1 Chapter 1: Purpose & Statutory Framework of Periodic Inspection

1.1 Statutory Framework & Purpose of Periodic Inspection 1.2 BS 7671 Chapter 65 Requirements for Periodic Inspection & Testing 1.3 Recommended Inspection Intervals & Trigger Events

2 Chapter 2: Visual Inspection & Sampling Procedures

2.1 Visual Inspection Fundamentals on Existing Installations 2.2 Guidance Note 3 Sampling Principles & Justification 2.3 Sample Expansion & Defect Escalation Criteria

3 Chapter 3: Electrical Installation Condition Report (EICR) Structure

3.1 EICR Layout, Sections, Declarations & Summary of Condition 3.2 Compiling the Schedule of Inspections for Existing Installations 3.3 Schedule of Test Results, Circuit Details & Instrument Data

4 Chapter 4: EICR Classification Coding Principles (C1, C2, C3, FI)

4.1 Overview & Engineering Principles of Classification Codes 4.2 Code C1 (Danger Present) & Code C2 (Potentially Dangerous) Criteria 4.3 Code C3 (Improvement Recommended) & Code FI (Further Investigation) Criteria

5 Chapter 5: Classification Code Application & Practical Scenarios

5.1 Coding Scenarios: Earthing, Bonding & Shock Protection Defects 5.2 Coding Scenarios: Wiring Systems, Accessories & Thermal Effects 5.3 Overall Assessment Determination & Client Communication

6 Chapter 6: Selected Dead Tests on Existing Installations

6.1 Dead Testing Overview & Continuity of Protective Conductors 6.2 Ring Final Circuit Continuity Testing 6.3 Insulation Resistance Testing & Protection of Sensitive Equipment

7 Chapter 7: Selected Live Tests & RCD Verification

7.1 Polarity Verification & Earth Fault Loop Impedance (Ze, Zs) 7.2 Prospective Fault Current (PFC) & RCD Testing 7.3 Functional Testing & Voltage Drop Assessment

8 Chapter 8: Scope, Limitations & Safe Testing Procedures

8.1 Agreeing Extent, Operational & Agreed Limitations 8.2 Safe Isolation Procedures & GS38 Guidance 8.3 Risk Assessment & Restoring Installations to Service

9 Chapter 9: Test Result Interpretation, Temperature Correction & Certification

9.1 Interpreting Zs Values & The 80% Rule (Rule of Thumb) 9.2 Temperature Correction Factors & Historical Trend Analysis 9.3 Certification Sign-off, Competency & Instrument Calibration

2.3 Sample Expansion & Defect Escalation Criteria

Key Takeaways Explain This Topic AI

When any defect or non-compliance is identified within an initial sample, Guidance Note 3 requires the inspector to immediately expand the sample size to determine whether the issue is isolated or systemic.

Sample expansion typically escalates step-wise (e.g. from 10% to 25%, and up to 100% of the affected circuit class or distribution board) if additional non-compliances are uncovered.

Systemic defects—such as missing CPC sleeving, widespread loose terminations, or un-earthed metal light fittings—mandate 100% inspection of all similar circuits across the installation.

Upon discovering a Code C1 (Danger Present) condition, the inspector has a statutory and professional duty to immediately notify the person ordering the work in writing before leaving site, issuing a Dangerous Condition Notification.

If an uninspectable hidden circuit shows evidence of severe degradation or thermal stress, it must be assigned a Classification Code FI (Further Investigation Required) and the scope of work re-negotiated with the client.

Last updated: July 2026

A fundamental principle of Periodic Inspection under IET Guidance Note 3 (Section 3.8.3) is that sampling is dynamic , not fixed. The initial sampling percentage agreed in Section D of the EICR represents only a baseline starting point. If non-compliances, physical damage, or unexpected degradation are uncovered within that initial sample, the inspector is mandated to execute a sample expansion strategy .

Dynamic Sampling & Escalation Triggers

The inspector cannot ignore defects found in a 10% sample and simply write up the report. If 10% of an installation exhibits defects, it is statistically probable that similar defects exist across the uninspected 90%.

Escalation Triggers (GN3 Section 3.8.3)

Sample expansion is automatically triggered when any of the following conditions are encountered:

Physical Damage or Severe Degradation: Cracking, broken enclosures, water ingress, or mechanical impact damage.

Thermal Overheating & Arcing: Discoloured insulation, charred terminal blocks, or melted switch components.

Widespread Wiring Non-Compliances: Missing CPC sleeving, un-earthed metal fittings, incorrect conductor identification, or loose terminations.

Incorrect Protective Device Coordination: Wrong MCB types, oversized fuses, or missing mandatory 30 mA RCD protection on socket circuits.

Inaccurate Circuit Schedules: Severe discrepancies between distribution board charts and actual circuit wiring layout.

Isolated vs. Systemic Defects

When a defect is identified, the inspector must categorize it as either an isolated defect or a systemic installation issue to determine the appropriate escalation response.

Feature Isolated Defect Systemic / Repeating Defect

Definition Single failure caused by localized impact or isolated component failure Widespread defect resulting from poor original installation or ongoing bad practice

Examples One cracked socket faceplate due to impact; one loose accessory terminal screw Missing CPC sleeving across all light switches; no earth connection to any metal light fitting

Escalation Scope Expand sample to 25% of points on that specific circuit Expand sample to 100% of all similar circuits or accessories across the distribution board

Action Required Note defect; verify adjacent accessories on the same circuit Immediately halt sampling; inform client; expand scope to 100% of affected installation area

Step-Wise Sample Escalation Protocol

The escalation protocol follows a clear engineering sequence:

Phase 1: Identification & Preliminary Assignment

Identify the non-compliance within the initial sample.

Assign an initial EICR Classification Code ( C1 , C2 , C3 , or FI ).

Phase 2: Targeted Local Expansion (Phase 1 Escalation)

Increase the sample size from the baseline (e.g., 10%) up to 25% or 50% within the same circuit class or distribution board.

Inspect adjacent accessories and circuits to determine whether the issue is isolated.

Phase 3: Total Circuit Class Expansion (Phase 2 Escalation)

If additional non-compliances are identified during Phase 2, escalate the sample to 100% inspection and testing of that entire circuit type (e.g., 100% of all lighting circuits or 100% of all socket outlets supplied by that DB).

Phase 4: Client Consultation & Contract Scope Variation

If 100% expansion across the distribution board uncovers multi-board failures, the inspector must formally halt work, contact the client, explain the systemic safety risk, and request written authorization for a full installation scope expansion (additional billable hours/access).

Mandatory Protocol for Code C1 (Danger Present)

A Code C1 classification represents an immediate threat to life or property . Examples include exposed live conductors accessible to touch, live metalwork due to a fault, or an un-earthed installation with a line-to-earth short circuit.

The inspector's duties upon discovering a Code C1 defect are strict and non-negotiable:

Immediate Verbal Notification: Verbally inform the client or duty holder immediately on site.

Make Safe / Isolation: Seek client permission to immediately isolate the dangerous circuit or equipment. If permission is granted, isolate, lock off, and tag out the circuit.

Written Dangerous Condition Notification: Issue a formal Dangerous Condition Notification (or Danger Notice) in writing to the person ordering the work before leaving the premises .

Warning Labelling: Apply prominent yellow warning labels to the isolated distribution board or equipment.

EICR Classification: Record the defect under Section F of the report. The overall assessment of the installation MUST be declared Unsatisfactory .

The Role of Classification Code FI (Further Investigation)

Code FI (Further Investigation Required) is assigned when an observation indicates potential danger, but the true extent of the hazard cannot be fully determined without further invasive investigation or specialized access.

Triggers for Code FI

Abnormally high Earth Fault Loop Impedance ( Z s Z_s Z s ​ ) readings on concealed sub-main cables where the protective route cannot be traced visually.

Unmapped, unlabeled distribution boards supplying locked or inaccessible areas.

Evidence of thermal overheating or moisture ingress inside sealed ceiling voids or floor ducting that cannot be opened during standard inspection.

Impact of Code FI on EICR Assessment

Under BS 7671, if ANY observation is assigned a Code C1, Code C2, or Code FI, the overall outcome of the EICR MUST be marked as UNSATISFACTORY . An installation cannot be reported as Satisfactory if uninvestigated potential hazards remain.

Managing Client Refusal of Sample Expansion

In some commercial or domestic situations, a client may refuse to authorise sample expansion due to cost constraints, fear of disruption, or operational requirements.

When a client refuses necessary sample expansion required by GN3:

Do Not Force Access / Overrule: The inspector cannot force access or overrule client refusal.

Document Formal Limitation: Record the client's explicit refusal as a formal Operational Limitation in Section D of the EICR (e.g., "Sample expansion to 100% of lighting circuits refused by client following discovery of un-earthed metal luminaires").

Highlight Unverified Risks: Clearly state in Section E (Summary of the Installation) that uninspected circuits pose unverified safety risks.

Issue Unsatisfactory Report: Issue an Unsatisfactory EICR based on the defects already uncovered in the initial sample.

Summary of EICR Classification Codes & Action Triggers

Code Definition Overall EICR Outcome Immediate Inspector Action Sample Expansion Impact

C1 Danger Present (Risk of injury) UNSATISFACTORY Immediate verbal & written Dangerous Condition Notice; make safe Mandatory expansion to 100% of affected circuit type

C2 Potentially Dangerous UNSATISFACTORY Record in Section F; recommend urgent remedial work Mandatory expansion to determine extent of systemic defect

C3 Improvement Recommended SATISFACTORY (if no C1/C2/FI) Record in Section F; advise client of upgrade Optional expansion based on engineering judgment

FI Further Investigation Required UNSATISFACTORY Record in Section F; request client authorization for investigation Triggers focused investigation outside standard scope