Study guide

10.3 Conduit Systems: Steel & PVC

City & Guilds 2365 Level 2 Diploma in Electrical Installations Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Qualification Overview

1.1 About the City & Guilds 2365 Level 2 Qualification 1.2 Study Strategy, Exam Technique & Resource Navigation

2 Health, Safety & Environmental Legislation, Risk Assessment & Permits

2.1 Statutory Framework & Health and Safety Law 2.2 Hazardous Substances, Incident Reporting & Welfare 2.3 Work Equipment, Manual Handling & PPE 2.4 Environmental Legislation, Pollution & Site Waste 2.5 Risk Assessments, Method Statements, Permits to Work & Safety Signs

3 Electrical Safety, Safe Isolation, Site Hazards & Emergencies

3.1 Safe Isolation Procedures & GS38 Compliance 3.2 Electrical Hazards & Electric Shock Physiology 3.3 Fire Safety, Site Supplies & Emergency Response 3.4 Accidents, First Aid, Emergency Procedures & Reporting

4 Working at Height & Access Equipment

4.1 Work at Height Regulations & Risk Management 4.2 Ladders, Stepladders & Podiums 4.3 Mobile Access Towers & Scaffolding Systems

5 Mathematical Principles, Units & Basic Mechanics

5.1 Mathematical Foundations & Transposition for Electricians 5.2 SI Units of Measurement in Electrotechnology 5.3 Basic Mechanics: Force, Work, Power & Mechanical Energy 5.4 Mass, Weight, Levers, Gears & Pulleys

6 Electron Theory, Resistance, Resistivity & DC Circuits

6.1 Resistance, Resistivity & Conductor Dimensions 6.2 Temperature Coefficient of Resistance 6.3 Ohm's Law, Power & Direct Current Calculations 6.4 Series, Parallel & Combination DC Circuits 6.5 Electron Theory, Conductors, Insulators & the Effects of Current

7 Magnetism, Electromagnetism & Transformers

7.1 Magnetic Fields, Flux & Solenoid Properties 7.2 Electromagnetic Induction & Motor/Generator Principles 7.3 Transformer Principles, Construction & Calculations

8 Alternating Current, Three-Phase Systems & Electronic Components

8.1 AC Waveform Generation & Key Values 8.2 AC Circuit Theory: Reactance, Impedance & Power Factor 8.3 Three-Phase Generation, Star-Delta & UK Distribution 8.4 Electronic Components in Electrical Systems

9 Industry Regulations, Technical Information & Drawings

9.1 Electrical Regulations, Standards & Part P 9.2 Electrical Drawings, Diagrams & BS EN 60617 Symbols 9.3 Technical Specifications, Schedules & Environmental Influences

10 Wiring Systems, Cables, Containment & Practical Installation

10.1 Thermoplastic, Armoured & Flexible Cables 10.2 Specialised Cables: MICC & Fire-Performance Cables 10.3 Conduit Systems: Steel & PVC 10.4 Trunking, Cable Tray & Cable Supports 10.5 Unit 204 Practical Skills: Tools, Preparation & Installing Wiring Systems

11 Final Circuits, Protective Devices, Alarm & Control Circuits

11.1 Lighting Circuits & Switching Arrangements 11.2 Power Circuits: Ring Final, Radial & Dedicated Circuits 11.3 Consumer Units, Distribution Boards & Protective Devices 11.4 Alarm, Emergency Lighting, Data & Control Circuits

12 Cable Selection & Structural Installation

12.1 Cable Current-Carrying Capacity & Correction Factors 12.2 Voltage Drop Principles & Calculations 12.3 Structural Integrity & Concealed Cable Routing

13 Supply Systems, Earthing, Shock Protection & Micro-Renewables

13.1 UK Electricity Supply Networks & Distribution 13.2 Earthing System Configurations: TN-S, TN-C-S (PME and PNB) & TT 13.3 Protective Conductors, Bonding & Earth Electrodes 13.4 Automatic Disconnection of Supply (ADS) & Maximum Zs 13.5 Micro-Renewable Energy Technologies

14 Electrical Inspection & Dead Testing Sequence

14.1 Inspection Principles & Testing Safety to GS38 14.2 Continuity Testing: Protective Conductors & Ring Circuits 14.3 Insulation Resistance & Polarity Verification

15 Live Testing, Certification & Handover

15.1 Live Testing: Earth Loop Impedance, PFC & RCD Testing 15.2 Certification, Handover & Commissioning

16 Communicating within Building Services Engineering (Unit 210)

16.1 The Construction Team: Site Management, Trades & Site Visitors 16.2 Information Sources: Legislation, Guidance & Workplace Documents 16.3 Customer Information, Company Policies & Limits of Authority 16.4 Communicating Effectively: Methods, Accessibility & Conflict

10.3 Conduit Systems: Steel & PVC

Key Takeaways Explain This Topic AI

Heavy gauge rigid steel conduit is classified into Class 2 (black stoved enamel for clean, dry indoor commercial use) and Class 4 (hot-dip galvanised inside and outside for damp, outdoor, and heavy industrial environments).

Fabrication of steel conduit requires a 32 tpi hacksaw blade, immediate internal deburring using a pipe reamer or half-round file to prevent cutting cable insulation, and threading with metric M20/M25 stocks and dies with a 1.5 mm thread pitch.

Rigid high-impact PVC conduit expands approximately five times more than steel (0.08 mm/m/°C), requiring expansion couplers with non-setting silicone grease on long runs, alongside cold-bending springs for forming sets and bends.

While Class 4 rigid steel conduit can function as the Circuit Protective Conductor (CPC) through sound mechanical jointing and serrated shakeproof washers, PVC conduit is an electrical insulator requiring a dedicated insulated copper CPC in every run.

Conduit cable capacity is governed by the unit factor method in the IET On-Site Guide, where the sum of individual cable factors must not exceed the conduit factor calculated for the run length and number of bends.

Last updated: October 2026

10.3 Conduit Systems: Steel & PVC

A conduit is a tube or piping system designed to enclose and protect insulated electrical cables. Unlike sheathed wiring systems (such as 6242Y) which are fixed directly to building structures, conduit forms a hollow, continuous, rewireable enclosure. Operatives first erect the complete conduit containment run and subsequently draw in unsheathed single-core thermoplastic cables (BS 6004 / 6491X).

Conduit systems provide outstanding mechanical protection, permit simple circuit rewiring and additions without structural damage, and can be sealed against the ingress of dust, moisture, and corrosive vapours.

Classifications of Conduit Systems

Under BS EN 61386 , conduit systems are classified by their construction material, mechanical impact resistance, and corrosion protection.

1. Heavy Gauge Rigid Welded Steel Conduit

Steel conduit provides the highest mechanical protection against heavy impact, crushing, vandalism, and fire:

Class 2 (Black Enamel): Coated internally and externally with a baked black enamel paint. Offers light corrosion protection. Strictly limited to clean, dry indoor commercial and industrial buildings (such as commercial office ceiling voids and dry workshops).

Class 4 (Hot-Dip Galvanised): Steel conduit dipped in molten zinc, providing a thick, metallurgical zinc alloy coating inside and out. Offers heavy corrosion resistance. Specified for outdoor installations, damp basements, car parks, agricultural buildings, chemical works, and heavy industrial plant .

2. Rigid High-Impact PVC Conduit

Manufactured from unplasticized polyvinyl chloride (uPVC):

Class 1 (Light Gauge): Thin wall, rarely used in commercial building services.

Class 2 (Heavy Gauge High-Impact): Thick wall, highly resistant to impact, acids, alkalis, and moisture. Non-conductive (eliminating touch-voltage hazards on containment) and non-corroding. Common across commercial offices, schools, hospitals, food processing facilities, and agricultural livestock units.

3. Flexible Conduit Systems

Flexible Metallic Conduit (BS 731): Constructed from interlocked helically wound galvanised steel strips, often encased in a smooth PVC outer jacket. Used to connect fixed rigid conduit systems to vibrating equipment, electric motors, HVAC fan coils, and luminaires in suspended ceilings .

Flexible PVC Conduit: Corrugated plastic tubing used for light-duty routing and domestic appliance connections.

Warning

BS 7671 does not permit flexible or pliable conduit to be used as a protective conductor. The interlocking spiral convolutions exhibit high electrical resistance and can uncoil or burn out under high earth fault currents. An insulated green-and-yellow copper CPC must always be drawn through flexible conduit to maintain earth continuity.

Rigid Steel Conduit: Workshop Tools & Fabrication

Working with rigid steel conduit requires precision measurement, cutting, deburring, threading, and forming. ┌─────────────────────────────────────────────────────────────────┐

  • │ Steel Conduit Fabrication Workflow │
  • │ 1. Measure & Mark ──► 2. Cut with 32 tpi Hacksaw │
  • │ 3. Ream Internal Burrs ──► 4. Cut M20/M25 Threads with Dies │
  • │ 5. Form 90° Bend / Offset on Bender ──► 6. Erect & Lock Joints │
  • └─────────────────────────────────────────────────────────────────┘
  • Essential Fabrication Tools

Conduit Vice & Stand: A heavy-duty tripod stand fitted with a pipe vice (chain vice or hinged-jaw vice) to clamp the conduit securely during cutting and threading without crushing the cylindrical wall.

Hacksaw (32 tpi Blade): Operatives must fit a High-Speed Steel (HSS) blade with 32 teeth per inch (tpi) . Standard 18 or 24 tpi blades have tooth pitches wider than the conduit wall thickness (approx. 1.2–1.6 mm), causing teeth to snag, strip, and snap.

Pipe Reamer / Half-Round File: Mandatory immediately after sawing. Cutting steel conduit creates razor-sharp internal burrs. An operative must insert a fluted pipe reamer or half-round engineer's file into the conduit bore to remove all burrs and produce a smooth internal chamfer.

Stocks and Dies: Metric conduit threads have a standardized pitch of 1.5 mm (distinguishing them from standard metric bolt threads): standard sizes are M20 × 1.5 and M25 × 1.5 . Two-part split dies held in a diestock cut clean external threads. The operative must lubricate the die with tallow, cutting compound, or thread-cutting oil, reversing the diestock every half-turn to break the metal swarf.

Hand Conduit Bender: A sturdy mechanical tripod bender incorporating a grooved cast-iron former wheel matched to the conduit outside diameter (20 mm or 25 mm) and a grooved roller. The former supports the inner bend radius while the roller supports the outer conduit wall, preventing kinking, flattening, or wall wrinkling.

Warning

Failing to deburr the internal cut edge of a steel conduit is the leading cause of insulation breakdown during cable installation. As unsheathed single-core cables are hauled through the conduit under pulling tension, sharp internal steel burrs act like razor blades, slicing open the PVC insulation and causing immediate dead short circuits to earth.

Bending Geometry and Offset Calculations

90-Degree Bends: Formed by pulling the bending handle steadily until the conduit reaches a right angle, allowing a slight overbend to compensate for metal spring-back.

Sets (Offsets): Two equal and opposite angle bends used to navigate structural projections (such as steel RSJs, brick offsets, or stepping conduit from a flat wall into an accessory knock-out). Conduit Set (Offset) Geometry:

  • ┌─────────────────────────────┐ Upper Plane
  • / Angle θ
  • /
  • / Distance between marks = H × cosec(θ)
  • / Angle θ
  • ────────────┘ Lower Plane
  • ◄─────────── Offset Height (H) ─────────────►

The distance between the two bend center marks along the conduit is calculated using trigonometry:

Distance Between Marks = Offset Height (H) × cosec(θ)

  • Desired Bend Angle (θ) Offset Multiplier (cosec θ) Practical Workshop Application
  • 15° 3.86 Shallow offsets across wide structural steps
  • 30° 2.00 Trade standard: Simple mental math (Distance = Offset Height × 2)
  • 45° 1.414 Tight offsets where longitudinal space is restricted

Example: An electrician needs to form an offset of 75 mm around a structural brick pillar using 30° bends. The distance between bend marks is 75 mm × 2.0 = 150 mm.

Bridge Saddles: A double offset formed in a single length to allow the conduit to jump over an intersecting pipe or conduit while returning to the same mounting plane.

Conduit Fittings & The Running Coupler

Steel conduit terminates into circular malleable cast-iron conduit boxes (BS 4568): Terminal (1-way) , Through (2-way inline) , Angle (2-way 90°) , Tee (3-way) , and Intersection / Cross (4-way) .

When two fixed lengths of rigid conduit meet between anchored boxes and cannot be rotated, they are joined using a running coupler :

A long thread (approx. 40–50 mm) is cut onto one conduit end.

A hexagon locknut followed by a standard conduit coupler is screwed fully onto the long thread.

The opposing conduit length (with standard thread length) is abutted tightly against it.

The coupler is unscrewed from the long thread and wound halfway onto the opposing conduit until tight.

The hexagon locknut is tightened firmly against the back of the coupler, locking the joint rigid and establishing earth continuity.

Steel Conduit as a Circuit Protective Conductor (CPC)

Under BS 7671 Regulation 543.2.1 , heavy gauge welded steel conduit can act as the sole CPC for installed circuits, provided:

All threaded joints are screwed fully home into fittings (metal-to-metal contact with threads free of paint, enamel, and grease).

Connections to sheet steel distribution boards and accessory back boxes utilize brass smooth-bore male bushes and serrated shakeproof star washers.

Expansion joints or flexible connections are bridged by external copper bonding links.

An earth fault loop impedance test (R1 + R2) confirms an exceptionally low resistance path back to the MET.

Rigid PVC Conduit Installation & Thermal Expansion

High-impact PVC conduit is lightweight, cuts rapidly, and requires no thread cutting. However, its thermal and physical behavior differs markedly from steel.

Cutting and Jointing

Cutting: Cut cleanly with a fine-toothed hacksaw or ratcheting PVC pipe cutters. Cut ends must be deburred and lightly chamfered.

Jointing: Joined into moulded PVC socket fittings using solvent cement . Solvent cement chemically softens and fuses the PVC surfaces together, creating a permanent, pressure-tight joint within minutes.

Cold Bending with an Internal Bending Spring

Rigid PVC conduit up to 25 mm diameter is bent cold using a coiled high-tensile steel internal bending spring :

Select the correct spring gauge (20 mm or 25 mm, matched to the conduit size).

Attach a strong draw wire to the spring eyelet.

Insert the spring into the conduit bore until it centers over the proposed bend line.

Place the conduit across the knee and bend slowly and smoothly past the desired angle (approximately 10°–15° extra) to compensate for natural plastic spring-back.

To withdraw the spring, twist the draw wire anticlockwise while pulling. Twisting anticlockwise slightly coils and reduces the spring diameter, freeing it from the conduit walls.

Thermal Expansion: The 5x Rule

PVC expands approximately five times more than steel. The coefficient of linear thermal expansion for PVC is 0.08 mm/m/°C (compared to 0.012 mm/m/°C for steel).

A 10-meter run of PVC conduit subject to a 25°C seasonal temperature rise will expand by:

ΔL = 10 m × 25°C × 0.08 mm/m/°C = 20 mm

If PVC conduit is glued solidly between fixed boxes without expansion provision, thermal expansion will cause the conduit to bow outwards, shear saddles off walls, and crack fittings.

Mandatory Expansion Solutions:

On straight runs exceeding 6 meters or runs subject to large temperature fluctuations, install expansion couplers .

An expansion coupler features an internal rubber O-ring or silicone grease seal. The conduit is inserted into the coupler, pushed home, and then withdrawn by 5 mm to 10 mm to leave an expansion gap.

Saddle fixings within 1 meter of an expansion joint must be loose-fitting (expansion saddles) allowing free longitudinal sliding.

Note

Because PVC is an electrical insulator, every circuit installed inside PVC conduit must include a dedicated insulated green-and-yellow copper CPC sized to BS 7671 Table 54.7 or calculated using the adiabatic equation.

Conduit Sizing: The Unit Factor Method (On-Site Guide)

Cables generate heat under load and require adequate air space for heat dissipation. Furthermore, pulling too many cables into a conduit damages conductor insulation due to friction and sidewall bearing pressure.

To ensure conduit is not overfilled, the IET On-Site Guide (Appendix E) provides standardized Cable Factor and Conduit Factor tables.

Sizing Rule

The fundamental rule for conduit sizing is:

Sum of (Number of Cables × Cable Factor) ≤ Conduit Factor

Conduit factors decrease significantly as the run length increases and as bends are introduced into the run.

  • Typical Cable Factors (Single-Core Stranded 6491X in Short Straight Runs)
  • 1.5 mm² Stranded Conductor: Cable Factor = 31
  • 2.5 mm² Stranded Conductor: Cable Factor = 43
  • 4.0 mm² Stranded Conductor: Cable Factor = 58
  • 6.0 mm² Stranded Conductor: Cable Factor = 88
  • Typical Conduit Factors for Straight Runs up to 3 Metres
  • 20 mm Diameter Conduit: Conduit Factor = 460
  • 25 mm Diameter Conduit: Conduit Factor = 800
  • 32 mm Diameter Conduit: Conduit Factor = 1400

Worked Example: Can six 2.5 mm² cables and three 1.5 mm² cables be drawn into a straight 3-meter length of 20 mm conduit?

  • Total Cable Factor: (6 × 43) + (3 × 31) = 258 + 93 = 351
  • 20 mm Conduit Factor: 460

Verification: 351 ≤ 460. Yes, compliant.

Tip

When designing conduit runs, avoid including more than two 90° bends (or equivalent 180° total angular deflection) between draw-in inspection boxes. Runs with excessive bends increase pulling tension exponentially, shredding cable insulation.

Loading diagram... Steel vs. PVC Conduit Selection and Fabrication Rules