Study guide
3.2 ACCA Manual S Equipment Selection and Manual D Duct Design Principles
Texas Air Conditioning and Refrigeration Contractor License Exam Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
About the Texas ACR Contractor Exam Open-Book Strategy and the Approved Reference Library
2 Chapter 1: Texas Licensing Laws & TDLR Regulations
1.1 TDLR Licensing Framework, Class A vs Class B Scope, and Technician Registration 1.2 Insurance, Financial Responsibility, Display of License, and Advertising Rules 1.3 TDLR Enforcement, Violations, Administrative Penalties, and Continuing Education
3 Chapter 2: Thermodynamics & Core HVAC Principles
2.1 Heat Transfer Principles: Conduction, Convection, Radiation, and Sensible vs Latent Heat 2.2 Temperature, Pressure, Enthalpy, and the Pressure-Temperature Relationship 2.3 System Airflow Fundamentals, CFM Calculations, and Total External Static Pressure
4 Chapter 3: Load Calculations & System Sizing (Manual J, S, D)
3.1 ACCA Manual J Load Calculations: Heat Gain, Heat Loss, and Building Envelope Factors 3.2 ACCA Manual S Equipment Selection and Manual D Duct Design Principles 3.3 Texas Climate Design Conditions, Solar Gain, and Infiltration Adjustments
5 Chapter 4: Refrigerants, EPA Section 608 & Low-GWP A2L Transition
4.1 Refrigerant Classifications (CFC, HCFC, HFC, HFO) and EPA Section 608 Rules 4.2 AIM Act Phasedown, Next-Gen Low-GWP Refrigerants (R-454B, R-32), and A2L Safety Rules 4.3 Refrigerant Recovery, Recycling, Reclamation, Leak Repair Thresholds, and Evacuation
6 Chapter 5: Refrigeration Cycle & Core System Components
5.1 The Vapor-Compression Refrigeration Cycle and System Component States 5.2 Compressors: Types (Scroll, Reciprocating, Rotary), Maintenance, and Failure Modes 5.3 Condensers, Evaporators, and Expansion Devices (TXV, EEV, Fixed Orifice) 5.4 Service Valves, Filter-Driers, Sight Glasses, and Solenoid & Check Valves
7 Chapter 6: Air Distribution, Ductwork & Indoor Air Quality
6.1 Duct Layouts, Materials, Insulation, Duct Sealing, and Friction Loss 6.2 Air Balancing, Blower Performance Curves, and Air Distribution Fittings 6.3 Indoor Air Quality (IAQ): Ventilation, Filtration, Humidity Control, and ASHRAE 62.2 6.4 Mechanical Ventilation Rates, Air Equipment, and Refrigeration Machinery Rooms
8 Chapter 7: Heating Systems, Gas Controls & Venting
7.1 Gas-Fired Heating: Natural Gas, LP, Burners, Heat Exchangers, and Gas Piping 7.2 Gas Furnace Venting Categories, Draft Hoods, and Combustion Air Requirements 7.3 Electric Resistance Heating and Heat Pump Operation in Heating & Defrost Modes 7.4 Clothes Dryer Exhaust and Product-Conveying Duct Systems 7.5 Combustion Testing and Analysis: CO, Oxygen, Stack Temperature, Draft, and Efficiency
9 Chapter 8: Electrical Systems, Controls & Troubleshooting
8.1 HVAC Electrical Fundamentals: Voltage, Current, Resistance, and Transformer Sizing 8.2 Electric Motors: PSC, ECM, Capacitor Sizing, Relays, Contactors, and Starters 8.3 Schematics Reading, Control Circuits (24V), Thermostats, and Diagnostic Sequence 8.4 Pressure and Safety Controls: High/Low Pressure, Oil Safety, Freeze Protection, and Head Pressure Control
10 Chapter 9: Mechanical Codes & Texas Local Standards (IMC, IFGC & UMC)
9.1 International Mechanical Code (IMC): Equipment Clearances, Access, and Support 9.2 International Fuel Gas Code (IFGC): Pipe Sizing, Materials, Purging, and Testing 9.3 Condensate Drain Piping, Trap Sizing, Secondary Drain Protection, and Auxiliary Pans 9.4 Uniform Mechanical Code vs. International Mechanical Code: Adoption, Differences, and Locating Code Answers 9.5 Refrigerant Line Sizing, Piping Materials, Brazing, Oil Return, and Pipe Support
11 Chapter 10: Commercial Refrigeration & Process Cooling Systems
10.1 Commercial Refrigeration Systems: Walk-in Freezers, Coolers, and Multi-Compressor Racks 10.2 Defrost Systems: Electric, Hot Gas, Off-Cycle, and Evaporator Pressure Regulators (EPR) 10.3 Hydronic Chilled Water Systems, Boilers, and Process Cooling Fundamentals
12 Chapter 11: Jobsite Safety, OSHA Compliance & Business Practice
11.1 OSHA Safety Standards: Fall Protection, Personal Protective Equipment (PPE), and Ladder Safety 11.2 Lockout/Tagout (LOTO), Electrical Safety, High-Pressure Gas Cylinder Handling 11.3 Contractor Business Operations: Contracts, Lien Laws, Permits, Inspections, and Warranties 11.4 OSHA 29 CFR Part 1904: Recording and Reporting Occupational Injuries and Illnesses
3.2 ACCA Manual S Equipment Selection and Manual D Duct Design Principles
Key Takeaways Explain This Topic AI
ACCA Manual S restricts single-speed equipment cooling capacity to 95%–115% of Manual J total cooling load to prevent severe short-cycling and humidity control failure.
Equipment expanded performance tables must be evaluated at actual local outdoor design dry-bulb and indoor entering wet-bulb/dry-bulb conditions rather than AHRI nominal rating points.
Available Static Pressure (ASP) is calculated by subtracting all internal and external component pressure drops (coils, filters, grilles, heaters) from the blower's Total External Static Pressure (TESP).
Friction Rate (FR) represents static pressure drop per 100 feet of duct length and is computed as FR = (ASP x 100) / TEL.
Maximum recommended airflow velocities in residential duct systems are 700–900 FPM for supply trunks, 600–700 FPM for return trunks, and 400–450 FPM across filter grilles to maintain quiet operation.
Last updated: August 2026
Once peak heating and cooling loads have been determined using ACCA Manual J, the HVAC contractor must select appropriate equipment using ACCA Manual S and design the air distribution system using ACCA Manual D . Oversizing equipment or improperly sizing ductwork creates excessive noise, uneven room temperatures, inadequate humidity removal, and high operating costs.
1. ACCA Manual S Equipment Sizing Limits
ACCA Manual S establishes maximum allowable sizing limits for residential cooling and heating equipment. Sizing equipment based solely on AHRI nominal ratings (e.g., calling a unit a "3-ton system") is illegal under Texas mechanical codes because nominal capacity drops significantly under actual Texas design temperatures.
Cooling Capacity Sizing Limits (Single-Speed Systems)
Minimum Allowable Capacity : Total equipment cooling capacity must not be less than 95% of the Manual J total cooling load.
Maximum Allowable Capacity : Total equipment cooling capacity must not exceed 115% of the Manual J total cooling load.
Heat Pump & Variable-Speed Exception : Heat pumps and variable-capacity (inverter-driven) air conditioners may be sized up to 125% to 140% of the Manual J total cooling load to satisfy winter heating requirements or operate efficiently across wide modulation ranges.
Consequences of System Oversizing
Short-Cycling : Oversized equipment satisfies indoor dry-bulb temperature settings rapidly ( 5 – 10 minutes 5\text{--}10\text{ minutes} 5 – 10 minutes per cycle). The system shuts off before the evaporator coil reaches saturation temperature long enough to condense moisture, leaving indoor relative humidity elevated above 60%.
Compressor Wear & Energy Spikes : Inrush starting current occurs frequently, increasing electrical bills and accelerating mechanical wear on contactors, capacitors, and compressor windings.
2. Latent vs. Sensible Equipment Capacity Matching
Equipment selection requires evaluating expanded performance tables at actual design conditions: Sensible Heat Ratio ( S H R ) = Sensible Cooling Load ( Q s ) Total Cooling Load ( Q t ) \text{Sensible Heat Ratio } (SHR) = \frac{\text{Sensible Cooling Load } (Q_s)}{\text{Total Cooling Load } (Q_t)} Sensible Heat Ratio ( S H R ) = Total Cooling Load ( Q t ) Sensible Cooling Load ( Q s )
Calculate Building SHR : Divide Manual J sensible load by Manual J total load. In humid regions, building SHR may range between 0.70 0.70 0.70 and 0.80 0.80 0.80 .
Obtain Expanded Performance Data : Select equipment performance tables provided by the manufacturer at:
Local Outdoor Design Dry-Bulb Temperature (e.g., 100 ∘ F 100^\circ\text{F} 10 0 ∘ F )
Indoor Entering Air Wet-Bulb Temperature (EWB, typically 62 ∘ F– 63 ∘ F 62^\circ\text{F}\text{--}63^\circ\text{F} 6 2 ∘ F – 6 3 ∘ F corresponding to 75 ∘ F 75^\circ\text{F} 7 5 ∘ F DB / 50% RH)
Design Airflow CFM (typically 350 – 400 CFM/ton 350\text{--}400 \text{ CFM/ton} 350 – 400 CFM/ton )
Verify Sensible and Latent Capacities :
Equipment Sensible Capacity ( S -CAP S\text{-CAP} S -CAP ) must meet or exceed Manual J Sensible Load ( S -LOAD S\text{-LOAD} S -LOAD ).
Equipment Latent Capacity ( L -CAP L\text{-CAP} L -CAP ) must meet or exceed Manual J Latent Load ( L -LOAD L\text{-LOAD} L -LOAD ).
3. ACCA Manual D Duct Sizing Procedure
ACCA Manual D outlines the equal friction method for sizing supply and return duct systems. Sizing ductwork requires calculating the system's Friction Rate (FR) .
Step 1: Total External Static Pressure (TESP)
Determine the total external static pressure ( T E S P TESP TESP ) delivered by the selected blower at design CFM from the manufacturer's fan performance table (typically 0.50 in. w.c. 0.50 \text{ in. w.c.} 0.50 in. w.c. for standard residential air handlers).
Step 2: Component Static Pressure Drops
Sum all internal and external device pressure losses within the air path:
Evaporator Coil ( D P coil DP_{\text{coil}} D P coil ): e.g., 0.20 in. w.c. 0.20 \text{ in. w.c.} 0.20 in. w.c.
High-Efficiency Air Filter ( D P filter DP_{\text{filter}} D P filter ): e.g., 0.12 in. w.c. 0.12 \text{ in. w.c.} 0.12 in. w.c.
Supply Registers & Return Grilles ( D P grilles DP_{\text{grilles}} D P grilles ): e.g., 0.06 in. w.c. 0.06 \text{ in. w.c.} 0.06 in. w.c.
Balancing Dampers / Electric Heater ( D P aux DP_{\text{aux}} D P aux ): e.g., 0.04 in. w.c. 0.04 \text{ in. w.c.} 0.04 in. w.c. Total Component Losses = 0.20 + 0.12 + 0.06 + 0.04 = 0.42 in. w.c. \text{Total Component Losses} = 0.20 + 0.12 + 0.06 + 0.04 = 0.42 \text{ in. w.c.} Total Component Losses = 0.20 + 0.12 + 0.06 + 0.04 = 0.42 in. w.c.
Step 3: Available Static Pressure (ASP)
Subtract total component pressure losses from blower T E S P TESP TESP : A S P = T E S P − Total Component Losses ASP = TESP - \text{Total Component Losses} A SP = TESP − Total Component Losses A S P = 0.50 − 0.42 = 0.08 in. w.c. ASP = 0.50 - 0.42 = 0.08 \text{ in. w.c.} A SP = 0.50 − 0.42 = 0.08 in. w.c.
Step 4: Total Effective Length (TEL)
Measure the physical length of the longest (most restrictive) duct run from the air handler outlet to the furthest supply register, plus the return path. Add equivalent length values for all fittings, turns, elbows, tees, and boots along that critical path: T E L = Measured Straight Feet + Equivalent Feet of Fittings TEL = \text{Measured Straight Feet} + \text{Equivalent Feet of Fittings} TE L = Measured Straight Feet + Equivalent Feet of Fittings
Example : 80 ft straight duct + 120 ft equivalent fitting losses = 200 ft TEL 80\text{ ft straight duct} + 120\text{ ft equivalent fitting losses} = 200 \text{ ft TEL} 80 ft straight duct + 120 ft equivalent fitting losses = 200 ft TEL .
Step 5: Calculate Friction Rate (FR)
Calculate the friction rate per 100 feet of ductwork: F R = A S P × 100 T E L FR = \frac{ASP \times 100}{TEL} FR = TE L A SP × 100
Using A S P = 0.08 in. w.c. ASP = 0.08 \text{ in. w.c.} A SP = 0.08 in. w.c. and T E L = 200 ft TEL = 200 \text{ ft} TE L = 200 ft : F R = 0.08 × 100 200 = 8.0 200 = 0.040 in. w.c. per 100 ft FR = \frac{0.08 \times 100}{200} = \frac{8.0}{200} = 0.040 \text{ in. w.c. per 100 ft} FR = 200 0.08 × 100 = 200 8.0 = 0.040 in. w.c. per 100 ft
4. Duct Velocity Limits and Air Balancing
Manual D specifies maximum recommended air velocities across residential supply and return ductwork to maintain acoustic comfort and prevent static pressure drops:
- Duct Component / Location Maximum Recommended Velocity (FPM) Primary Noise & Performance Constraint
- Main Supply Trunk (Rigid Metal) 900 FPM Air rush noise in main trunk
- Main Supply Trunk (Flexible Duct) 700 FPM Duct sag and wall friction loss
- Main Return Trunk (Rigid / Flex) 600–700 FPM Excessive suction pressure drop
- Branch Runouts (Supply to Room) 600 FPM Air velocity noise at takeoff boots
- Filter Grilles (Return Register) 400–450 FPM Whistling noise through grille face
- Supply Diffusers / Registers 500–600 FPM Excessive face velocity and draftiness
Duct Sizing Reference Table (typical residential practice, roughly F R ≈ 0.08 – 0.10 in. w.c. / 100 ft FR \approx 0.08\text{--}0.10 \text{ in. w.c. / 100 ft} FR ≈ 0.08 – 0.10 in. w.c. / 100 ft )
Read this as a field rule of thumb, not as a Manual D answer. These are the diameters commonly run in residential work. At a true design friction rate of 0.05 in. w.c./100 ft the ducts come out noticeably larger — 100 CFM needs about a 7-inch metal round and 200 CFM about a 9-inch. On the exam, size from the actual friction chart or the ADI Duct Size Calculator at the friction rate the question gives you.
Airflow Volume (CFM) Flexible Duct Diameter (Inches) Round Metal Duct Diameter (Inches) Equivalent Rectangular Metal Size (Inches)
100 CFM 6 in. 5 in. 6 x 4 in.
200 CFM 8 in. 7 in. 8 x 6 in.
400 CFM 10 in. 9 in. 10 x 8 in.
600 CFM 12 in. 11 in. 12 x 8 in.
1,000 CFM 14 in. 13 in. 14 x 10 in.
1,200 CFM 16 in. 14 in. 16 x 10 in.