------------------------------------------------------+
- | CLOSEOUT DOCUMENTATION PACKAGE |
- | |
- | |-- Texas installation certificate (Form SF035) 28 TAC 34.617 |
- | |-- Record (as-built) drawings incl. sequence of |
- | | operation, delivered to the owner 28 TAC 34.619(c) |
- | |-- Completed installation inspection form 28 TAC 34.618 |
- | |-- Battery standby and alarm load calculations NFPA 72 Ch. 10 |
- | |-- NAC voltage-drop calculations to the last |
- | | appliance, verified at the lowest regulated |
- | | output voltage the panel is listed to deliver NFPA 72 Ch. 18 |
- | |-- Input/output sequence of operation matrix NFPA 72 Ch. 7 |
- | |-- Manufacturer cut sheets and operating manuals NFPA 72 Ch. 7 |
- | `-- Site-specific software backup and passwords |
- | provided to the owner on request, subject to |
- | the firm's liability waiver 28 TAC 34.616(b)(6)
- | |
- | NOTE: 28 TAC 34.619(e) - plans, manuals and documents shall NOT be |
- | stored inside fire alarm panels. |
- +-------------------------------------------------------------------------+
- The Texas installation certificate (28 TAC § 34.617)
Required after completion of the installation, modification, or addition of a system or single station detector unit, except for a one- or two-family residence .
Completed in the format provided by the state fire marshal , in lieu of the installation form required by the adopted standard, unless required otherwise by the local AHJ . TDI publishes the form as SF035, Fire Alarm Installation Certificate .
Must identify the standards applicable to the installation and certify compliance ; where a § 34.616(b)(4) variance applies, the specific variance and the authority for it must be identified.
Presented to the owner or the owner's representative , or posted near the main control panel.
Distribution: original at the site of installation ; one copy retained by the certifying company for the life of the system or ten years, whichever occurs first ; one copy sent to the local AHJ within 10 days after completion of installation.
Under § 34.616(b)(1) the certifying licensee must be present for the final acceptance test and must be licensed under the ACR number of the firm responsible for the installation .
4. Texas Record Retention — Four Different Clocks
- Document Rule Retention Clock starts
- Service, maintenance and testing records § 34.616(d) 2 years minimum —
Installation certificate — certifying company copy § 34.617(2) Life of the system or 10 years, whichever occurs first Completion of installation
Installation inspection form § 34.618 5 years , kept at the licensed firm's office Date of system certification
One- and two-family dwelling drawings § 34.619(f) Not less than 1 year Completion of the installation
Records of service, maintenance and testing must be available for examination by the state fire marshal or the state fire marshal's representative (§ 34.616(d)), and every registration application includes written authorization for the SFMO to enter, examine and inspect the applicant's premises (§ 34.613(a)(2)).
Administrative sanctions for non-compliance are imposed as provided in Government Code § 417.010 (28 TAC § 34.625(c)) and may include suspension, revocation, refusal to issue or renew, a cease and desist order, an administrative penalty, or restitution. Neither Chapter 6002 nor Subchapter F states a per-day penalty amount.
5. Texas Labels at Closeout (28 TAC §§ 34.620–34.624)
Texas documents system status with adhesive labels , approximately three inches high by three inches wide, each headed "DO NOT REMOVE BY ORDER OF TEXAS STATE FIRE MARSHAL" in all capitals in at least 10-point bold face type.
- Label Rule Color Placement Time in place
- Installation § 34.620 White , black lettering Inside the control panel cover Permanent installation record
- Service § 34.621 White , black lettering Inside or outside the cover At least 2 years
- Inspection/Test § 34.622 Blue , black lettering Inside or outside the cover At least 5 years
Yellow § 34.623 Yellow , black lettering Outside the cover Until corrected and a service label certifies the correction
Red § 34.624 Red , black lettering Outside the cover Until corrected and a service label certifies the correction
Closeout sequencing. Section 34.620(a) prohibits attaching a yellow or red label for the installation of a new system or new equipment used in an extension, alteration or modification. Section 34.622(c) permits an inspection/test label on a new installation only after the system has been accepted by the local AHJ .
Notification deadlines.
- Event Deadline Rule
- Yellow label attached → written notice to owner and AHJ 5 business days § 34.623(c)
- Red label, system inoperable → oral notice Immediately § 34.624(c)
- Red label, system inoperable → written notice Next business day § 34.624(c)
- Red label, fault or impairment → written notice 3 business days § 34.624(c)
- Yellow or red label removed → notice to AHJ 5 business days §§ 34.623(d), 34.624(d)
Caution
Who may remove a label. A yellow or red label remains in place until the conditions are corrected and a service label is attached certifying that the corrections were made , with the removed label's color and date marked on the service label (§ 34.621(b)). Labels may be removed by a licensed employee or agent of a registered firm, an employee of the State Fire Marshal's Office, or an authorized representative of a governmental agency with appropriate regulatory authority. Under § 34.616(b)(2), the licensee attaching a label must be licensed under the ACR number of the primary registered firm .