Study guide
10.4 Trunking, Cable Tray & Cable Supports
City & Guilds 2365 Level 2 Diploma in Electrical Installations Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Qualification Overview
1.1 About the City & Guilds 2365 Level 2 Qualification 1.2 Study Strategy, Exam Technique & Resource Navigation
2 Health, Safety & Environmental Legislation, Risk Assessment & Permits
2.1 Statutory Framework & Health and Safety Law 2.2 Hazardous Substances, Incident Reporting & Welfare 2.3 Work Equipment, Manual Handling & PPE 2.4 Environmental Legislation, Pollution & Site Waste 2.5 Risk Assessments, Method Statements, Permits to Work & Safety Signs
3 Electrical Safety, Safe Isolation, Site Hazards & Emergencies
3.1 Safe Isolation Procedures & GS38 Compliance 3.2 Electrical Hazards & Electric Shock Physiology 3.3 Fire Safety, Site Supplies & Emergency Response 3.4 Accidents, First Aid, Emergency Procedures & Reporting
4 Working at Height & Access Equipment
4.1 Work at Height Regulations & Risk Management 4.2 Ladders, Stepladders & Podiums 4.3 Mobile Access Towers & Scaffolding Systems
5 Mathematical Principles, Units & Basic Mechanics
5.1 Mathematical Foundations & Transposition for Electricians 5.2 SI Units of Measurement in Electrotechnology 5.3 Basic Mechanics: Force, Work, Power & Mechanical Energy 5.4 Mass, Weight, Levers, Gears & Pulleys
6 Electron Theory, Resistance, Resistivity & DC Circuits
6.1 Resistance, Resistivity & Conductor Dimensions 6.2 Temperature Coefficient of Resistance 6.3 Ohm's Law, Power & Direct Current Calculations 6.4 Series, Parallel & Combination DC Circuits 6.5 Electron Theory, Conductors, Insulators & the Effects of Current
7 Magnetism, Electromagnetism & Transformers
7.1 Magnetic Fields, Flux & Solenoid Properties 7.2 Electromagnetic Induction & Motor/Generator Principles 7.3 Transformer Principles, Construction & Calculations
8 Alternating Current, Three-Phase Systems & Electronic Components
8.1 AC Waveform Generation & Key Values 8.2 AC Circuit Theory: Reactance, Impedance & Power Factor 8.3 Three-Phase Generation, Star-Delta & UK Distribution 8.4 Electronic Components in Electrical Systems
9 Industry Regulations, Technical Information & Drawings
9.1 Electrical Regulations, Standards & Part P 9.2 Electrical Drawings, Diagrams & BS EN 60617 Symbols 9.3 Technical Specifications, Schedules & Environmental Influences
10 Wiring Systems, Cables, Containment & Practical Installation
10.1 Thermoplastic, Armoured & Flexible Cables 10.2 Specialised Cables: MICC & Fire-Performance Cables 10.3 Conduit Systems: Steel & PVC 10.4 Trunking, Cable Tray & Cable Supports 10.5 Unit 204 Practical Skills: Tools, Preparation & Installing Wiring Systems
11 Final Circuits, Protective Devices, Alarm & Control Circuits
11.1 Lighting Circuits & Switching Arrangements 11.2 Power Circuits: Ring Final, Radial & Dedicated Circuits 11.3 Consumer Units, Distribution Boards & Protective Devices 11.4 Alarm, Emergency Lighting, Data & Control Circuits
12 Cable Selection & Structural Installation
12.1 Cable Current-Carrying Capacity & Correction Factors 12.2 Voltage Drop Principles & Calculations 12.3 Structural Integrity & Concealed Cable Routing
13 Supply Systems, Earthing, Shock Protection & Micro-Renewables
13.1 UK Electricity Supply Networks & Distribution 13.2 Earthing System Configurations: TN-S, TN-C-S (PME and PNB) & TT 13.3 Protective Conductors, Bonding & Earth Electrodes 13.4 Automatic Disconnection of Supply (ADS) & Maximum Zs 13.5 Micro-Renewable Energy Technologies
14 Electrical Inspection & Dead Testing Sequence
14.1 Inspection Principles & Testing Safety to GS38 14.2 Continuity Testing: Protective Conductors & Ring Circuits 14.3 Insulation Resistance & Polarity Verification
15 Live Testing, Certification & Handover
15.1 Live Testing: Earth Loop Impedance, PFC & RCD Testing 15.2 Certification, Handover & Commissioning
16 Communicating within Building Services Engineering (Unit 210)
16.1 The Construction Team: Site Management, Trades & Site Visitors 16.2 Information Sources: Legislation, Guidance & Workplace Documents 16.3 Customer Information, Company Policies & Limits of Authority 16.4 Communicating Effectively: Methods, Accessibility & Conflict
10.4 Trunking, Cable Tray & Cable Supports
Key Takeaways Explain This Topic AI
Cable trunking provides an accessible, rewireable containment enclosure with removable lids, requiring multi-compartment trunking to segregate Band I extra-low voltage circuits from Band II low-voltage power circuits under BS 7671 Regulation 528.1.
Under the IET On-Site Guide 45% Space Factor Rule, trunking must not be filled to more than 45% of its internal cross-sectional area, preventing dangerous conductor overheating and mechanical damage during cable installation.
BS 7671 Regulation 521.10.202 strictly mandates that wiring systems must be supported to prevent premature collapse in the event of a fire throughout the entire building, prohibiting plastic clips, plastic ties, or snap-on PVC lids as the sole means of support.
Welded wire mesh cable basket offers 100% open ventilation to minimize thermal grouping derating in data/commercial installations, while perforated steel cable tray supports heavy multi-core cables, and cable ladder racks accommodate high-current industrial risers.
Secure containment anchoring requires substrate-matched fixings, including masonry plugs and steel screws for brickwork, spring toggles and hollow-wall anchors for cavity plasterboard, and beam clamps (Lindapters) for structural steelwork.
Last updated: October 2026
10.4 Trunking, Cable Tray & Cable Supports
In commercial, educational, healthcare, and industrial buildings, electrical containment systems must support hundreds of diverse power, lighting, control, and data cables. Containment systems provide mechanical protection, allow convenient cable drawing and modification, and support cables across building structures. Electricians must select the appropriate containment medium— cable trunking, cable tray, cable basket, or cable ladder —while adhering to strict thermal space factor rules, circuit segregation mandates, and fire safety regulations.
Cable Trunking Systems
A cable trunking system is an enclosure of rectangular or square cross-section comprising a trough with a removable lid. Unlike conduit, which requires cables to be pulled through from box to box, trunking allows cables to be laid in along its entire run once the lid is removed, significantly speeding up first-fix installation.
Trunking Materials and Profiles
Pre-Galvanised Sheet Steel Trunking: Fabricated from mild steel sheet hot-dip galvanised to BS EN 10346. Features inward-turned return flanges along both top edges. Return flanges provide structural rigidity over long spans and prevent sharp metal sheet edges from cutting cable insulation. Lids are secured with turnbuckle fasteners or quick-release screw fixings.
PVC Trunking: Extruded high-impact uPVC trunking: mini-trunking (e.g., 16 × 25 mm, 25 × 38 mm) for surface additions in domestic and light commercial retrofits; maxi-trunking (50 × 50 mm to 100 × 100 mm) for distribution routes; and dado / skirting trunking with multi-compartments for commercial offices.
Circuit Segregation (BS 7671 Regulation 528.1)
Modern commercial installations carry diverse electrical services. BS 7671 categorizes circuits into two distinct voltage bands:
Band I: Extra-Low Voltage (ELV) circuits, including telecommunications, Cat5e/Cat6/Cat6A data networking, door access, CCTV, and addressable fire alarm signalling operating at ≤ 50 V AC or ≤ 120 V DC ripple-free.
Band II: Low Voltage (LV) power and lighting circuits operating at standard supply voltages (230 V AC single-phase, 400 V AC three-phase). Three-Compartment Steel Dado Trunking Segregation:
- ┌─────────────────────────────────────────────────────────────┐
- │ Compartment 1: Band I Data / Telecoms (Cat6 Networking) │
- ├─────────────────────────────────────────────────────────────┤ Continuous Metal
- │ Compartment 2: Band II Low Voltage Power (230 V Sockets) │ Earthed Dividers
- ├─────────────────────────────────────────────────────────────┤
- │ Compartment 3: Band I Fire Alarm / ELV Control Circuits │
- └─────────────────────────────────────────────────────────────┘
The Segregation Rule: Band I and Band II circuits must not be drawn into the same containment compartment unless:
Every cable is insulated to the highest voltage present (e.g., data cables insulated to 400 V dielectric rating), or
The circuits are separated by a continuous, earthed metallic divider or separate compartments within multi-compartment trunking.
Physical separation prevents electromagnetic interference (EMI) and noise induction from high-current power cables from corrupting sensitive high-speed digital data streams, while eliminating the catastrophic hazard of 230 V mains crossing into touch-accessible telephone or data accessories.
Site Fabrication of Sheet Steel Trunking Fittings
While manufactured prefabricated fittings (bends, tees, crossovers) are readily available, electricians regularly fabricate custom fittings on site using standard lengths:
90° Gusset Bends & Flat Bends: Formed by measuring the trunking width, scribing two 45° lines on the side walls to form a 90° V-notch, cutting the notch with a hacksaw and aviation tin snips, filing all burrs smooth, folding the trunking into a right angle, and securing the overlapping corner gussets.
Bolting Rules: Fittings are secured using M6 mushroom-headed roofing bolts (gutter bolts). The smooth, rounded mushroom head must always be installed on the INSIDE of the trunking , with the threaded shank and nut positioned on the exterior. If bolt threads project into the interior trough, pulling cables into the trunking will drag insulation across the razor-sharp threads, causing line-to-earth faults.
Earth Continuity Links: When steel trunking is cut and bolted on site, paint and zinc coatings may compromise electrical continuity. A flexible copper bonding braid or green-and-yellow earth link must be bolted across every joint and across removable trunking lids.
The 45% Space Factor Rule (On-Site Guide Appendix E)
Cables generate heat (I²R) during operation. If a trunking trough is packed solid with cables, heat cannot dissipate by convective air movement. Conductor temperatures rise rapidly, degrading insulation life, causing thermal runaway, and creating fire risks.
Using the IET On-Site Guide Appendix E method, the total cross-sectional area of the cables installed in trunking must not exceed 45% of the internal cross-sectional area of the trunking :
Space Factor = (Total External Area of All Cables / Internal Area of Trunking) × 100% ≤ 45%
To calculate capacity, the On-Site Guide provides the unit factor method . Each cable size has a cable factor, and each trunking size has a trunking factor equal to about 45% of its usable internal area (the tabulated factors allow for wall thickness, so they are slightly less than width × depth × 0.45). The rule is:
Sum of (Number of Cables × Cable Factor) ≤ Trunking Factor
- Trunking Dimensions (mm) Trunking Capacity Factor (45% Space Factor)
- 50 mm × 50 mm 1,037
- 75 mm × 50 mm 1,555
- 75 mm × 75 mm 2,371
- 100 mm × 50 mm 2,091
- 100 mm × 100 mm 4,252
Worked Example: An installer wishes to run twenty-five 2.5 mm² stranded cables (cable factor = 12.6) and twelve 6.0 mm² stranded cables (cable factor = 21.2) along a trunking run. What is the minimum standard trunking size required?
Total Cable Factor: (25 × 12.6) + (12 × 21.2) = 315 + 254.4 = 569.4
Checking standard trunking: A 50 mm × 50 mm trunking provides a factor of 1,037.
Because 569.4 ≤ 1,037, a 50 mm × 50 mm trunking is fully compliant.
Cable Tray, Cable Basket & Cable Ladder Racking
Where large volumes of multi-core, armoured, or heavy power cables are routed, enclosed trunking is replaced by open-support containment systems. ┌─────────────────────────────────────────────────────────────┐
- │ Open Cable Support Systems │
- │ │
- │ 1. Perforated Cable Tray ── Heavy multi-core & SWA cables │
- │ 2. Wire Mesh Cable Basket ── 100% open airflow, IT & data │
- │ 3. Cable Ladder Rack ── Heavy industrial risers & HV mains │
- └─────────────────────────────────────────────────────────────┘
- 1. Perforated Sheet Steel Cable Tray
Manufactured from pre-galvanised or post-galvanised steel sheet with perforations across its base and low-profile side return flanges:
Perforations allow cables to be fastened securely using cable ties or cable cleats while permitting air circulation and dust egress.
Classified into Light Duty , Medium Duty , and Heavy Duty Return Flange (HDRF) .
Ideal for industrial plant rooms, underground tunnels, and vertical service shafts carrying heavy sub-mains.
2. Wire Mesh Cable Basket
Constructed from welded high-tensile steel wire mesh (typically 50 × 100 mm grid pattern), electro-zinc plated or stainless steel:
Rapid Site Fabrication: Electricians quickly cut individual wire spokes using angled bolt cutters to form radius bends, tees, and drops without needing manufactured fittings.
Maximum Heat Dissipation: 100% open mesh structure allows free, uninhibited convective air cooling around cables, minimizing the severe thermal grouping derating factors (Cg) that penalize enclosed trunking.
Data & Commercial Routing: Standard containment choice for Category 6A computer network cabling, fiber optic links, and commercial false-ceiling voids.
3. Cable Ladder Racking
Consists of two heavy-gauge structural side channels connected by cross rungs spaced at regular intervals (typically 250 mm or 300 mm):
Maximum structural load-bearing capacity.
Accommodates very large, heavy multi-core and single-core SWA power cables.
Open rung design allows heavy-duty metallic cable cleats or trefoil cleats to be bolted securely across rungs on high-voltage vertical riser runs.
Note
When single-core cables carry heavy alternating currents, magnetic and mechanical forces can tear cables off containment during a short circuit. Single-core cables in three-phase circuits must be bundled in a trefoil (cloverleaf) formation using non-magnetic aluminium or stainless steel trefoil cleats. The trefoil geometry balances electromagnetic fields and nullifies repulsive forces.
Cable Supports & Prevention of Premature Collapse (Regulation 521.10.202)
One of the most critical life-safety regulations tested in electrotechnical examinations is BS 7671 Regulation 521.10.202 .
The Historical Rationale: Firefighter Safety
This regulation was enacted following coroners' inquests into fatal residential and commercial tower block fires—most notably the Harrow Court fire (Stevenage, 2005) and the Shirley Towers fire (Southampton, 2010) . During these fires, plastic cable clips melted, and plastic trunking lids softened and fell away. Heavy bundles of electrical cables cascaded down from ceilings, forming a web of hanging wires across corridors and stairwells. Entering firefighters, operating in zero visibility and thick black smoke, became hopelessly entangled in the fallen cables and died before they could escape.
The Mandatory Regulatory Requirement
Regulation 521.10.202 states:
"Wiring systems shall be supported such that they will not be liable to premature collapse in the event of a fire."
Key Scope and Compliance Rules:
Applies to the ENTIRE Installation: The regulation applies throughout the entire building—not just designated escape routes. Cables in ceiling voids, service shafts, offices, and domestic dwellings must all comply.
Prohibition of Plastic as Sole Support: Non-metallic cable clips (standard plastic masonry clips), plastic cable ties, plastic conduit saddles, and PVC mini-trunking with snap-on plastic lids are strictly forbidden as the sole means of cable support .
Fire-Resistant Metallic Fixings Mandatory: Installers must fit metallic supports at specified intervals to carry the entire weight of the cable run during a fire:
Fire-rated all-metal cable clips and metal banding.
Stainless steel or zinc-plated steel cable ties on cable tray and basket.
Internal metal fire clips fitted inside PVC mini-trunking: these U-shaped spring-steel clips hold the cables inside the trunking base even after the plastic casing and lid completely melt away.
All-Metal Anchors: A metal clip screwed into a plastic wall plug does not comply! Plastic wall plugs soften and fail in a fire, letting the screw pull out of the ceiling or wall. Installers must use all-metal masonry anchors, concrete self-tapping screws, or all-metal drop-in wedge anchors.
Substrate Fixing Methods & Anchoring Technologies
Electrical containment must be anchored securely to withstand both mechanical dead loads and dynamic cable-pulling forces:
Substrate Material Approved Fixing Technology Installation Method & Best Practice
Solid Brickwork / Dense Concrete All-metal concrete screws (self-tapping) or drop-in wedge anchors (Rawlbolts) Drill masonry hole to exact manufacturer diameter, blow out dust, drive in concrete screw. Required for fire-rated supports.
Hollow Block / Cavity Plasterboard Spring toggles, metal cavity umbrella fixings, or zinc self-drill anchors Spring wings collapse for hole entry and snap open flat against the rear plasterboard face. Never use standard plugs in hollow cavities.
Structural Steelwork (RSJs / I-Beams) Beam clamps (Lindapter clamps), girder clips, flange C-clamps Clamps onto the steel beam flange without drilling, cutting, or weakening structural steelwork.
Concrete Soffits (Ceilings) Internal threaded drop-in anchors with M8/M10 threaded rod Set into drilled ceiling bore using a setting punch. Supports trapeze unistrut channels carrying heavy trays and trunking.
Warning
Never drill holes into prestressed concrete floor beams or the structural flanges of load-bearing steel columns on a construction site without written engineering authorization. Weakening structural building fabric creates catastrophic structural collapse liabilities.