Study guide

6.2 Continuity of Ring Final Circuits (r1, rn, r2)

City & Guilds 2391-52 Combined Inspection & Testing of Electrical Installations Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 About the 2391-52 Exam 1.2 How to Use This Guide & Open-Book Exam Strategy

2 Chapter 2: Statutory & Non-Statutory Documents

2.1 Statutory Documents 2.2 Non-Statutory Documents 2.3 Roles, Responsibilities & the Statutory/Non-Statutory Relationship

3 Chapter 3: Certification & Documentation

3.1 The Electrical Installation Certificate (EIC) & Schedules 3.2 The Minor Electrical Installation Works Certificate (MEIWC) 3.3 The Electrical Installation Condition Report (EICR) & Schedules 3.4 Why the Documents Exist: Reasons, Information Needed, Recording & Retention

4 Chapter 4: Initial Verification & Safe Isolation

4.1 Safe Isolation & Safety Management 4.2 Visual Inspection Requirements 4.3 Initial Verification: Requirements & Process 4.4 Additions & Alterations to an Existing Installation 4.5 Inspection Methods: The Senses, Verifying Items & IP Classification

5 Chapter 5: Sequence of Tests & Test Instruments

5.1 The Correct Sequence of Tests 5.2 Test Instruments: Selection, Calibration & Accuracy 5.3 Factors That Affect Test Results & Tests That May Be Unnecessary at Periodic Inspection

6 Chapter 6: Continuity Testing

6.1 Continuity of Protective Conductors (R1+R2) 6.2 Continuity of Ring Final Circuits (r1, rn, r2) 6.3 Main & Supplementary Protective Bonding Continuity

7 Chapter 7: Insulation Resistance & Polarity

7.1 Insulation Resistance Testing 7.2 Polarity Verification 7.3 Verifying SELV, PELV & Electrical Separation

8 Chapter 8: Earth Fault Loop Impedance

8.1 Ze & Zs Measurement 8.2 Zs Limits, Disconnection Times & the 0.8 Rule 8.3 Prospective Fault Current (PFC/PSCC)

9 Chapter 9: RCD & Earth Electrode Testing

9.1 RCD Testing 9.2 Earth Electrode Resistance on TT Systems

10 Chapter 10: Periodic Inspection & EICR Reporting

10.1 Purpose, Scope & Limitations of Periodic Inspection 10.2 Sampling & Extent of Inspection 10.3 Observation Classification Codes C1/C2/C3/FI 10.4 Outcomes, Inspection Intervals & Completing the EICR

11 Chapter 11: Phase Sequence, Functional Testing & Voltage Drop

11.1 Check of Phase Sequence 11.2 Functional Testing 11.3 Verification of Voltage Drop

12 Chapter 12: The 2391-502 Practical Assignment

12.1 The Practical Assignment & Establishing a Safe System of Work 12.2 Carrying Out the Practical: Inspection, Tests, Verification & Documentation

6.2 Continuity of Ring Final Circuits (r1, rn, r2)

Key Takeaways Explain This Topic AI

A ring final circuit needs a special three-step test because its two parallel paths mean a broken ring can still show continuity via the other half

Step 1 measures end-to-end r1, rn, r2 at the DB; r1 ≈ rn, and r2 ≈ 1.67 × r1 when the CPC is 1.5 mm² against 2.5 mm² phase

Step 2 (P–N crossover) gives (r1+rn)/4 at every socket; step 3 (P–CPC crossover) gives (r1+r2)/4 at every socket, which is the R1+R2 recorded for the ring

The /4 value arises because the cross-connection forms a figure-of-eight with two equal parallel halves, so each accessory sees one quarter of the total loop

A socket that reads markedly higher than the others in step 2 or 3 is a spur off the ring or has a high-resistance joint

Last updated: August 2026

Why Ring Final Circuits Need a Special Test

A ring final circuit (the standard UK domestic socket circuit, BS 7671 Appendix 15) is wired as a loop: the phase, neutral, and CPC conductors each run from the distribution board, through every socket, and back to the distribution board. Each conductor therefore forms a closed ring with two parallel paths from the board to any given socket.

This parallel-path geometry defeats an ordinary end-to-end continuity test. If the ring is broken at one point, current can still reach every socket via the other half of the ring — so a simple end-to-end test at the board would still show continuity and miss the break. BS 7671 therefore requires a three-step ring continuity test , described in GN3 10th Edition and examined heavily on the 2391-52.

Step 1: End-to-End Resistance of Each Conductor (r1, rn, r2)

At the distribution board, identify and label the three conductor pairs . A ring has two ends for each conductor returned to the board:

Phase (line): two ends, labelled r1 — call them P1 and P2.

Neutral: two ends, labelled rn — N1 and N2.

CPC: two ends, labelled r2 — CPC1 and CPC2.

With the circuit isolated, measure the end-to-end resistance of each conductor by connecting the ohmmeter across its two ends at the board. This confirms each conductor is unbroken around the ring.

  • Conductor End-to-end value Expected relationship
  • Phase r1 e.g. 0.40 Ω —
  • Neutral rn e.g. 0.40 Ω rn ≈ r1 (same CSA)
  • CPC r2 e.g. 0.67 Ω r2 ≈ 1.67 × r1 if CPC is 1.5 mm² and phase is 2.5 mm²

The phase and neutral are normally the same cross-sectional area (2.5 mm² thermoplastic), so r1 ≈ rn . The CPC is often 1.5 mm² — 60% of the phase CSA — so its resistance is higher by the ratio 2.5 / 1.5 = 1.67 . If r2 is roughly 1.67 times r1, the CPC is the right size and unbroken. If r1 and rn differ significantly, investigate before proceeding — one conductor may be a different length or have a poor joint.

Step 2: Phase–Neutral Crossover (P1–N2 and P2–N1)

Cross-connect the phase and neutral ends across the ring: link P1 to N2 and P2 to N1 at the distribution board. This creates a figure-of-eight loop. Now test between phase and neutral at every socket on the ring.

The reading at every socket should be approximately:

(r1 + rn) / 4

and the readings should be roughly equal at every socket .

Why /4?

The cross-connection puts the two conductor rings in parallel as a figure-of-eight. From any socket, the test current can travel to the board by two equal paths — one clockwise, one anticlockwise — each of half the total conductor length. The resistance seen at the socket is therefore one quarter of the sum of the two conductor resistances: (r1 + rn) / 4. If every socket gives the same value, the ring is correctly formed phase-to-neutral.

  • Worked Example (Steps 1 and 2)
  • r1 = 0.40 Ω, rn = 0.40 Ω, r2 = 0.67 Ω
  • Step 2 expected reading at every socket = (0.40 + 0.40) / 4 = 0.20 Ω

A socket that gives a markedly higher reading in step 2 is not on the ring — it is a spur, or there is a high-resistance joint. Spurs are identified this way: the ring sockets all read about 0.20 Ω, and the spur reads higher because it adds an extra radial run on top of the ring value.

Step 3: Phase–CPC Crossover (P1–CPC2 and P2–CPC1)

Cross-connect the phase and CPC ends: link P1 to CPC2 and P2 to CPC1 at the distribution board. Test between phase and earth at every socket.

The reading at every socket should be approximately:

(r1 + r2) / 4

and again roughly equal at every socket. This value is the R1+R2 for the ring final circuit and is what you record on the schedule of test results — not the end-to-end r1 or r2 from step 1.

  • Worked Example (Step 3)
  • r1 = 0.40 Ω, r2 = 0.67 Ω
  • Step 3 expected reading at every socket = (0.40 + 0.67) / 4 = 0.2675 ≈ 0.27 Ω

Record R1+R2 = 0.27 Ω on the schedule.

Then Zs = Ze + (R1+R2) = Ze + 0.27 Ω, compared to the tabulated maximum for the protective device (typically a 32 A Type B MCB, or a 30 mA RCD on a TT system).

Summary of the Three Steps

  • Step Action Connect at DB Test at each socket Expected reading
  • 1 End-to-end each conductor Across own two ends — r1, rn, r2 (r1≈rn; r2≈1.67×r1)
  • 2 P–N crossover P1–N2, P2–N1 Phase to Neutral (r1+rn)/4
  • 3 P–CPC crossover P1–CPC2, P2–CPC1 Phase to Earth (r1+r2)/4 = R1+R2
  • Exam-Critical Points

Record (r1+r2)/4 as R1+R2 , not the end-to-end r1 or r2. The end-to-end value is a check that each conductor is unbroken; the crossover value is the figure used for Zs.

The figure-of-eight is why you divide by 4 — two equal parallel halves each carry half the current, so each accessory sees one quarter of the total loop. This derivation is exam-critical.

A socket reading higher than the others in step 2 or 3 indicates a spur or a fault — investigate before recording the circuit's R1+R2.

Always null the test leads before step 1; lead resistance is significant at these values and propagates into every subsequent reading if not removed.

The three step-1 end-to-end values confirm each conductor is unbroken; the two crossover steps confirm the ring is correctly formed and give the recorded R1+R2.