Study guide

16.3 Customer Information, Company Policies & Limits of Authority

City & Guilds 2365 Level 2 Diploma in Electrical Installations Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Qualification Overview

1.1 About the City & Guilds 2365 Level 2 Qualification 1.2 Study Strategy, Exam Technique & Resource Navigation

2 Health, Safety & Environmental Legislation, Risk Assessment & Permits

2.1 Statutory Framework & Health and Safety Law 2.2 Hazardous Substances, Incident Reporting & Welfare 2.3 Work Equipment, Manual Handling & PPE 2.4 Environmental Legislation, Pollution & Site Waste 2.5 Risk Assessments, Method Statements, Permits to Work & Safety Signs

3 Electrical Safety, Safe Isolation, Site Hazards & Emergencies

3.1 Safe Isolation Procedures & GS38 Compliance 3.2 Electrical Hazards & Electric Shock Physiology 3.3 Fire Safety, Site Supplies & Emergency Response 3.4 Accidents, First Aid, Emergency Procedures & Reporting

4 Working at Height & Access Equipment

4.1 Work at Height Regulations & Risk Management 4.2 Ladders, Stepladders & Podiums 4.3 Mobile Access Towers & Scaffolding Systems

5 Mathematical Principles, Units & Basic Mechanics

5.1 Mathematical Foundations & Transposition for Electricians 5.2 SI Units of Measurement in Electrotechnology 5.3 Basic Mechanics: Force, Work, Power & Mechanical Energy 5.4 Mass, Weight, Levers, Gears & Pulleys

6 Electron Theory, Resistance, Resistivity & DC Circuits

6.1 Resistance, Resistivity & Conductor Dimensions 6.2 Temperature Coefficient of Resistance 6.3 Ohm's Law, Power & Direct Current Calculations 6.4 Series, Parallel & Combination DC Circuits 6.5 Electron Theory, Conductors, Insulators & the Effects of Current

7 Magnetism, Electromagnetism & Transformers

7.1 Magnetic Fields, Flux & Solenoid Properties 7.2 Electromagnetic Induction & Motor/Generator Principles 7.3 Transformer Principles, Construction & Calculations

8 Alternating Current, Three-Phase Systems & Electronic Components

8.1 AC Waveform Generation & Key Values 8.2 AC Circuit Theory: Reactance, Impedance & Power Factor 8.3 Three-Phase Generation, Star-Delta & UK Distribution 8.4 Electronic Components in Electrical Systems

9 Industry Regulations, Technical Information & Drawings

9.1 Electrical Regulations, Standards & Part P 9.2 Electrical Drawings, Diagrams & BS EN 60617 Symbols 9.3 Technical Specifications, Schedules & Environmental Influences

10 Wiring Systems, Cables, Containment & Practical Installation

10.1 Thermoplastic, Armoured & Flexible Cables 10.2 Specialised Cables: MICC & Fire-Performance Cables 10.3 Conduit Systems: Steel & PVC 10.4 Trunking, Cable Tray & Cable Supports 10.5 Unit 204 Practical Skills: Tools, Preparation & Installing Wiring Systems

11 Final Circuits, Protective Devices, Alarm & Control Circuits

11.1 Lighting Circuits & Switching Arrangements 11.2 Power Circuits: Ring Final, Radial & Dedicated Circuits 11.3 Consumer Units, Distribution Boards & Protective Devices 11.4 Alarm, Emergency Lighting, Data & Control Circuits

12 Cable Selection & Structural Installation

12.1 Cable Current-Carrying Capacity & Correction Factors 12.2 Voltage Drop Principles & Calculations 12.3 Structural Integrity & Concealed Cable Routing

13 Supply Systems, Earthing, Shock Protection & Micro-Renewables

13.1 UK Electricity Supply Networks & Distribution 13.2 Earthing System Configurations: TN-S, TN-C-S (PME and PNB) & TT 13.3 Protective Conductors, Bonding & Earth Electrodes 13.4 Automatic Disconnection of Supply (ADS) & Maximum Zs 13.5 Micro-Renewable Energy Technologies

14 Electrical Inspection & Dead Testing Sequence

14.1 Inspection Principles & Testing Safety to GS38 14.2 Continuity Testing: Protective Conductors & Ring Circuits 14.3 Insulation Resistance & Polarity Verification

15 Live Testing, Certification & Handover

15.1 Live Testing: Earth Loop Impedance, PFC & RCD Testing 15.2 Certification, Handover & Commissioning

16 Communicating within Building Services Engineering (Unit 210)

16.1 The Construction Team: Site Management, Trades & Site Visitors 16.2 Information Sources: Legislation, Guidance & Workplace Documents 16.3 Customer Information, Company Policies & Limits of Authority 16.4 Communicating Effectively: Methods, Accessibility & Conflict

16.3 Customer Information, Company Policies & Limits of Authority

Key Takeaways Explain This Topic AI

An estimate is an approximate price, a quotation is a fixed price for a defined scope of work, an invoice requests payment, and a statement summarises the customer's account.

For contracts made in the customer's home or at a distance, consumers normally have a 14-day cancellation period under the Consumer Contracts Regulations 2013, and must be given cancellation information.

Handover information includes certificates, the Building Regulations compliance certificate, user instructions, warranties and as-fitted drawings.

Company policies on behaviour, timekeeping, dress code and the contract of employment shape working relationships and the company's image.

Apprentices and Level 2 staff work within limited authority and must refer requests such as extra work or price changes to their supervisor.

Last updated: October 2026

16.3 Customer Information, Company Policies & Limits of Authority

This section completes Unit 210 learning outcome 2. It covers the information given to customers , the company policies that affect working relationships, and the limits of personal authority at each level of the trade.

Information Given to Customers

Document What it is

Estimate An approximate cost based on the information available. It is a guide and may change.

Quotation A fixed price for a clearly defined scope of work. Once accepted, the price is binding unless the scope changes, in which case a variation is agreed.

Invoice A bill requesting payment for work done or goods supplied, showing the amount, payment terms and VAT details if the company is VAT registered.

Statement A summary of a customer's account showing invoices, payments received and the balance outstanding.

Statutory cancellation rights Information about the customer's legal right to cancel (see below).

Handover information Electrical certificates (EIC or MEIWC), the Building Regulations compliance certificate, manufacturers' user instructions, warranties, as-fitted drawings, operation and maintenance manuals, and a demonstration of how to use the installation.

Statutory cancellation rights

When a contract with a consumer is made away from the trader's business premises (for example in the customer's home) or at a distance (online or by phone), the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 normally give the consumer 14 days to cancel. The trader must give the customer the cancellation information and a cancellation form. If that information is not given, the cancellation period can be extended by up to 12 months. If the customer asks for work to start within the 14 days and then cancels, they may have to pay for the work already done.

Separately, the Consumer Rights Act 2015 requires services to be carried out with reasonable care and skill.

Good practice when giving customers information

Put it in writing. Quotations and estimates should describe exactly what is included and what is not (for example making good, decorating or removing old equipment), state how long the price is valid, and set out the payment terms.

Make invoices complete. An invoice normally shows the company's name and address, an invoice number and date, a description of the work, the price, any VAT (if the business is VAT registered), the payment terms and how to pay.

Agree changes before doing them. Any change to the scope or price is confirmed in writing as a variation before the extra work is carried out, so that the final invoice matches what the customer agreed.

Explain the handover pack. Show the customer what each certificate means, where the main switch and RCD test buttons are, how to use any new controls, and who to contact if there is a problem. Keep copies of everything the company issues.

Follow the complaints procedure. If a customer disputes an invoice or the quality of the work, record the details and pass them to your supervisor rather than arguing or promising a refund yourself.

Company Policies and Procedures

Policy area What it covers Why it matters

Behaviour Courtesy, appropriate language, respect for the customer's property, no smoking or vaping on customers' premises, sensible use of mobile phones and music Customers judge the company by your behaviour, and good conduct brings repeat work and recommendations

Timekeeping Start and finish times, breaks, and telling the office and customer if you will be late Other trades and customers plan around you, and lateness damages trust

Dress code Company uniform, ID badge, clean workwear and the right PPE A professional image and security: customers know who is in their home

Contract of employment Pay, hours, holidays, sickness reporting, notice periods, and disciplinary and grievance procedures Both sides know their rights and duties, which prevents disputes

Loading diagram... Handling a Customer's Request for Extra Work

Limits of Personal Authority

Every person on site works within limits set by their training, experience and role:

Person Typical limits of authority

Apprentice Works under supervision and follows instructions; does not sign certificates, agree prices or extra work with customers, or work on or near live equipment unless authorised and supervised; asks when unsure

Level 2 qualified staff (improver) Installs to drawings and specifications under direction; reports problems and variations; does not design, certify or agree extra work

Level 3 qualified staff (electrician) Installs independently, inspects and tests, and may complete certificates where the company authorises it; supervises and guides apprentices

Supervisors and managers Plan and allocate work, enforce health and safety, agree variations and prices, deal with complaints, sign off work and handle discipline

Example: extra work requested by the customer

A householder asks the apprentice to "just add two more sockets while you're here". The apprentice should politely explain that they must check with their supervisor, note the request, and pass it on. The supervisor agrees the price and scope with the customer, and a written variation is issued before the work is done. Agreeing to it on the spot could mean unpaid work, an unsafe design (for example an overloaded spur) or a dispute later.

Important

Never accept cash for unofficial extra work. It breaks company policy, leaves the work uncertified and uninsured, and can lead to dismissal.